19324 (2) PIRMH NO.
POST THIS CARD NEAR FRONT OF BUILDING 19324
CITY OF CUPERTINO A AL DAj.
INSPECTION DIVISION- JOB INSPECTION RECORD
• D UNIT# LOT f
CONTROL x
JOB ADDRESS CATEGORY
BUILDING PERMIT IN
FO
OWNERCONTRACTOR`fe-J Sin;-""Term
INSPECTION.' ' - DATE. INSPECTOR INSPECTION RECORD �X
FOUNDATION/PIER$ NOTE ALL GRADING AND DRAINAGE
FOUNDATION
SHALL BE INSTALLED TO COMPLY WITH JOB DESCRII'IT N
UFERGROUNTHE APPROVED PLANS AND CITY OF {b I�J,�'�\(�q.SV,b Ld t-lV
PAD/SETBACK-CERT CLVERTTNOSfANDARDS. 1�"" •C q
GARAGE SLABS/PREGUNITE �� 0 I-^Pz e
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED INSPECTION DATE INSPECTOR
UNDERGROUND/SLAB
PLUMBING
ELECTRICAL
MECHANICAL
DO NOT.POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED
WOOD FLOOR
PLUMBING
MECHANICAL
ELECTRICAL
FRAMING VENTS CLEAR \
INSULATION
-PLACE'WO-SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED
ROUGH
PLUMBING
TUBS&SHOWER PAN
MECHANICAL
ELECTRICAL/JACUZZI BOND I
FRAMING/STAIRS Y
INSULATION/VENTILATION
EMERG.EGRESS
SEWER WATER
n � COVERWO"WORK-UNTIUABOVE-HAS BEEN.SIGNED
• EXTERIOR SHEAR HOLD DOWN
INTERIOR SHEAR/HOLD DOWN
SHEETROCK/SHEETROCK SHEAR
EXTERIOR LATH/W-SCREEN
SHOWER LATH @.
SCRATCH COAT
-NO'TAPE'OR`PLASTER,UNTTLABOVEHAS BEEN SIGNED:
NOTE:NO FINAL INSPECTTON SHALL BE MADE BEFORE
THE�CONSTRUCTIONTAX IS PAID .,
FINALS DATE IINSPECTOR
$AN.#
ELECT.ENERGY
PLUMBING ENERGY
MECH.ENERGY
BUILDING ENERGY
ELECT.FINAL TEST
PLUMBING
GAS TEST
MECHANICAL
HEATING
ELECTRICAL RELEASE
FIRE DEPT.
GRADE
OCCUPANCY
TEMPORARY APPROVALS
ELECTRIC
GAS
BUILDING ISSUANCE DATE
,OCCUPANCY OF BUILDING IS NOT PERMITTED UNTIL
BUILDING FINAL IS*SIGNED BY BUILDING INSPECTOR
ARRANGE FOR INSPECTION BY PHONING 252-4505 BETWEEN
• 12:30 PM AND,4:30 PM MONDAY THROUGH FRIDAY,24 HOURS
BEFORE REQUIRED INSPECTION. JOB ADDRESS AND
PERMIT # ARE NEEDED WHEN PHONING.
IMPORTANT! �' . .
PLEASE READ REVERSE SIDE BEFORE CALLING FOR FINAL INSPECTION ISSI.TD BY
OFFICE COPY