Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
08080073 (2)
CITY OF CUPERTINO ca1' .a. 6,$ ," `-- BUILDING DIYJSION PERMIT i�Ul .It�i-CTLTRsiQMAT.I�',� ,'. BUILDING ADDRESS: M PERMIT NO. 7588 ORANGE BLOSSOM DR CHUNG YIN WONG 08080073 OWNERS NAME: PERMIT ISSUE DATE TING LI—CHUNG AND TENG LI—TEH 1049 SITKA TER 08/11/2008 11111-24E: SANITARY NO. CONTROL NO. (408) 985-9289 ARCHITECT/ENGINEER: BUILDING PERMIT INFO 0 ELECT = MECH Ai LICENSED CONTRACTOR'S DECLARATION Job Description i ti I hereby affirm that 1 sin licensed under provisions of Chapter 9(commencing escrp A with Secdon7000)ofDiv41on3ofthe Business and Professions Code.and mylicense is KITCHN REMDL; NON—STRUCTURL n< kfall Imcaand erten R r/ 224 Dale Cau Lk.1 a7& s Dae r ARCHITECTS DECLARATION I understand my plans shall be used as public records R u.C Licensed Professional m OWNER-BUILDER DECLARATION <E I hereby affirm Nm I am exempt from the Contractors License Law for the is-C o following reason.(Sudan 7031.5,Business and Professions Code:Any city or county 5$M which requires a permit to cnnWucL alter.improve.demolish,or repair any structure La prior to its issuance,also requires the applicant for such permit to file a signed statement �< that he is licensed pursuant to the provisions of the Contmctars License Law(Chapter9 Sq.Ft.Floor Area Valuation 0 - ( mencinempl Section 7 00)ofDivision3ofNeBusinessaProfessions Code)or $5000 .. that he I. therefrom and the hula for the alleged exemption.Any l pen tun of Section 7031.3 by any applicant for a permit subjects the applicant u a civil penally of �p7�p Number Occupancy Type m nmore than five hundred dollars(1.503). 36611059 ,'C!'V' ❑L as myna of the property,or my employees with wages as lheh sole compensation. will do the work.and thestructure 4 not intended or offered for sale(Sec.7014,Business and Professions Code:The Convector's License Law does not apply to an owner or Required Inspections property who builds or improves thereon,and who does such work himself or through his own employees,provided that such improvements are not intended or offered for sale.B, • however,the building or improvement is sold within one year of completion,the owner- builder will have the bunko of proving that he did not build or improve for purpose of sok.). . O I.as owner of the property.am exclusively contracting with licensed contractors to construct the project(Sec.7044.Business and Professions Code:)The Counter's U. . cense Law does not apply to an owner of property who builds or improves themun,and, who contracts for such projects with a canuactm(l)licensed pursuant to the Contractors License Law. ' ❑l am exempt under See. ,B tePC for thls recon _ Owner Date - WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: •I haw and will maintain a Certificate of Consent to self-insure for Workers Compen • - atm.as provided for by Section 3703 of the Labor Code.for the performance of the work for which this permit is issued. 0(have and will maintain Workers Compensation Insurance,es required by Section • 3700 of the Labor Code,for the performance of the work for which this permit is Issued My Workers%pCom�gpensW onInsurancecarrier and Policy number ate Cartier 514 N 7E lBH Policy No.: /771: tiO • CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE • (This section need not be=melted if the permit Is(none hundred dollen(5100) . , or less.) I unify that in the performance of the work for which this permit is blued.I shall not employ any person in any manner a as lo become subject to the Workers'Compenadon Laws of California.Date Applicant NOTICE TO APPLICANT:If.after making this Certificate of Exemption,you should become subject to the Workers Compensation provisions of the Labor Code,you muse yJ Z forthwith comply with such provisions or this permit shall be deemed revoked. Z "' CONSTRUCTION LENDING AGENCY • y. [--h I hereby shim that them isued(Suctina lending agency fm the pafarmco anof C4 ti to work for which this permit is issued(Sec.3097,Civ.C.) ' W O Lenders Name 0z Lenders Address U O I certify that I have read this application and cote that the above infomadm Is 0. - correct.I agree to comply with all city and county ordinances and cote laws relating u O building construction,and hereby authorise representatives of this city to enter upon the t17 above-mentioned property for Inspection purposes / pry (We)agree to caw,indemnify and keep hams. the City of Cupertino against y liabilities.judgments.cons and expense*which may in any way acme against said City ( L)Z in consequence of the granting of this permit. Of APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: re 44����� Date // '(D ' SOURCE REGULATIONS. /,/ o, OF /—v/ Re-roofs Signature of Applicant/Con r Das • OUS MATERIALS DISCLOSURE Type of Roof Will the applicant or future building oceupant more or handle hazardous material as defined by Ore Cupertino Municipal Code,Chapter 9,11,and the Health ant Safety Cade,section 23532(07 All roofs shall be inspected prior to any roofing material being installed. ❑Yes Will the applicant or future building occupant use equipment or devises which If a roof is installed without first obtaining an inspection,I agree to remove t hazardous air contaminants as defined by the Bay Arca Air Quality Management all new materials for inspection. mict7 ❑Yes kith. . I have mad the hantdens materialsrcquimmens under Caper 6.95 of the Califor • - niaHuith&SafetyCodeSasio x25305.23533 and 13534.1 undcresnd drat lithe building does not cumndY have a tenni.Ilial It 4 MY responsibidty m notify the cccupant of the • requirements which inset prior 10 isamcc of a Ccrtificampf�t7mpsgcyca_ Signature of Applicant . Date Owner or authorized d'/ /�LLD,YY¢"� All roof coverings to be Class'q'or better CITY OF CUPERTINO • 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg COPY # : 1 Sec : Twp: Rog: Sub: Blk: Lot: APN • 36611059 . 00 DATE ISSUED • 08/11/2008 RECEIPT # • BS000005746 REFERENCE ID # . . . : 08080073 SITE ADDRESS • 7588 ORANGE BLOSSOM DR SUBDIVISION CITY • CUPERTINO IMPACT AREA OWNER • TING LI-CHUNG AND TENG LI-TEH ADDRESS • 7588 ORANGE BLOSSOM DR CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-5225 RECEIVED FROM • CHUNG Y WONG CONTRACTOR • CHUNG YIN WONG LIC # 23900 COMPANY • CHUNG YIN WONG ADDRESS • 1049 'SITKA TER CITY/STATE/ZIP . . . : SUNNYVALE, CA 94086 TELEPHONE • (408) 985-9289 • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW HAL 1.BSEISMICR VALUATION 5, 000 . 00 0 . 50 0 . 00 0 . 50 0 . 00 1REMRESKIT SQ FEET 200 . 00 429 . 00 0 . 00 429 . 00 0 . 00 1STPLNCK HOURS 1 . 00 122 . 00 0 . 00 122 . 00 0 . 00 TOTAL PERMIT : 551 . 50 0 . 00 551 . 50 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER CREDIT CARD 551 . 50 VISA TOTAL RECEIPT : 551. 50 • 080,j 0073 • CITY OF CUPERTINO ADDITION/REMODEL CUPErJINo PERMIT APPLICATION FORM APN #j- c6, I 105 ,70 Date: Building Address: 7588 0,4terre &Lome," edysenwo Mailing Address (if different from building address): Owner's Name: Phone# : ,[Z — eNa•4 rms. k Lt - 73-6/ 7-x.'f Olo0 2s.5 Fa/ Contractor: Phone#: Fax #: Contractor License#: . "/ Cupertino Business License#: 23Poo Contact: ,44,07 GvavO Phone#: .4zetP —sc'6-3cEj Fax #: Building Permit Info: Bldg. ❑ Elect. ® Plumb. ® Mech. ❑ Hillside ❑ •Job Description: Addition (adding sq footage): What is being remodeled (not including addition)? fr/7CNE'v M010.n//A6?• nal stn..c*'.fcA Remodel Includes Re-Roof: Yes ❑ No If yes list number of squares Remodel Includes Structural: Yes ❑ No Square Footage: Addition: Porch: Deck: Garage: Detached Attached Remodel: Kitchen if Lam" Bath Other Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B ❑ II/HUY-A ❑ IUIII B, IV-HT, V-B _2 Valuation: . Dooms Please check this box if the project is a second-story addition ❑ Project Size: Express ❑ Standard © Large ❑ Major❑ Please complete relevant portion of the Green Building Checklist & attach it to the application or if applicable, Green Building Points Achieved: include in plan set& the sheet index. ***For Office Use Only*** Over-the-Counter ❑ Revised 7/01/08 • • CITY OF CUPERTINO • ADDITION/REMODEL CUPEVINO FEE SCHEDULE 11, Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft ADDITIONS 1R3SFDADD PLLONGRNGR Long Range PL Planning/Residential 1R3INSP Dwellings Inspections B 1R3PLNCK Dwellings plan check B 1R3REPINSP Dwellings Repeat B Inspection 1R3REPPLNC Dwellings Repeat Plan B Check 1R3HINSP Dwellings Hillside B inspection 1R3HPLNCK Dwellings Hillside plan B check 1R3HREINSP Dwellings Hillside B Repeat Inspection S 1R3HREPLNC Dwellings Hillside B Repeat Plan Check I R3ALTINSP Dwellings Alternate B Materials Inspection 1R3ALTPLNC Dwellings Alternate B Materials Plan Check 1PCESS Cesspool P 1PPRSEWG Ea. Private Sewage P Disposal System 1PRSEWER Sewers P 1BPSPRINK Lawn Sprinkler/Backflow P 1BPWSVCS Main Water Service P 1BSEISMICRE SeismicResidential B DECKS 1R3SFDADD OR 1R3SFDREM 1DECKWOOD Deck (Wood)-Each B (Each) 1 DECKRAIL Deck Railing-Each B • (Each) • • CITY OF CUPERTINO ADDITON/REMODEL • FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft GARAGES 1R3SFDADD OR DETACHED 1R3SFDREM 1GARDTW<=1K Wood Frame up to B 1,000 SF (each) 1GARDTM<=1K Masonry up to 1,000 SF B (each) BCONSTAXR Construction Tax Res (new detached garage) PATIO'S OPEN 1R3SFDADD OR 1R3SFDREM IPATIOWOOD Wood Frame up to 300 B SF IPATIOMETAL Metal Frame up to 300 B SF , 1PATIOOTHER Other Frame up to 300 SF B PATIO'S CLOSED 1R3SFDADD OR • & SUN ROOMS IRSSFDREM 1PATIOENCLW Enclosed Wood up to 300 B SF 1PATIOENCLM Enclosed Metal up to 300 B SF IPATIOENCLO Other Enclosed Patio up B to 300 SF 1COVPORCH Porch Covered-Each B (Each) REMODELS 1R3SFDREM 1REMRESKIT Kitchen Remodel up to B (Deduct "$"for ea plan 210 300 SF check) 1REMRESBAT Bath Remodel up to 300 B �� SF 1 REMREOTH Other Remodel up to 300 B it SF 1REMRES2 Remodel Residential B Greater than 1000 sq ft 1REMRES3 Remodel Residential • B Greater than 2500 sq ft. 3of3 CITY OF CUPERTINO • ADDITON/REMODEL FEE SCHEDULE S Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft REMODEL PLNCK r 1 STP LNCK(1-3 for Standard Plan Check B NOT FOR OVER THE remodel) COUNTER PLAN CKS. IREROOFRES Residential Re-roof Each B 100 SF WINDOW/SLIDING 1R3SFDREM GLASS DOOR 1 WINREP Replacement windows B (ea 8 windows) 1WINNEWNSTR New Window (non- B structural) 1 WINMEWSTR New Window (Structural B Shear Wall/Masonry) 1 WINBAYSTR Bay Window (Structural) B SKYLIGHTS • 1R3SFDREM • 1 SKYL<10 SF Skylight less than 10 sf B 1 SKYL>I OSF Skylight greater than 10 B sf or structural 1STAIRS Stairs-first flight/ea addt'l B 1 EPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee M IPPERMITFEE Plumbing Permit Fee P 1ELCPLNCK Stand Alone Electric Pln E Ck (hourly) 1 MECPLNCK Stand Alone Mechanical M Pln Ck (hourly 1 PLMPLNCK Stand Alone Plumbing P Pln Ck (hourly) 4 of 3 • CITY OF CUPERTINO ADDITON/REMODEL • FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft 1BSEISMICRE Seismic Residential B 1TRAVDOC Travel & Documentation B 1BUSLIC Business License B • • • 5 of 3 Green Building Plan Check • Index of Green Building Points/Categories I A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be • shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)* L-1 2 points 11. Permeable Paving, (Note) L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, (detail) S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec.) A.4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11.A 2500 Gal. Tank, (Note/Spec) L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec.) A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point W•g_ `:r +a. 1:,rVb,t•r, TOTAL POINTS 40 points • • • • • Plan Review Process Work Book Page-12-Revised 3/25/08 L Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a"total points"value to a project to be considered environmentally friendly is not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project. INPUT Resources Energy IAO/Health ' •. ite 1.Recycle Job Site Construction&Demolition Waste 65%=1 point;75%= 2 points;80%=4 points . 1 up to 4 Resource pts 0 2.Salvage Reusable Building Materials I 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction Site Storrnwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 B.Design Resource-Efficient Landscapes and Gardens _1 4 Resource pts y=yes 0 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 0 0 0 B.Foundation 1.Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource pts 0 2,Use Recycled Content Aggregate 2 Resource pts y=yes 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes_ 0 0 0 0 C.Structural Frame [1.Substitute Solid Sawn Lumber with Engineered Lumber 7 3 Resource pts y=yes 0 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0 6,Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPs) a.Floors 3 Energy pts y=yes 0 b.Wall 3 Energy pts y=yes 0 c.Roof 3 Energy pts y=yes 0 10,Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes ' 0 12.Use OSB a.Subfloors 1 1 Resource pt y=yes 0 1 b.Sheathing I 1 Resource pt y=yes 0 • -- 0 0 0 • . INPUT Resources Energy IAOIHealth �. xter or n s • 1.Use Sustainable Decking Materials a,Recycled content 3 Resource pts y=yes- 0 b.FSC Certified Wood 3 Resource pts y=yes- 0 lor 2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAO/Health pt y=yes 0 3.Install House Wrap under Siding 1 IAC!/Health pt y=yes_ 0 4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0 0 0 0 E.Plumbing 1.Install Water Heater Jacket 1 Energy pt y=yes 0 2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0 3.Retrofit all Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0 b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0 4.Replace Toilest with Ultra-Low Flush Toilets (1 point each,up to 3 points) Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showerhead 1 IAO/Health pt y=yes 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 41A0/Health pts. 0 6.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes D U 0 0 r.Clean= 1.Install Compact Fluorescent Light Bulbs(CFLs) (6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) Up to 4 Energy pts. 0 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to 5 points) Up to 5 Energy pts. 0 • 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 0 0 0 G.Appliances • 1.Install Energy Star Dishwasher 1 Energy pt y=yes- 0 2.Install Washing Machine with Water and Energy Conservation Features 1 Energy pt y=yes 0 3.Install Energy Star Refrigerator 1 Energy pt y=yes_ 0 4.Install Built-In Recycling Center 3 Resource pts y=yes_ 0 U 0 0 H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.walls 2 Energy pts y=yes 0 b.Ceilings 2 Energy pts y=yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 3.Install Recycled-Content,Fiberglass Insulation with No Added Formaldehyde 3 IAO/Health pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 b.Ceilings 4 Resource pts y=yes 0 6.Alternative Insulation Products(Cotton,spray-foam) • a.Walls 4 Resource pts y=yes 0 o.Uellings 4 Resource pts y=yes 0 0 0 0 • INPUT Resources Energy IAO/Health ."rmows ' .1.Install Energy-Efficient Windows • a.Double-Paned 1 Energy pt y=yes 0 .b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0 L c.Low.Conductivity Frames j 2 Energy pts y=yes 0 2.Install Low Heat Transmission Glazing 1 Energy pt y=yes 0 0 0 0 J.Heating Ventilation and Air Conditioning •• 1.Use Duct Mastic on All Duct Joints ? . 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts yryes 0 3.Vent Range Hood to the Outside 1 IAO/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAO/Health pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 . 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 8.Install Sealed Combustion Units a.Furnaces 3 IAOMealth pts y=yes 0 b.Water Heaters 3 lAO/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13,Retrofit Wood Burning Fireplaces • a.Install EPA certified wood stovesfinserts 1 IAO Health pt y=yes 0 b. Install/Replace Dampers 1 Energy pt y=yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 • 15.Install High Efficiency Filter 4 IAO/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAO/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAO/Health pts yryes 0 • 0 0 0 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0 6.Select Safe and Durable Roofing Materials 1 Resourcet y=yes 0 7.Install Radiant Barrier t 3 Energy pts y=yes 0 0 0 0 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0 • 0 0 0 • • INPUT Resources Energy IAO/Health 1. n.00r r •uaity an. ns es 1.Use Low/No-VOC Paint 1 IAQ/Health pts y=yes 0 . 2,Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0 3.Use Low/No VOC Adhesives 31AQ/Health pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 6 IAQ/Health pts y=yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAD/Health pts y=yes 0 7.Seal all Exposed Particleboard or MDF 4 IAQ/Health pts y=yes 0 B.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0 . 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House Vacuum System 3 IAQMealth pts y=yes 0 0 0 0 N.Flooring 1.Select FSC Certified Wood Flooring B Resource pts y=yes 0 2.Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 0 0 0 Total Points Available:) 1401 1301 57 . Total Points Project Received: `e 1 0J 01 01 • GAatatprogsrgreenbulldingguidelinesrremodelerslgreenpanlsf ne,12.12a4protecled.ds r'• ��,„ - ,..ti'�r 'g�crrvr4* �r”-`� vsc' a4w . R ; Ei ': �a "'"s�` `aw'yt�pr , Pr a > r.'r C �}'yy .. a `S-D r Fj4 n*G 't,�� u3f` }� �.r 1 .u)r as a A9 silo fikk -}ft vett �A • N afg-'1'- 't r w y- "'�:� � 1+`_1 Y 'x'4'1 q N 34 CTS[ l P ! Y' {` I S`A tri, )YV !F Yu 3SPId—'t'L' � s :` `4. y�+��,.r, 4d}�c 4.1.1:1144‘.� 1y' t,t ' er '5.'° " . h7 "1•X. s Et?c,5- }.F T T31�.Y .- 4 �` i" .^vim ' �"`:"`4' Y , ~ a A�• R,.$ aY�ITA..J. (_~ C ' �r^T �f 'S a4 11 v1 1 '1 1 J X � JEC;t e,-•' 41 +ErT8 •��, , "_t� td �ar4r , .� ' + -psrxq .. f' . r Assessor's Parcel Number: Name of owner. L7 —ew&A-fj 7e4-4 z_ - 77-t/ 7gc'q Project address. 7S-d'8 enAflevciE SCoStoAi Lryr.+Zre7/4/ Contact person. 4ti0/ �✓`�"'�' Phone. #0, - 30/e. 3/a'? Fax. Net square footage of lot. ecrav Existing Pro L ed Square footage: First floor: Second floor: Garage: TOTAL: •e there at least two 10 foot by 20 foot clear spaces inside the garage? c —N---- Is privacy protection planting required for the project? On what floor(s) is work being done? Brief description of work. nT«'� haavwoeti.4 . lwoN- s".eut7Ko . t) h &Lac- (f-1)( ) (% \ r. Code editions:2008 CBC ,e, , 0 �Cl� �-N)2008 CMC e� _r ` 2008 CPC iN da $ T i COPERn►ND MODES OD tORDNfitfl s Jqt ( l —4,19- Effective 1/1/08 ;IONED kb est ot�;n 1 C1 i; 2la v � oaA :lt:.:Ja tcnthei I+ctaMt lit Sit�n • Isethll to make :nb r;;;; Clerettebt ; an Cine tnth.d Cl,i: p a itsfan the building Dept., C:iy of Cuportino. the stomping of this p:Jn•no spagficntiom. �; F MALL NOT be held N permit or to be or. • (f G MALL l of the held to of any women- ' ro be or Cop/ frir • •f am City °rotr a=or Vete Lew. Plan Review Process Work Book Page-8-Revised 1/1/08 14'8 • .a-o°7 31 11'7 /)444Arxs x,,..e E. RFtzp>Accr AvP 4'1 7'6 4,4T...ts Disposal .2;vi""'" . /4 ( 31. ,r An, 3'4' iI2, __....c . (E) 220V 5 0 FL. 0FL. GFI Oven -}-.- Sink . \ ' 111 CGFI FL. rFL. GFI °' Cook • Top s,,,,(/ (E) 220V FL, GFI in • OGFI F > ._. _ Y� 0 in HE> Ref. la Z-7, Cary GFI FL. N . _}, r (..n Dining 0 . o 14'8 • Community Development 4 a 10300 Torre Avenue WW Cupertino CA 95014 Telephone(408)777-3228 CITY Of Fax(408)777-3333 •UPEI TINO Building Department All Cupertino building permits must meet certain conditions related to maintaining environmental quality and public peace and safety. The'two most common conditions are described below. STORMWATER POLLUTION CONTROL State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and the Santa Clara Valley Water District control stormwater pollution. Educating local residents and businesses and enforcing stormwater pollution control laws are key parts of the City's compliance efforts. Stormwater pollution prevention: It's up to us In northern Santa Clara Valley, storm drains flow directly to local creeks and San Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife dependent on our waterways, for people living near streams and baylands, and for the • local water supply. Common sources of stormwater pollution include: • Dripped oil, fuel, and antifreeze from vehicles and heavy equipment; • Construction debris, including dirt, concrete and paint; 111 • Landscaping runoff containing pesticides or weed killers; and • Any material dumped or spilled into streets or storm drains • The property owner and the contractor share ultimate responsibility for activities occurring at a construction site and will be held responsible for any environmental damage caused by subcontractors or employees. • For more information on construction-related stormwater requirements, see the Stormwater Quality Regulations section of the City of Cupertino web site at: . http://www.cupertino.org/city government/departments and offices/ environmental services COMMUNITY NOISE CONTROL The basic noise control requirements for construction sites are as follows: • Typical construction work hours are: - Weekdays - 7 a.m. to 8 p.m. - Weekends - 9 a.m. to 6 p.m. • Construction other than street construction is prohibited on holidays. • Residential daytime noise levels from complaint site - 60 dBA • Nonresidential daytime noise levels from complaint site - 65 dBA For more information on noise control, please see Chapter 10.48 of the Cupertino Municipal Code, which can be accessed at http://www.amleaal.com/cupertino ca/ • Greg Casteel Building Official a. TJT11i.�,. .:'Ys<-r-�e57"t a -a• .".•7 e t i... cx i �`e s `'- a�-.*'1,.. cf a' m Z' n,-. T� '.V y 7p 's 1 t(a :F# Ta tJ yiyYM 3 `h' Y3 �j�}5 Z� '.P Fr • a ; 1 +1 'P, ' ,..',yt,:::; +a s i'SiT'"` w�cF+a za a.a + tv;U`u� x`tyrQ ry,7A 'xs a t$ r r.,.r1:F -:ow' .a�• >rr z�� � "' s 'gyp r�` " r x1�cr 61114.:,7a . 6'9'." f rt . miµ �#n E.p', k �t -�K'b'S i e.^ `.� w 'I a E y�5 "lR�E`�,ySIDENTFA I PP' OJEC' T GOVERtSIIED .`� ; 1a+ .r"e t{ Ar.•. g� '_�r�k°f, %z•,.'Y ,n _au. C W }- . �'✓ '�.' v: '4� .'.i'f Pa.�:"-.141:rittliril;,;:iiiii" �.,. ��__ ��e k�X�i- eek' ''J � � ,. .T. � v. Assessor's Parcel Number: Name of owner. LZ —CH"-7 7ev4 4{ L_' — 77,+/ 7E-4/¢' . Project address. 73-18 ae,A.t'eE 2zcsfbr- . Gly +sae7/nvo Contact person. tilitey W44'E/ Phone. Q6' — -lei- -Vie' Fax. Net square footage of lot. deer Existing Prow. ed Square footage: First floor: c`` Second floor: / Garage: ' TOTAL: Ore there at least two 10 foot by 20 foot clear spaces inside the garage? cv N Is privacy protection planting required for the project? J"' On what floor(s) is work being done? Brief description of work. t7« ernoagt/A¢ . (.tew— S7seun7a,4C) The.IL,8..4— (am)cg) C% Code editions:2008 CBC ® -N)2008 CFC 5)-N)2008 CMC -N) 2008 CPC (-N)2008 NEC 4'-N) Effective 1/1/08 1 s ASSESSOR COPY • Plan Review Process Work Book Page-8-Revised 1/1/08 • 14'8 • e°7 3'1 t 11'7 `1 v.)454,-92x) X,,e E. RFcrv7.9ccs AvP 41 T6 . 4/6 ArnirS Disposal �'in°"` /3A 3/ .f AA re ;nrf' (E) 220V S O FL. O I FL. GFI Oven -c--� Sink, Ln CGFI l FL. FL. GFI Zr) Cook Top r„,� 0 • �'�,,'S"c s (E) 220V i �,FL. GFIr • OGFILA La Ref.:b -\TEO to j I FL. • N co r w Dining 0 0 • • J • 1 j 14'8 Community Development 0 e u Cupertino1030TorrCA Aven95014e Telephone(408) 777-3228 CITY OF Fax(408)777-3333 •UPERJINO Building Department JOB ADDRESS: 7j8° a i *e e � PERMIT # 0,v�oo73 OWNER'S NAME: Lz-cyeex# 7�, . - Lr-as,/ r ,� PHONE # Ave- 30ere /e$PCp GENERAL CONTRACTOR: TDs 41023?o0 FAX # I am not using any subcontractors: Si ature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical • Excavation Fencing Flooring: Carpeting Linoleum/ Wood 1110- Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile CPA VO Owner/Contrictor Signature Date