S 0982 (3) BUILDING PROJEcr IDENTIFICATIONUILDING DIVISION % u zi 0 Z-
BUILOING ADDRCtiS: p l d SANITARY I, APPLICATION SIMMITIAL DAI
105c'o ' r �tfrktl -Dr . C.t.l' .uT i U olSC) i C�
S:NAME: <' 1 U PIIONE:l.1' 'o CO(II�7 NAM^ o- LIC NO
1
"J J--�T frCtQ NC CONTROL-#
"ARCNIT[Cf/ENGINIiIiR: LIC NO: A`DIS S +-w oe f c �t-`1„P L� ❑
BUILDING PERMIT INFO
INSPECTIONS ' DATE INSPEC:I ❑ COnSUIMt FM Paid by Applicant UniliaD PLUG IR.ECT PLUMB M�rtJx
FOUNDATION/PIERS/H.D.S. INSPECTION RECORD
J06 DESCRIPTION
UFERGROUND NOTE: ALL GRADING AND DRAINAGE RESIDENTIAL:
SHALL BE INSTALLED TO COMPLY WITH ❑SPUW'I. ❑KITCHEN REMODEL
PAD/SETBACK-CERT THE APPROVED PLANS AND CITY OF ❑ADDITION [I PLUMPING RIi-PIPI!
GARAGE SLABS/PREGUNITE CUPERTINO STANDARDS. OMULTbuNIT ❑STRUCTURAL
MODIFICATION
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED TO ARRANGE INSPECTION ❑INTERIOR 0 CHIMNEY REPAIR
UNDERGROUND/SLAB CALL AFTERNOONS (1:00 PM - 4:30 PM) IMPROVEMENT C]SWIMMING POOLS
❑BATH REMql r�aEIPAIR IiMOLI'TIOH'
PLUMBING 777-3228 MON DAY TO FR I DAY 24 HOU RS B E- ❑OTHER
ELECTRICAL FORE REQUIRED INSPECTION. JOB ADDRESS
AND PERMIT N ARE NEEDED WHEN PHONING. AL:
B
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED
--"" - - - - -- ATTENTION CONTRACTORS: coM UIDG
PLUMBING -NEW LIXi/ADUI'TION ❑UEMULI'IION
MECHANICAL NO PERSON(S)SHALL PERFORM WORK ON El NAN"T0FOOD SERVICE
IMPROVEMENT
THIS JOB SITE WITHOUT BEING IN COM- ,O
LECTRICAL PLIANCE WITH WORKERTCOMPENSATION
ER
FRAMING VENTS INSURANCE REQUIREMENTS.
INSULATION INSPECTION SPECIAL INSPECTION REQUIRED ❑ DATE INSP.
PLACE NO SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED'
ROOF SHEATH/DIAPHRAM
PLUMBING
TUBS&SHOWER PAN
MECHANICAL
" ELECTRICAIIPOOL BOND
FRAMING/STAIRS/E.EGRESS
INSULATION/VENTILATION
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED
EXTERIAL SHEAR/HOLD DOWN
INTERIOR SHEAR/HOLD DOWN
SHEEI'WROCK/SHEETROCK SHEAR
EXTERIOR LATH/W-SCREED
SHOWER LATH
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED
SCRATCH COAT
SEWER/WATER
TEMPORARY APPROVALS
OCCUPANCY
ELECTRICAL
GAS
FINALS
GAS TEST P A I D
GRADE
FIRE
HANDICAP CII t
ELECTRICAL IL V
LUMBING
MECHANICAL
ENERGY CERTIFICATE OF OCCUPANCY ❑
VISUAL FINAL ONLY
BUILDING IMPORTANT: ISSUANCE DATE
OCCUPANCY OF BUILDING IS NOT PERMITTED PLEASE READ REVERSE SIDE BEFORE
UNTIL BUILDING FINAL IS SIGNED BY BUILDING CALLING FOR FINAL INSPECTION!!
INSPECTOR. ISSUED BY:
weer Inwurn nnr•,rwn n�rw.