CC Resolution No. 4422
' }
~ RESOLUTION N0. 4422
~ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
ADOPTING A CITY OF CUPERTINO MASTER STORM DRAINAGE FEE
POLICY AND ESTABLISHING MAXIMIJM UNIT PRICES FOR MASTER
STORM LINE INSTALLATION REIMBURSEMENT
WHEREAS, the City Council of the City of Cupertino has adopted the
Revised P~aster Plan, City of Cupertino Storm Drainage System, setting
forth the fee structure as shown in the attached Exhibit "A"; and
WHEREAS, the City requires developers to install parts of the master
storm drain system as adopted by the City in the Revised Master Plan; and
WHEREAS, the City has agreed to reimburse the developers for the actual
construction cost of these master lines; and
.
WHEREAS, the reimbursement should not exceed the unit prices on which the
storm drainage fees are collected; and
WHEREAS, the unit prices shown in "Exhibit A" and made a part hereof by
reference shall be the maximum reimbursement;
~ NOW, THEREFORE, BE IT RESOLVED THE1T:
1. The storm drain fee policy herein referred to is adopted.
2. The maximum reimbursement unit prices for master storm line
installation reimbursement is hereby approved.
3. All resolutions and parts of resolutions in conflict with the
newly adopted policies and procedures are hereby expressly re-
scinded.
4. The following resolutions are specifically rescinded - Resolutions
No. 79, No. 180, No. 466, and No. 633.
PASSED AND ADOPTED at a regular meeting of the City Council of the City
of Cupertino this 21st day of March , 1977, by the following vote:
Vote Members of the City Council
AYES: Jackson, Meyers, 0'Keefe, Frolich
NOES: None
ABSENT: None
ABSTAIN; Nellis
ATTEST: APPROVED:
/s/ Wm. E. Ryder /s/ Donald A. Frolich
City Clerk Mayor, City of Cupertino
~ ~ EXHIBIT A
STORM DRAINAGE FEE POLICY
March 16, 1977
~
1. Fees will be based on the following schedule:
a. Low density residential $950 per dwelling unit
(Less than one dwelling unit per acre
hillside zoning only)
b. Single-family residential greater than $1,290 per gross acre
one dwelling unit per. acre and less than
5.2 dwelling units per acre
c. Multiple family greater than 5.2 $926 per gross acre plus
dwelling units per acre $70 a unit*
d. Commercial and industrial $2,420 per gross acre
e. Public educational uses $950 per gross acre
f. Public facility uses $480 per gross acre
g. The Mark Thomas Revised Master Plan,
City of Cupertino Storm Drainage System,
dated October, 1975, as amended.
2. Storm Drain Master Plan Reimbursement
Master Line - Master •line construction cost not to exceed City
~ reimbursement schedule.
3. Developer will construct drainage facilities to the nearest down-stream
manhole or outfall outside development frontage.
4. Developer's credit will not be reimbursement from City of Cupertino
engineering or other fees paid by the developer.
5. Developer credit will be reimbursement from the master storm drain fund.
* Maximum chargeable dwelling units of 20 units per acre.
, Exhibit "A"
- Page 2
SCHEDULE OF UNIT PRICES FOR MASTER STORM DRAIN REIMBURSEMENT DATED MARCH 16, 1977
,
Item of Work Unit Unit Price
12" R.C.P. Lin. Ft. ' $ 10
15" R.C.P. Lin. Ft. 12
18" R.C.P. Lin. Ft. 15
~ 21" R.C.P. Lin. Ft. 18
24" R.C.P. Lin. Ft. 21
27" R.C.P. Lin. Ft. 23
30" R.C.P. Lin. Ft. 25
33" R.C.P. Lin. Ft. 2$
36" R.C.P. Lin. Ft. 30
39" R.C.P. Lin. Ft. 34
42" R.C.P. Lin. Ft. 37
45" R.C.P. Lin. Ft. 41
48" R.C.P. Lin. Ft. 45
Manhole Each 600
Catch Basin Each 400