Loading...
08070221 (2) CITY OF CUPERTINOT�a,�i s •,.rt'i.:.ea..-�na�r�3 >< 'a `'' "Ec �'•" ' BUILDING DIVISION • PERMIT iigONTRAsTORINFORM, ANION : t *qC. , auatjlnTDPERMIT NO.cEsRICE AVE TBD - TO BE DETERMINED 08070221 OWNER'S NAME: PERMIT ISSUE DATE DANIEL KAU & CHUANAN LIN 07/30/2008 •NE: SANITARY NO. CONTROL NO. • ARCHITECT/ENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH O C l� 0 u O o LICENSED CONTRACTOR'S DECLARATION - Job Description 'velZC 1 onand 7 affirm Nall un licensed under provisionsdProfessions ofChapterCOde. 9(commencing <G wnNSeIup byp)ocDlvinon3ofthe BusircvandProfessioNeode,andmylicen¢u RMDL 183SQ -CLS OFF 1WNDW,NW CBNTR, GS PUIPE epi License til s�� Le.N RELOCTE 3—NN DateContractor DECLARATION CNTRTP) *DE ANZA INTERIOR, INC BSL 25672 GD THRU U I understand my plans shall be used as public records R LLo t Licensed Professional OWNER-BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for the O O following reason.(Section 7031.5,Business and Professions Code:Any city or county i'2 E which requires a permit to construct.alter,improve,demolish.or repair any structure i i prior to its issuance.also requires the applicant for such permit to file a signed statement . < that he is licensed pursuant to the provisions of the Contractor's Licevc w(Chapter 9 Sq.Ft. Floor Area Valuation i-G (commencing with Section 7000)of Division 3oftheBusinessandPmfLaw de)or $25000 R— that he u exemptm mpt t erefroand the basis for the alleged exemption.Any violation of Section 7031.5 by any applicant far a permit subjects the applicant to a civil penalty of Number Occupancy Type not more than five hundred dollars(S508). 36904030 .E P Y YP 0 I.as owner of the property,or my employees with wages u their sole compensadon, will do the work.and the structure is not intended or offered for sale(Sec.7044,Business and Professions Cade:The Contractor's License Law does not apply to an owner of Required Inspections property who builds or improves thereon,and who does such work himself or through his own employees,provided that such improvements are not intent or offered(mule If, . however,the building or improvement is sold within one year of completion,the owner- builder will have the burden of proving that he did not build or improve for purpose of sale.). . tyt as owner of the property am exclusively contracting with licensed contractors to construct the project(Sec.7044 Business and Professions Code:)The Contractor's Li- censee Law does oat apply to an owner of property who builds or improves thereon,and. • who contracts for such projects with a comactor(s)licensed pursuant to the Contractor's License Law. I am exempt under Sec ,Bk PC for Nueason Owner 67w--Th--- I/3 a(o? WOR RERSCOAAI I'EEEFFFSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I here and will maintain a Ceetifae of Consent to self-insure for Worker's Compen- ' nation,as provided for by Section 3700 of the Labor Cade.for the performance of the work for which this permit is issued. 0 I have and will maintain Worker's Compensation Insurance,as required by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued ' My Worker's Compensation Insurance artier and Policy number are: Cartier. Policy No.: CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE • • (ITB section need not be completed If the permit Is for one hundred dollar(S100) or less.) I certify that in the performance of the work for which this permit is issued.I shall not . employ any person in any manner so as to become subject to the Workers Compensation ' Laws of California.Dae -9 Applicant re NOTICE TO APPLICANT:IL after making this Certificate of Exemption,you should become subject to the Worker's Compensation provisions of the Labor Cede.you must .,Z forthwith comply with such provisions or this permit shall be deemed revoked. Z "" CONSTRUCTION LENDING AGENCY i-,. I hereby affirm thatthere is a construction lending agency for the performance of C> the work for which this permit b issued(See 3097,Civ.C.) . W E Lender's Name ] z Lender's Address ' U 0 I certify that I have mad this application and state that the above information is • ty" correct agree to comply with all city and county ordinances and state laws relating to 0 kt^Jbuilding construction,and hereby euthorire representatives of this city to enter upon the r w above-mentioned properly for inspection purposes / 6, (We)agree to save,indemnify andharmless keep haless the City of Cupertino against E+VI Iiabilitiesdudgmenta.cosu and expenses which may in any way accrue against said City .� ' �I� VZ in consequence of the granting of this permit. APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: . t 41P1100. . Date — 2 C SOUR ftEGUTATIONS. , �/ 7/j e/o61 Re-roofs Signature of Appliomr Dae HAZARDOUS MATERIALS DISCLOSURE Type of Roof Will the applicant or future building occupant start or handle hazardous material as defined by the Cupertino Municipal Code.Chapter 9.12.and the Health and Safely Code.Section 25532(,)7 ❑Yes Pflo All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtainingan inspection,I agree to remove illWill the applicant or furore building occupant arc equipment or devices which P g -mit hazardous air ecouminwu as defined by the Bay Arca Air Quality Management all new materials for inspection. District? 0 Yes u I have read the hazardous mum-leis requirements under Chapter 6.95ofthe Califor- nia Health&SafctyCode,Sections 25505,25533 and 25534.1 understand distil the building does not currently have a tenant that it is my responsibility to notify the=upset of the requirements which must be met prior to. ..h,.of a Certificate of Occupancy. gnature of Applicant Date 7e 3e�6 All roof coveringstobe Class's" Ow«orwNorizad agent Date' or better CITY OF CUPERTINO • 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg COPY # : 1 Sec : Twp: Rng: Sub: Blk: Lot: APN • 36904030 . 01 DATE ISSUED • 07/30/2008 RECEIPT # • BS000005632 REFERENCE ID # . . . : 08070221 SITE ADDRESS • 19884 PRICE AVE SUBDIVISION CITY • CUPERTINO IMPACT AREA OWNER • DANIEL KAU & CHUANAN LIN • ADDRESS • 19884 PRICE AVE CITY/STATE/ZIP . . . : CUPERTINO, CA 95014 RECEIVED FROM - AGNES CHUAN-AN LIN CONTRACTOR • TBD - TO BE DETERMINED LIC # 00096 COMPANY • TBD - TO BE DETERMINED ADDRESS CITY/STATE/ZIP . . . : TELEPHONE • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL 1BSEISMICR VALUATION 25 , 000 . 00 2 . 50 0 . 00 2 . 50 0 . 00 ].REMRESKIT SQ FEET 183 . 00 429 . 00 0 . 00 429 . 00 0 . 00 1STPLNCK HOURS 1 . 00 122 . 00 0 . 00 122 . 00 0 . 00 TOTAL PERMIT : 553 . 50 0 . 00 553 . 50 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER CREDIT CARD 553 . 50 DISCVR TOTAL RECEIPT : 553 . 50 • 0 ty-02 M-4t (ct,„- jTl/K, CITY OF CUPERTINO 08070V-I ADDITION/REMODEL • CURfINO PERMIT APPLICATION FORM APN # %9- Ci,-0. 3o, 0 U Date: 3-6(0, 28 , zoos Building Address: kg S 5+ ?RICE ,4r: GUPEg-n N O , CA qC014 Mailing Address (if different from building address): Owner's Name: Phone# : 408_777887_6 paneCttu-ate a h I ;h Contractor: Phone#: 40$ -$M1,Ol b b. Pf ANSA 1NTEC1012 INC • Fax#: 40$-8(01 -01% Contractor License #: 155,20gc1(� Cupertino Business License#: 2'5(012- Contact: Phone#: 4-0S-8101—pi bb JC-NNIFG-{= 1-t0 Fax #: 408-8 61 -0196 Building Permit Info: Bldg. '7J Elect. 10 Plumb. © Mech. ❑ Hillside ❑ *ob Description: Addition (adding sq footage): 0 What is being remodeled (not including addition)? 01,05E OW ONE W1NPOW , MEW CAY�1N�rf &M PIPE t?E-WCATE (COOK'COF) /B3 s71/ e.Vz4� , dd& Remodel Includes Re-Roof: Yes ❑ No © If yes list number of squares Remodel Includes Structural: Yes ❑ No Square Footage: Addition: NIA Porch: NIA Deck: 1.1 I(} Garage: Detached N IA Attached NIA Remodel: Kitchen 1$3 5F Bath Other Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B ® II/III/V-A ❑ II/III B, IV-HT, V-B ❑ R- Valuation: vi rxv Please check this box if the project is a second-story addition ❑ Project Size: Express ® Standard ❑ Large ❑ Major ❑ Please complete relevant portion of the Green Building �hecklist& attach it to the application or if applicable, Green Building Points Achieved: include in plan set & the sheet index. ***For Office Use Only*** Over-the-Counter ❑ Revis /01/08 CITY OF CUPERTINO • ADDITION/REMODEL CUPEIQTINO FEE SCHEDULE • Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft ADDITIONS 1R3SFDADD PLLONGRNGR Long Range PL Planning/Residential 1R3INSP Dwellings Inspections B • IR3PLNCK Dwellings plan check B I R3REPINSP Dwellings Repeat B Inspection 1R3REPPLNC Dwellings Repeat Plan B Check 1R3HINSP Dwellings Hillside B inspection • 1R3HPLNCK Dwellings Hillside plan B check 1R3HREINSP Dwellings Hillside B Repeat Inspection • 1R3HREPLNC Dwellings Hillside B Repeat Plan Check 1R3ALTINSP Dwellings Alternate B • Materials Inspection 1R3ALTPLNC Dwellings Alternate B Materials Plan Check 1PCESS Cesspool P • • 1PPRSEWG Ea. Private Sewage. P Disposal System 1PRSEWER Sewers P 1BPSPRINK Lawn Sprinkler/Backflow P • IBPWSVCS Main Water Service P IBSEISMICRE SeismicResidential B DECKS 1R3SFDADD OR 1R3SFDREM 1DECKWOOD Deck (Wood)-Each B (Each) • 1DECKRAIL Deck Railing-Each B (Each) • • CITY OF CUPERTINO ADDITON/REMODEL • FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft GARAGES 1R3SFDADD OR DETACHED 1R3SFDREM 1GARDTW<=1K Wood Frame up to B 1,000 SF (each) 1 GARDTM<=1 K Masonry up to 1,000 SF B (each) BCONSTAXR Construction Tax Res (new detached garage) PATIO'S OPEN 1R3SFDADD OR 1R3SFDREM 1PATIOWOOD Wood Frame up to 300 B SF 1 PATIOMETAL Metal Frame up to 300 B SF , 1PATIOOTHER Other Frame up to 300 SF B PATIO'S CLOSED 1R3SFDADD OR & SUN ROOMS 1R3SFDREM 1 PATIOENCLW Enclosed Wood up to 300 B SF 1PATIOENCLM Enclosed Metal up to 300 B SF 1 PATIOENCLO Other Enclosed Patio up B to 300 SF 1COVPORCH Porch Covered-Each B (Each) REMODELS 1R3SFDREM 1 REMRESKIT Kitchen Remodel up to B (Deduct "S"for ea plan 153 300 SF check) 1 REMRESBAT Bath Remodel up to 300 B SF 1 REMREOTH Other Remodel up to 300 B Lf SF 1 REMRES2 Remodel Residential B Greater than 1000 sq ft 1REMRES3 Remodel Residential B Greater than 2500 sq ft. • • 3 of 3 W • CITY OF CUPERTINO • ADDITON/REMODEL FEE SCHEDULE • Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft REMODEL PLNCK ' 1 STPLNCK(1-3 for Standard Plan Check B remodel) NOT FOR OVER THE COUNTER PLAN CKS. 1REROOFRES Residential Re-roof Each B 100 SF WINDOW/SLIDING 1R3SFDREM GLASS DOOR 1 WINREP Replacement windows B (ea 8 windows) 1 WINNEWNSTR New Window (non- B structural) 1 WINMEWSTR New Window (Structural B Shear Wall/Masonry) 1 WINBAYSTR Bay Window (Structural) B SKYLIGHTS 1R3SFDREM • 1 SKYL<10 SF Skylight less than 10 sf B 1 SKYL>10SF Skylight greater than 10 B sf or structural 1ST AIRS Stairs-first flight/ea addt'l B 1 EPERMITFEE Electrical Permit Fee E 1 MPERMITFEE Mechanical Permit Fee . M 1 PPERMITFEE Plumbing Permit Fee P 1 ELCPLNCK Stand Alone Electric Pln E Ck (hourly) 1MECPLNCK Stand Alone Mechanical M Pln Ck (hourly • 1PLMPLNCK Stand Alone Plumbing P Pln Ck (hourly) 4 of 3 CITY OF CUPERTINO ADDITON/REMODEL • FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft I1BSEISMICRE Seismic Residential B ip� ITRAVDOC Travel & Documentation B / 1BUSLIC Business License B • • 5 of 3 Green Building Plan Check Index of Green Building Points/Categories '•A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below ` B. Site 9. Install H.E. Irrigation, (details/spec)* L-1 2 points 11. Permeable Paving, (Note) L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) 5-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, (detail) S-2 . 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points ' 4. B. Fiber Cement Siding, (Note/Spec.) A-4 2 points _ F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) 13-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal.Tank, (Note/Spec) L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) AJ 1 point 3. Energy Star Refrigerator, (Note/Spec.) A-3 1 point P. Other 1. List Green Features on Plans A-1 1 paint TOTAL POINTS 40 points . • • • Plan Review Process Work Book Page-12-Revised 3/25/08 - Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a"total points°value to a project to be considered environmentally friendly is • not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for'greening°your project. INPUT Resources Energy IAN/Health .Site 1.Recycle Job Site Construction&Demolition Waste 1 1 65%=1 point;75%= 2 80%— points; _4 points up to 4 Resource pts 0 2.Salvage Reusable Building Materials 1 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0 9.Reuse Matedals/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 , 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 0 0 0 B.Foundation 1.Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource pts 0 2.Use Recycled Content Aggregate 2 Resource pts y=yes— 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes— 0 0 0 0 C.Structural Frame LSubstiTute Solid Sawn Lumber with Engineered Lumber J 3 Resource pts y=yes 0 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 . 5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0 . 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPs) a.Floors 3 Energy pts y=yes 0 b.Wall 3 Energy pts y=yes 0 c.Roof 3 Energy pts y=yes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 12.Use OSB --- — — --I a.Subfloors I1 Resource pt y=yes 0 • b.Sheathing ` 1 Resource pt y=yes 0 INPUT Resources Energy IAO/Health • I.Exterior Finish 11 Use Sustainable Decking Materials a.Recycled content Resource pts y=yes_ D • 1 b.FSC Certified Wood 3 Resource pts y=yes- 0 2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAQ/Health pt y=yes 0 3.Install House Wrap under Siding • 1 IAQ/Health pt y=yes- 0 4,Use Fiber-Cement Siding Materials _ 1 Resource pt y=yes 0 0 0 0 E.Plumbing 1.Install Water Heater Jacket 1 Energy pt y=yes 0 2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0 3.Retrofit all Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) t Up to 2 Resource pts. 0 b.Showerheads(1 point each,up to 2 points) ‘ Up to 2 Resource pts. 0 4.Replace Toilest with Ultra-Low Flush Toilets I (1 point each,up to 3 points) I Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0 B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0 0 a 0 r.electrical • 1.Install Compact Fluorescent Light Bulbs(CFLs) (6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) I • Up to 4 Energy pts. 0 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to • 5 points) Up to 5 Energy pts. 0 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 0 0 0 G.Appliances 1.Install Energy Star Dishwasher 11 1 Energy pt y=yes- 0 2.Install Washing Machine with Water and Energy Conservation Features 1 Energy pt y=yes. 0 3.Install Energy Star Refrigerator I 1 Energy pt y=yes_ 0 4.Install Built-In Recycling Center 3 Resource pts y=yes 0 - - - -- a 0 0 H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.Walls 2 Energy pts y=yes 0 b.Ceilings 2 Energy pts y=yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 13:Install Recyoled-Content,FibergIaiilnsulation with' - - ' Iwo Added Formaldehyde 3 IAQ/Health pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 b.Ceilings 4 Resource pts y=yes 0 • 6.Alternative Insulation Products(Cotton,spray-foam) a.Walls 4 Resource pts y=yes 0 D.ceilings 4 Resource pts y=yes 0 0 0 0 ' INPUT Resources Energy IAQIHeatth . I.Windows - 1.Install Energy-Efficient Windows • / a.Double-Paned 1 Energy pt y=yes 0 b.Low-Emissivity(Low-E) - 2 Energy pts y=yes 0 c.Low.Conductivity Frames 2 Energy pts y=yes 0 2.Install Low Heat Transmission Glazing - 1 Energy pt y=yes 0 0 0 0 J.Heating Ventilation and Air Conditioning 17.Use Duct Mastic on All Duct Joints J 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 8.Install Sealed Combustion Units a.Furnaces 3[AO/Health pts y=yes 0 b.Water Heaters 3 IAQ/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non=HCFC Refrigerants 2 Resource pts y=yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burning Fireplaces • a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y=yes 0 b. Install/Replace Dampers 1 Energy pt y=yes _ 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 4lAQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 0 0 0 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0 i6.Select Safe and Durable Rofi ong Materials _ __ _ 1 Resource pt y=yes 0 '7 Install Radiant Barrier —� -� - 3 Energy pts y=yes 0 0 0 0 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes 0 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0 0 0 0 • • INPUT Resources Energy IAolHealth M.Indoor Air Quality an• Finishes • 1.Use Low/No-VOC Paint 1 IAO/Health pts y=yes •• 0 y= • yes 2.Use Low VOC,Water-Based Wood Finishes 2 IAD/Health pts y=yes 0 • 3.Use-Le-iv/N-0 LVOC Adhesives 3 IAO/Health P es 0 --- - - 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 6lAO/Health pts y=yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAO/Health pts y=yes 0 R.Seal all Exposed Particleboard or MDF _ 4 IAO/Health pts y=yes 0 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House Vacuum System 3 IAO/Health pts y=yes 0 0 0 0 N.Flooring . 1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0 2.Use Rapidly Renewable Flooring Materials __ 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 51AO/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 • 0 0 0 • Total Points Available: 1401 1301 57 Total Points Project Received: 01 01 0 • • • G:datalprogslgreenbuildingguidelineslremodelerslgreenpointsfina12.12.04protected.xls • • 4fr-24" yr 18- ----21" ,":1; 42" , ,.-Z-- ;' 21"-- 18"— =— —24" frt 'I I 1; fil 8 C 41:" fr• 1; '" I , ; I i. 36" !' =] 1 i-21" fr;-91-1,1 3 ,•; ' / /,'30" I 'II 1, '17 1 1 1 I i 1 I 1 c(oc.e ,z.ri dAr,i't-rdo Qs) 1 il 1 . Ts," , 1,"... Tddd;F-r.-dd-dd, ' di- .. ,-, .?1,frt.- k!r/1,4) :777:77":"--:-:-.7":17T--,- ., s•-.r .......:: ......:- :•.• - ! • I i TIA/184- 1_2W2142L i VV4218 ; VV2krfriff2IT WiWRI EZR2442F '1 • ',11);, . ;r1- - 1 1 1 '7 B63 BD21 BLBE 1 BOCU36 ; 1330BUTT2F 7, '1 I ri i 0)! 1 ,_ k I . _____.... ... .. _ --- —EZR36R.SS Ln , ; I Co• •,,, ; .I‘ H tr_i • , a ' 1 i o : ! ! -1 •',' !//' CO ! . i. L • I • "3 ;CL - I ' • if ) ,4 I: . c L . 1 " ' ! 0) - L.,- ' ,-.1 I 'II • 14% I 1... r : , 1 i : -11 w 4't• - OD -,-.•t 7- --r A-,--- ' I , d. h r‘ N J.,/ . 111: -= , e , FL. 1 'FL `''---" ' I I „ II 0 -L-L...i.-..4-1-,-4-1-4-4...,..4” ,. il . , . . • 41. (N ; ii:1 .1 , L-1 t--i..i.cor-L_L I' • ' ' !.. ?Li ' 4 1-j-1-6.): " E' if; 4-I !! r .1 to . I FR:t-. ---tt -..„, -_ _____I r j 1 , , ,...,-- e, : , . I • : p T14.. ts•-.4111;r4.1...L.;.2"ilunil SO, (0 1 i . I In ti1 tj 0' i m i 1 1 , Ai afo9 • D •.-t, : ipm ,%. .„.„.., '011 CO 1.4;41-Vg •03 4.4 .....1.... , d , it. E cm( or V L 1-L, d , IV ritc--71.-Vai-A—T• ! ri I I-'- 1 ' I CliPERTINO 10 it*" , , 1 IIRDINANCES 1 I • alk rE •4.„_,..c0_, , , ,: .p, .L1 • :i -1 I 1 Li • ,,„ :itb _ L ,„ H,_ ,,,. )ATE,- ,-, , , t, --J--.- "-- I ' 001 1 II F) ! i i 1-11'7 -171- .77i1-- P i IGNED-1'111j:),1 --r--! ' -r-M. t". - I j,j17 cg' I ,, fn.r i 11-r'.. 0 , I r 6 ; • !414 ; ; ! ! 1 • : ": n H " , 0 0 1.0• This Set ofipalic4nlii v 0 mi'cations Ict."6.0 L ' N. ;be tip o Iii.e.c,,,'•3 .t1 t N as and it is on ,J.J. ±. it ; ! : I; ; Ls-- -r FL 7J .:,) 0 „ Iv , = .: • - ...._..,___ i m lawful to oh; 9, chg) 4. or alteration' • I co < on sre vyit ie I riiten leimission fron 1••• (...) i A. 'the buildiiie! opt., t.,-.ci-Ortypertino. i , 1 i I b ' Tt,i- •• - f he amping ofthis pitIrt ,rig spectlication. bo E244-2BL4-T-T-TF L.; z; -,-----7----"•<- ; t F L , --- -- Lj—71 7sItt ;HALL N9W_Ml to pnAmit or to be al Ipprovaltf tfle°vIdlation/Zinc prAege , Cc-12-eklith-D c± c,r-pisc .ttqnv city Orcimance ot smtp LAI., -rf_4\-r. (N) C Iva re sent Reces‘ ( p.0:(ac4 Ex. i erM,, e5ce,„-r airptce‘s ) 4-- (E ) Low VoL32 0,e c e c s NH 0 t -Int h ir,..,---------i CE ) c lvo re s e4.7( “ d fA- (fate e n a r.1 .•- / ':- ,. ,.. . f 1 . LI-1 I * ii ® 1-° LK) ki0 (bite 14 4 PkflAre 0 ! y-r! (t2. Nal i i. _ 1- a 1 ritf._ 0100fra_0.1 -43- Cc h-Ø •rt.\ -1._00-7 C E C • i 1 ' LI ,... 0.) 'l "--ta c...kc" a_e4 23o2 0-4. C 7 . i 0 I a !,..,, r•:), ; pi. 1,),,, 2_007 C_P C._ I .-4, i ils 11111' = NJ I or- 1 N) i! , CI i xi ' __ Itsxr, LI_:III_ — 11:1p: __._. .. All dimensions size designations 20 20.9P This is an original design and must Designed:7/18/20W given are subject to verification on TECHNOLOGIES ja riot be released or copied unless Printed:7/25/2008 job site and adjustment to lit job applicable fee has been paid or job conditions. order placed. Daniel Kau Kitchen^1 TWO TONE.kit I All I Drawing 4: I Scale:0 3/1 ; l' • Community Development ,I' 0-4 • 10300 Torre Avenue f 4 I Cupertino CA 95014 Telephone(408)777-3228 CITY OF Fax(408) 777-3333 IUPERJINO Building Department All Cupertino building permits must meet certain conditions related to maintaining environmental quality and public peace and safety. The two most common conditions are described below. STORM WATER POLLUTION CONTROL • State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and the Santa Clara Valley Water District control stormwater pollution. Educating local residents and businesses and enforcing stormwater pollution control laws are key parts • of the City's compliance efforts. Stormwater pollution prevention: It's up to us In northern Santa Clara Valley, storm drains flow directly to local creeks and San Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife dependent on our waterways, for people living near streams and baylands, and for the local water supply. Common sources of stormwater pollution include: • Dripped oil, fuel, and antifreeze from vehicles and heavy equipment; • Construction debris, including dirt, concrete and paint; • • Landscaping runoff containing pesticides or weed killers; and • Any material dumped or spilled into streets or storm drains The property owner and the contractor share ultimate responsibility for activities occurring at a construction site and will be held responsible for any environmental damage caused by subcontractors or employees. For more information on construction-related stormwater requirements, see the Stormwater Quality Regulations section of the City of Cupertino web site at: http://www.cupertino.org/city government/departments and offices/ environmental services COMMUNITY NOISE CONTROL The basic noise control requirements for construction sites are as follows: • Typical construction work hours are: - Weekdays - 7 a.m. to 8 p.m. - Weekends - 9 a.m. to 6 p.m. • Construction other than street construction is prohibited on holidays. • Residential daytime noise levels from complaint site - 60 dBA • Nonresidential daytime noise levels from complaint site - 65 dBA For more information on noise control, please see Chapter 10.48 of the Cupertino Municipal Code, which can be accessed at http://www.amleual.com/cupertino ca/ • Greg Casteel Building Official ,I, 24" "r 18" -21" X 42" Pi 21" 7 18" , 24"--: I I ! i 1 I i i I I 1, 84 I! 1 1,1 , . „ ., I " i ., li IL-2-21" ,y 914 T 1 —30--i=r---11-36" 1 1 1 1 C(0i:rail LAdill.Cf05al 1 1 I ..., j.,.=4*t.r 1,1 I:It''"7.277;""•7-1-,:•77-1"'-''':77-''"'41177, r.".. 4: 77Pr: 1 ; eq!..;_ - --8 J b I' 1 t----;_. '-------1 ,\-,,,, VV1842L W2142L . W4218 i W2T42FI TN8.4R WEZR2442R,j N -Ns 11 1 ' i N.) th-Dt Bff3 BD21 SLUG : BOCU36 j ...3....0B__U.....T...T....2FV..F..T I11 [1 : ± - =!=EZR36C k -- —aKl 1 I 1 I f I it :;-tr ., ,x : '4‘ 1 H i cr?—. / `N 1 b.) . -v, t - i k : ,t ,,, 1 at:(s3I: I , I 03 i 1 : ::' -.7.—41 \ . X.le. 4 cl.. k-3 -4 • I. , I-% . I L. r :1 ; rj 1 ! . I - -1---3- ,.,_____;,.. —, cn -1-,:lf 7- I I i C: 'j , o ,4_,.. I / f_r_js] FL % 1- ri, , TN— I:: ' KI i I 1 H A NI : MI I • Rj 1 L.P 's 1 ; :;1' • I ' - ;"' +-Pt"- . . i a IS, ' -o3 1 '' ''7,-1 't 1 : 1 • j-ten-1-1-1-4;7145 E, 11 I gi' !: : r . 1 ; ;E4-11 I-71 II . ii 1 • I A :41;4 ,I • 1 iirt-I- 4+\ CD `-1‘ CO : ' ' : 1 , •,_r_t.4- , L'Hr .o. 1 iiio 4. --r-t-t- 1 1 l' F L 1 :; ls- 1 l-111- t-bt • 4 r 1 C •,.1 j 1 I [ fp co I , :-1 t+16 03-1-b1+1-1,97 I"I ' 1 1 1 1 1 '65 ; 1 ; ; I:717-14 P-Ibt-t—filblA b 7 , I I ;4\1 :-b i l? ; /71 i I I I a 4.•\ I 41: ' 1-1 : ' I:I i CO I 11 , ,r? '4.) (sj t , • II • ... I 0 -i ce I I 1 r 1. .i.r4-,-iiri--HrTri-F!'. , Vg' !:::, roi, I m er, . i) .-Rt.r1 ' gill ift. 73 ; 1.:), r"ati N , ID a I '1 II l Hai 1 -'• '' a b.) 0 tn kr‘)- . -s— ''• " \\_;______, i ill ' , _ ! : • / x :k24-12BUT-TbEt i t FL . -----u-1.-It. t ?art l'r, e A wa I C 4 ,---72...e.t-ti),-L2 C(3.--- 4-0()C. 441-- (N) C illoreseatt Recess ( Pet(ax--.2 Ex, t caAnAes c..e4 Pece gs ) t (E ) Lo t.4 Vat rix la ec ecs 1 . ' ASSESSOR COPY _-_ L2 CE ) c(i)orese-m wide - c-alo eh ' ___ .,• ca_-:"_Nut • , 'tt- ,!Sr---7- . t , 1 , . , 1 * , ,, L, . Low Vo (fate 1-i"4 r,•ki-citre -n . , o 1 Xn 1 c9 k.) -,. : a 011. 1 15)/ k- C-_-.1.e_ciM-X-c_k. -t-0 c ornoLe_ : I : 1 V I CaC., : d 1 1 x i 1,.. /Li e c_tiucyli7-C•i ct 00 71 Cr--c C_ , 2 1 ! I, 1 sl 1 a I /4 L,rnnL) too-) CP C • All dimensions size designations 20 20LA 01 r .._.... . _ Chis is an original design and must Designed:7/18/2008 given are subject to verification on not he released or copied unless Printed:7/25/2008 job site and adjustment to lit jnh applicable fee has been paid or job conditions, order placed. Daniel Kau Kitehen•1 TWO TONE.kit _ I All Drawing 4: I Scale:0 3/r= l' 3 Community Development ft I 10300 Torre Avenue 4L' Cupertino CA 95014 Telephone(408) 777-3228 CITY OF Fax(408)777-3333 alUPEI�TINO Building Department JOB ADDRESS: ADDRESS: ,} PERMITS# T cc Pr Sr�C.e A,e (.t p.erf i-kr C f;-`r�/ C W rJ a 221 OWNER'S NAME: po,,, �,Q tent_ 9. CHua,,, curl i- n PHONE # GENERAL CONTRACTOR pe A a to Ln t.4,ire r FAX # I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum/ Wood • Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile • 77?o / off' Owner/Contractor Signature Date