16827 (2) POST THIS CARD. NEAR FRONT OF BUILDING PERMIT NUMBER
CITY OF CUPERTINO 16827
INSPECTION DIVISION
JOB INSPECTION RECORD
? [� PERMIT EXPIRATION
JOB ADDR ESS Z-1-710 llM6-ff . 3TQ/NCr 5—iT.UNIT# _LOT#
PERMIT EXPIRES IF WORK
OWNER T,J CONTRACTOR �- Z E' z�-Z IS NOT STARTED WITHIN
INSPECTION TE, INSPECTOR ' INSPECTION RECORD 160 DAYS OF PERMIT ISSU
FOUNDATION AWE OR 180 DAYS FROM
NOTE: LASTCALLED INSPECTION.
LIFER ALL GRADING AND DRAINAGE SHALL BE INSTALLED
PREGUNITE TO COMPLY WITH THE APPROVED PLANS AND CITY OF PERML
IT VAIDATION
CUPERTINO STANDARDS.
GARAGESLABS
'POUR,NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED _
UNDERGROUND /SLAB
PLUMBING -
ELECTRICAL ISSUANCE DATE
BLDG ELECT I PLG. MECH.
MECHANICAL r �O ❑ ❑ � ,
00 NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNEDBUILDING PERMIT.'4, ;,Y
WOOD FLOOR \MIIFORMATION,tiaJ::,{�,;:
VALUATION SIFT.
PLUMBING
MECHANICAL
ELECTRICAL PERMIT TO
FRAMING
STOR S TYPE CONSTR.
INSULATION
OCC GROUP RES UNITS
PLACE NO SUBFLOOR UNTIL,ABOVE.HAS BEEN.SIGNED+
50.ET.FLOOR AREA TOTAL ACREAGE
ROOF NOTE:NO FINAL INSP.SHALL MADE BEFORE
DIAPHRAGM THE CONSTRUCTION TAX IS PAID
9u LLOION USE
ROOF SHEATHING
RES IrvO CON Pe owr�
APPLY NO ROOFING UNTIL ABOVE HAS BEEN SIGNED: FINALS.': :`' ,F, DATE, INSP. El ❑ ❑ 1
ASSESSORS PARCEL NO.
ROUGH SAN.#
PLUMBING ELECT.ENERGY
TRACT NO. PARCEL NO.
TUBS 8 SHOWER PAN PLUMBING ENERGY
MECHANICAL MECH.ENERGY
ACC DATE ACC.FILE No.
ELECTRICAL
BUILDING ENERGY
FRAMING ELECT.FINAL TEST
INSULATION PLUMBING zorvlrvG ENSITE NO.
G.
GAS TEST GAS
FIRE SPRINK ENERGY T 24
MECHANICAL Y L N Y [:] NL
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED- HEATING
EXTERIOR SHEAR ELECTRICAL RELEASE FLOOD zorvE A U.c.
INTERIOR SHEAR FIRE DEPT. v❑ NL Y L N❑
SHEETROCK GRADE FEE SUMMARY
EXTERIOR LATH BUILDING BUILDING
INTERIOR LATH TEMPORARY APPROVALS
SCRATCH COAT ELECTRIC PLAN CHECK
FEE
GAS
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED OCCUPANCY SEISMIC FEE
OCCUPANCYOF BUILDING IS NOT PERMITTED UNTIL BUILDING FINAL IS SIGNED BY BUILDING INSPECTOR. MICROFILM
ARRANGE FOR INSPECTION BY PHONING 252-4505, ELECTRICY.'
o� ONE WORKING DAY BEFORE REQUIRED INSPECTION. PLUMBING
Z PLEASE GIVE JOB ADDRESS WHEN PHONING.
' SEE PERMIT FOR EXPIRATION DATE - MECHANICAL'
IMPORTANT!
CONST.
PLEASE,READ REVERSE SIDE BEFORE' TOTAL r
CALLING FOR FINAL INSPECTION.
OFFICE COPY