Loading...
08040220 (2) CITY OF CUPERTINO BUILDING DIVISION PERMIT CONTRACTOR IN'FURMATION °4�X'�is._.��S•t"II'4 th �3Y+a`!.m c PERMIT NO. eulLDlt{CagpQRES�:0380 TOWN CENTER LN GIDEL AND KOCAL 08040220 OWNERS I1.NNA/MEE; PERMIT ISSUE DATE STEVE LACHMAN 574 DIVISION ST 04/30/2008 NE: (408) 370-0287 SANITARY NO. CONTROL NO. ' ARCHITECUENGINEER: BURRING PERMIT INFO BLDG ELECT PLUMB MECH 0 0 0 0 O o LICENSED CONTRACTOR'S DECLARATION IOU Description G 1 hereby&M m Nat 1 am lived umler pmv OM of CMplar 9(commencing — P b wiNsectwn]OlkpofDividan3ofNCBusinecvaMPmfessiomCotle.Wmylk--is RPLCMNT OF DOORS PERMIT GOOD THRU 5/30/8 u in full forte and Wcoc ZLicenm C R.ic.N �t•� Da¢ Coconuts, RCHTECTSD ON V 1 undcmak my plans shall be used as public rermrda s Licensed Professional 3 OWNER.BUILDERDECLARATION 1 bcreby affil m that I am caempt from the Convanor's License Law for the O o following mason.(Section 1031.5,Business and Professions Cade:Any city Or county 3 which requires a peril to Cnnsuuct,.]ter,improve,demoiah.lir repair any mmdum _ii prior m its isavance.edam rtquirca we applicant for such permit to Ilileasiined summem < wed x it licensed pu.11.the pmvisiom of the Comracmr',U..Law(chapter9 Sq.Ft. Floor Area Valuation .�n (commenting with Section 7000)of Division 3 of the Business and Professions Code)or 4(]000 egg that he is exempt therefrom and the baso for we alleged exemption.Any violation of Section 7031.3 by any applicant fee a Permit subjects we applicant to a civil penally of am an E more Owns hundred dollars ISM 36940059 .�Wtfktuber Occupancy P Y Type ❑1,at owner of the Property,or my employees with wages as their role compensation, will do we work,and the svueture is rot Nuked or offered for sale(Sec.7014,Buainea and Professions Code The Contractors Li.law does nut apply m an ow.of Required Inspections property builds aimproves themun,ak whodocssuds were himselfar through his awn cmploycv,provided Nn such improvements art not inmkrd oraffered forsala IL however.we building or improvement isald within one year ofeompledon,the,ownv- builder will have the Imel n of proving that M did not build Or improve for purpose of sale.). El 1,as Owner of the property am exclusively contracting with licensed nowwwor to construct the projca(Sea 7014,Business and Professions Code:)The Contraemr's U. come law docs not apply to an Owner of property who builds or impeo ew thereon,and, who contracts for such project win a atrxtor(s)licensed pursmnt to the Comracso's License Law. ❑Iomcaemptundv See ,BkPCfo Nismamn 0. Dale WORKER'S COMPENSATION DECLARATION 1 hemby affimt under prsulty of perjury was of Ne following declarations- 1 have and will maintain a Certificate of Consent to self-iaurt for WorkersCompen- wt..a Provided for by Section 3700 of Ne labor Code.for the pvfmmence of we work for which Nis permit is wok. ❑1 have and will maintain Works's Compensation Insurance,as required by Section 371)().1'the labor Code.for we performance of the wast for which this iss permit u ued ' My Workers Com eaut nInsu ce earn and Policy number Carriee Policy Is P CERTIFICATE FFXEMION FR)MWORKERT COMPENSATION INSURANCE v (Thu auction reed not be completed iftbe permit is forone hundred dollars($10111) M lea) 1 COMfv that in the pvfonnerce of tiro work for which this permit is issued,l Nall not employ any person in any manner an as to become subject to the Workers'Compensation Laws of California.Dam 4 Applicant NOTICE TO APPLICANT:IL after matlng this Certificate of Emosim. ,you should become subject to we Wohcri Compensation provisions of the labor Code.you mum •J,Z forthwith comply with such provisions or Nu permit shall be doomed remkcd. ?O DI CONSTRUCTION LENDG AGENCY F Ihemby a@sm Nat them is a connotation lending agency for rte Performance of f� > tine work for which this permit U issued(Sec.3097,Civ.C.) Q Lenders Name .7. Z lenders Adduces U Q 1 certify that I have read this application and auto Nu the above information is 11w coneCh 1 agree In Comply with all city and County ordinances and slam laws rtlNng to .C)RgJ^ building conswction.and hereby atmori a mpressundims of this city m enter upon Ne Fakw-mendoand property rte inspection purposes G (We)eg.to avu,indemnify and keep harming,dte City of Cupertino against liabilities,judgments.costs and expenses which may in my way accrue against uid City V Z in consequemtCe of the grating of this permit. APPLICANT UNDERSTANDS AND WILL MPLY ITH ALL NON-POINT Issued by: Date 4 SO EqV ONS, �7 4 V i•O I �­ Re-roofs a HAZAAIrDOUS MA ASURE Dam Type of Roof Will apylicatm forum Wildingaccupantsmmorbaklchaalloamamrud u de0ned by the Cupertino Municipal Cade.Chapter 9.11,and the Health and Safety code.Seed.y.155324)?❑Yes 1,1All roofs shall be inspected prior to any roofing material being installed. - OWill the applicant or futurebuilding occupant use equipment or devices which If a roof is installed without firs[obtaining an inspection,I agree to remove il haardna air canureiwits u derined by Ute Bay Ama Air Quality Management all new materials for inspection. District? P 0 y. / 1u I haw mad the hureart materials requirements under Chapter 6.95 of the Caller. nu Houth h Safety Colo Swuoo nSD5,25533 and 255th.l undersand Nat ifwhe Wilding does not croseky haw a lead that it is my usponsiMlily to notify use ncupam of dam req.' k mmkmetpdarmissuanceofaCcnif a(aeuamey Signature of Applicant Date Ownd ar aummi.d PI fj Dam' - All roof coverings to be Class'R!'or better CITY OF CUPERTINO • ITEM 1 OF 1 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec: Twp: Rng: Sub: B1k: ,Lot; APN . . . . . . . . : 36940059 .CMPLX DATE ISSUED. . . . . . . : 04/30/2008 RECEIPT #. . . . . . . . . : BS000004627 REFERENCE ID # . . . : 08040220 SITE ADDRESS . . . . . : 20370-20380 TOWN CENTER LN SUBDIVISION . . . . . . . CITY CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : STEVE LACH14AN ADDRESS 574 DIVISION ST CITY/STATE/ZIP . . . : CAMPBELL, CA 95008 RECEIVED FROM . . . . : GIDEL & KOCAL CONST CONTRACTOR . . . . . . . : LANCE GIDEL LIC # 28790 COMPANY . . . . . . . . . . : GIDEL AND KOCAL ADDRESS 574 DIVISION ST CITY/STATE/ZIP . . . : CAMPBELL, CA 95008 TELEPHONE (408) 370-0287 • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BTEMPPERM FLAT RATE 1 . 00 200. 00 0. 00 200. 00 0. 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 200. 00 0. 00 200. 00 0. 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CHECK 200 . 00 #65224 --------------- TOTAL RECEIPT 200. 00 CITY OF CUPERTINO • CUPEkTINO GENERAL BUILDING PERMIT APPLICATION FORM APN #&! L10 05-Q , Date: — �U—Od� Building Address: D3�0 Mailing Address (if efferent from building address): Owner's Name: Phone#: svve-- 4&-15-e8 41S35 Contractor: Phone: zG? 3'o-O� Fax: ��"vv _ 3-70355� Contractor License Cupertino Business License#: • Contact: Phone: �/ Fax: / A Residential Commercial Job Description: �- Is the project in the Wildland- Urban Interface Fire Area? Yes ❑ No [!- Building Permit Info: Bldg Elect ❑ Plumb ❑ Mech ❑ Type of Construction (Usage Class): Occupancy Type:]-A, 11-B ❑ 'l 1, 111, V-A F111, 111, 1V V-B [� 0 Valu ion• Square Footage: 7I Bao Project Size: Standard PZI—Lar e ❑ Major ❑ Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it • to the application or if applicable, include in plan set & the sheet index. Points Achieved: 7Z7— For help, contact Build it Green at www.builditgreen.orll Slor CITY OF CUPERTINO CUPEI,TINO GENERAL BUILDING PERMIT APPLICATION FORM Quantity/Sf Fee ID Fee Description Fee Permit Type Group 1GENRES or 1GENCOM 1 BTEMPPER Temporary Building Permit (good for B 30 days) 1 BBOILERI For the installation or relocation of ea M boiler/compressor to &including 3 horsepower, or ea absorption sys to & incl 100,000 Btu/h (29.3kw)_ 1 BBOILER2 Installation/relocation of ea M boiler/compressor over 3 horsepower to &incl 15 horsepower, or ea absorption ss over 100,000 Btu/h 1BBOILER3 Installation/relocation ofea M boiler/compressor over 15 horsepower to & incl 30 horsepower, or ea absorption sys over 500,000 Btu/h to • & incl 1,000,000 Btu/h 1BBOILER4 Install ation/relocation of ea M boiler/compressor over 30 hosepower to & incl 50 horsepower, or for ea absorption sys over 1,000,000 Btu/h to & incl 1,750,000 Btu/h 1 BBOILER5 installation/relocation of ea boiler or M refrigeration compressor over 50 horsepower, or ea absorption sys over 1,750,000 Btu/h 1BAPPLOTH For ea appliance or piece of equip M regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this code. 1 ELECINSP Other Electrical Inspections (per hour) E 1MECHINSP Other Mechanical Inspections (per M hour) IPLMBINSP Other Plumbing & Gas Inspections P (per hour 1MEETINGIHR Application Meeting B ;(C - CITY OF CUPERTINO CUPITYEfF GENERAL BUILDING APPLICATION • FEE SCHEDULE Quantity/Sf Fee ID Fee Description Fee Permit Type Group 1GENRES or 1GENCOM ACOUSTICAL REVIEW IACOUSFDW SFDWL/DuplexNew B IACOUSRESAD SFDWL/Duplex-Addition/Alteration B IACOUSCOM Multi-Family/Commercial B CHIMNEY'S 1CHIMNEY Chimney B I CHIMNEYR Chimney Repair B FENCES Ak 1 FENCE>6FT Non-masonry, over 6 ft in height B 1 FENCEMAS>6 Masonry, over 6 ft in height B FIREPLACES 1FIREPLMAS Fireplace Masonry B 1FIREPLFAB Fireplace Pre-Fabricated/Metal B 1FLAGPOL>20 Flag pole (over 20 ft in height) B 1MODUSTRU Modular Structures B FOUNDATIONS 1FOUNDREP Foundation Repair B 1 PILECAST Pile Foundation Cast in place concrete B 1PILEDRIV Pile Foundation Driven (steel, pre- B stressed concrete 3of5 CITY. OF CUPERTINO CITY Of GENERAL BUILDING APPLICATION CUPERTINO FEE SCHEDULE • Quantity/Sf Fee ID Fee Description Fee Permit Type Group 1GENRES or 1GENCOM RETAINING WALL(CONCRETE OR MASONRY 1RETSTN Standard (up to 50 ft) B IRETSP310 Special Design, 3-10' high (up to 50 `) B 1RETSPI O Special Design, over 10' high (up to B 50' IRETCRB< Gravity/Crib Wall, 0-10'high (up to B 50 ft 1RETCRB> Gravity/Crib Wall over 10' high (up to B 50 ft SIDING 1 SIDEST/BK Siding, Stone & Brick Veneer B (interior/exterior) 1SIDEOTHER Siding all other B SKYLIGHTS 1 SKYL<10 SF Skylight less than 10 sf B 1SKYL>IOSF Skylight greater than 10 sf or B structural 1STAIRS Stairs-first flight/ea addt'l B STORAGE RACKS 1 SRACKS<=8 Storage Racks 0-8' high (up to 100 sf) B 1 SRACKS>8 Storage Racks over 8' high (up to 100 B st 1STUCOAP Stucco Applications (up to 400 sf) B additional stucco application 4of5 �TCITY OF CUPERTINO CUCITY TYOF O GENERAL BUILDING APPLICATION • FEESCHEDULE Quantity/Sf Fee ID Fee Description Fee Permit Type Group 1GENRES or 1GENCOM 1 WINREP Replacement windows/sliding glass B door (ea 8 windows) 1WINMEWSTR New Window-structural shear B wall/masonry (includes plan ck fee) IEPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee M 1PPERMITFEE Plumbing Permit Fee P 1 ELCPLNCK Stand Alone Electric Pln Ck (hourly) E Alk IMF 1MECPLNCK Stand Alone Mechanical Pln Ck (hrly) M 1PLMPLNCK Stand Alone Plumbing Pln Ck (hrly) P 1 STPLNCK-(3 Hr Min Standard Plan Check (when no E/M/P) B when not over counter) hourly-stand alone 1BSEISMICR Seismic Residential B IBSEISMICO Seismic Commercial B 1TRAVDOC Travel & Documentation B 1BUSLIC Business License B e 5of5 . Community Development (+ 10300 Torre Avenue Cupertino CA 95014 Telephone(408) 777-3228 U P E kT IY OF N O Fax(408) 777-3333 Building Department All Cupertino building permits must meet certain conditions related to maintaining environmental quality And public peace and safety. The two most common conditions are described below. STORMWATER POLLUTION CONTROL State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and the Santa Clara Valley Water District control stormwater pollution. Educating local residents and businesses and enforcing stormwater pollution control laws are key parts of the City's compliance efforts. Stormwater pollution prevention: It's up to us In northern Santa Clara Valley, storm drains flow directly to local creeks and San Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife dependent on our waterways, for people living near streams and baylands, and for the local water supply. Common sources of Stormwater.pollution include: • Dripped oil, fuel, and antifreeze from vehicles and heavy equipment; • Construction debris, including dirt, concrete and paint; • Landscaping runoff containing pesticides or weed killers; and Any material dumped or spilled into streets or storm drains The property owner and the contractor share ultimate responsibility for activities' occurring at a construction site and will be held responsible for any environmental damage caused by subcontractors or employees. For more information on construction-related stormwater requirements, see the Stormwater Quality Regulations section of the City of Cupertino web site at: htti)://www.cui)ertino.oro/city government/departments and offices/ environmental services COMMUNITY NOISE CONTROL The basic noise control requirements for construction sites are as follows: • Typical construction work hours are: - Weekdays - 7 a.m. to 8 p.m. - Weekends - 9 a.m. to 6 p.m. • Construction other than street construction is prohibited on holidays. • Residential daytime noise levels from complaint site - 60.dBA • Nonresidential daytime noise levels from complaint site - 65 dBA For more information on noise control, please see Chapter 10.48 of the Cupertino Municipal Code, which can be accessed at http://www.amleaal.com/cupertino ca/ Greg Casteel Building Official Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 7points 11. Permeable Paving, Note L-1 C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 D. Structural 3. Uses Wood 1-Joist, (See Spec.) S-2 5. Use Truss with heels, (detail) S-2 6. B. OSB Sheathing, detail S-2 E. Ext, Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11.A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A3 1 po- nt P. Other 1. List Green Features on Plans A-1 1 nt MMMAMM TOTAL POINTS 40 nts 203 7v 7ac,�� cin-►9r �1 �f - 30_ b 2 4, 0 0 • Plan Review Process Work Book Page A2-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is • not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project. INPUT ResDurces Energy IAQ1Heal0E A.Site 1.Recycle Job Site Construction&Demolition Waste _t 65%=1 point;75%= 2 points;80%=4 points up to 4 Resource pts 0 2.Salvage Reusable Building Materials f 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 ' 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 F8_. esD ign Resource-Efficient Landscapes and Gardens— _j 4 Resource pts y=yes 0 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10.Install High-Efficiency Irrigation Systems 2 Resource pis y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 1 I 1 B.Foundation 1.Incorporate Recycled Flyashin Concrete 25%Recycled Flyash=2 points;Add 1 point for every 10% • . increase of flyash,up to 5 points up to 5 Resource pts 0 2.Use Recycled Content Aggregate 2 Resource pts y=yes 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yesl;;F 0 1 1 1 C.Structural Frame f1.Substitute Solid Sawn Lumber with Engineered Lumber _ 3 Resource pts y--yes 0 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor.Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPS) a.Floors 3 Energy pts y=yes 0 b.Wall 3 Ener is Energy y-yes 0 c.Roof 3 Energy pts y=yes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11,Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 12.Use-OSB � a.Subfloors 1 Resource pt y=yes 0 • b.Sheathing 1 Resource pt y=yes p L-_ - - 1 MEN" W.Exterwr imsI INPUT Resources Energy IAO/Health it.Use Sustainable Decking Materials 1 a.Recycled content 3.Resource pts y=yes 0 • b.FSC Certified Wood 3 Resource pts y=yes 0 2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAQ/Health pt y=yes 0 3.Install House Wrap under Siding j 1 IAQ/Health pt y=yes 0 4.Use Fiber-Cement Siding Materials 1 Resource of y=yes 0 E.Plumbing 1.Install Water Heater Jacket __ 1 Energy pt y=yes 0 and Cold 2.Insulate Hot Water Pipes 2 Energy pts y=yes 0 3.Retrofit all Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0 b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0 4.Replace Toilest with Ultra-Low Flush Toilets (1 point each,up to 3 points) _ Up to 3 Resource pts. 0 5,Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 41AQ/Health pts. 0 S.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0 1 1 1 P.tiecmcar It.Install Compact Fluorescent Light Bulbs(CFLs) I(6 bulbs=2 points,10 bulbs 4 points,12 bulbs=4 points) Up to 4 Energy pts. 0 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to • 5 points) Up to 5 Energy pts. 0 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 1 1 1 G.Appliances 1.Install Energy Star Dishwasher 1 Energy pt y--yes 0 2.Install Washing Machine with Water and Energy Conservation Features 1 Energy of y=yes 0 3.Install Energy Star Refrigerator 1 Energy pt y=yes 0 4.Install Built-In Recycling Center I 3 Resource pts y=yes 0 H.Insulation 1,Upgrade Insulation to Exceed Title 24 Requirements a.Walls 2 Energy pts y=yes 0 b.Ceilings 2 Energy pts y=yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 �3.Install Recycled-Content,Fiberglass Insulation with No Added Formaldehyde 3 IAQ/Health pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 b.Ceilings 4 Resource pts y=yes 0 6.Alternative Insulation Products(Cotton,spray-foam) • a.Walls 4 Resource pts y=yes 0 b.Ueuings 4 Resource pts y=yes 0 INPUT ReSDUTCeS Energy IAQ/HeaI0E m ows 1.Install Energy-Efficient Windows -} • j a.Double-Paned 1 Energy pt y yes 0 b.Low-Emissivity(Low-E) '2 Energy pts y=yes 0 c.Low.Conductivity Frames —_1 2 Energy pts y=yes 0 2.Install-Low Heat Transmission Glazing 1 Energy pt y=yes 0 1 1 1 J.Heating Ventilation and Air Conditioning i.Use Duct Mastic on All Duct Joints__ -- 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y--yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y--yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 B.Install Sealed Combustion Units a.Furnaces 31AQ/Health pts y=yes 0 b.Water Heaters 3 IAQ/Health pts y=yes 0 9,Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER111 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burning Fireplaces • a.Install EPA certified wood stoveslnserts 1 IAQ/Health pt y=yes 0 b. Install/Replace Dampers i Energy pt y=yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15,Install High Efficiency Filter 41AO/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 1 K.Renewable Energy and Roofing 1 1 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=16 points) Up to 16 Energy pts 0 f6.Select Safe and durable ffoofing MatMater a_is J 1 Resource pt y=yes p 7 Install Radiant Barrier -- -- --— 3 Energy pts y=yes 0 1 L.Natural Heating and Cooling I 1 1,Incorporate Passive Solar Heating 5 Energy pts y=yes 0 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts , y=yes 0 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes p 1 1 • WnTr000r Air duality and Fmtshes INPUT Resources Energy IAO/Heam `1.Use Low/No-VOC Paint 1 IAQ/Health pts y=yes 0 2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0 • 13.Use LowMo VOC Adhesives 31A0/Health pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0 7.Seal all Exposed Particleboard or OF 4 IAQ/Health pts y=yes 0 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0 1 1 1 N.Flooring 1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0 Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 1 1 Total Points Available: 1 1401 130 57 Total Points Project Received: 01 01 0 • G:datalprogs�greenbuildingguidelineslremodelerslgreenpointslinal2.12.04protected.xls • Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone(408) 777-3228 CITY OF Fax(408)777-3333 4UPEI�TINO ByRding De artment JOB ADDRES PERMIT# Zo 70low I" OWNER'S AME: PHONE — 5 7 —02 GENERAL CONTRACTOR: e I am not using any subcontractors• ature ate Please check applicable subcontractors and complete the followin information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass/ Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date