Loading...
R 4696 (2) PERMIT R_ 4 6 9 6 APPLICATION FOR CITY OF CUPERTINO NUMBER INSPECTION DIVISION PERMIT EXPIRATION ' REROOF PERMIT (408)777-3228 PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 100 DAYS OF PERMIT ISSUANCE OR 100 DAYS FROM LAST CALLED INSPECTION. BUILDING ADDRESS RESIDENTIAL COMMERCIAL OTHER NE S ' HAZARDOUS FIRE AREA NAME / I/�Jf7� YES ❑ If yes-roof as embly is Wquiredd that Class roof assembly is requiretl. s��� � J NO Initial LC.8.0.# , �Q WQ/�((�� C�C� EXISTING ROOF COVERING PHONE d /(42 NUMBER OF EXISTING COVERINGS CONTRAC R'S TO BE REMOVED TO BE RETAINED NAME ADDRESS �� OSCOVERING CITY&ZI,P ��� - PHONE ���D b BUILT-UP ROOF ❑ LICENSE ❑ f NUMBER ASPHALT SHINGLES LICENSED CONTRACTORS DECLARATION I hereby affirm that I am licensed under provisions of Chapter Il(commencing with Section WOOD SHAKES C 7000)of Division 3 of the Business and Professions Code,and my license is In full force and affect WOOD SHINGLES ❑ License Class ... Lic.Number O Date ^q Comramor OTHER(SPECIFY) ❑ OWNER-Bt ft'DFR CrECLARATION PROPOSED hereby affirm that am exempt from the Contractor's License Lew for the following r t to V (Sec.70315,Business and Profedemolish, or rep Cade: Any city or county which requires also a permit to /�^µ1��� 4 199 ❑ constructalter,Improve,to file 81mrepairanystructure.priorto Its Issuance,alsorequiresthe BUILTU IR"in�il L of the o tr such permit a file a signetl statement that g with Sectio pursuant to the Provisions �U of the ss and Contractors License Law(Chapter h(commencing with om and 70001 of for the 3 of the rl•, Business and Professions f Cade)or that he Is exempt therefrom and the belle for the applicant to ASPHALT SHINGLE$ ❑ exemption.Any ltyofolt more then 703 1.5 any s($50applicant for e permit subjects the applicant to - -u ffNQ e civil penalty of not more then five y employees m o dollyeesre with wage ❑tee owner sthctureI not ty,or tended oyeffered wages as their Bole compensation,sandPnfes- WOOD SHAKES the work,and the structure is not Intended or s not for eels n ow er of property and Plds or improves thereon, The Contractor's License Lew does elft apply to an owner of property who provided t or WOOD SHINGLES Improves thereon,end who tloes such work himself or through his own employees,Improvement etl that ❑ suchImprovementswithin on eyeere not or owner-builder for leer.It however,the en of pr vi Improvement Is not bull or prove for pucompletion,pose sthe owner-bulltlar will have the burden lft proving that he did OTHER(SPECIFY) ❑ not build or Improve for purpose of sale.). ❑I,as owner of the property,am exclusively contracling with licensed contractors to construct the project(Sec.7044,Business and Professions Code:The Contractors License Lew does not PROVIDE I.C.B.O.REPORT NO. apply to an owner of property who builds or improves thereon,and who contracts for such projects with a contractors)licensed pursuant to the Contractor's License Law. PROVIDE MFGR.INSTALLATION SPECS. p 1 am exempt under Sec. ,S&P.C.for this reason Owner Date WORKER'S COMPENSATION DECLARATION APPLICATION DATE VALUATION PERMIT FEE I hereby affirm under penalty of perjury one of the following declaration: - [3 _/�` 1 have and will maintain a Certificate of Consent to solbinsure for Worker's Compensation, // /� D / Building as provided for by Section 3700 of the Labor Cotle,for the performance of the work for which this ( ` Sp permit Is Issuetl. Seismic 1 have and will maintain Workers Compensation Insurance,as required by Section 3700 of the Labor Code,for the performance of the work for which this permit Is Issued.My Worker's Compensation Insurance carrier and Policy number are: Total Carrier Policy No. PERMIT AUTHORIZATION DATE CERTIFICATE EXEMPTION FROM WORKERS' COMPENSATION INSURANCE NCO o (This section need not be completed II the permit Is for one hundred dollars($100)00)or IaesJ s.•� I certify that In the performance of the work for which this permit Is issued.I shall not employ any person In any manner so as to become subject to In Workers'Compensation Laws of call- All roofs shall be inspected prior to any roofing material being fornia. installed. If a roof is installed without first obtaining an Date / YV Applicant inspection,I agree to remove all new materials for inspection. NOTICE TOAPPLICANT. If,after make Is Certificate of Exemption,you sh become Applicant understands and will cora p subject to the Workers'Compensation provisions of the Labor Code,you must for ifth comply PP ply with all non point with such provisions or this permit shall be deemed revoked. Source regulations. I certify that I have read this application and state that the above information IS correct.I agree to comply with all city and county ordinances and slate laws relating to building construction,and All roof rings to be of S"C"Or better. hereby authorize representatives of this city to enter upon the above-mehiioned property for in. spection purposes. (Wel agree to save,Indemnify antl keep harmless the City of Cupertino against Ilabllltlas, judgments,costs and expenses which may In any way accrue against said Cit,In conaapusnce of the granting of this permit SIGNATURE OF APPLICANT DAT PRE-INSPECTION: PLYWOOD: IN-PROGRESS: INSP. DATE INSP. DATE INSP. DATE TEAR OFF INSPECTION: BATTENS: FINAL: INSP. DATE INSP. DATE INSP. DATE NOTE: OSHA APPROVED ACCESS TO ROOF SHALL BE PROVIDED FOR INSPECTION OFFICE COPY SUBJECT: REROOFING POLICY FOR THE CITY OF CUPERTINO BUILDING DEPARTMENT PRIOR TO ISSUANCE OF PERMIT AND INSPECTION PHASE. 1. Prior to permit issuance, you must agree to comply with U.B.C. standards and manufacturers spec's on reroofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the reroofing is completed. 3. All types of roof shall be inspected prior to any roof being installed. 4. In order to receive a final,you must complete steps 1, 2,and 3. 1,) Preinspection or tear off approval. 2.) In progress inspection approval. 3.) Final inspection approval. a.) Operable smoke detector verification • b.) Spark arrestor installation 5. If plywood is installed,a plywood nail inspection is required. 6. If any roof is applied without first obtaining an inspection, you will be required to remove all new material down to the sheathing and a building inspector will inspect all sheathing at that time. WE UNDERSTAND THE ABOVE POLICY ON REROOFING AND WILL COMPLY WITH THE POLICY HOMEOWNERS NAME: ADDRESS: REROOFING COMPANY NAME: O /V APPLICANT'S SIGNATURE: CITY OF CUPERTINO BUILDING DEPARTMENT Reroof/winword