06060226 777
CITY OF CUPERTINO
'BUILDINd DIVISION PERMIT
BUILDING ADDRESS: SILICON VALLEY ROOFING PERMIT NGO 6 0 6 0 2 2 6
10277 E ESTATES DR
PERMIT ISSUE DATE
OWNER'S NAME:
SPANGLE YVONNE C 2988 NEAL AVE. 06127/2006
SANrrARY NO. CONTROL NO.
)NE:
(4 08) 615-7200
BUILDING PERMIT INFO
ARCHITECT/ENGINEER:
BLDG ELECT PLUMB MECH
1400 ICENSED CONTRACTOR'S DECLARATION Job Description
v
C I hereby affirm that I am licensed under provisions of Chapter 9(commencing
=z m with Section 7000)of Division 3 of the Business and rofessions Cod my license is
yin full force and efjec 2 3 REMOVE 2 ROOF INSTALL 1/2" OSB, INSTALL 4 0 YEA
? License CI Lic-" COMP CLASS A
Contractor Nv
3 y� Date ARCHITECTS DECLARATION
a-a I understand my plans shall be used as public records
D0.
U.y Licensed Professional
< OWNER-BUILDER DECLARATION
I hereby affirm that 1 am exempt from the Contractor's License Law for the
00 following reason.(Section 7031.5,Business and Professions Code:Any city or county
m which requires a permit to construct alter,improve,demolish,or repair any structure
y Z y prior to its issuance,also requires the applicant for such permit to file a signed statement Ft.Floor Area Valuat b8 0 0 0
< that he is licensed pursuant to the provisions of the Contractor's License Law(Chapter 9 Sq
x F (commencing with Section 7000)of Division 3 of the Business and Professions Code)or
y that he is exempt therefrom and the basis for the alleged exemption.Any violation of
Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of ppN Number Occupancy Type
not more than five hundred dollars(5500). 3 6 9 0 8012 . 00
❑I,as owner of the property,or my employees with wages as their sole compensation,
will do the work and the structure is not intended or offered for sale(Sec.7044,Business Required Inspections
and Professions Code:The Contractor's License Law does not apply to an owner of
property who builds or improves thereon,and who does such work himself or through his
own employees,provided that such improvements are not intended or offered for sale.If,
however,the building or improvement is sold within one year of completion,the owner-
builder will have the burden of proving that he did not build or improve for purpose of
sale.).
❑1,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044.Business and Professions Code:)The Contractor's u-
cense Law does not apply to an owner of property who builds or improves thereon,and
who contracts for such projects with a contractor(s)licensed pursuant to the Contractors
License Law. —� �-'� r--'-^--
❑I am exempt under Sea B&P C for this reason
Owner Date
WORKER'S COMPENSATION DECLARATION ,y
t
I hereby affirm under penalty of perjury one of the following declarations:
t t
❑1 have and will maintain a Certificate of Consent to self-insure for worker's Compen- < Mi C S t j
sation,as provided for by Section 3700 of the Labor Code,for the performance of the i
work for which this permit is issued.
❑I have and will maintain Workers Compensation Insurance,as required by Section
3700 of the Labor Code,for the performance of the work for which this permit is issued.
My Worker's Compensation Insurance carrier and Policy number.arc:
2
Cartier.GF�41t4ZA^a Policy No.:'! y ( T
CERTIFICATE OF EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
(This section need not be completed if the permit is for one hundred dollars($100)
or less.)
I certify that in the performance of the work for which this permit is issued,1 shall not
employ any person in any manner so as to become subject to the Workers'Compensation
Laws of California.Date
Applicant
NOTICE TO APPLICANT:If,after making this Certificate of Exemption,you should
become subject to the Worker's Compensation provisions of the Labor Code,you must
O forthwith comply with such provisions or this permit shall be deemed revoked.
z" CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a conswction lending agency for the performance of -
GY..� the work for which this permit is issued(Sec.3097,Civ.C.)
W Q L.endces Name
0,z Lender's Address
U C) I certify that 1 have read this application and state that the above information is
tL correct.I agree to comply with all city and county ordinances and state laws relating to
0 V building construction,and hereby authorize representatives of this city to enter upon the
aahovc-mentioned property for inspection purposes.
(We)agree to save,indemnify and keep harmless the City of Cupertino against
0.4 to liabilities,judgments,costs and expenses which may in any way accrue against said City
U Z in consequence of the granting of this permit. Date —tJv
►" APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by:
RE TIONS.
(A-4-7 O Re-roofs
Signiture of A cant/Conuactor I batc Type Of Roof
HAZARDOUS MATERIALS DISCLOSURE yP
Will the applicant or future building occupant store or handle hazardous material
as defined by the Cupertino Municipal Code,Chapter 9.12,and the Health and Safety
Code,Section 25532(a)? All roofs shall be inspected prior to any roofing material being installed.
❑Yes 'No
If a roof is installed without first obtaining an inspection,I agree to remove
Will the applicant or future building occupant use equipment or devices which
emit hazardous air contaminants as defined by the Bay Area Air Quality Management all new materials for inspection.
District?
❑Yes �Nu
I have read the hazardous materials requirements under Chapter 6.95 of the Califor-
nia Health&Safety Code,Sections 25505,25533 and 25534.1 understand that if the building
docs not currently have a tenant.that it is my responsibility to notify the occupant of the
require is w Ix met prior to issuance of a Corti era ,f Occu cy. Signature of Applicant Date
C1 All roof coverings to be Class"B"or better
Ownc or authorized agent Date
CITY OF CUPERTINO
;m 1 of 1 PERMIT RECEIPT OPERATOR: amyw
COPY # 2
Sec : Twp: Rng: Sub: Blk: Lot :
APN . . . . . . . . : 36908012 . 00
DATE ISSUED. . . . . . . : 06/27/2006
RECEIPT # . . . . . . . . . : 35031
REFERENCE ID # . . . : 06060226
SITE ADDRESS . . . . . : 10277 E ESTATES DR
SUBDIVISION . . . . . . .
CITY CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : SPANGLE YVONNE C
ADDRESS . . . . . . . . .
CITY/STATE/ZIP . . . : ,
RECEIVED FROM . . . . : SILICON VALLEY ROOF
CONTRACTOR . . . . . . . : PAUL HORSAGER LIC # 23342
COMPANY . . . . . . . . . . : SILICON VALLEY ROOFING
ADDRESS . . . . . . . . . . : 2988 NEAL AVE.
CITY/STATE/ZIP . . . : SAN JOSE, CA 95128
TELEPHONE . . . . . . . . : (408) 615-7200
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
BPERMFEE VALUATION 9, 000 . 00 158 . 76 0 . 00 158 . 76 0 . 00
BSEISMICRE VALUATION 91000 - 000 . 90 0 . 00 0 . 90 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 159 . 66 0 . 00 159 . 66 0 . 00
METHOD OF PAYMENT AMOUNT NUMBER
----------------- ------------ ------------------
CHECK 159 . 66 1137
TOTAL RECEIPT 159 . 66
Community Development
10300 Torre Avenue
a~ "' Cupertino CA 95014
Telephone(408) 777-3228
CITY OF Fax(408)777-3333
*UPEkTINO
Building Department
JOB ADDRESS: PERMIT#
O Z-7 7 s—i+7�S /L, >L �G G - �- 6
OWNER'S NAME: t v WA-le S L12PHONE # YOY— 6 L!8C-5YD
GENERAL CONTRA TOR: Z(c>q c; FAX # --F V
I am not using any subcontractors:
Signature Date
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass/ Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
2 716w
Owner/Contractor i tore Date
OL&o2(P
CITY OF CUPERTINO
REROOF
CUPEkTI NO PERMIT APPLICATION FORM
APN# 1 l„ i N
Date: ZBuilding Address: 1 !�"
�02'1'1 '� • �5 �-��
Owner's Name: Phone#:
l Vt�NN� ,4 GV — 7
r: License#:
Contracto
Cup ertino Business License#:
Contact:
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ Asphalt Shingles Al Asphalt Shingles
d- Wood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
❑ Other(Specify) ❑ Other(Specify)
Number of existing coverings ❑ Provide I.C.B.O.Report#
❑ To be Removed ❑ Provide Mfgr.Installation Specs.
I Have Read,Understand and Will Comply With Cupertino's Tear Off Policy: ❑
Job Description:
�� � S r �// �?_
,r O��j
Residential � Commercial ❑
Fire Zone: Yes ❑ No Confirmed with Planning Dept. if
there are any restrictions. U
Cost of Project: Type of Construction: Occupy roup:
Qty. if Fee Description Fee Group
Applicable Fee ID
BPERMFEE Bldg Permit Fees BUILDING
BENERGY Energy BUILDING
BSEISMICRE Seismic Fee Res BUILDING
BSEISMICOM Seismic Commercial BUILDING
BPLANCHK Plan Check Fee BUILDING
BUSLIC Business License BUILDING
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re-roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4" per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: Va ux e S24� Le
Job Site Address: ,z 9 , Z-57-nl4e, -L/1--e
Roofing Company Name:
Applicant's Signature: Date: Z -7
Greg Casteel
Building Official
Revised 11/2/04