13. Fee ScheduleOFFICE OF ADMINISTRATIVE SERVICES
CUPERTINO
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 950143255
TELEPHONE: {408) 777-3220 • FAX: (408) 777-3366
SUMMARY
Agenda Item No. ~~
SUBJECT
Consider the 2008-09 Fee Schedule.
BACKGROUND
Meeting Date: April 1, 2008
All user fees are reviewed each year in conjunction with the preparation of the budget. City
policy is to ensure that, to the extent possible, fees cover the cost of providing services. The
majority of fees were updated by 3.5% reflecting the negotiated salary increase effective July 1,
2008 while some fees are set based on what the market will bear, such as Sports Center
memberships.
General Fees:
Minimal increases were made with the exception of massage permit appeals, which is proposed
to be increased from $150 to $502. This increase is based on the two most recent massage
permit denial hearings which took seven to 10 hours of staff time to process.
Building Fees:
Building permit fees were modified slightly to more accurately reflect the latest building codes
while providing adequate cost recovery. .
Planning and Engineering Fees:
Fees were increased 3.5% for cost of living.
Recreation Fees:
Fees were modified slightly to reflect market changes. New picnic area fees for Blackberry Farm
have been added as the park will be opening in fiscal year 2008-09.
13-1
Please note that two fees do not follow our cost recovery policy and have been subsidized in the
past. The first is a solar permit fee set at $300, which approximates 30% of the cost to provide
this service. This fee was established at a lower amount to encourage solar installations.
The second fee is for reconsideration .hearings and is set at $161 or three percent of the average
cost. Since the establishment of this fee, we have had nine reconsideration hearings, none of
which were approved. Staff is asking Council to provide direction on both of these fees.
RECOMMENDATION:
Staff recommends that the City Council approve the 2008-09 Fee Schedule.
Submitted by:
C A. Atwood
Administrative Services Director
Approved for submission:
David W. Knapp
City Manager
13-2
RESOLUTION NO: 08-044
DR,aFr
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF CUPERTINO RESCINDING RESOLUTION NOS. 07-056 AND 07-109
AND ADOPTING USER FEES
WHEREAS, the State of California requires fees charged for service rendered not to exceed
the cost of delivering said services; and
WHEREAS, a public hearing has been held to review user fees; and
WHEREAS, the City Counci] of the City of Cupertino has established guidelines for setting
user fees;
NOW, THEREFORE, BE IT RESOLVED that:
1. User fees are .established per attachments A thorough E.
2. User fees are effective July 1, 2008
PASSED AND- ADOPTED at a regular meeting of the City Council of the City of Cupertino
this ls` day of Apri12008 by the following vote:
Vote Members of the City Council '
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST: APPROVED:
City Clerk Mayor, City of Cupertino
.:.,:
13-3
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 0$-044
Fees Effective July 1, 200$
Department Schedule
General A
Engineering B
Planning C
Building D
Recreation E
13-4
CITY OF CUPERTINO
Resolution 08-044
Fees Effective Ja1y 1, 2008
Schedule A -General
Photocopies -per sheet $0.20
Microfilm/Microftche Printout $0.50/frame
Budget Documents $50.00
Comprehensive Annual Financial Reports {CAFR) $30.00
Returned Check Charge ~ ~ $25.00
Late Payment on 30 Day Delinquent City Invoices 12% per annum
Property Liens Administrative Fee $30/book/block/parcel lien
Municipal Code Book $77.00
Williamson Act Filings $105.00
Candidate Statement Fee .. $1,730.00
Tape Dubbing -Audio, Video, DVD, CD
VHS $12.00/tape
DVD $20.00/DVD
CD Webcast/CD Audio $12.00/CD
DV CAMBETA CAM - $50.00/tape
U-Matic $25.00/tape
Mini DV $30.00/DV
Audio Cassette ~ $1.00/tape
Notary Fee $10.00/signature
Fingerprinting Processing State Fee $32.00 plus $12.00 City Fee
Handbill Permit ~ $58.00
Renewals $29.00
Solicitor Permit (Includes fingerprinting) $87.00
Renewals $43.00
Massage Establishment Fee (Includes fingerprinting/background $337.00
check and business start-up inspection)
Establishment with Therapist Permit ~ $366.00
Renewals (Includes two inspections per year) $87.00
Massage Therapist Fee (Includes fingerprinting/background ck) $279.00
Therapist with Managing Employee $308.00
Renewals $58.00
1 - 13-5
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule A -General
Massage Managing Employee (Includes fingerprint/bkgrnd ck) $279.00
Managing Employee with Therapist Permit ~ $308.00
Renewals $58.00
Massage Permit Appeal (Denial/Revocation} $502.00
Taxi Driver Permit (Includes fingerprinting/background check $290.00
Renewals $174.00
All Municipal Code Parking Violations $36.00
CVC Parking Citation Dismissals Administrative Fee $25.00
Noise Variances $168.00
Duplicate Business Licenses $26.00
Business License Exemption Administrative Fee $64.00
Business License Database ~ $105.00
New Business Monthly Reports ~ $21.00/month
Community Festivals $8.50/day/vendor
Farmers Market - $2,10/week/vendor
Flea Markets $9.20/month/vendor
Sign Removal (Public Right-of-Way) $29.00/sign
Dangerous Dog Annual Registration Fee $174.00
Internet Processing Fee ~ $2.00/transaction
False Alarms $142.00
Abatement Fee ~ Actual Cost
Compilation of New Records (requests greater than 1/2 hour) Actual Cost
Graffiti Cleanup Actual Cost
Event Video Taping/Editing Actual Cost
Damage to City Property Actual Cost
Grounds, Streets, Facilities, Traffic Engineering/Maintenance
Code Enforcement Actual Cost
2 73-6
CITY OF CUPERTINO
Resolution 08-044
Fees Effective Jaly 1, 2008
Schedule A -General
Public Requests for GiS Printed Maps
Standard pre-formatted maps
Plotted maps
Printed maps
Custom request maps
Prints or plots of aerial photogaphy, see Engineering fees
Public Requests for GIS Data
Digital data layers for GIS data
Custom request data layers on CDROM
Ortho-rectified aerial photography
$25.00
$2.00
Actual Cost
$25.00/layer
$200.00 for all city layers
Actual Cost
$25.00/tile
$300.00 full City of Cupertino (153 tiles)
* Actual cost is: 1) Employee hourly rate plus 56% for benefits and overhead, and 2) cost of materials,
contractors and supplies.
3 ~s-~
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule B -Engineering
Street Cuts Miscellaneous
Cost of Improvements $10;000 or under ~ $224.00
Cost of Improvements between $10,001 and $15,000 $335.00
Cost of Improvements $15,001 and over 5% of cost
Utility, greater of $1,456 minimum or 5% of cost of improve. $1,456.00 minimum
Grading permit; greater of $2,239-min. or 6% of cost of improve. $2,239.00 minimum
Parcel Map/Tract Map (Map Checking Fee)
Parcel Map (1-4 lots) $3,638.00
Tract Map (> 4 lots) $7,553.00
Plan Check and Inspection
Review of Building Permit Only $560.00
Review of Public/Private Improvemen# Plans:
Residential; greater of $2,385 min. or 5% of cost of improve. ~ $2,385.00 minimum
Commercial; greater of $3,847 min. or 6% of cost of improve. $3,847.00 minimum
Annexation (plus county filing fee) _ $1,565.00
Certificates of Compliance $1,342.00
Encroachment Permits
Residential ~ $224.00
Non-Residential $224.00
Annual Utility Company $391.00
Pool Permit $560.00
Lot Line Adjustment $2,576.00
Soil &Geo Reports (plus any material/service fees} .
Short Report ~ $672.00
Long Report $672.00
Geo Report Deposit $8,004.00
Engineering Copies
Microfiche $22.00/sheet
Improvement Plans $22.00/sheet
Traffic Reports/Plans $22.00/sheet
Microfilm $0.56/frame
Transportation Permit (Per Department of Transportation}
Single $18.00
Annual Utility Company $101.00
Additional Engineering Investigation or Coordination $57.00/hr.
* Price is for first sheet only. Each additional sheet is $10.85.
4 ~s-s
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule B -Engineering
Telecommunications Facility Fee (5% increase per year)
Installation Rate $1.99/lineal ft. of conduit/yr
Occupancy Rate $1.05/lineal ft. of leased conduit/yr
Banners
Large Banners Across Stevens Creek Boulevard $359.00
Small Banners on Light Poles (for 20 poles) $707.00 .
Aerial Photo Custom Work
24" x 36" $57.00/sheet
8 1/2" x 11" ~ $11.00/sheet
SoillGeo Report Research $1,342.00
Special Events ~ $1 220.00
Schools -Traffic Request $1,378.00
Insurance Review $353.00
Block Party/Parade ($1,033.00} .. No Charge
Vacation of Public Street ROW/PUE $516.00
Small Traffic Calming Request ~ $968.00
RuraUSemi-Rural Classification Application $672.00
Comprehensive Neighborhood Traffic Request $1,926.00
Certificate of Correction $147.00
Floodplan Evaluation $57.00
Permit Parking Study $983.00
~ 13-9
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule C - Def ninon of Planning Fee Services
Major
Five thousand or more square feet commercial; 10,000 or more square feet office/residential; eight or more
residential units.
Minor
Less than 5,000 square feet commercial; less than 10,000 square feet office/residential; less than eight
residential units.
Anneal
A request from the project applicant or interested party to reverse or amend a decision made by staff or an
advisory body. An appointed public official serving on the boazd that made the decision subject to the appeal,
an appointed public official serving on a board that is directly affected by the decision and the City Council
members are exempted from the fee requirement.
Directors Application
An application that receives final approval by staff either via an advertised public hearing ornon-hearing format.
The application may involve apre-application meeting and/or Environmental Review committee review.
Temporar~Sign Permit
A staff review of a temporary sign application that includes an evaluation of the sign request, the entry into the
temporary log and site review by Code Enforcement Officers. The permit fee is in addition to the submittal of
a deposit to guarantee removal of the sign upon expiration of the temporary permit.
Tentative Map: Five or more parcels.
Parcel Map: Four or less parcels.
Housing Mitigation Fee
Fee collected is used to construct new affordabe residential units for Cupertino residents and employees. The
fees mitigate the need for affordable units caused by expanding offices, retail, hotel and industrial buildings
creating new jobs and new residential development creating a need for more affordable development.
An impact fee shall be assessed on any new retail, hotel and office/industrial development applications. The
following uses shall be exempt from the impact fee, but still required to provide Below Market Rate Housing as
part of a residential development: projects in a redevelopment project area and mixed use projects providing
two thirds residential and one third retail/office. Developments in the PIMP) zoning district shall be assessed
a fee of $2.38 per square foot.
An in-lieu fee shall be assessed on all new residential units in developments of and on new single family lots
created through a subdivision. Existing single family lots are exempt.
Notes: Mixed use applications will be~classified based upon the highest intensity and review process. The
Director of Community Development will have discretion to classify projects based upon the above criteria.
b 13 - 10
CITY OF CUPERTINO
Resolution OS-044
Fees Effective July 1, 2008
Schedule C -Definition of Planning Fee Services
General Plan Amendment Authorization -Major
General Plan Amendment Authorization -Minor
Study Session .
General Plan Amendment -Major
General Plan Amendment -Minor
Development Agreement
Zoning -Minor
Zoning < one acre
Zoning one to five acres
Zoning > five acres
Tentative Map
Use Permit -Major
Exception
Amendment to Development Approval •
Hillside Exception
Parcel Map
Use Permit -Minor
Planning Commission -Architectural and Site Approval
Planning Commission interpretation
Environmental Impact Report (Plus State & County Filing Fees)
Negative Declaration -Major (Plus State & County Filing Fees)
Negative Declaration -Minor (Plus State & County Filing Fees)
Tree Removal Permit
First Tree
Each Additional Tree
Retroactive Tree Removal Permit
Tree Management Plan
For atl projects requiring more than 48 hours of staff time, applicants will be charged at the hourly rate of
$122.00 per hour, which includes staff time, overhead and administrative oversight.
$4,019.00
$2,009.00
$4,019.00
$12,519.00
$6,260.00
$16,554.00
$3,100.00
$6,200.00
$9,425.00
$12,842.00
$ l 3,662.00
$13,662.00
$2,406.00
$3,648.00
$6,052.00
$6,381.00
$6,3 81.00
$6,3 81.00
$3,188.00
$23,901.00
$3,677.00
$1,838.00
$155
$78
$2,755
$1,077
7 13 - 11
Cl T'Y OF CUPERTINO
Resolution 08-044
Fees Eft'ective July 1, 2008
. Schedule C -Definition of Planning Fee Services
Categorical Exemption (Plus County Filing Fee} ~ $213.00
Design Review Committee -Architectural and Site Approval $3,086.00
R-1 Design Review $2,142.00
R-1 Exception $2,406.00
Sign Exception $1,804.00
Fence Exception $613.00
Director -Variance $1,540.00
Director -Minor Modification $1,077.00
Minor Residential Permit $1,077.00
Temporary Use Permit ~ $1,231.00
Temporary Sign Permit $180.00
Sign Program - $617.00
Appeal/Petitions for Reconsideration $161.00
Zoning, Planning, Municipal Code (Building Permit Fees)
CommericaUMulti-Family $0.24/sq. ft.
Residential Single Family ~ $0.13/sq. ft.
Wireless Master Plan Fee: Equipment Mount on Existing Light
Utility Pole $5.59/mount
Wireless Master Plan Fee: Other Personal Wireless Facility $1,119.00/facility
Housing Mitigation In-Lieu Fees
Residential $2.58/sq. ft.
Office/IndustriaUHotel/RetaiUR&D $4.91/sq. ft.
p(Mp) 2.46/sq. ft.
Stevens Creek Boulevard Specific Plan Fee ~ $.044/sq. ft.
Zoning Verification Letter $162.00
For al[ projects requiring more than 48 hours of stafftime, applicants will be charged at the hourly rate of
$122.00 per hour, which includes staff time, overhead and administrative oversight.
g 13 - 12
CITY OF CUPERTINO
Resolution OS-044
Fees Effective Jaly 1, 2008
Schedule D -New Construction Plan Check Fees
Construction Types:
[-A, I-B Construction Types:
~ li-A, III-A, V-A Construction Types:
Il-B, (II-B, N, V-8
UBC
Class
BC Occupancy Type
Project Size
Threshold Base Cost
a~
Threshold
Size Cost for
Each
Additional
100 sf' Base Cost
@
Threshold
Size Cost for
Each
Additional
100 sf" Base Cost
~
Threshold
Sae Cost for
F~ch
Additional
100 sf •
A-1 - 1,000 $6,906 $5.21 $5,755 $4.34 $4,604 $3.47
- - 5,000 $7,1.14 $14.29 $5,929. $11.91 $4,743 $9.53
- ~ - 10,000 $7,829 $3.58 $6,524 $2.98 $5,219 $2.38
- - 20,000 $8,186 $5.35 $6,822 $4.46 $5,458 $3.57
- - 50,000 $9,792 $2,86 $8,160 $2.38 $6,528 $1.90
100,000 $11,220 $11.22 $9,350 $9.35 $7,480 $7.48
A-2 - 250 $6,882 $20.77 $5,735 $17.31 $4,588 $13.85
- - 1,250 $7,090 $56.97 $5,908 $47.48 $4,727 $37.98
- - 2,500 $7,802 $14.22 $6,502 $11.85 $5,202 $9.48
- - 5,000 $8,158 $21.36 $6,798 $17.80 $5,439 $1424
- - 12,500 $9,759 $11.39 $8,133 $9.49 $6,506 $7.59
25,000 $11,183 $44.73 $9,319 $37.28 $7,455 $29.82
A-3 - 1,000 $6,9D6 $5.21 $5,755 $4.34 $4,604 $3.47
- - 5,000 $7,114 $14.29 $5,929 $11.91 $4,743 $9.53
- - 10,000 $7,829 $3.58 $6,524 $2.98 $5,219 $2.38
- - 20,000 $8,186 $5.35 $6,822 ~ $4.46 $5,458 $3.57
- - 50,000 $9,792 $2.86 $8,160 $2.38 $6,528 $1.90
100,000 $11,220 $11.22 $9,350 $9.35 $7,480 $7.48
A-4, A-5 - 500 $5,646 $8.53 $4,705 $7.10 $3,764 $5.68
- - 2,500 $5,816 $23.35 $4,847 $19.46 $3,878 $15.57
- - 5,000 $6,400 $5.84 $5,334 $4.87 $4,267 $3.90
- - 10,000 $6,692 $8.76 $5,577 $7:30 $4,462 $5.84
- - 25,000 $8,007 $4.67 $6,673 $3.89 $5,338 $3.11
50,000 $9,174 $18.35 $7,645 $15.29 $6,116 $12.23
A A Occupancy Tenant Improvements 500 $3,127 $4.71 $2;606 $3.93 $2,084 $3.14
- - 2,500 $3,221 $12.94 $2,684 $10.78 $2,147 $8.62
- - 5,000 $3,544 $3.23 $2,954 $2.69 $2,363 $2.15
- - 10,000 $3,706 $4.86 $3,088 $4.05 $2,470 $3.24
- - 25,000 $4,43,4 $2.59 $3,695 $2,16 $2,956 $1.73
50,OOD $5,082 $10.16 $4,235 $8.47 $3,388 $6.78
B Banks 500 $6,795 $10.25 $5,662 $8.54 $4,530 $6.83
- - 2,500 $7,000 $28.14 $5,833 $23.45 $4,667 $18.7fi
- - 5,000 $7,703 $7.04 $6,419 $5.86 $5,136 $4.69
- - 10,000 $8,055 $10.55 $6,713 $8.79 $5,370 $7.03
- - 25,000 $9,638 $5.61 $8,031 $4.68 $6,425 $3.74
50,000 $11,040 $22.08 $9,200 $18.40 $7,360 $14.72
B Laundromat 200 $6,445 $24.32 $5,371 $20.27 $4,297 $16.21
- - ~ 1,000 $6,639 $66.68 . $5,533 $55.56 $4,426 $44.45
- - 2,000 $7,306 $16.68 $6,089 $13.90 $4,871 $11.12
- - 4,000 $7,640 $25.00 $6,367 $20.83 $5,093 $16.66
- - 10,000 $9,140 $13.34 $7,616 $11.11 $6,093 $8.89
20,000 $10,473 $52.37 $8,728 $43.64 $6,982 $34.91
B MedlcalOffice 500 $8,049 $12.15 $6,708 $10.13 $5,366 $8.10
- - 2,500 $8,292 $33.30 $6,910 $27.75 $5,528 $22.20
- - 5,000 $9,125 $8.34 $7,604 $6.95 $6,083 $5.56
- - 10,000 $9,542 $12.49 $7,951 $10.41 $6,361 $8.33
- - 25,000 $11,415 $6.66 $9,513 $5.55 $7,610 $4.44
50,000 $13,080 $26.16 $10,900 $21.80 $8,720 $17.44
9~ 13-13
CITY OF CUPERTINO
Resolution OS-044
Fees Effective Daly 1, 2008
Schedule D -New Constriction Plan Check Fees
Construction Types:
I-A, 1-8 Construction Types:
II-A, III-A, V-A Construction Types•
II•B, III-B, IV, V-B •
UBC
Class
BC Occupancy Type
Project Size
Threshold Base Cyst
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
(~
Threshold
Size Cost for
Each
Additional
100 sf
B Offices 1,000 $7,670 $5.79 $6,392 $4.82 $5,113 $3.86
- - 5,000 $7,901 $15.89 $6,588 $13.24 $5,268 $10.59
- - 10,000 $8,696 $3.98 $7,246 $3.31 $5,797 $2.65
- - 20,000 $9,093 $5.94 $7,578 $4.95 $6,062 $3.96
- - 50,000 .$10,875 $3.78 $9,063 $2.65 $7,250 $2.12
700,000 $12,465 $12.47 $10,388 $10.39 $8,310 $8.31
B B Occu an Tenant ]m rovements 300 $2,434 $6.12 $2,029 $5.10 $1,623 $4.08
- - 1,500 $2,508 $16.79 $2,090 $13.99 $1,672 $71.19
- - 3,000 $2,759 $4.20 $2,300 $3.50 $7,8.40 $2,80
- - 6,000 $2,885 $6.29 $2,405 $5.24 $1,924 $4.19
- - 15,000 $3,452 $3.36 $2,876 $2.80 $2,301 $2.24
30,000 $3,956 $13.19 $3,296 $10.99 $2,637 $8.79
E Preschool/School 100 $7,A~8 $53.02 $5,857 $44.18 $4,685 $35.35
- - 500 $7,240 $145.43 $6,034 $127,19 $4,827 $96.95
- - 1,000 $7,967 $36.36 $6,640 $30.30 $5,312 $24.24
- - 2,000 $8,331 $54.53 $6,943 $45.44 $5,554 $36.35
- - 5,000 $9,967 $29.09 $8,306 $24.24 $6,645 $19.39
10,000 $17,421 $174.21 $9,518 $95.18 . $7,614 $76.14
E E Occu ancy Tenant Improvements 100 $4,228 $31.89 $3,524 $26.58 $2,819 $21.26
- - 500 $4,356 $87.50 $3,630 $72.91 $2,904 $58.33
- - 1,000 $4,793 $21.87 $3,995 $18.23 $3,796 $14.58
- - 2,000 $5,012 $32.81 $4,177 $27.34 $3,341 $21.87
- - 5,000 $5,996 $17.51 $4,997 $14.59 $3,998 $11.67
10,000 $6,872 $68.72 $5,726 $57.26 $4,581 $45.81
F-7, F-2 Factory/Industrial 1,000 $8,545 $6.45 $7,121 ~ $5.38 $5,697 $4.30
- - 5,000 $8,803 $17.69 $7,336 $14.74 $5,869 $11.79
- - 10,000 $9,687 $4.41 $8,073 $3.68 $6,458 $2.94
- - 20,000 $70,128 $6.64 $8,440 $5.53 $6,752 $4.43
- - 50,000 $12,120 $3.54 $10,700 $2.95 $8,080 $2.36
100,000 $13,890 $13.89 $11,575 $11.58 $9,260 $9.26
F F Occupancy Tenant Improvements 1,000 $6,270 $4.73 $5,225 $3.94 $4,180 $3.15
- - 5,000 $6,459 $12.99 $5,383 $10.83 $4,306 $8.66
- - 1.0,000 $7,109 $3.23 $5,924 $2.69 $4,739 $2.15
- - 20,000 $7,431 ~ $4.88 $6,193 $4.07 $4,954 . $3.25
- - 50,000 $8,895 $2.58 $7,413 $2.15 $5,930 $1.72
100,000 $10„I$5 $10.19 $8,488 $8.49 $6,790 $6.79
H-1 H-10ccupancies ~ 100 $7;349 $55.44 $6,124 $46.20 $4,899 $36.96
- - 500 $7,571 $152.07 $6,309 $126.73 $5,047 $701.38
- - 1,000 $8,331 $37.99 $6,943 $31.66 $5,554 $25.33
- - 2,000 $8,711 $57.03 $7,259 $47.53 $5,807 $38.02
- - 5,000 $10,422 $30.42 $8,685 $25.35 $6,948 $20.28
10,000 $11,943 $119.43 $9,953 $99.53 $7,962 $79.62
10 13 - 14
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -New Construction Plan Check Fees
Construction Types:
1-A, I-B Construction Types:
11-A, III-A, V-A Construction Types:
II-B, 111-B, N, V-B
BC
Class
BC Occupancy Type
•
Project Size
Threshold Base Cost
@
:..:
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
940 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
700 sf
H-2 to Hazardous Rooms 100 $5,862 $44.22 $4,885 $36.85 $3,908 $29.48
H-5 - 500 $6,038 $121.28 $5,032 $141.06 $4,026 $80.85
- - 1,000 $6,645 $30.31 $5,537 $25.26 $4,430 $20.21
- - 2,000 $6,948 $45.48 $5,790 $37.90 $4,632 $30.32
- - 5,000 $8,312 $24.26 $6,927 $20.21 $5,542 $16.17
10,000 $9,525 $95.25 $7,938 $79.38 $6,350 $63.50
H H Occupancy Tenant Improvements 100 $5,512 $41.58 $4,593 $34.65 $3,674 $27.72
- - 500 $5,678 $114.03 $4,732 $95.03 $3,785 $76.02
- - 1,000 $6,248 $28.53 $5,207 $23.78 $4,165 $19.02
- - 2,000 $6,533 $42.77 $5,445 $35.64 $4,356 $28.51
- - 5,000 $7,817 $22.80 $6,514 $19.00 $5,211 $15.20
10,000 $8,957 $89.57 $7,464 ' $74.64 $5,971 $59.71
I-1 to 1-4 Institutional 500 $6,299 $9.51 $5,249 $7.92 $4,199 $6.34
- - 2,500 $6,489 $26.06 $5,408 $21.72 $4,326 $17.38
- - 5,000 $7,141 $6.52 $5,951 $5.43 $4,760 $4.34
- - 10,000 $7,466 $9.78 $6,222 $8.15 $4,978 $6.52
- - 25,000 $8,934 $5.21 $7,445 $4.34 $5,956 $3.47
50,000 $10,236 $20.47 $8,530 $17.06 $6,824 $13.65
I I Occupancy Tenant Improvements 100 $3,849 $29.04 $3,207 $24.20 $2,566 $19.36
- - 500 $3,865 $79.64 $3,304 $66.37 $2,643 $53.10
- - 1,000 $4,363 $19.91 $3,636 $16.59 $2,909 $13.27
- - 2,000 $4562 $29.86 $3,802 $24.88 $3,042 $19.91
- - 5,000 $5,458 $1S.92 $4,549 $13.27 $3,639 $10.62
10,000 $6,254 $62.54 $5,212 $52:12 $4,170 $41.70
M Market 2,000 $6,206 $2.35 $5,172 $1.96 $4,137 $1.56
- - 10,000 $6,394 $6.41 $5,328 $5.34 $4,262 $4.27
- - 20,000 $7,034 $1.62 $5,862 $1.35 $4,690 $1.08
- - 40,000 $7,358 _ $2.40 $6,132 $2.00 $4,906 $1.60
- - 100,000 $$,796 $1.28 $7,330 $1.07 $5,864 $0.86
200,000 $10;080 $5.04 $8,400 $4.20 $6,720 $3.36
M M Occupancy Tenant Improvements 300 $3,646 $9.16 $3,038 $7.63 $2,431 $6.11
- - 1,500 $3,756 $25.14 $3,130 $20.95 $2,504 $16.76
- - 3,000 $4,133 $6.30 $3,444 $5.25 $2,755 $4.20
- - 6,000 $4,322 $9.43 $3,602 $7.86 $2,881 $6.29
- - 15,000 $5,171 $5.04 $4,309 $4.20 $3,447 ~ $3.36
30,000 $5,927 $19.76 $4,939 $16.46 $3,951 $13.17
R-2 Apartment 81dg 800 $7,279 $6.87 $6,066 $5.72 $4,853 $4.58
- - 4,000 $7,499 $18.82 $6,249 $15.68 $4,999 $12.54
- - 8,000 $8,251 $4.72 $6,876 $3.93 $5,501 $3.14
- - 16,000 $8,628 $7.05 $7,190 $5.87 $5,752 $4.70
- - 40,000 $10,320 $3.77 $8,600 $3.14 $6,880 $2.51
' 80,000 $11,827 $14.78 $9,856 $12.32 $7,885 $9.86
R-2 Apartment Bldg - Repeat•Unit 800 $3,789 $3.50 $3,091 $2.92 $2,473 $2.33
- - 4,000 $3,821 $9.59 $3,184 $7.99 $2,548 $6.39
- - 8,000 $4,;?OS $2.40 $3,504 $2.00 $2,803 $1.60
- - 16,000 $4,397
A $3.60 $3,664 $3.Q0 $2,931 $2.40
- - 40,000 $5,261 $1.92 $4,384 $1.60 $3,507 $1.28
80,000 $6,029 $7.54 $5,024 $6.28 $4,019 $5.02
1~ 13-15
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -New Construction Plan Check Fees
Construction Types:
1-A, I-B Construction Types:
II-A, III-A, V-A Construction Types:
ll-B, III-B, IV, V-B
UBC
Class
BC Occupancy Type
Project S¢e
Threshold Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
~
Threshold
Size Cost for
Each
Additional
700 sf " Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf
R-1 Hotels & Motels 3,000 $10,626 $2.72 $9,022 $2.27 $7,218 $1.81
_ - 15,000 $11,153 $7.46 $9,294 $6.22 $7,435 $4.98
_ - 30,000 $12,272 $1.86 $10,227 $1.55 $8,182 $1.24
_ - 60;000 $12,830 $2.80 $10,692 $2.34 $8,554 $1.87
_ ~ - 150,000 $15,354 $1.50 $12,795 $1.25 $10,236 $1.00
300,000 $17,604 $5.87 $14,670 $4.89 $11,736 $3.91
R-3 Dwellin s -Custom, Models, 1,000 $3,405 $26.46 $2,837 $22.05 $2,270 $17.64
- Frst Master Plan 2,500 $3,802 $26.43 $3,168 $22.03 $2,535 $17.62
_ - ~ 4,000 $4,1.98 $9.92 $3,499 $8.26 $2,799 $6.61
_ - 6,000 $,4,397 $69.44 $3,664 $57.86 $2,931 $46.29
_ - 8,000 $5,7$5 $29.79 $4,821 $24.83 $3,857 $19.86
10,000 $6,381 $63.81 $5,318 $53.18 $4,254 $42.54
R-3 Dwellings -Production Phase 1,000 $1,768 $1.31 $1,474 $1.09 • • $1,179 $0.87
- of Master Plan 2,500 $1,788 $1.32 $1,490 $1.10 $1,192 $0.88
- (repeats) 4,000 $1,808 $1.00 $1;507 $0.84 $1,205 $0.67
- - 6,000 $1,828 $31.73 $1,523 $26.44 $1,219 $21.15
_ - 8,000 $2,462 $9.93 $2,052 $8.28 $1,642 $6.62
10,000 $2,661 $26.61 $2,218 $22.18 $1,774 $17.74
R-3 Dwellings Alternate Ma#erials 1,000 $5,851 $52.89 $4,876 $44.08 $3,901 $35.26
_ - 2,500 $6,644 $52.89 $5,537 $44.08 $4,430 $35.26
- - 4,000 $7,438 $19.85 $6,198 $16.54 $4,958 $13.23
_ - 6,000 $7,835 $138.86 $6,529 $115.71 $5,223 $92.57
- - 8,000 $10,612 $59.52 $8,843 $49.60 $7,074 $39.68
10,000 $11,802 $118.02 $9,835 $98.35 $7,868 $78.68.
R-3 Dwellings-Hillside -Custom, Models, 1,000 $6,347 $13.23 $5,289 $11.02 $4,231 $8.82
- First Master Plan 2,500 $6,545 $52.89 $5,454 $44.08 $4,364 $35.26
- - 4,000 $7,339 $9.95 $6,116 $8.29 $4,892 $6.63
- - 6,000 $7,538 $59.50 $6,281 $49.59 $5,025 $39.67
_ - 8,000 $8,728 $69.42 $7,273 $57.85 $5,818 $46.28
10,000 $10,116 $101.16 $8,430 $84.30 $6,744 $67.44
R-3 Dwellings-Hillside - Production Phas 1,000 $3,609 $6.60 $3,008 $5.50 $2,406 $4.40
- of Master Plan 2,500 $3,708 $28.18 $3,090 $23.48 $2,472 $18.78
- (repeats 4,000 $4,131 $4.95 $3,443 $4.12 $2,754 $3.30
- - 6,000 $4,30 S30.66 $3,525 $25.55 $2,820 $20.44
_ - 8,000 $4,843 $36.39 $4,036 $30.33 $3,229 $24.26
10,000 $5,571 $55.71 $4,643 $46.43 $3,714 $37.14
R-3 Dwellings-Hillside-AftemateMateria .1,000 $11,967 $26.45 $9,972 $22.04 $7,978 $17.63
_ - 2,500 $12,363 $105.82 $10,303 $88.18 $8,242 $70.54
_ - 4,000 $13,951 $19.82 $11,626 $16.51 $9,300 $13.21
_ - 6,000 $14,347 $119.06 $11,956 $99.21 $9,565 $79.37
_ - 8,000 $16,728 $138.83 $13,940 $115.69 $11,152 $92.55
10,000 $19,505 $195.05 $16,254 $162.54 ~ $13,003 $130.03
R-3.1 Grou Care 1,000 $12,482 $9.42 $10,402 $7.65 $8;321 .$6.28
_ - 5,000 $12,859 $25.82 $10,716 $21.51 $8,573 $17.21
- - 10,000 $14,150 $6.46 $11,791 $5.39 $9,433 $4,31
_ - 20,000 $14,796 $9.68 $12,330 $8.07 $9,864 $6.45
_ - 50,000 $17,700 $5.16 $14,750 $4,30 $11,800 $3.44
100,000 $20,280 $2028 $16,900 $16.90 $13,520 $13.52
R-4 Group Care 100 $8,399 $63.36 $6,999 $52.80 $5,599 $42.24
- 500 $8,653 $173.80 $7,210 $144.83 $5,768 $115.86
_ - 1,000 $9,522 $43.44 $7,935 $36.20 $6,348 - 8.96
12
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -New Construction Plan Check Fees
• Construction Types:
•1-A,1-B Construction Types:
II-A, 111-A, V-A Construction Types:
II-B, III-B, N, V-B
UBC
Class
BC Occupancy Type
Project S¢e
Threshold Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
(d1
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf
- - 2,000 $9,956 $65.18 $8,297 $54.31 $6,637 $43.45
- - 5,000 $11,911 $34.75 $9,926 $28.96 $7,941 $23.17
10,000 $13,649 $136.49 $11,374 $113:74 $9,099 $90.9
R R Occupancy Tenant Improvements 80 $3,639 $34.31 $3,033 $28.59 $2,426 $22.87
- - 400 $3,749 $94.14 $3,124 $78.45 $2,499 $62.76
- - 800 $4,126 $23.52 $3,438 $19.60 $2,750 $15.68
- - 1,600 $4,314 $35.30 $3,595 $29.41 $2,876 $23.53
- 4,000- $5,161 $18.84 $4,301 $15.70 $3,441 $12.56
8,000 $5,915 $73.93 $4,929 $61.61 $3,943 $49.29
S-1 Moderate-Hazard Storage 600 $8,223 $10.34 $6,853 $8.62 $5,482 $6.90
- 3,000 $8,472 $28.35 $7,060 $23.63 $5,648 $18.90
- 6,000 $9,322 $7.08 $7,769 $5.90 $6,215 $4.72
- - 12,000 $9,747 $10.65 $8,123 $8.87 $6,498 $7.10
- - 30,000 $11,664 $5.67 $9,720 $4.73 $7,776 $3.78
60,000 $13,365 $22.28 $11,138 $18.56 $8,910 $14.85
13 13.17
CITY OF CUPERTINO
Resolution 08-044
Fees Effective Jaly 1, 2008
Schedule D -New Constmction Plan Check Fees
Construction Types:
I-A, I-B Construction Types:
it-A, Ill-A, V-A Construction Types:
II-B, III-B, N, V-B
UBC
Class
•
UBC Occupancy Type
Project Size
Threshold Base Cost
~
Threshold
Sae Cost for
Each
Additional
100 sf ` Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf' Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf "
S-2 Low-Hazard Storage 10,OOD $10,149 $0.77 $8,458 $0.64 $6,766 $0.51
- - 50,000 $10,455 $2.10 $8,713 $1.75 $6,970 $1.40
- - '100,000 $11,505 $0.52 $9,588 $0.44 $7,670 $0.35
- - 200,000 $12,030 $0.79 $10,025 $0.66 $8,020 $0.53
- - 500,000 $14,400 $0.42 $12,000 $0.35 $9,600 $0.26
1,000,000 $16,500 $1.65 $13,750 $1.38 $11,OD0 $1.10
S S Occupancy Tenant Improvements 600 $4,987 $6.27 $4,156 $5.23 $3,324 $4.18
- - 3,000 $5,137 $17.19 $4,281 $14.33 $3,425 $11.46
- - - 6,000 $5,653 $4.31 $4,711 $3.59 $3,769 $2.87
- - 12,000 $5,911 $6.46 $4,926 $5.38 $3,941 $4.31
- _
- 30,000 $7,074 $3.42 $5,895 $2.85 $4,716 $2.28
60,000 $8,100 $13.50 $6,750 $11.25 $5,400 $9.00
U Private Garage/Agricultural Bldg 40 $4,024 $75.90 $3,354 $63.25 $2,683 $50.60
- - 200 $4,146 $208.17 $3,455 $173.48 $2,764 $138.78
- - 400 $4,562 $52.04 $3,802 $43.36 $3,041 $34.69
- - 800 $4,770 $78.07 $3,975 $65.05 $3,180 $52.04
- - 2,000 $5,707 $41.63 $4,756 $34.69 $3,805 $27.75
4,OD0 $6,539 $763.49 $5,450 $136.24 $4,360 $108.99
- Deferred Submittal-Ali Except R-3 1,040 $5,803 $4.38 $4,836 $3.65 $3,869 $2.92
- - 5,000 $5,978 $12.02 $4,982 $10.01 $3,986 $8.01
- - 10,000' $6,579 $3.00 $5,483 $2.50 $4,386 $2.00
- - 20,000 $6,879 $4.50 $5,733 $3.75 $4,586 . $3.00
- - 50,0 $8,228 $2.42 $6,856 $2.01 $5,485 $1.61
100,000 $9,435 $9.44 $7,863 $7.86 $6,290 $629
- Deferred Submittal--R-3 1,000 $3,878 $7.79 $3,232 $6.49 $2,586 $5.19
- - 2,500 $3,995 $26.77 $3,329 $22.31 $2,664 $17.85
- - 4,000 $4,397 $10.02 $3,664 $8.35 $2,931 $6.68
- - 6,000 $4,597. $45.12 $3,831 $37.60 $3,065 $30.08
- - B,Q00 $5,500 $40.17 $4,583 $33.48 $3,666 $26.78
10,000 $6,303 $63.03 $5,253 $52.53 $4,202 $42.02
- Standard Comm. Foundation wo/Podi 500 X8;049 $12.15 $6,708 $'[0.13 $5,366 $8.10
- - 2,500 $8,292 $33.30 $6,910 $27.75 $5,528 $22.20
- - 5,000 $9,125 $8.34 $7,604 $6.95 $6,083 $5.56
- - 10,0 $9,542 $12.49 $7,951 $10,41 $6,361 $8.33
- - 25,000 $11,415 $6.66 $9,513 $5.55 $7,610 $4.44
50,000 $13,080 $26.16 $10,900 $21.80 $8,720 $17.44
- Standard Comm. Foundation 3,OD0 $9,216 $2.32 $7,679 $1.93 $6,144 $1.54
- w/Podium 15,000 $9,494 $6.35 $7,911 $5.29 $6,329 $423
- - 30,000 $10,446 $1.64 $8,705 $1.33 $6,964 $7.07
- - 60,000 ~ $10,926 $2.38 $9,105 $1.98 $7,284 $1.58
- - 150,000 $13,065 $1.27 $10,887 $1.06 $8,710 $0.85
300,000 $14,970 $4.99 $12,475 $4.16 $9,980 $3.33
SHELL B UILDINGS
- Ail Other Shell Buildings 500 $10;499 $15.84 $8,749 $13.20 $6,999 $10.56
- - 2,500 $10,876 $43.44 $9,013 $3620 $7,211 $28.96
- - 5,000 $11,902 $10.88 $9,918 $9.06 $7,935 $7.25
- - 10,000 $12,446 $16.28 $10,371 $13.57 $8,297 $10.85
- - 25,000 $14,888 $8.70 $12,40fi $7.25 $9,925 $5.80
50,000 $17,063 $34.13 $14,219 $28.44 $11,375 $22.75
Each additional 100 square feet, or portion thereof, up to the next highest project sae threshold.
14 13 -18
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedu{e D -New Construction Inspection Fees
Construction Types:
-A, I-B Construction Types:
fl-A, Ill-A, V-A Construction Types:
II-8,111-8, N, V-B
UBC
Class
BC Occupancy Type
Project Size
Threshold Base Cost
@
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
104 sf *
A-1 - 1,000 $1,940 $67.70 $1,617 $56.41 .$1,.294 $45.13
- ~ - 5,000 $4,648 $79.52 $3,874 $66.27 $3,099 $53.02
- - 10,000 $8,624 $81.16 $7,187 $67.63 $5,750 $54.10
- - 20,000 $16,740 $36.98 $13,950 $30.82 $11,160 $24.65
- - 50,000 $27,834 $24.20 $23,195 $20.17 $18,556 $16.14
100,000 $39,936 $39.94 $33,280 $33.28 $26,624 $26.62
A-2 - 250 $1,146 $159.88 $955 $133.23 $764 $106.59
- - 1,250 $2,744 $187.82 $2,287 $156.51 $1,830 $125.21
- - 2,500 $5,092 $191.69 $4,243 $159.74 $3,395 $127.79
- - 5,000 $9,884 $87.34 $8,237 $72.78 $6,590 $58.22
- - 12,500 $16,434 $57.94 $13,695 $47.61 $10,956 $38.09
25,000 $23,576 $94.31 $19,647 $78.59 $15,718 $62.87
A-3 - 1,000 $1,940 $67.70 $1,617 $56.41 $1,294 $45.13
- - 5,000 $4,648 $79.52 $3,874 $66.27 $3,099 $53.02
- - 10,000 $8,624 $81.16 $7,187 $67.63 $5,750 $54.10
- - 20,000 $16,740 $36.98 $13,950 $30.82 $11,160 $24.65
- - 50,OOQ $27,834 $24.20 $23,195 $20.17 $18,556 $16.14
100,000 $39,936 $39.94 $33,280 $33.28 $26,624 $26.62
A-4, A-5 ~ - 500 $1,214 $84.67 $1,011 $70.56 $809 $56.45
- - 2,500 $2,907 $99.48 $2,423 $82.90 $1,938 $66.32
- - 5,000 $5,394 $101.52 $4,495 $84.60 $3,596 $67.68
- - 10,000 $10,470 $46.26 $8,725 $38.55 $6,980 $30.84
- - 25,000 $17,409 $30.28 $14,508 $25.23 $11,606 $20.18
50,000 $24,978 $49.96 $20,815 $41.63 $16,652 $33.30
A A Occupancy Tenant Improvements 500 $760 $53.04 $633 $44.20 .$507 $35.36
- - 2,500 $1,821 $62.30 $1,518 $51.92 $1,214 $41.54
- - 5,000 . $3,379 $63.59 $2,816 $52.99 $2,252 $42.39
- - 10,000 $6,558 $28.98 $5,465 $24.15 $4,372 $19.32
- - 25,000 $10,905 $18.95 $9,088 $15.79 $7,270 $12.63
50,000 $15,642 $31.28 $13,035 $26.07 $10,428 $20.86
B Banks 500 $1,428 $99.61 $1,190 $83.01 $952 $66.41
- - 2,500 $3,420 $117.03 $2,850 $97.53 $2,280 $78.02
- - 5,000 $6,346 $119.45 $5,288 $99.54 $4,231 $79.63
- - 10,000 $12,318 $54.43 $10,265 $45.36 $8,212 $36.29
- - 25,000 $20,483 $35.61 $17,069 $29.68 $13,655 $23.74
50,000 $29,385 $58.77 $24,488 $48.98 $19,590 $39.18
8 Laundromat 200 $781 $136.15 $650 $113.46 $520 $90.77
- - 1,000 $1,870 $159.95 $1,558 $133.29 $1,247 $106.63
- - 2,000 $3,469 $163.26 $2,891 $136.05 $2,313 $108.84
- - 4,000 $6,734 $74:39 $5,612 $61.99 $4,490 $49.59
- - 10,000 $1,198 $48.68 $9,331 $40.56 $7,465 $32.45
20,000 $16,065 $80.33 $13,388 $6fi.94 $10,710 $53.55
B Medical Office 500 $1,376 $96.03 $1,147 $80.03 $918 $64.02
- - 2,500 $3,297 .$112.83 $2,748 $94.03 $2,198 $75.22
- - 5,000 $6,118 $115.16 $5,098 $95.96 $4,079 $76.77
- - 10,000 $11,876 $52.46 $9,896 $43.71 .$7,917 $34.97
- ~ - 25,000 $19,744 $34.34 $16,453 $28.61 $13,163 $22.89
50,000 $28,328 $56.66 $23,606 $47.21 $18,885 $37.77
15" 13 -19
CITY OF CUPERTINO
Resolution 08-044
Foes Effective July 1, 2008
Schedule D -New Construction Inspection Fees
Construction Types:
I-A,1-B Construction Types:
11-A, 111-A, V-A Construction Types:
II-B, III-B, N, V-B
UBC
Class '
'
UBC Occupancy Type
Project Size
Threshold Base Cost
@
Thn~shold
Size ~ Cost for
Each
Additional
1'00 sf " Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf" Base Cost
@
Threshold
Size Cost for
Each
Additional
~ 100 sf
B Offices 1,000 $2,339 $81.58 $1,949 $67.98 $1,559 $54.39
- - 5,000 $5,602 $95.84 $4,668 $79.86 $3,735 $63.89
- - 10,000 $10;394 $97.82 $8,661 $81.51 $6,929 $65.21
- - 20,000 $20,175 $44.58 $16,813 $37.15 $13,450 $29.72
- - 50,000 $33,548 $29.15 $27,956 $24.29 $22,365 $19.43
100,000 $48,120 $48.12 $40,100 $40.10 $32,086 $32.08
B B Occupancy Tenant Im rovements 300 $714 $82.98 $595 $69.15 $476 $55.32
- - 1,500 $1,709 $97.49 $1,424 $81.24 $1,140 $64.99
- - 3,000 $3,172 $99.51 $2,643 $82.93 $2,114 $66.34
- - 6,000 $6,157 $45.34 $5,131 _ $37.78 $4,105 $30.23
- - 15,000 $10,238 $29.67 $8,531 $24.73 $6,825 $19.78
30,000 $14,688 $48.96 $12,240 $40.80 $9.,792 $32.64
E Preschool/School 100 $541 $188.69 $451 $157.24 $361 $125.79
- - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77
- - _1,000 $2,404 $226.26 $2,003 $188.55 $1,603 $150.84
- - 2,000 $4,667 $103.08 $3,889 $85.90 $3,111 $68.72
- - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97
10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21
E E Occupancy Tenant Improvements 100 $541 $188.69 ~ $451 $157.24 $361 $125.79
- - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77
- - 1,000 $2,404 $226.26 $2,003 $188.55 $1,603 $150.84
- - 2,000 $4,667 $103.08 $3,889 $85.90 $3,111 $68.72
- - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97
10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21
F-1, F-2 Facto /Industrial 1,000 $2,3 8 $81.11 $1,938 $67.59 $1,550 $54.07
- ~ - 5,000 $5,570 $95.28 $4,641 $79.40 $3,713 $63.52
- - 10,000 $10,334 $97.28 $8,611 $81.06 $6,889 $64.85
- - 20,000 $20,061 $44.31 $16,718 $36.92 $13,374 $29.54
- - 50,000 $33,353 $29.00 $27,794 $24.16 $22,235 $19.33
100,000 $47,850 $47.85 $39,875 $39.88 $31,900 $31.90
F F Occupancy Tenant Improvements 1,000 $2,057 $71.78 $1,714 $59.81 $1,372 $47.85
- - 5,000 $4,928 $84.32 $4,107 $70.26 $3,286 $56.21
- - 10,000 $9,144 $86.07 $7,620 $71.73 $6,096 $57.38
- - 20,000 $17,751 $39.21 $14,793 $32.67 $11,834 $26.14
- - 50,000 $29,513 $25.67 $24,594 $21.39 $19,675 $17.11
100,000 $42,345 $42.35 $35,288 $35.29 $28,230 $28.23
H-1 H-1 Occupancies 100 $541 $188.69 $451 $157.24 $361 $125.79
- - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77
- - 1,000 $2,404 $226.26 $2,003 $188.55 $1,603 $150.84
- - 2,000 $4,667 $103.08 $3,689 $85.90 $3,111 $68.72
- - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97
10,000 $11,132 $111.32 $9,276 ~ $92.76 $7,421 $74.21
`::~ , , •.
16
13-20
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -New Construction Inspection Fees
Construction Types:
(-A, 1-B Construction Types:
II A, III-A, V-A Construction Types:
II-8, III-B, N, V-B
UBC
Class
BC Occupancy Type
Project Size
Threshold Base Cost
@
Threshold
Size Cost for
Each
Additional
900 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
400 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
100 sf
H-2 to Hazardous Rooms 100 $541 $188.69 $451 $157.24 $361 $125.79
H-5 - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77
- - 1,000 $2,404 $226.26 $2,003 $188,55 $1,603 $150.84
- - 2,000 $4,667 $'103.08 $3,889 $85.90 $3,191 $68.72
- - 5,000 $7,759 $67.46 $6,466 $5621 $5,173 $44.97
10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21
H H Occupancy Tenant Improvements 100 $541 $188.69 $451 $157.24 $361 $125.79
- - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77
- - 1,000 $2,404 $226.2fi $2,003 $188.55 $1,603 $150.84
- - 2,000 $4,667 $103.08 $3,889 $85.90 $3,111 $68.72
- - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97
10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21
I-1 to (-4 Institutional 500 $894 $62.38 $745 $51.99 $596 $41.59
- - 2,500 $2,142 $73.28 $1,785 $61.07 $1,428 $48.86
- - 5,000 $3,974 $74.80 $3,312 $62.33 $2,649 $49.86
- - 10,000 $7,714 $34.08 $6,428 $28.40 $5,142 $22.72
- - 25,000 $12,825 $22.31 $10,688 $18.59 $8,550 $14.87
50,000 $18,402 $36.80 $15,335 $30.67 $12,268 $24.54
[ I Occupancy Tenant Improvements 100 $d33 $150.95 $361 $125.79 $288 $100.63
- - 500 $1,037 $177.32 $864 $147.77 $691 $118.22
- - 1,000 $1,923 $181.01 $1,603 $150.84 $1,282 $120.67
- - 2,000 $3,733 $82.46 $3,111 $68.72 $2,489 $54.97
- - 5,000 $6,207 $53.96 $5,173 $44.97 $4,138 $35.98
10,000 $8,905 $89.05 $7,421 $74.21 $5,937 $59.37
M Market. 2,000 $2,860 $49.89 $2,383 $41.57 $1,907 $33.26
- - 10,000 $6,851 $58.60 $5,709 $48.83 $4,567 $39.06
- - 20,000 $12,710 $59.81 $10,592 $49.84 $8,474 $39.87
- - 40,000 $24,672 $27.26 $20,560 $22.72 $16,448 $18.17
- - 100,000 $41,028 $17.82 $34,190 $14.85. $27,352 $11.88
200,000 $58,848 $29.42 $49,040 $24.52 $39,232 $19.62
M M Occupancy Tenant Improvements 300 $686 $80.90 $580 $67.42 $464 $53.94
- - 1,500 $1,667 $95.06 $1,389 $79.21 $1,111 $63.37
- - 3,000 $3,092 $97.02 $2,577 $80.85 $2,062 $64.68
- - 6,000 $ ,003 $44.20 $5,003 $36.83 $4,002 $29.47
- - 15,000 $9,981 $28.92 $8,318 $24.10 $6,654 $19.28
30,000 $14,319 $47.73 $11,933 $39.78 $9,546 $31.82
R-2 Apartment Bld 800 $1,376 $60.00 $1,146 $50.00 $917 $40.00
- - 4,000 $3,296 $70.46 $2,746 $58.72 $2,197 $46.98
- - 8,000 $6,114 $71.94 $5,095 $59.95 $4,076 $47,96
- - 16,000 $11,869 $32.76 $9,891 $27.30 $7,913 $21.84
- - 40,000 $19,733 $21.44 $16,444 $17.87 $13,155 $14.30
80,000 $28,310 $35.39 $23,592 $29.49 $18,874 $23.59
R-2 Apartment Bldg -Repeat Unit 800 $1,376 $60.00 $1,146 $50.00 $917 $40.00
- - 4,000 $3,296 $70.4fi $2,746 $58.72 $2,197 $46.98
- - 8,000 $6,114 $71.94 $5,095 $59.95 $4,076 $47.96
- - 16,000 $11,869 $32.76 ~ $9,891 $27.30 $7,913 $21.84
- - 40,000 $19,733 $21.44 $16,444 $17.87 $13,155 $14.30
80,000 $28,310 $35.39 $23,592 $29.49 $18,874 $23.59
17 13 - 21
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -New Construction Inspection Fees
Construction Types:
i-A, I-B Construction Types:
II-A, Ill-A, V-A Construction Types:
II-B, III-B, N, V-B
UBG
Class
BC Occupancy Type • '.
Project Size
Threshold Base_ Cdst
Threshold
Size Cost for
Each
Additional
100 sf' Base Cost
(~
Threshold
Size Cost for
Each
Additional
100 sf' Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf'
R-1 Hotels 8 Motels 3,000 $4,606 $53.57 $3,838 $44.64 $3,071 $35.71
- - 15,000 $11,034 $62.90 $9,195 $52.42 $7,356 $41.94
- - 30,000 $20,470 $64.22 $17,058 $53.52 $1.3,646 $42.82
- - 60,000 $39,737 $29.27 $33,114 $24.39 $26,491 $19.51
- - 150,000 $66,078 $19.14 $55,065 $15.95 $44,052 $12.76
300,000 $94,788 $31.60 $78;990 $26.33 $63,192 $21.06
R-3 Dwellings -Custom, Models, 1,000 $2,136 $94.82 $1,780 $79.01 $1,424 $63.21
- First Master f?lan 2,500 $3,558 $61.10 $2,965 $50.91 $2,372 $40.73
- - 4,000 $4,475 $78.17 $3,729 $65.14 $2,983 $52.11
- - 6,000 $6,038 $77.78 $5,032 $64.81 , $4,025 $51.85
- - 8,000 $7,594 $107.75 $6,328 $89.79 $5,062 $71.83
10,000 $9,749 $97.49 $8,124 $81.24 $6,499 $64.99
R-3 Dwellings -Production Phase . 1,000 $2,136 $94.82 $1,780 $79:01 $1,424 $63.21
- of Master Plan 2,500 $3,558 $61.10 $2,965 $50.91 $2,372 $40.73
- (repeats) ~ 4,000 $4,475 $78.17 $3,729 $65.14 $2,983 $52.11
- - 6,000 $6,038 $77.78 $5,032 $64.81 $4,025 $51.85
- - 8,000 $7,594 $107.75 $6,328 $89.79 $5,062 $71.83
10,000 $9,749_ $97.49 $8,124 $81.24 $6,499 $64.99
R-3 Dwellings~Aftemate Materials 1,000 $2,136 $94.82 $1,780 $79.01 $1,424 $63.21
- - 2,500 $x,558 $61.10. $2,965 $50.91 $2,372 $40.73
- - 4,000 ,475 $78.17 $3,729 $65.14 $2,983 $52.11
- - 6,000 $6,038 $77.78 $5,032 $64.81 $4,025. $51.85
= . ' - 8,000 $7,594 $107.75 $6,328 $89.79 $5,062. $71.83
10,000 $9,749 $97.49 $8,124 $81.24 $6,499 $64:99
R-3 ~ Dwellings-Hillside -Custom, 1,000 $2,434 $94.82 $2,029 $79.02 $1,623 $63.21
- Models First Master Plan 2,500 $3,857 $61.10 $3,214 $50.92 $2,571 $40.73
- - 4,000 $4,773 $78.15 $3;978 $65.13 $3,182 $52.10
- - 6,000 $6,336 $77.76 $5,280 $64:80 $4,224 .- $51.84
- - 8,000 $7,891 $107.79 $6,576 $89.83 $5,261 $71.86
10,000 $10,047 $100.47 $8,373 $83.73 $6,698 $66.98
R-3 Dwellings-Hillside -Production 1,000 $2,434 $94.82 $2,029 $79.02 $1,623 $63.21
- Phase of Master Plan 2,500 $3,857 $61.10 $3,214 $50.92 • _ $2,571 $40.73
- (repeats) 4,000 $4,773 $78.15 $3,978 $65.13 $3,"182 $52.10
- - 6,000 $6,336 $77.76 $5,280 $64.80 $4,224 $51.84
- - 8,000 $7,891. $107.79 $6,576 $89.83 $5,261 $71.86
10,000 $10,047 ~ $100.47 $8,373 $83.73 $6,698 $66.98
R-3 Dwellings--Hillside-AltemateMateria 1,000 $2,434 $94.82 $2,029 $79.02 $1,623 $63.21
- - 2,500 $3,857 $61.10 $3,214 $50.92 $2,571 $40.73
- - 4,000 $4,773 $78.15 $3,978 $65.13 $3,182 $52.10
- - 6,000 $6,336 $77.76 $5,280 $64.80 $4,224 $51.84
- - 8,000 $7,891 $107.79 $6,576 $89.83 $5,261 $71.86
10,000 $10,047 $100.47 $8,373 $83.73 $6,698 $66.98
R-3.1 Group Care 1,000 $2,550 $88.98 $2,125 $74.15 $1,700 $59.32
- ~ - 5,000 $6,x10. $104.52 $5,091 $87.10 $4,073 $69.68
- - 10,000 $11,336 $106.70 $9,446 $88.91 $7,557 $71.13
- - 20,000 $22,005 $48.60 $18,338 $40.50 $14,670 $32.40
- - 50,000 $36,585 $31.80 $30,488 $26.50 $24,390 $21.20
100,000 $52,485 $52.49 $43,738 $43.74 .$34;9 $34.99
R-4 Grou Care 100 $413 $144.10 $344 $120.08 $275 $96.07
- - 500 $989 $169.28 $825 $141,07 $660 2.86
ig
CITY OF CUPERTINO
Resolution 08-044
Fees Effective Jaly 1, 2008
Schedule D -New Construction Inspection Fees
Construction Types:
[-A,1-B Construction Types:
I{-A, III-A, V-A Construction Types:
II-B, 111-B, IV, V-B
UBC
Class
BC Occupant Type
Project Size
Threshold Base Cost
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
100 sf
- - 1,000 $1,836 $172.79 $1,530 $143.99 $1,224 $115.19
- - 2,000 $3,564 $78.73 $2,970 $65.61 $2,376 $52.49
- - 5,000 $5,926 $51.50 $4,938 $42.92 $3,950 $34.34
10,000 $8,501 $85.01 $7,084 $70.84 $5,667 $56.67
R R Occupancy Tenant Improvements 80 $410 $178.89 $342 $149.08 $273 $119.26
- - 400 $983 $210.14 $819 $175,12 $655 $140.10
- - 800 $1,823 $214.49 $1,519 $178.74 $1,215 $142.99
- - 1,600 ~ $3;539 $97.72 $2,949 $81.43 $2,359 $65.14
- - 4,000 $5,884 $63.95 $4,904 $53.29 $3,923 $42.63
8,000 $8,442 .$105.53 $7,035 $87.94 $5,628 $70.35
S-1 Moderate -Hazard Storage ~ 600 $1,367 $79.47 $1,139 $66.22 $911 $52.98
- 3,000 $3,274 $93.35 $2,728 $77.79 $2,183 $62.23
- 6,000 $6,074 .$95.27 $5,062 $79.39 $4,049 $63.51
- - 12,000 $11,790 $43.40 $9,825 $36.17 $7,860 $28.93
- - 30,Q00 $19,602 $28.41 $16,335 $23.68 $13,068 $18.94
60,000 $28,125 $46.88 $23,438 $39.06 $18,750 $31.25
~ ;;:
19 13 -23
CITY OF CUPERTINO
Resolution 08-044
Fees Effective duly 1, 2008
Schedule D -New Construction Inspection Fees
Construction Types:
• .~ `~I-A, I-B Construction Types:
II-A, Ill-A, V~- Construction Types:
I!-B, 111-8, N, V-e
UBC
Class
BC Occupancy Type
Project Sae
Threshold Base cost
~
Threshold
Size Cost for
Each
Additional
100 sf' Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf • Base Cost
@
Threshold
Size Cost for
Each
Additional
100 sf
S-2 Low- Hazard Storage 10,000 $13,205 $46.06 $11,004 $38.38 $8,803 $30.71
- - 50,000 $31,628 $54.14 $26,356 $45.11 $21,085 $36.09
- - 100,000 $58,695 $55,22 $48,913 $46.01 $39,130 $36.81
- - 200,000 $113,910 $25.18 $94,925 $20.98 $75,940 $16.79
- ~ - 500,000 $189,450 $16.47 $157,875 $13.73 $126,300 $10.98
1,000,000 $271,600 $27.18 $226,500 $22.65 $181,200 $18.12
S S Occupancy Tenant Im rovements 600 $1,152 ~ $67.00 $960 $55.83 $768 $44.67
- - 3,000 . §2,760 $78.72 $2,300 $65.60 $1,840 $52.48
- - 6,000 $5,122 $80.33 $4,268 $66.94 . $3,415 $53.55
- - 12,000 S9,941 $36.60 $8,285 $30.50 $6,628 $24.40
- - 30,000 $16,529 $23.96 $13,774 $19.96 $11,019 $15.97
60,000 $23,715 $39.53 _ $19,763 $32.94 $15,810 $26.35
U Private Garage/Agricultural Bld 40 $461 $402.05 $384 $335.04 $307 $268.03
- - 200 $1,104 $472.31 $920 $393.59 $736 $314.87
- - 400 $2,049 $482.07 $1,707 $401.73 $1,366 $321.38
- - 800 $3,977 $219.65 $3,314 $183.04 $2,651 $146.43
- - 2,000 $6,613 $143.72 $5,511 $119.76 $4,409 $95.81
• 4,000 $9,487 $237.18 $7,906 $197.65 $6,325 $158.12
- Deferred Submi#ta{-All Except R-3 1,000 .$358 $12:47 $298 $10.39 $238 $8.32
- - 5,000 $857 $14.64 $714 $12.20 $571 $9.76
- - .10,000 $'1;589 $14.96 $1,324 $12.46 $1,059 $9.97
- - 20,Q00 $3,084 $6.82 $2,570 $5.68 $2,056 $4.55
- - 50,000 $5,130 -$4.47 $4,275 $3.73 $3,420 ~ $2.98
100,000 $7,365 $7.37 $6,138 $6.14 $4,910 $4.91
- Deferred Sutxnittal-R-3 1,000 $0 $0.00 $0 $0.00 $0 $0.00
- - 2,500 $o $a.oo . $o $a.oo $o $a.oo
- - 4,000 $0 $0.00 $0 $0.00 $0 $0.00
- - 6,000 $0 $0.00 $0 $0.00 $0 $0.00
- - 8,000 $0 $0.00 $0 $0.00 $0 $0.00
10,000 $0 $0.00 $0 $0.00 $0 $0.00
- Standard Comm. Foundation wo/Podi 500 $1,316 $91.82 $1,097 $76.52 $877 $61.22
- - 2,500 $3,153 $107.90 $2,627 $89.91 $2,102 $71.93
- - 5,000 $5,850 $110.10 $4,875 $91.75 $3,900 $73.40
- - 10,000 $11,355 $50.18 $9,463 $41.81 $7,570 $33.45
- - 25,000 $18,881 $32.84 $15,734 $27.36 $12,588 $21.89
50,000 $27,090 $54.18 $22,575 $45.15 $18,060 $36.12
- Standard Comm. Foundation 3,000 $3,340 $38.84 $2,783 $32.37 $2,227. $25.90
- w/Podium 15,000 $8,001 $45.62 $6,667 $38.02 $5,334 $30.41
- - 30,000 $14,844 $46.56 $12,370 $38.80 $9,886 $31.04
- - 60,000 $28,812 $21.22 $24,009 $17.68 $19,209 $14.15
- - 150,000. $47,910 $13,88 $39,923 $11.57 . $31,942 $9.25
300,000 $68,730 $22,91 $57,273 $19.09 $45,822 $15.27
SHELL BUILDINGS
- All Other Shell Buildings 500 $1•;539 $107.40 $1,283 $89.50 $1,026 $71.60
- - 2,500 $3;687 $126.17 $3,073 $105.14 $2,458 $84.11
- - 5,000 $6,842 $128.79 $5,701 $107.33 $4,561 $85.86
- ~ - 10,000 $13,281 $58.66 _ $11,068 $48.68 $8,854 $39.11
- - 25,000 $22,080 $38,40 $18,400 $32.00 $14,720 $25.60
50,000 $31,680 $63.36 $26,400 $52.80 . $21,120 $42.24
Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. 13 - 24
20
CITY OF CUPERTINO
Resolution. 08-044
Fees EffectivcJuly 1, 2008
Schedule D -Consolidated Schedule of Total Construction Fees
Construction Types:
I-A, I-B Construction Types:
II-A, III-A, V-A Construction Types:
II-B, 111-8, N, V-B
UBC
Class
BC Occupancy Type
Project Size
Threshold Base Cost
.Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf
A-1 - 1,000 $8,846 $72.90 $7,372 $60.75 $5,898 $48.60
- - 5,000 $11,762 $93.82 $9,802 $78.18 $7,842 $62.54
- - 10,000 $16,453 $84.73 $13,711 $70.61 $10,969 $56.49
- - 20,000 $24,926 $42.35 $20,772 $35.29 $16,618 $28.23
- - 50,000 $37,632 $27.05 $31,360 $22.54 $25,088 $18.03
- - 100,000 $51,156 $51.16 $42,630 $42.63 $34,104 $34.10
A-2 - 250 $8,028 $180.63 $6,690 $150.53 $5,352 $120.42
- - 1,20 $9,834 $244.77 $8,195 $203.98 $6,556 $163.18
- - 2,500 $12,894 $205.95 $10,745 $171.63 $8,596 $137.30
- - 5,000 $18,043 $108.71 $15,036 $90.59 $12,029 $72.47
- - 12,500 $26,196 $68.54 $21,830 $57.11 $17,464 $45.69
- - 25,000 $34,763 $139.05 $28,969 $115.88 $23,175 $92.70
A-3 - 1,000 $8,846 $72.90 $7,372 $60.75 $5,898 $48.60
- - 5,000 $11,762 $93.82 $9,802 $78.18 $7,842 $62.54
- - 10,000 $16,453 $84.73 $13,711 $70.61 $10,969 $56.49
- - 20,000 ~$~d,J26 $42.35 $20,772 $35.29 $16,618 $28.23
- - 50,000 $37,632 $27.05 $31,360 $22.54 $25,088 $18.03
- - 100,000 $51,156 $51.16 $42,630 $42.63 $34,104 $34.10
A-4, A-5 - 500 $6,860 $93.20 . $5,716 $77.66 $4,573 $62.13
- - 2,500 $8,723 $122.83 $7,270 $102.36 $5,816 $81.89
- - 5,000 $11,794 $107.36 $9,829 $89.47 $7,863 $71.58
- - 10,000 $17,162 $55.02 $14,302 $45.85 $11,442 $36.68
- - 25,000 $25,4'16 $34.94 $21,180 $29.12 $16,944 $23.30
- - 50,000 $34,152 $68.30 $28,460 $56.92 $22,768 $45.54
A A Occupancy Tenant Improvemenfs 500 $3,887 $57.75 $3,239 $48.13 $2,591 ~ $38.50
- - 2,500 $5,042 $75.24 $4,202 $62.70 $3,361 $50.16
- - 5,000 $6,923 $66.84 $5,769 $55.70 $4,615 $44.56
- - 10,000 $10,265 $33.83 $8,554 $28.19 $6,843 $22.55
- - 25,000 $15,339 $21.54 $12,783 $17.95 $10,226 $14.36
50,000 $20,724 $41.45 $17,270 $34.54 $13,816 $27.63
B Banks 500 $8,223 $109.88 $6,852 $91.56 $5,482 $73.25
- - 2,500 $10,420 $145:13 $8,683 $120.94 $6,947 $96.75
- - 5,000 $14,048 $126.50 $11,707 $105.41 $9,366- $84.33
- - 10,000 $20,373 $64.96 $16,978 $54.13 $13,582 $43.30
- - 25,000 $30,11f $41.24 $25,097 $34.36 $20,078 $27.49
- - 50,000 $40,425 $80.85 $33,688 $67.38 $26,950 $53.90
B Laundromat 200 $7,225 $960.47 $6,021 $133.72 $4,817 $106.98
- - 1,000 $8,509 $226.62 $7,091 $188.85 $5,673 $151.08
- - 2,000 $10,775 $179.91 $8,980 $149.93 $7,184 $119.94
- - 4,000 $14,374 $99.39 $11,978 $82.83 $9,582 $66.26
- - 10,000 $20,337 $62.01 $16,948 $51.68 $13,558 $41.34
- - 20,000 $26,538 $132.69 $22,115 $110.58 $17,692 $88.46
B Medical Office 500 $9,425 $108.18 $7,855 $90.15 $6,284 $72.12
- - 2,500 $11,589 $146.13 $9,658 $121.78 $7,726 $97.42
- - 5,000 $15,242 $123.47 $12,702, $102.89 $10,162 $82.31
- - 10,000 $21,416 $64.96 $17,646 $54.13 $14,277 $43.30
- - 25,000 $31,159 $41.00 $25,966 $34.16 $20,773 $27.33.
50,000 $4'1,408 $82.82 $34,506 $69.01 $27,605 $55.21
21 13 - 25
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -Consolidated Schedule of Total Construction Fees
Construction Types:
I-A,1-B Construction Types:
II-A, 111-A, V-A Construction Types:
II-B, Ill-B, IV, V-B
UBC
Class
BC Occupancy Type
Project Size
Threshold Base Cost
~
Threshold.
Size ` ~ Cost for
Each
Additional
100 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
100 sf" Base Cost
~
Threshold
Slze Cost for
Each
Additional
100 sf
B Offices 1,000 $10,008 $87.37 $8,340 $72.81 $6,672 $58.25
_ - 5,000 $13,503 $111.72 $11,253 $93.10 $9,002 $74.48
_ - 10,000 $19,089 $101.79 $15,908 $84.83 $12,726 $67.86
_ - 20,000 $29,268 $50.52 $24,390 $42.10 $19,512 $33,68
_ - 50,000 $44,423 $32.33 $37,019 $26.94 $29,615 $21.55
100,000 $60,585 $60.59 $50,488 $50.49 $40,390 $40.39
B B Occupancy Tenant Improvements 300 $3,148 $89.11 $2,623 $74.2fi $2,099 $59.41
_ - 1,500 $4,217 $114.26 $3,514 $95.21 $2,811 $76.17
_ - 3,000 $5,931 $103.71 $4,943 $86.43 $3,954 $69.14
_ - 6,000 $9,042 $51.63 $7,535 $43.03 $6,028 $34.42
_ - 15,000 $13,689 $33.03 $11,408 $27.53 $9,126 $22.02
- - 30,000 $18,644 $62.15 $15,536 $51.79 $12,429 $41.43
E PreschoollSchool 100 $7,569 $241.72 $6,308 $201.43 $5,046 $161.15
_ - 500 $8,536 $367.10 $7,113 $305.91 $5,691 $244.73
_ - 1,000 $10,371 $262.61 $8,643 $218.84 $6,914 $175.07
- - 2,000 $12,998 $157.63 $10;831 $131,35 $8,665 $105.08
- - 5,000 $17,726 $96.53 $14,772 $80.44 $11,818 $64.35
- - 10,000 $22,553 $225.53 $18,794 $187.94 $15,035 $150.35
E E Occupancy Tenant Improvements 100 $4,769 $220.60 $3,974 $183.83 $3,179 $147.07
_ - 500 $5,652 ~ $309.17 $4,710 $257.64 $3,768 $206.11
_ - 1,000 $7,197 $248.12 $5,998 $206.76 $4,798 $165.41
_ - 2,000 $9,679 $135.91 $8,066 $11325 $6,452 $90.60
~- - 5,000 $13 756 $84.95 $11,463 $70.79 $9,171 $56.63
_ - 10,000 $18,003 $180.03 $15,003 $150.03 $12,002 $120.02
F-1, F-2 Factory/industrial 1,000 $10,870 $87.56 $9,058 $72.97 $7,247 $58.37
- - 5,000 $14,372 $112.97 $11,977 $94.14 $9,582 $75.31
- - 10,000 $20,021 $101.69 $16,684 $84.74 $13,347 $67.79
- - 20,000 $30,189 $50.95 $25,158 $42.45 $20,126 $33.96
_ - 50,000 $45,473 $32.54 $37,894 $27.11 $30,315 $21.69
- - 100,000 $61,740 $61.74 $51,450 $51.45 $41,160 . $41.16
F F Occu ancy Tenant Improvements 1,000 $8,327 $76.50 $6,939 $63.75 $5,552 $51.00
- - 5,000 $11,387 $97.28 $9,489 $81.06 $7,592 $64.85
- - 10,000 $16,251 $89.31 $13,543 $74.43 $10,834 $59.54
- - 20,000 525,182 $44.09 $20,985 $36.74 $16,788 $29.39
- - 50,000 $38,408 $28.25 $32,006 523.54 $25,605 $18.83
- - 100,000 $52,530 $52.53 $43,775 $43.78 $35,020 $35.02
H-1 H-10ccupancies 100 $7,890 $244.13 $6,575 $203.44 $5,260 $162.75
- - 500 $8,866 $373.73 $7,389 $311.44 $5,911 $249.15
- - 1,000 $10,735 $264.26 $8,946 $220.21 $7,157 ~ $176.17
_ - 2,000 $13,378 $160.11 $11,148 $133.42 ~ $8,918 $106.74
- - 5,000 $18,181 $97.88 $15,151 $81.56 $12,121 $65;25
- - 10,000 $23,075 $230.75 $19,229 $192.29 $15,383 $153.83
~~
13-26
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -Consolidated Schedule of Total Construction Fees.
Construction Types:
i-A, 1-B Construction Types:
I!-A, III-A, V-A Construction Types:
11-B, III-B, N, V-B
UBC
Class
BC Qccupancy Type
Project Size
Threshold Base Cost
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
@
Threshold
Size Cost for
Each
Additional
100 sf *
H-2 to Hazardous Rooms 100 $6,402 $232.91 $5,335 $194.09 $4,268 $155.27
H-5 - 500 $7,334 $342.96 $6,112 $285.80 $4,889 $228.64
- - 1,000 $9,049 $256,56 $7,541 $213.80 $6,033 $171.04
- - 2,000 $11,615 $148.58 $9,679 $123.81 $7,743 $99.05
- - 5,000 $16,072 $91.69 $13,393 $76.41 $10,715 $61.13
10,000 $20,657 $206.57 $17,214 $172.14 $13,771 $137.71
H H Occupancy Tenant Improvements 100 $6,053 $230.27 $5,044 $191.89 $4,035 $153.51
- - 500 $6,974 $335.72 $5,811 $279.76 $4,649 . $223.81
- - 1,000 $8,652 $254.78 $7,210 $212.31 $5,768 $169.85
- - 2,000 $11,200 $145.85 $9,333 $121.54 $7,467 $97.23
- - 5,000 $15,575 $90.26 $12,979 $75.21 $10,384 $60.17
10,000 $20,088 $200.88 $16,740 $167.40 $13,392 $133.92
I-1 to I-4 Institutional 500 $7,193 . $71.88 $5,994 $59.90 $4,795 $47.92
- - 2,500 $8,630 $99.36 $7,192 $82.80 $5,754 $66.24
- _
- 5,000 $11,114 $81.31 $9,262 $67.76 $7,410 $54.21
- - 10,000 $15,180 $43.86 $12,650 $36.55 $10,120 $29.24
- - 25,000 $21,759 $27.52 $18,133 $22.93 $14,506 $18.34
50,000 $28,638 $57.28 $23,865 $47.73 $19,092 $38.18
I I Occupancy Tenant Improvements 100 $4,282 $179.99 $3,568 $149.99 $2,854 $119.99
- - 500 $5,002 $256.97 $4,168 $214.14 $3,334 $171.31
- - ~ 1,000 $6,286 $200.92 $5,239 $167.43 $4,191 $133.94
- - 2,000 $8,296 $112.34 $6,913 $93.62 $5,530 $74.89
- - 5,000 $11,666 $69.88 $9,722 $58.23 $7,777 $46.58
- - .10,000 $15,160 $151.60 $12,633 $126.33 $10,106 $101.06
M Market' 2,000 $9,066 $52.23 $7,555 $43.53 $6,044 $34.82
- - 10,000 $13,244 $65.03 $11,037 $54.19 $8,830 $43.35
- - 20,000 $19,747 $61.42 $16,456 $51.18 $13,165 $40.94
- - 40,000 $32,030 $29.66 $26,692 $24.71 $21,354 $19.77
- - 100,000 $49,824 $19.13 $41,520 $15.94 $33,216 $12.75
200,000 $68,952 $34.48 $57,460 $28.73 $45,968 $22.98
M M Occupancy Tenant Improvements 300 $A,34~ $90.08 $3,618 $75.07 $2,894 $60.06
- - 1,500 $5,423 $120.18 $4,519 $100.15 $3,615 $80.12
- - 3,000 $7,225 $103.29 $6,021 $86.08 $4,$17 $68.86
- - 6,000 $10,324 $53.64 $8,603 $44.70 $6,883 $35.76
- - 15,000 $15,152 $33.96 $12,626 $28.30 $10,101 $22.64
30,000 $20,246 ~ $67.49 $16,671 $56.24 $13,497 $44.99
R-2 Apartment Bldg 800 $8,654 $66.85 $7,212 $55.71 $5,770 $44.57
- - 4,000 $10,794 $89.29 $8,995 $74.41 $7,196 $59.53
- - 8,000 $14,365 $76.66 $11,971 $63.88 $9,577 $51.10
- - 16,000 $20,498 $39.83 $17,082 $33.19 $13,665 $26.55
- - 40,000 $30,058 $25.20 $25,048 $21.00 $20,038 $16.80
BO,p00 $40,138 $50.17 $33,448 $41.81 $26,758 $33.45
R-2 Apartment Bldg -Repeat Unit 800 $5,085 $63.50 $4,238 $52.92 $3,390 $42.33
- - 4,000 $7,117 $80.05 $5,931 $66.71 $4,745 $53.37
- - 8,000 $10,319 $74.34 $8,599 $61.95 $6,879 $49.56
- - 16,000 $16,266 $36.36 $13,555 $30.30 $10,844 $24.24
- - 40,000 $24,994 $23.36 $20,828 $19.47 $16,662 $15.58
80,000 $34,339 $42.92 $28,616 $35.77 $22,893 $28.62
23 13 - 27
CITY OF CUPERTINO
Resolution 0&044
Fees Effective July 1, 2008
Schedule D -Consolidated Schedule of Total Construction Fees
• Constriction Types:
I-A, I-B Construction Types:
II-A, III-A, V-A Construction Types:
il-B, III-B. N, V-B
UBC
Class
BC Occupancy Type
Project Sae
'Threshold Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf" Base Cost
@
Threshold
Sae Cost for
Each
Additional
100 sf" Base Cost
~
Threshold
Sae Cost for
Each
Additional
100 sf •
R_1 Hotels 8 Motels 3,000 $15,432 $56.29 $12,860 $46.91 $10,288 $37.53
- 15,000 $22,187 $70.39 $18,489 $58.66 $14,791 $46.93
_ - 30,000 $32,746 $66.10 $27,288 $55.08 $21,830 $44.06
_ - 60,000 $52,574 $32.06 $43,812 $26.72 $35,050 $21.38
_ - 150,000 $81,432 $20.64 $67,860 $17.20 $54,288 $13.76
300,000 $112,392 $37.48 $93,660 $31.22 $74,928 $24.98
R-3 Dwellings -Custom, Models, 1,000 •$5,541 $121.27 $4,618 $101.05 $3,694 $80.84
- First Master Plan 2,500 $7,360 $87.57 $6,133 $72.97 $4,907 $58.38
- - 4,000 $8,674 $88.05 $7,228 $73.38 $5,782 $58.70
- - 6,000 $10,435 $147.21 $8,696 $122.68 $6,956 $98.14
_ - 8,000 $13,379 $137.54 ,$11,149 $114.61 $8,919 $91.69
10,000 $16,130 $161.30 $13,441 $134.41 $10,753 ~ $107.53
R-3 Dwellings -Production Phase 1,000 $3,905 $96.15 $3,254 $80.13 $2,603 $64.10
- of Master Plan 2,500 $5,347 $62.43 $4,456 $52.03 $:1,565 $41.62
- (repeats) 4,000 $6,283 $79.14 $5,236 $65.95 $4,189 $52.76
- - 6,000 $7,866 $109.50 $6,555 $91.25 $5,244 $73.00
- - 8,000 $10,056 $117.68 $8,380 $98.06 $6,704 $78.45
. 10,000 $12,410 $124.10 $10,341 $103.41 $8,273 $82.73
R-3 Dwellings-Alternate Materials 1,000 $7,9$7 $147.73 $6,656 $123,11 $5,325 $98.49
_ - 2,500 $10,203 $114.00 $8,503 $95,00 $6,802 $76,00
_ - 4,000 $11,913 $97.98 $9,928 $81,65 $7,942 $65.32
_ - 6,000 $13,873 $216.63 $11,561 $180.53 $9,248 $144.42
_ - 8,000 $18,205 $167.27 $15,171 $139.39 $12,137 $111.51
10,000 $21,551 $215.51 $17,959 $179.59 $14,367 $143.67
R-3 Dwellings-Hillside - Cus#om, Models, 1,000 ~ ,$8,781 $108.05 $7,318 $90.04 $5,854 $72.03
- First Master Plan 2,500 $10,402 $113.99 $8,668 $94.99 $6,935 $75.99
_ - 4,000 $12,112 $88.10 $10,093 $73.41 $8,074 $58.73
_ ~ - 6,000 $13,874 $137.27 $11,561 $114.39 $9,249 $91.51
- - 8,000 $16,619 . _ $177.21 $13,849 $147.68 $11,079 $118.14
10,000 $20,163 $201.63 $16,803 $168.03 $13,442 $134.42
R-3 Dwellings-HIIlside -Production Phas 1,000 $6,043 $101.44 $5,036 $84.53 $4,029 $67.62
of Master Plan 2,500 $7,565 $89.28 $6,304 $74.40 $5,043 $59.52
- (repeats) 4,000 $8,904 $83.10 $7,420 $69.25 $5,936 , $55.40
_ - 6,000 $10,566 $108.42 $8,805 $90.35 $7,044 $72.28
_ - 8,000 $12,734 $144.18 $10,612 $120.15 $8,490 $96.12
10,000 $15,618 $156.18 $13,015 $130.15 $10,412 $104.12
R-3 Dwellings-Hillside -Alternate Materia 1,000 $14,401 $121.27 $12,001 $101.05 $9,601 $80.84
- - 2,500 $16,220 $166.92 .$13,517 $139.10 $10,813 $111.28
- - 4,000 $18,724 $98.01 $15,603 •$81.68 $12,482 $65.34
_ - 6,000 $20,684 $196.77 $17,237 $163.98 $13,769 $131.18
- - 8,000 $24 619 $246.62 $20,516 $205.51 $16,413 $164.41
10,000 $25;552 $295.52 $24,626 $246.26 $19,701 $197.01
R-3.1 Group Can: 1,000 $15,033 $98.39 „$12,527 $81.99 $10,022 $65.60
- - 5,000 $18,968 $130.37 $15,807 $108.64 $12,646 $86.91
- - 10,000 $25,487 $113.15 $21,239 $94.29 $16,991 $75.43
- - 20,000 $36,801 $58.28 $30,668 . $48.57 $24,534 $38.85
- - 50,000 $54,285 $36.99 .. $45,238 $30.83 $36,190 $24.66
100,000 $72,780 $72.78 $60,650 $60.65 $48,520 $48.52
R-4 Group Care 100 $8,812 $207.46 $7,343 $172.89 $5,875 $138.31
- - 500 $9,642 $343.08 $8,035 $285.90 $6,428 $228.72
- - 1,000 $11,357 $216.23 $9,465 $180.19 $7,572 .15
24
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -Consolidated Schedule of Total Construction Fees
Construction Types:
-A,1-B Construction Types:
II-A, III-A, V-A Construction Types•
II-B, Iii-B, N, V-B •
UBC
Class
BC Occupancy Type
Project Size
Threshold Base Cost
@
Threshold
Size Cost for ~
Each
Additional
100 sf' Base Cost
@
Threshold
Size Cost for
Each
Additional
700 sf * Base Cost
@
Threshold
S¢e Cost for
Each
Additional
100 sf'
- - 2,000 $13,520 $143.90 $11,266 $119.92 $9,013 $95.94
- - 5,000 $17,837 $86.26 $14,864 $71.88 $11,891 $57.50
10,000 $22,150 $221.50 $18,458 $184.58 $14,766 $147.66
R R Occupancy Tenant Improvements 80 $4,050 $213.20 $3,375 $177.67 $2,700 $142.13
- - 400 $4;732 $304.26 $3,943 $253.55 $3,155 $202.84
- - 800 $5,949 $238.02 $4,957 $198.35 $3,966 $158.68
- - 1,600 $7,853 $133.03 $6,544 $110.86 $5,235 $88.69
- -- 4,000 $11,046 $82.75 $9,205 $68.96 $7,364 $55.17
8,000 $14,356 $179.45 $11,963 $149.54 $9,571 $119.63
S-1 Moderate-Hazard Storage 600 $9,590 $89.81 $7,992 $74.84 $6,393 $59.87
- 3,000 ~ $11,745 $121.70 $9,788 $101.41 $7,830 $81.13
- 6,000 $15,396 $102.38 $12,830 $85.31 $10,264 $68.25
- - 12,000 $21,539 $54.04 $17,949 $45.03 $14,359 $36.03
- - 30,000 $31,266 $34.08 $26,055 $28.40 $20,844 $22.72
60,000 $41,490 $69.15 $34,575 $57.63 $27,660 . $46.10
25 13 - 29
CITY OF CUPERTINO '
Resolution OS-044
Fees Effective July 1, 2408
Schedule D -Consolidated Schedule of Total Construction Fees
Construction Types:
I A, I-B Construction Types:
II-A, III-A, V-A .Construction Types:
11-B, III-B, N, V-B
UBC
Class
BC Occupancy Type
Project Size
Threshold Base Cost
~
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
oLD
Threshold
Size Cost for
Each
Additional
100 sf * Base Cost
aLD
Threshold
Size Cost far
Each
Additional
100 sf *
S-2 Low-Hazard Storage 10,000 $23,354 $46.82 $19,461 $39.02 $15,569 $31.22
- - 50,000 $42,083 $56.24 $35,069 $46.86 $28,055 $37.49
- - 100,000 $70,200 $55.74 $58,500 $46.45 $46,800 $37.96
- - 2,000 $125,940 $25.95 $104,950 $21.62 $83,960 $17.30
- - 500,000 $203,775 $16.91 $169,813 $14.09 $135,850 $11.27
9,000,000 $288,300 $28.83 $240,250 $24.03 $192,200 $19.22
S S Occupancy Tenant Improvements 600 $6,139 $73.27 $5,116 $61.06 $4,093 $48.85
- - 3,000 $7,898 $95.91 $6,581 $79.93 $5,265 $63.94
- - 6,000. $10,775 $84.63 $8,979 $70.53 $7,183 $56.42
- - 12,000 $15,853 $43.06 $13,211 $35.88 $10,568 $28.70
- - 30,000 $23,603 $27.38 $19,669 $22.81 $15,735 $18.25
60,000 $31,895 $53.03 $26,513 $44.19 $21,210 $35.35
U Private GaragelAgricultural Bldg 40 $4,485 $477.95 $3,738 $398.29 $2,990 $318.63
- - 200 $5 250 $680.48 $4,375 $567.06 $3,500 $453.65
- - 400 $6,611 $534.11 $5,509 $445.09 $4,407 $356.07
- - 800 $8,747 $297.71 $7,269 $248.09 $5,832 $198.47
- - 2,000 $12,320 $185.34 $10,267 $154.45 $8,213 $923.56
4,000 $16,027 $400.67 $13,356 $333.89 $10,684 $267.11
- peferred Submittal-All Except R-3 1,000 $6,161 $16.85 $5,134 $14.04 $4,107 $11.23
- - 5,000 $6,835 $26.66 $5,696 $22.21 $4,557 $17.77
- - 90,000 $8,168 $17.96 $6,806 $14.96 $5,445 $11.97
- - 20,000 $9,963 $11.32 $8,303 $9.43 $6,642 $7.54
- - 50,000 $13,358 $6.86 $11,131 $5.71 $8,905 $4.57
100,000 $16,785 $16.79 $13,988 $13.99 $11,190 $11.19
- Deferred Submittal-R-3 9,000 $3,878 $7.79 $3,232 $6.49 $2,586 $5.19
- - 2,500 $3,995 $26.77 $3,329 $22.31 $2,664 $17.85
- - 4,000 $4,397 $10.02 $3,664 $8.35 $2,931 $6.68
- - 6,000 $4,597 $45.12 $3,831 $37.60 $3,065 $30.08
- - 8,000 $5,500 $40.17 $4,583 $33.48 $3,666 $26.78
10,000 $6,303 $63.03 $5,253 $52.53 $4,202 $42.02
- Standard Comm. Foundation wo/Podi 500 $9,365 $103.97 $7,804 $86.64 $6,243 $69.32
- - 2,500 $11,445 $141.20 $9,537 $117.66 $7,630 $94.13
- - 5,000 $14,975 $118.44 $12,479 $98.70 $9,983 $78.96
- - 10,000 $20,897 $62.67 • $17,414 $52.22 $13,931 $41.78
- - 25,000 $30,296 $39.50 $25,247 $32.91 $20,198 $26.33
50,000 $40,170 $80.34 $33,475 $66.95 $26,780 $53.56
- Standard Comm. Foundation w/Podiu 3,000 . $12,556 $41.16 $10,463 $34.30 $8,371 $27.44
- - 15,000 $i 7,495 $51.97 $14,578 $43.31 $11,664 $34.65
- - 30,000 $25,290 $48.16 $21,074 $40.13 $16,861 $32.11
- - 60,000 $39,738 $23.60 $33,194 $19.66 $26,493 $15.73
- - 150,000 $60,975 $15.15 $50,810 $12.62 $40,652 $10.10
300,000 $83,700 $27.90 $69,747 $23.25 $55,803 $18.60
SHELL BUILDINGS
- All Other 5he11 Buildings 500 $12,038 $123.25 $10,032 $102.71 $8,025 $82.17
- - 2,500 $14,503 $169.61 $12,086 $141.34 $9,669 $113.07
- - 5,000 $18,T43 $139.64 $15,619 $116.36 $12,496 $93.09
- - 10,000 $25,725 $74.98 $29,438 $62.48 $17,150 $49.98
- - 25,000 $36,971 $47.09 $30,809 $39.24 $24,648 $31.39
50,000 $48,743 $97.49 $40,619 $81.24 $32,495 $64.99
Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
26 13 - 30
CTTY OF CUPERTINO
Resolution 08-044
Fees Effective•Jtily 1, 2008
Schedule D -Mechanical, Electrical & Plumbing
Fee Types Fee
;ATNE AND MISC, FEES
and Documentation Fees: $ 40.79
MECHANICAL. PERMIT FEES
Mechanical Permit Fee $ 40.79
- Stand Alone Mechanical Plan Check (hourly rate) $ 122.38
UNIT FEES:
Residential Appliance
New mufti-faintly residen#ial buildings (apartmenfs and condominiums) having
three or more living units not including the area of garages, carports and other
non-commercial automobile storage areas constructed at the same time, per
' square foot • , ~ • $ p,07
New and single and iwafamiljr residential buildings not including the area of
garages, carports and other minor accessory buildings constructed at the same
time, per square foot $ 0.08
_ New commercial buildings and completely remodeled spaces not including the
area of garages, per square foot $ 0.13
For the repair of alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, VAV boxes, absorption unit, or each heating,
cooling, absorption, or evaporative coaling system, including installation of
controls regulated by this Code {Commercial) $ 61.19
For each air-handling unit, AlC units, heat pumps to and including 10,000 cubic
feet per minute, inciuding ducts attached thereto. Does not apply to central type
(Commercial) $ 122.38
For each air-handling unit, A/C units, heat pumps to and including 10,000 cubic
feet per minute, including ducts attached thereto. Does not apply to central type
(Residential) - ~ $ 61.19
Repair/Alteration/Addition to each heating appliance, refrigeration unit, cooling
unit, absorption unit, or each heating, cooling, absorption, or evaporat[ve
cooling system, including installation of controls regulated by this code. -
(Commercial) $ 122,38
Repair/Ateration/Addition to each heating appliance, refrigeration unit, cooling
unit, absorption unit, or each heating, cooling, absorption, or evaporative
cooling system, including instalation of controls regulated by this code.
(Residential) $ 61.19
For each air-handling unit AIG unit, heat pump over 10,OOp cfmp to and
including 3HP, or each absorption system up to and including 100,000. Btu/h.
(Residential) $ 122.38
For the installation or relocation of each commercial or industrial-type hood
'- ` ~ $ 122.38
For the installation of each residential hood that is served by a mechanical
• exhaust, Including the ducts for such hood ~ $ 30.60
For the instalation or relocation of each forced-air orgravity-type fumace or
bumer, including ducts and vents attached to such appliance, up to and
Including 100,000 Btu/h $ 122.38
For each ventilation system which is not a portion of any heating or air
conditioning system authorized by a permit $ 91.79
For each ventilation fan connected to a single duct $ 20.40
For the installation or relocation of each forced air or gravity type fumace or
bumer, including ducts and vents attached to such appliance over 100,000
etu/h $ 122.38
For the installation or relocation of each floor fumace, including vent $ 61.19
13-31
27
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -Mechanical, Electrical & Plumbing
Fee Types # Fee
For the installation or relocation of each suspended heater, recessed wall
heater orfloor-mounted unit heater (Commercial) ~ ~ $ 61.19
For the installation or relocation of each suspended hea#er, recessed wall
heater or floor-mounted unit heater (Residential) $ 61.19
F'or the Installation, relocation or replacement of each appliance vent installed
and not included in an appliance permit (Commercial) $ 61.19
For the installation, relocation or replacement of each appliance vent installed
and not included 1n an appliance permit (Residential) $ 61.19
For the installation or relocation of each boiler or compressor to and inGuding
three horsepower, or each absorption system to and including 100,000 Btufi
(29.3 kw) $ 91.79
For the installation or relocation of each boiler ar compressor over three
horsepower to and inc[uding 15 horsepower, or each absorption system over
100,000 Btufi and including 500,000 Btu/h $ 112.1 B
For the installation or relocation of each boiler or wmprQSSOr over 15
horsepower to and including 30 horsepower, or each absorption system over
500,000 i3tufi to and including 1,000,000 Btufi $ 132.58
For the installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption system .
over 1,000,000 Btu/h to and including 1,750,000 Btufi $ 152.98
For the installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btufi
$ 173.37
For each appliance or piece of equipment regulated by this Cade but not
classed in other appliance categories, or for which no other fee is listed in this
Code $ 61.19
COTNER FEES: - ' ' -,•; ~;,;:';: ~ ~
122.38
PLUMBING/GAS PERMIT FEES
Plumbing Permft Fee $ 40.79
Stand Alone Plumbing Plan Check (hourly rate) $ 122.38
UNIT' FEES:
New multi-famity residential buildings (apartments and condominiums) having
three or more living units not including the area of garages, carports and other
non-commercial automobile storage areas constructed at the same, per square
foot
$
.07
New single and two-family residential buildings not including the area of
garages, carports and other minor accessory buildings constructed at the same
time, er square foot
$
0.08
New commercial buildings and completely remodeled spaces not including the
area of garages, per square foot
$
0.13
For installation, alteration or repair of water piping water treating equipment $ 40.79
For repair or alteration of drainage or vent piping, floor, area, condensate piping $ ~ 40,79
For each plumbing fixture or trap or set of fodures on one trap (including water,
drainage ipng and backflow protection therefore)
$~
8.16
For each gas piping system of one (1) to four 4) outlets (Commercial) $ 61.19
For each gas piping system of one 1 to four (4) outlets (ResidentlaE) $ 61.19
For each gas piping system of five (5) or more, per outlet $ _ 61.19
13-32
2g
CITY OX+' CUPERTINO
Resolution OS-034
• Fees Effective July 1, 2008
Schedule D -Mechanical, Electrical & Plumbing
Fee Types
For each industrial waste pre-treatment interceptor, induding fts trap and vent
Fee
excepting kitchen type grease traps functioning as fixture traps $ 30.60
Kitchen type trap and/or system $ 8.16
For each building sewer, sanitary sewer, and each troller park sewer
{Commercial)
$
20,40
For each building sewer, sanitary sewer, and each trailer park sewer
(Residential)
$
2040
$torm/rainwatersgstems per drain $ 8.16
For each water heater and/or vent (Commercial) $ 24.48
For each water heater and/or vent {Residential) $ 24.48
Water service (Residential) ~ . ° $ 20.40
Re-pipe per fixture (Commercial) $ 6.12
Re-pipe per fixture (Residential) $ 10.20
For each lawn sprinkler system on any one meter, including backfiow protection
devices therefore
$
61.19
For atmospheric type vacuum breakers/backfiow not included in item 1
1 to 5 $ 61.19
over 5 each additions! $ 61.'19
For each private sewage disposal system $ 122.38
For each cesspool $ 122.38
OTHER
Other Plumbing and Gas Inspections (per hour) I $ 122.38
PERMIT FEES
Electrical Permit Fee $ 40.79
Stand Alone Electrical Plan Check (hourly rate) $ 1,38
SYSTEM FEES:
New multi-family residential buildings
(apartments and condominiums) having three or more living units not
Including the area of garages, carports and other non-commercial automobile
storage areas constructed at the same time, per square foot '
$ 0.07
New single and two-family residential
buildings not including the area of garages, carports and other minor
accessory buildings constructed at the same time, per square foot
$ ~ 4.08
New commercial buildings and completely remodeled spaces
not including the area of garages, r square foot $ 0.13
UNIT FEES:
Residential Appliances
For faced residential appliances or receptade outlets for same, including wall-
mounted electric ovens; taunter mounted coolting tops; electric ranges, self-
contained room console, or through-wall air conditioners; space heaters; food
waste grinders; dishwashers washing machines; water heaters; dothes
dryers; or other motor operated appliances not exceeding one horsepower
(HP) in rating, each
20.40
Non-Residential Appliances
13-33
29
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -Mechanical, Electrical & Plumbing
Fee Types Fee
For residential appliances and self-contained factory-wired, non-residential
appliances non exceeding one horsepower (HP), kilowatt (K11V), or .
kilovotampere (kVA) In rating including medical and dental devices; food,
beverage, and ice cream cabinets; illuminated show cases; drinking
fountains; vending machines; laundry machines; or other similar types of
equipment, each
40.79
Services (Tempos Power)
For services of 600 vatts or less and not over 200 amperes in rating, each
(Commercial)
$ 40.79
For services of 600 volts or less and over 200 amperes to 1,000 amperes In
rating, each (Commercial)
$ 61.19
For services over 600 volts over 1,000 amperes [n rating, each (Commercial) $ 71.3
For services of 600 volts or less and not over 200 amperes in rating, each
(Residential)
$ 40.79
For services of 600 volts or less and over 200 amperes to 1,000 amperes In
rating, each (Residential)
$ 61.19
For services over 600 volts over 1,000 amperes lri rating, each (Residential) $ 71.39
Signs, Outline Lighting and Marquees •
For signs, outline lighting systems or marquees supplied from one branch
circuit, each
$ 40.79
For additional bsnch circuits within the same sign, outline lighting system or
marquee, -each
$ 20.40
Miscellaneous Apparatus, Conduits, Conductors, and Special Circuits
For electrical appastus, conduits and conductors for which a permit is
required but for which no fee is herein set brth
$ 122.38
Power Device/Appastus
For motors, genestors, tsnsformers, n+ctifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking or
baking equipment and other apparatuses, as follows: Rating in horsepower
(HP), kilowatts {kW}, kilovolt-amperes (kVA), or kilovoR-amperes-reactive
(KVAR):
122.38
1 unit $ ~ 30.60
Z through 5 units, each addftional $ 30.60
6 and over, each additional $ 30.60
Busways
For trolley and plug-in-type liusways, each 100 feet or fsction thereof $ 20.40
Receptacle, Switch and Lighting Outlets
For receptacle, switch, lighting or other outlets at which current is used or
controlled, except services, feeders and meters follows:
First 20 ~ $ 40.79
Additional outlets, each $ 2.04
Lighting Fixtures •
For lighting fixtures, sockets or other lamp hiildin~j devices
First 20 $ 61.19
Additional fixtures, each $ 3.06
For pole or platform-mounted lighting fixtures, each $ 12.24
For theatrical-type lighting fixtures or assemblies each $ 10.20
OTHER FEES:
Other Electrical Inspections (per hour) $ 122.38
13-34
30
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -Mechanical, Electrical & Plumbing
Fee Types
Minutes Consumed:'
Hours Consumed:
Productive Hours per FTE:
FTE Consumed:
4~.,
Note: This table would be used if, for example, someone just wants a'permit for
a water~heater or electrical panel. Please review & revise the time requirements
for the various fixture types. '
Fee
31 13 - 35
CITY OF CUPERTIlVO
Resolution 08-04+4
Fees Eft'ective July 1, 2008
Schedule D -Miscellaneous Items
Work Item Unk .Fee
Standard Hourly Rate S 122
ust~al Review S -
Sin le Famil HomelDu lex--New each S 551
Sin le Family Home/Du lex--Addition/AtteraUon each S 612
Multi-Fami /Commerclal each S 245
Address AS ' nment ~ ` er hour S 306
Antenna-Telecom Facili
Radio each S 367
Celluiar/Mobile Phone, tree-standing each S 979
CellularlMobile Phone, attached to buildin each S 979
Application Meeti
First Hour hou rate S 122
Each additional hour hou rate S 122
Arbor/Trellis
Awnin Cano y (supported b buikiin each $ 306
Balcon Addition each S 673
Carport each S 551
Certifications '
Special Inspector Certificaton Application each S 4,161
Materials Testes Lab Certification each S 2,570
Chimne each S 490
Chimney Re it each $ 490
Close Existin Openings
Interior wall each S 428
Exterior wall each $ 428
Commercial Coach ( ar unfi each unit $ ~ 734
Covered Porch each ~ 857
Deck ( each S ~ 428
Deck RaiG each S 428
Demolition
Commercial to 3,000 Sf) each S 490
Commercial (each add'I 3,000 s each 3,000 of S 245
Residential u to 3,000 s ,each S 490
Resuiential (each add9 3,000 s each 3,000 sf S 122
Disabled Acxess Com !lance Fns ect'ron hour S 122
Door
New door non stnictu each S 245
New door structural shear walUmason each S 367
Duplicate/Re lacement Job Card each S 61
Fence
Non-mason ,over 6 feet in height up to 100 l.f. S 367
Non-masonry, each additional 100 K each 100 I.f. S 6i
Masonry, over 6 feet in he' ht u to 100 I.f. S 612
-Mason ,each addkional 100 tf each 100 I.f. S 245
Fireplace
Mason each S 612
Pre-Fabricated/Metal each S 42B
Flag over 20 feet in height each S 337
Foundation Repair each S 734
Garage (detached
Wood frame u to-1,000 sf each $ 1,101
Mason up to 1,000 sf each S 1,101
lnspecfions
Outside of normal business hours, 0.2 Faults (minimum
charge)
to 2 hrs
S 245
Each additional hour or portion !hereof 1 hour 5 122
Reins ion fa er hour 1 hour S ~ 122
Inspections for which no fee is speafically indicated-per
hour (minimum charge = 112 hour)
1 hour
S 122
Life Safety R each S 734
l.ightin ~ each S 367
each add'I le each $ 367
Modular Structures each S 734
32 13-36
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -Miscellaneous Items
1Nark item Unit Fee
Standard Hourly Rate $ 122
Partition--Commercal, Interior up to 30 I.f. u to 30 I.f. $ 428
Additional partition each 30 I.f. $ 92
Partition-Residential, Interior {u to 30 I.f. up to 30 I.f_ S 428
Additional partition each 30 I.f. $ 92
Patio Cover! Sun Room
Wood frame u to 300 sf $ 612
Metal freme up to 300 sf $ 612
Other frame u to 300 sf $ 612
Additional patio each 300 sf $ 490
Enclosed, wood frame u to 3D0 sf $ 734
Enclosed, metal frame u tq 300 sf $ 734
Enclosed, other frame up to 300 sf $ 734
Additional encbsed do each 300 sf $ 612
Photovoltaic System
Residential each S 300
Commercial, up to 4 kilowatts u to 4 kW $ 612
Commercat, each additional 1 kilowatt each 1 kW $ 245
Plie Foundation
Cast in Place Concrete (first 10 Iles) ,u to-10 $ 857
Additional Piles increments of 1D} each 10 $ 734
Driven (steel, pre-stressed concrete ~ up to 10 $ 857
Additional Piles increments of 10) ~ each 10 $ 734
Product Review er hour $ ~ 122
Remodel-Residential
Kitchen u to 300 sf $ 551
Bath up to 300 sf $ 551
Other Remodel up to 300 sf $ 367
Additional remade! each 300 sf $ 61
Other Remodel 1000 sf $ 3,694
Additional remodel each 300 sf $ 242
Other Remodel 2500 sf ± S 4,907
Additional remodel each 300 sf $ 175
Re-reof
Residential each 100 sf $ i3
Multi-Fami Dwelling each 100 sf $ 13
Corhmeraal
Commercial first 5,000 s - each $ 337
Commercial (each add'I 2,500 sf) each 2,500 sf $ 153
Retaining Wall concrete or mason ) ~"
Standard up to 50 If) up to 50 I.f. $ 734
Additional retaini wall each 50 I.f. $ 612
S 'al Design, 3-10' high u to 50 tf) up to 50 I.f. $ 857
Additional retaini welt each 50 I.f. $ 734
5 I Desi n, over 10' hi h (up to 50 I u to 50 I.f. S 918
Additional retaining wall each SO I.f. S 795
GravityJCrib Wali, 0-10' h' h u to 50 I u to 50 I.f. $ 918
Additional Grevi /Crib Wall each 50 I.f. $ 795
Grevi !Crib Wall, over 10' hi h (up to 501 up to 50 t.f_ $ 918
Additional Gravity/Crib Wall each 50 I.f. $ 795
Revisions
Commercial New each $ 734
Tenant Im rovement each $ 734
SFDWL each $ 734
Addition each $ 612
Remodel each $ 612
Roof Structure Re ment u to 100 sf $ 612
Additional roof structure re lac~rrrent each 100 sf $ 490
Sauna-steam each $ 673
51di
Stone and Brick Veneer ('mterbr or exterior) up to 400 sf $ 551
Ap Other u to 400 sf $ 367
Addtional sidin each 400 sf $ 184
33 13 - 37
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule D -Miscellaneous Items
Work Item Unit Fee
Standard Hourly Rate $ 122
Si ns
Directional each $ 245
Each additional Diredional 5~ n, each S 122
GnwrxtlRoof/P ~ectin Si ns each $ 308
Master Plan Si n Cfiedt each $ 308
Rework of any existin Ground S' n each $ 306
Other Sign each $ 306
Rein dion Fee each $ 61
WalUAwn Sign, Non-Eledric each $ 245
Wall, Eledric each $ 245
Shed over 120 uarefeet each $ 366
Sk li ht
Less than i0 sf each $ 367
Greater than 10 sf or structural each $ 673
Solar Panels s tem $ 300
Stairs-First Flight first fl' ht $ 306
• Each additional fli ht r night $ 184
Store a Rados
0-8' high u to 100 first 100 N S 306
each additonal 100 ff each 100 ff $ 61
over 8' huh u to 100 • • ~fvst 100 ff $ 337
each additonal 100 K ~~ each 100 H $ 92
Stucco A ications ~u to 400 sf S 428
Additional Stucco lication each 400 sf $ 31
Supplemental Inspection Fee~f a project requires
significantly more inspections than
average, the Building Official may charge additional
inspection fees
First 112 hour minimum first 30 min $ 61
Each Additional hour hour S 122
Supplemental Plan Check Fee after 2nd review)
First 1I2 hour minimum first 30 min S 81
Each Additional hour per hour S 122
Swimmin PooUSpa
Yn -lined ( to 800 s each S 857
Fiber lass each S 612
Gunite up to 800 sf) each S 1,346
Additional I over 800 s each 100 sf S 184
Commerdal I (u to 800 s each• S 1,713
Commercial pool over 800 s each S 214
S or Hot Tub (Pre-tabricated each S 3~
Tempos Permit (commercial onl each S. 366
Window or 5lidin Glass Door
Re acement (each 8 windows each B S 367
New Window non structural each $ 428
New window (structural shear waNmason each $ 734
Ba Window structure each $ 734
34 13 - 38
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule E -Recreation
Recreation classes and excursion fees shall be determined as follows:
Classes
1. Determine the maximum hourly rate paid to instructor.
2. Multiply the instructor's hourly rate by the number of class meetings.
3. Determine the minimum number of participants and divide into the instructor's cost.
4. Add indirect overhead percent - 32%.
5. Add 20% to establish non-resident fee.
6. Add cost for specialized equipment or supplies.
Special Condi#ions: For classes taught by contract instructors, the indirect overhead is only added to the City's
percentage.
Excursions
1. Transportation cost divided by the number of participants plus overhead transfer.
2. Add 20% #o establish non-resident fee.
3. Add any admission cost, supplies or leadership cost.
Additional factors that may be used to determine the class or excursion user fee:
The total number of participants in a given activity may generate additional revenue whereby the total program
cost may be reduced.
Classes that traditionally have waiting lists may have the user fee increased.
Programs in competition with adjacent cities or the private sector may require fees to be increased or decreased
to remain competitive.
35 13 - 39
CITY OF CUPERTINO
Resolution 0&044
Fees Effective Jnly 1, 2008
Schedule E -Recreation
Facility Use Fee Schedule (Staff Use Only)
CLASSIFICATIONS:
Group I: City of Cupertino activities that are open to the public. O~cia1 city sponsored programs.
Group II: Clubs with 51% resident membership, recreation programs and events with full or affiliated city
co-sponsorship and open to the public.
Group III: Programs and events sponsored by Cupertino based non-profit recreation, education or community
service organization with S I% resident participation. These organizations must show an official
structure and status.
Group IV: Private, special interest or business groups for functions not open to the public. These functions
would include parties, banquets, receptions, industrial conferences, seminars, trade shows, etc.
Group V: Cupertino businesses using the Cupertino Roam of the Quinlan Community Center for promotional
and business related purposes other than negotiation or direct sale.
35 ~a-ao
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule E -Recreation
Quinlan Community Center
ROOM RENTAL SCHEDULE PER HOURS
Cupertino Room Mon-Thurs Fri-Sun
Group II $30 $80
Group III $30 $80
Group N $140 $230
Group V $50 $140
Group VI $265 $265
Classroom
Group II $20 $60
Group III $20 $60
Group N ~ $45 $90
Group V $25 $75
Conference Room
Group II $10 $25
Group III $10 $25
Group N $40 $60
Group V $25 $50
Securit~Staff
Security staff is required when alcohol is served at any City facility. $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour,
and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies
to all City facilities.
Securit~Deposit
A security deposit shall be required for Groups.III, N, V, and VI. Security deposit is due at time of reservation.
The Deparhnent Director may also require a deposit based on the nature of an event. The security deposit will
be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time.
Quinlan Community Canter
Cupertino Room -Groups N, VI $750
All Other Rooms - Group N $300
Group II, III, V -All Rooms $330
37 13 - 41
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule E -Recreation
Monta Vista Recreation Center/Creekside Park Building
Room Rental Schedule Per Hour
Monta Vista Creekside Park
Recreation Center Building
Multi-Purpose
Group III
Group IV
Group V
Classroom
Group II
Group III
Group IV
Group V
Conference RoomJKitchen
Group II .
Group III
Group N
Group V
N/A N/A
N/A N/A
N/A N/A
$25 $25
$25 $25
$SO $50
$35 $35
$25 N/A
$25 N/A
$50 N/A
$35 N/A
Security Staff
Security Staff is required when alcohol is served at any City facility; $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time sha[1 be charged $150.00 for any time up to the first half hour,
and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies
to all City facilities.
Security Deposit
A security deposit shall be required for Groups III, IV, V and VI. Security deposit is due at time of reservation.
The Department Director may also require a deposit based on the nature of an event. The security deposit will
be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time.
3g 13-42
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule E -Recreation
Senior Center
Annual Membership
End of Aug. to End of Oct. Membership Sale
Day Pass Fee
Resident
$22
$17
$5
Non-Resident
$27
$22
$5
Room Rental Schedule Fer Hour
Reception Room
Group II
Group III
Group N
Group V
Classroom, Conference Room, Arts & Crafts Room, Bad
Group II
Group III
Group N
Group V
Evenings and
Weekends
$12
$80
$230
$l40
$12
$60
$90
$75
* Senior Center rooms are not available for rental Monday through Thursday $;00 a.m, to 10:00 p.m. and
Friday, 8:00 a.m. to 5:00 p.m.
Security Staff
Security Staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour,
and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies
to all City facilities.
Security Deposit
A security deposit shall be required for Groups III, N, V and VI. Security deposit is due at time of reservation.
The Department Director may also require a deposit based on the nature of an event. The security deposit will
be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time.
Cupertino Senior Center
Reception Hall - Group N $750
All Other Rooms - Group N $300
Group II, III, V -All Rooms $300
39 ~ 13 - 43
CITY OF CUPERTIlITO
Resolution 08-044
Fees Effective July 1, 2008
Schedule E -Recreation
Outdoor Facilities
Memorial Softball Field
Cupertino residents/businesses only ~ $25.00
Non-Residents ~ $40
Field can be reserved for a maximum of 2 hours. THERE IS NO FEE FOR
CURRENT SOFTBALL TEAMS PLAYING IN CUPERTINO LEAGUES
Field preparation (includes dragging, watering, chalking, and bases) $36.50
Field Attendant (2 hour minimum). Field Attendant is required any time lights or field $8.25/hr
preparation is requested.
Lights (in the evening) $5.00/hr
Memorial Park A~hitheater
Cupertino resident/resident business $55.00
Non-Resident/Non-Resident business $75.00
Memorial Park Gazebo
Cupertino resident/resident business $55.00
Non-resident/non-resident business $75.00
Picnic Areas {daily rate)
Cupertino residents $55.00
Cupertino business $75.00
Non-residents $80.00
Non-resident business $100.00
Electricity at Memorial or Linda Vista Park $25.00
Snorts Field Fees
Adult Leagues (two hour minimum) $50.00lhr
Deposit $600.00
Youth Leagues (participant/season)
Resident $11.00
Non-resident $22.00
40 ~ s - as
CITY OF CUPERTINO
Resolution 08-044
Fees Effective Juty 1, 2008
Schedule E -Recreation
Blackberry Farm Golf Course
Resident Non-Resident Resident
9-Holes $14.00 $16.00 $12.00
Junior & Senior $14.00 $16.00 $11.00
Second 9 Holes (all players) $12.00 $14.00 $11.00
All groups and tournaments pay the full rate (Cupertino resident still applies). Staff is authorized to set
merchandise fees according to current cost.
Annual Rate (Weekdays Only} Adults {17-61)
Cupertino Residents $850
Non-Residents $1,000
Semi-Annual Rate (Weekdays Only) . -
Cupertino Residents $4S5
Non-Residents- $540 •
Super-Annual Rates (Goad on Weekends & Holidays)
Cupertino Residents ~ $1,000
Non-Residents ~ $1,125
Super Semi-Annual Rates (Good on Weekends & Holidays)
Cupertino Residents ~ $500
Non-Residents $600
Quick Passes (Ten-play card for the price of nine)
Cupertino Resident Weekday $9g
Cupertino Resident Weekend $l 17
Non-Resident Weekday ~ $117
Non-Resident Weekend $135
Green Fees
Cupertino Resident Weekday $12
Cupertino Resident Weekend $14
Non-Resident Weekday $14
Non-Resident Weekend ~ _ $16
Non-Resident
$14.00
$13.00
$13.00
Jr/Sr
$775
$925
$415
$495
$ l,aoo
$1,125
$500
$500
$90
$117
$108
$135
$11
$14
$13
$16
41 13 - 45
CITY OF CUPERTINO
Resolution 08-044
Fees Effective July 1, 2008
Schedule E -Recreation
Blackberry Farm
Picnic Areas (Daily Rate
300 Person Picnic Area
200 Person Picnic Area
100 Person Picnic Area
SO Person Picnic Area
Pool Pass for Picnic Area Groups
Day-Use Pass Only
Weekday Tuesday -Friday
Weekend Saturday -Sunday
Resident Non-Resident
$300 $450
$200 $300
$100 $150
$50 ~ $75
$2 per person $3 per person
$4 $6
$6 $8
Deposit for Picnic Areas
One half of fees will be due at time of reservation. The remainder will be due two weeks.prior to event.
42 13 - 46
CITY OF CUPERTINO
Resolution 0&044
Fees Effective July 1, 2008
Schedule E -Recreation
Sports Center/Child Watch/Teen Center
. Tune Resident -Non-Resident
Day Passes ~ $7.00 $10.00
Monthly Passes
One Month Single $55.00 $65.00
One Month Couple ~ $75.00 $90.00
One• Month - Family $95.00 $115.00
Annual Passes
One Year Juniors (<17} $300.00 $330.00
One Year Single $425.00 $455.00
One Year Couple $810.00 $880.00
One Year Family $905.00 $980.00
One Year ~ Senior $380.00 $405.00
Enrollment Fee All $50.00 $50.00
ADDITIONAL CONDITIONS -
1. The Cupertino Tennis Club. will be charged $10.00/hour during primetime and $ b.00/hour per court during
non-primetime for all C.T.C. sponsored activities other than U.S.T.A. leagues and practices.
2. All competitors in C.T.C./CT.S.T.A. leagues participating at the Sports Center must purchase an annual pass.
3. Individuals may purchase a ten pack of day passes, $b0.00 Resident, $90.00 Non-Resident.
4. Specials will be offered on an on-going basis.
Child Watch Fees
One visit $5.00
Ten visits $45.00
One Month Pass $100.00
Teen Center
Rental Rate - $200/3 hours
Deposit $750.00
Overtime Rate: $100.00 first hour; $50.00 each half hour after.
Resident - ~` ' ~ Non-Resident
Daily Pass $0.00 $5.00
Annual Pass $0.00 -
~3 ~ 13 - 47
CITY OF CUPERTINO
Resolution OS-044
Fees Effective Jnly 1, 2008
Schedule E -Recreation
Community Hall
ROOM RENTAL SCHEDULE PER HOUR
Group II
Group III
Group N
Group V .
Group VI
Mon-Thurs Fri-Sun
$80 $250
$80 $250
$80 $250
$80 $250
$80 $250
Securit~Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation shall be charged $150.00 for any time up to the first half hour, and
$150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies to
all City facilities.
Security Deposit
A aecurity deposit shall be required for Groups III, N, V and VI. Security deposit is due at time of reservation.
The Department Director may also require a deposit based on the nature of an event. The security deposit will
be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time.
Community Hall
Groups N, VI
Groups II, III, V
$700
$300
'~ 13 - 48