Loading...
13. Fee ScheduleOFFICE OF ADMINISTRATIVE SERVICES CUPERTINO CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 950143255 TELEPHONE: {408) 777-3220 • FAX: (408) 777-3366 SUMMARY Agenda Item No. ~~ SUBJECT Consider the 2008-09 Fee Schedule. BACKGROUND Meeting Date: April 1, 2008 All user fees are reviewed each year in conjunction with the preparation of the budget. City policy is to ensure that, to the extent possible, fees cover the cost of providing services. The majority of fees were updated by 3.5% reflecting the negotiated salary increase effective July 1, 2008 while some fees are set based on what the market will bear, such as Sports Center memberships. General Fees: Minimal increases were made with the exception of massage permit appeals, which is proposed to be increased from $150 to $502. This increase is based on the two most recent massage permit denial hearings which took seven to 10 hours of staff time to process. Building Fees: Building permit fees were modified slightly to more accurately reflect the latest building codes while providing adequate cost recovery. . Planning and Engineering Fees: Fees were increased 3.5% for cost of living. Recreation Fees: Fees were modified slightly to reflect market changes. New picnic area fees for Blackberry Farm have been added as the park will be opening in fiscal year 2008-09. 13-1 Please note that two fees do not follow our cost recovery policy and have been subsidized in the past. The first is a solar permit fee set at $300, which approximates 30% of the cost to provide this service. This fee was established at a lower amount to encourage solar installations. The second fee is for reconsideration .hearings and is set at $161 or three percent of the average cost. Since the establishment of this fee, we have had nine reconsideration hearings, none of which were approved. Staff is asking Council to provide direction on both of these fees. RECOMMENDATION: Staff recommends that the City Council approve the 2008-09 Fee Schedule. Submitted by: C A. Atwood Administrative Services Director Approved for submission: David W. Knapp City Manager 13-2 RESOLUTION NO: 08-044 DR,aFr A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO RESCINDING RESOLUTION NOS. 07-056 AND 07-109 AND ADOPTING USER FEES WHEREAS, the State of California requires fees charged for service rendered not to exceed the cost of delivering said services; and WHEREAS, a public hearing has been held to review user fees; and WHEREAS, the City Counci] of the City of Cupertino has established guidelines for setting user fees; NOW, THEREFORE, BE IT RESOLVED that: 1. User fees are .established per attachments A thorough E. 2. User fees are effective July 1, 2008 PASSED AND- ADOPTED at a regular meeting of the City Council of the City of Cupertino this ls` day of Apri12008 by the following vote: Vote Members of the City Council ' AYES: NOES: ABSENT: ABSTAIN: ATTEST: APPROVED: City Clerk Mayor, City of Cupertino .:.,: 13-3 CITY OF CUPERTINO SUMMARY OF USER FEES Resolution 0$-044 Fees Effective July 1, 200$ Department Schedule General A Engineering B Planning C Building D Recreation E 13-4 CITY OF CUPERTINO Resolution 08-044 Fees Effective Ja1y 1, 2008 Schedule A -General Photocopies -per sheet $0.20 Microfilm/Microftche Printout $0.50/frame Budget Documents $50.00 Comprehensive Annual Financial Reports {CAFR) $30.00 Returned Check Charge ~ ~ $25.00 Late Payment on 30 Day Delinquent City Invoices 12% per annum Property Liens Administrative Fee $30/book/block/parcel lien Municipal Code Book $77.00 Williamson Act Filings $105.00 Candidate Statement Fee .. $1,730.00 Tape Dubbing -Audio, Video, DVD, CD VHS $12.00/tape DVD $20.00/DVD CD Webcast/CD Audio $12.00/CD DV CAMBETA CAM - $50.00/tape U-Matic $25.00/tape Mini DV $30.00/DV Audio Cassette ~ $1.00/tape Notary Fee $10.00/signature Fingerprinting Processing State Fee $32.00 plus $12.00 City Fee Handbill Permit ~ $58.00 Renewals $29.00 Solicitor Permit (Includes fingerprinting) $87.00 Renewals $43.00 Massage Establishment Fee (Includes fingerprinting/background $337.00 check and business start-up inspection) Establishment with Therapist Permit ~ $366.00 Renewals (Includes two inspections per year) $87.00 Massage Therapist Fee (Includes fingerprinting/background ck) $279.00 Therapist with Managing Employee $308.00 Renewals $58.00 1 - 13-5 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule A -General Massage Managing Employee (Includes fingerprint/bkgrnd ck) $279.00 Managing Employee with Therapist Permit ~ $308.00 Renewals $58.00 Massage Permit Appeal (Denial/Revocation} $502.00 Taxi Driver Permit (Includes fingerprinting/background check $290.00 Renewals $174.00 All Municipal Code Parking Violations $36.00 CVC Parking Citation Dismissals Administrative Fee $25.00 Noise Variances $168.00 Duplicate Business Licenses $26.00 Business License Exemption Administrative Fee $64.00 Business License Database ~ $105.00 New Business Monthly Reports ~ $21.00/month Community Festivals $8.50/day/vendor Farmers Market - $2,10/week/vendor Flea Markets $9.20/month/vendor Sign Removal (Public Right-of-Way) $29.00/sign Dangerous Dog Annual Registration Fee $174.00 Internet Processing Fee ~ $2.00/transaction False Alarms $142.00 Abatement Fee ~ Actual Cost Compilation of New Records (requests greater than 1/2 hour) Actual Cost Graffiti Cleanup Actual Cost Event Video Taping/Editing Actual Cost Damage to City Property Actual Cost Grounds, Streets, Facilities, Traffic Engineering/Maintenance Code Enforcement Actual Cost 2 73-6 CITY OF CUPERTINO Resolution 08-044 Fees Effective Jaly 1, 2008 Schedule A -General Public Requests for GiS Printed Maps Standard pre-formatted maps Plotted maps Printed maps Custom request maps Prints or plots of aerial photogaphy, see Engineering fees Public Requests for GIS Data Digital data layers for GIS data Custom request data layers on CDROM Ortho-rectified aerial photography $25.00 $2.00 Actual Cost $25.00/layer $200.00 for all city layers Actual Cost $25.00/tile $300.00 full City of Cupertino (153 tiles) * Actual cost is: 1) Employee hourly rate plus 56% for benefits and overhead, and 2) cost of materials, contractors and supplies. 3 ~s-~ CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule B -Engineering Street Cuts Miscellaneous Cost of Improvements $10;000 or under ~ $224.00 Cost of Improvements between $10,001 and $15,000 $335.00 Cost of Improvements $15,001 and over 5% of cost Utility, greater of $1,456 minimum or 5% of cost of improve. $1,456.00 minimum Grading permit; greater of $2,239-min. or 6% of cost of improve. $2,239.00 minimum Parcel Map/Tract Map (Map Checking Fee) Parcel Map (1-4 lots) $3,638.00 Tract Map (> 4 lots) $7,553.00 Plan Check and Inspection Review of Building Permit Only $560.00 Review of Public/Private Improvemen# Plans: Residential; greater of $2,385 min. or 5% of cost of improve. ~ $2,385.00 minimum Commercial; greater of $3,847 min. or 6% of cost of improve. $3,847.00 minimum Annexation (plus county filing fee) _ $1,565.00 Certificates of Compliance $1,342.00 Encroachment Permits Residential ~ $224.00 Non-Residential $224.00 Annual Utility Company $391.00 Pool Permit $560.00 Lot Line Adjustment $2,576.00 Soil &Geo Reports (plus any material/service fees} . Short Report ~ $672.00 Long Report $672.00 Geo Report Deposit $8,004.00 Engineering Copies Microfiche $22.00/sheet Improvement Plans $22.00/sheet Traffic Reports/Plans $22.00/sheet Microfilm $0.56/frame Transportation Permit (Per Department of Transportation} Single $18.00 Annual Utility Company $101.00 Additional Engineering Investigation or Coordination $57.00/hr. * Price is for first sheet only. Each additional sheet is $10.85. 4 ~s-s CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule B -Engineering Telecommunications Facility Fee (5% increase per year) Installation Rate $1.99/lineal ft. of conduit/yr Occupancy Rate $1.05/lineal ft. of leased conduit/yr Banners Large Banners Across Stevens Creek Boulevard $359.00 Small Banners on Light Poles (for 20 poles) $707.00 . Aerial Photo Custom Work 24" x 36" $57.00/sheet 8 1/2" x 11" ~ $11.00/sheet SoillGeo Report Research $1,342.00 Special Events ~ $1 220.00 Schools -Traffic Request $1,378.00 Insurance Review $353.00 Block Party/Parade ($1,033.00} .. No Charge Vacation of Public Street ROW/PUE $516.00 Small Traffic Calming Request ~ $968.00 RuraUSemi-Rural Classification Application $672.00 Comprehensive Neighborhood Traffic Request $1,926.00 Certificate of Correction $147.00 Floodplan Evaluation $57.00 Permit Parking Study $983.00 ~ 13-9 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule C - Def ninon of Planning Fee Services Major Five thousand or more square feet commercial; 10,000 or more square feet office/residential; eight or more residential units. Minor Less than 5,000 square feet commercial; less than 10,000 square feet office/residential; less than eight residential units. Anneal A request from the project applicant or interested party to reverse or amend a decision made by staff or an advisory body. An appointed public official serving on the boazd that made the decision subject to the appeal, an appointed public official serving on a board that is directly affected by the decision and the City Council members are exempted from the fee requirement. Directors Application An application that receives final approval by staff either via an advertised public hearing ornon-hearing format. The application may involve apre-application meeting and/or Environmental Review committee review. Temporar~Sign Permit A staff review of a temporary sign application that includes an evaluation of the sign request, the entry into the temporary log and site review by Code Enforcement Officers. The permit fee is in addition to the submittal of a deposit to guarantee removal of the sign upon expiration of the temporary permit. Tentative Map: Five or more parcels. Parcel Map: Four or less parcels. Housing Mitigation Fee Fee collected is used to construct new affordabe residential units for Cupertino residents and employees. The fees mitigate the need for affordable units caused by expanding offices, retail, hotel and industrial buildings creating new jobs and new residential development creating a need for more affordable development. An impact fee shall be assessed on any new retail, hotel and office/industrial development applications. The following uses shall be exempt from the impact fee, but still required to provide Below Market Rate Housing as part of a residential development: projects in a redevelopment project area and mixed use projects providing two thirds residential and one third retail/office. Developments in the PIMP) zoning district shall be assessed a fee of $2.38 per square foot. An in-lieu fee shall be assessed on all new residential units in developments of and on new single family lots created through a subdivision. Existing single family lots are exempt. Notes: Mixed use applications will be~classified based upon the highest intensity and review process. The Director of Community Development will have discretion to classify projects based upon the above criteria. b 13 - 10 CITY OF CUPERTINO Resolution OS-044 Fees Effective July 1, 2008 Schedule C -Definition of Planning Fee Services General Plan Amendment Authorization -Major General Plan Amendment Authorization -Minor Study Session . General Plan Amendment -Major General Plan Amendment -Minor Development Agreement Zoning -Minor Zoning < one acre Zoning one to five acres Zoning > five acres Tentative Map Use Permit -Major Exception Amendment to Development Approval • Hillside Exception Parcel Map Use Permit -Minor Planning Commission -Architectural and Site Approval Planning Commission interpretation Environmental Impact Report (Plus State & County Filing Fees) Negative Declaration -Major (Plus State & County Filing Fees) Negative Declaration -Minor (Plus State & County Filing Fees) Tree Removal Permit First Tree Each Additional Tree Retroactive Tree Removal Permit Tree Management Plan For atl projects requiring more than 48 hours of staff time, applicants will be charged at the hourly rate of $122.00 per hour, which includes staff time, overhead and administrative oversight. $4,019.00 $2,009.00 $4,019.00 $12,519.00 $6,260.00 $16,554.00 $3,100.00 $6,200.00 $9,425.00 $12,842.00 $ l 3,662.00 $13,662.00 $2,406.00 $3,648.00 $6,052.00 $6,381.00 $6,3 81.00 $6,3 81.00 $3,188.00 $23,901.00 $3,677.00 $1,838.00 $155 $78 $2,755 $1,077 7 13 - 11 Cl T'Y OF CUPERTINO Resolution 08-044 Fees Eft'ective July 1, 2008 . Schedule C -Definition of Planning Fee Services Categorical Exemption (Plus County Filing Fee} ~ $213.00 Design Review Committee -Architectural and Site Approval $3,086.00 R-1 Design Review $2,142.00 R-1 Exception $2,406.00 Sign Exception $1,804.00 Fence Exception $613.00 Director -Variance $1,540.00 Director -Minor Modification $1,077.00 Minor Residential Permit $1,077.00 Temporary Use Permit ~ $1,231.00 Temporary Sign Permit $180.00 Sign Program - $617.00 Appeal/Petitions for Reconsideration $161.00 Zoning, Planning, Municipal Code (Building Permit Fees) CommericaUMulti-Family $0.24/sq. ft. Residential Single Family ~ $0.13/sq. ft. Wireless Master Plan Fee: Equipment Mount on Existing Light Utility Pole $5.59/mount Wireless Master Plan Fee: Other Personal Wireless Facility $1,119.00/facility Housing Mitigation In-Lieu Fees Residential $2.58/sq. ft. Office/IndustriaUHotel/RetaiUR&D $4.91/sq. ft. p(Mp) 2.46/sq. ft. Stevens Creek Boulevard Specific Plan Fee ~ $.044/sq. ft. Zoning Verification Letter $162.00 For al[ projects requiring more than 48 hours of stafftime, applicants will be charged at the hourly rate of $122.00 per hour, which includes staff time, overhead and administrative oversight. g 13 - 12 CITY OF CUPERTINO Resolution OS-044 Fees Effective Jaly 1, 2008 Schedule D -New Construction Plan Check Fees Construction Types: [-A, I-B Construction Types: ~ li-A, III-A, V-A Construction Types: Il-B, (II-B, N, V-8 UBC Class BC Occupancy Type Project Size Threshold Base Cost a~ Threshold Size Cost for Each Additional 100 sf' Base Cost @ Threshold Size Cost for Each Additional 100 sf" Base Cost ~ Threshold Sae Cost for F~ch Additional 100 sf • A-1 - 1,000 $6,906 $5.21 $5,755 $4.34 $4,604 $3.47 - - 5,000 $7,1.14 $14.29 $5,929. $11.91 $4,743 $9.53 - ~ - 10,000 $7,829 $3.58 $6,524 $2.98 $5,219 $2.38 - - 20,000 $8,186 $5.35 $6,822 $4.46 $5,458 $3.57 - - 50,000 $9,792 $2,86 $8,160 $2.38 $6,528 $1.90 100,000 $11,220 $11.22 $9,350 $9.35 $7,480 $7.48 A-2 - 250 $6,882 $20.77 $5,735 $17.31 $4,588 $13.85 - - 1,250 $7,090 $56.97 $5,908 $47.48 $4,727 $37.98 - - 2,500 $7,802 $14.22 $6,502 $11.85 $5,202 $9.48 - - 5,000 $8,158 $21.36 $6,798 $17.80 $5,439 $1424 - - 12,500 $9,759 $11.39 $8,133 $9.49 $6,506 $7.59 25,000 $11,183 $44.73 $9,319 $37.28 $7,455 $29.82 A-3 - 1,000 $6,9D6 $5.21 $5,755 $4.34 $4,604 $3.47 - - 5,000 $7,114 $14.29 $5,929 $11.91 $4,743 $9.53 - - 10,000 $7,829 $3.58 $6,524 $2.98 $5,219 $2.38 - - 20,000 $8,186 $5.35 $6,822 ~ $4.46 $5,458 $3.57 - - 50,000 $9,792 $2.86 $8,160 $2.38 $6,528 $1.90 100,000 $11,220 $11.22 $9,350 $9.35 $7,480 $7.48 A-4, A-5 - 500 $5,646 $8.53 $4,705 $7.10 $3,764 $5.68 - - 2,500 $5,816 $23.35 $4,847 $19.46 $3,878 $15.57 - - 5,000 $6,400 $5.84 $5,334 $4.87 $4,267 $3.90 - - 10,000 $6,692 $8.76 $5,577 $7:30 $4,462 $5.84 - - 25,000 $8,007 $4.67 $6,673 $3.89 $5,338 $3.11 50,000 $9,174 $18.35 $7,645 $15.29 $6,116 $12.23 A A Occupancy Tenant Improvements 500 $3,127 $4.71 $2;606 $3.93 $2,084 $3.14 - - 2,500 $3,221 $12.94 $2,684 $10.78 $2,147 $8.62 - - 5,000 $3,544 $3.23 $2,954 $2.69 $2,363 $2.15 - - 10,000 $3,706 $4.86 $3,088 $4.05 $2,470 $3.24 - - 25,000 $4,43,4 $2.59 $3,695 $2,16 $2,956 $1.73 50,OOD $5,082 $10.16 $4,235 $8.47 $3,388 $6.78 B Banks 500 $6,795 $10.25 $5,662 $8.54 $4,530 $6.83 - - 2,500 $7,000 $28.14 $5,833 $23.45 $4,667 $18.7fi - - 5,000 $7,703 $7.04 $6,419 $5.86 $5,136 $4.69 - - 10,000 $8,055 $10.55 $6,713 $8.79 $5,370 $7.03 - - 25,000 $9,638 $5.61 $8,031 $4.68 $6,425 $3.74 50,000 $11,040 $22.08 $9,200 $18.40 $7,360 $14.72 B Laundromat 200 $6,445 $24.32 $5,371 $20.27 $4,297 $16.21 - - ~ 1,000 $6,639 $66.68 . $5,533 $55.56 $4,426 $44.45 - - 2,000 $7,306 $16.68 $6,089 $13.90 $4,871 $11.12 - - 4,000 $7,640 $25.00 $6,367 $20.83 $5,093 $16.66 - - 10,000 $9,140 $13.34 $7,616 $11.11 $6,093 $8.89 20,000 $10,473 $52.37 $8,728 $43.64 $6,982 $34.91 B MedlcalOffice 500 $8,049 $12.15 $6,708 $10.13 $5,366 $8.10 - - 2,500 $8,292 $33.30 $6,910 $27.75 $5,528 $22.20 - - 5,000 $9,125 $8.34 $7,604 $6.95 $6,083 $5.56 - - 10,000 $9,542 $12.49 $7,951 $10.41 $6,361 $8.33 - - 25,000 $11,415 $6.66 $9,513 $5.55 $7,610 $4.44 50,000 $13,080 $26.16 $10,900 $21.80 $8,720 $17.44 9~ 13-13 CITY OF CUPERTINO Resolution OS-044 Fees Effective Daly 1, 2008 Schedule D -New Constriction Plan Check Fees Construction Types: I-A, 1-8 Construction Types: II-A, III-A, V-A Construction Types• II•B, III-B, IV, V-B • UBC Class BC Occupancy Type Project Size Threshold Base Cyst Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost (~ Threshold Size Cost for Each Additional 100 sf B Offices 1,000 $7,670 $5.79 $6,392 $4.82 $5,113 $3.86 - - 5,000 $7,901 $15.89 $6,588 $13.24 $5,268 $10.59 - - 10,000 $8,696 $3.98 $7,246 $3.31 $5,797 $2.65 - - 20,000 $9,093 $5.94 $7,578 $4.95 $6,062 $3.96 - - 50,000 .$10,875 $3.78 $9,063 $2.65 $7,250 $2.12 700,000 $12,465 $12.47 $10,388 $10.39 $8,310 $8.31 B B Occu an Tenant ]m rovements 300 $2,434 $6.12 $2,029 $5.10 $1,623 $4.08 - - 1,500 $2,508 $16.79 $2,090 $13.99 $1,672 $71.19 - - 3,000 $2,759 $4.20 $2,300 $3.50 $7,8.40 $2,80 - - 6,000 $2,885 $6.29 $2,405 $5.24 $1,924 $4.19 - - 15,000 $3,452 $3.36 $2,876 $2.80 $2,301 $2.24 30,000 $3,956 $13.19 $3,296 $10.99 $2,637 $8.79 E Preschool/School 100 $7,A~8 $53.02 $5,857 $44.18 $4,685 $35.35 - - 500 $7,240 $145.43 $6,034 $127,19 $4,827 $96.95 - - 1,000 $7,967 $36.36 $6,640 $30.30 $5,312 $24.24 - - 2,000 $8,331 $54.53 $6,943 $45.44 $5,554 $36.35 - - 5,000 $9,967 $29.09 $8,306 $24.24 $6,645 $19.39 10,000 $17,421 $174.21 $9,518 $95.18 . $7,614 $76.14 E E Occu ancy Tenant Improvements 100 $4,228 $31.89 $3,524 $26.58 $2,819 $21.26 - - 500 $4,356 $87.50 $3,630 $72.91 $2,904 $58.33 - - 1,000 $4,793 $21.87 $3,995 $18.23 $3,796 $14.58 - - 2,000 $5,012 $32.81 $4,177 $27.34 $3,341 $21.87 - - 5,000 $5,996 $17.51 $4,997 $14.59 $3,998 $11.67 10,000 $6,872 $68.72 $5,726 $57.26 $4,581 $45.81 F-7, F-2 Factory/Industrial 1,000 $8,545 $6.45 $7,121 ~ $5.38 $5,697 $4.30 - - 5,000 $8,803 $17.69 $7,336 $14.74 $5,869 $11.79 - - 10,000 $9,687 $4.41 $8,073 $3.68 $6,458 $2.94 - - 20,000 $70,128 $6.64 $8,440 $5.53 $6,752 $4.43 - - 50,000 $12,120 $3.54 $10,700 $2.95 $8,080 $2.36 100,000 $13,890 $13.89 $11,575 $11.58 $9,260 $9.26 F F Occupancy Tenant Improvements 1,000 $6,270 $4.73 $5,225 $3.94 $4,180 $3.15 - - 5,000 $6,459 $12.99 $5,383 $10.83 $4,306 $8.66 - - 1.0,000 $7,109 $3.23 $5,924 $2.69 $4,739 $2.15 - - 20,000 $7,431 ~ $4.88 $6,193 $4.07 $4,954 . $3.25 - - 50,000 $8,895 $2.58 $7,413 $2.15 $5,930 $1.72 100,000 $10„I$5 $10.19 $8,488 $8.49 $6,790 $6.79 H-1 H-10ccupancies ~ 100 $7;349 $55.44 $6,124 $46.20 $4,899 $36.96 - - 500 $7,571 $152.07 $6,309 $126.73 $5,047 $701.38 - - 1,000 $8,331 $37.99 $6,943 $31.66 $5,554 $25.33 - - 2,000 $8,711 $57.03 $7,259 $47.53 $5,807 $38.02 - - 5,000 $10,422 $30.42 $8,685 $25.35 $6,948 $20.28 10,000 $11,943 $119.43 $9,953 $99.53 $7,962 $79.62 10 13 - 14 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -New Construction Plan Check Fees Construction Types: 1-A, I-B Construction Types: 11-A, III-A, V-A Construction Types: II-B, 111-B, N, V-B BC Class BC Occupancy Type • Project Size Threshold Base Cost @ :..: Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 940 sf * Base Cost @ Threshold Size Cost for Each Additional 700 sf H-2 to Hazardous Rooms 100 $5,862 $44.22 $4,885 $36.85 $3,908 $29.48 H-5 - 500 $6,038 $121.28 $5,032 $141.06 $4,026 $80.85 - - 1,000 $6,645 $30.31 $5,537 $25.26 $4,430 $20.21 - - 2,000 $6,948 $45.48 $5,790 $37.90 $4,632 $30.32 - - 5,000 $8,312 $24.26 $6,927 $20.21 $5,542 $16.17 10,000 $9,525 $95.25 $7,938 $79.38 $6,350 $63.50 H H Occupancy Tenant Improvements 100 $5,512 $41.58 $4,593 $34.65 $3,674 $27.72 - - 500 $5,678 $114.03 $4,732 $95.03 $3,785 $76.02 - - 1,000 $6,248 $28.53 $5,207 $23.78 $4,165 $19.02 - - 2,000 $6,533 $42.77 $5,445 $35.64 $4,356 $28.51 - - 5,000 $7,817 $22.80 $6,514 $19.00 $5,211 $15.20 10,000 $8,957 $89.57 $7,464 ' $74.64 $5,971 $59.71 I-1 to 1-4 Institutional 500 $6,299 $9.51 $5,249 $7.92 $4,199 $6.34 - - 2,500 $6,489 $26.06 $5,408 $21.72 $4,326 $17.38 - - 5,000 $7,141 $6.52 $5,951 $5.43 $4,760 $4.34 - - 10,000 $7,466 $9.78 $6,222 $8.15 $4,978 $6.52 - - 25,000 $8,934 $5.21 $7,445 $4.34 $5,956 $3.47 50,000 $10,236 $20.47 $8,530 $17.06 $6,824 $13.65 I I Occupancy Tenant Improvements 100 $3,849 $29.04 $3,207 $24.20 $2,566 $19.36 - - 500 $3,865 $79.64 $3,304 $66.37 $2,643 $53.10 - - 1,000 $4,363 $19.91 $3,636 $16.59 $2,909 $13.27 - - 2,000 $4562 $29.86 $3,802 $24.88 $3,042 $19.91 - - 5,000 $5,458 $1S.92 $4,549 $13.27 $3,639 $10.62 10,000 $6,254 $62.54 $5,212 $52:12 $4,170 $41.70 M Market 2,000 $6,206 $2.35 $5,172 $1.96 $4,137 $1.56 - - 10,000 $6,394 $6.41 $5,328 $5.34 $4,262 $4.27 - - 20,000 $7,034 $1.62 $5,862 $1.35 $4,690 $1.08 - - 40,000 $7,358 _ $2.40 $6,132 $2.00 $4,906 $1.60 - - 100,000 $$,796 $1.28 $7,330 $1.07 $5,864 $0.86 200,000 $10;080 $5.04 $8,400 $4.20 $6,720 $3.36 M M Occupancy Tenant Improvements 300 $3,646 $9.16 $3,038 $7.63 $2,431 $6.11 - - 1,500 $3,756 $25.14 $3,130 $20.95 $2,504 $16.76 - - 3,000 $4,133 $6.30 $3,444 $5.25 $2,755 $4.20 - - 6,000 $4,322 $9.43 $3,602 $7.86 $2,881 $6.29 - - 15,000 $5,171 $5.04 $4,309 $4.20 $3,447 ~ $3.36 30,000 $5,927 $19.76 $4,939 $16.46 $3,951 $13.17 R-2 Apartment 81dg 800 $7,279 $6.87 $6,066 $5.72 $4,853 $4.58 - - 4,000 $7,499 $18.82 $6,249 $15.68 $4,999 $12.54 - - 8,000 $8,251 $4.72 $6,876 $3.93 $5,501 $3.14 - - 16,000 $8,628 $7.05 $7,190 $5.87 $5,752 $4.70 - - 40,000 $10,320 $3.77 $8,600 $3.14 $6,880 $2.51 ' 80,000 $11,827 $14.78 $9,856 $12.32 $7,885 $9.86 R-2 Apartment Bldg - Repeat•Unit 800 $3,789 $3.50 $3,091 $2.92 $2,473 $2.33 - - 4,000 $3,821 $9.59 $3,184 $7.99 $2,548 $6.39 - - 8,000 $4,;?OS $2.40 $3,504 $2.00 $2,803 $1.60 - - 16,000 $4,397 A $3.60 $3,664 $3.Q0 $2,931 $2.40 - - 40,000 $5,261 $1.92 $4,384 $1.60 $3,507 $1.28 80,000 $6,029 $7.54 $5,024 $6.28 $4,019 $5.02 1~ 13-15 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -New Construction Plan Check Fees Construction Types: 1-A, I-B Construction Types: II-A, III-A, V-A Construction Types: ll-B, III-B, IV, V-B UBC Class BC Occupancy Type Project S¢e Threshold Base Cost ~ Threshold Size Cost for Each Additional 100 sf * Base Cost ~ Threshold Size Cost for Each Additional 700 sf " Base Cost ~ Threshold Size Cost for Each Additional 100 sf R-1 Hotels & Motels 3,000 $10,626 $2.72 $9,022 $2.27 $7,218 $1.81 _ - 15,000 $11,153 $7.46 $9,294 $6.22 $7,435 $4.98 _ - 30,000 $12,272 $1.86 $10,227 $1.55 $8,182 $1.24 _ - 60;000 $12,830 $2.80 $10,692 $2.34 $8,554 $1.87 _ ~ - 150,000 $15,354 $1.50 $12,795 $1.25 $10,236 $1.00 300,000 $17,604 $5.87 $14,670 $4.89 $11,736 $3.91 R-3 Dwellin s -Custom, Models, 1,000 $3,405 $26.46 $2,837 $22.05 $2,270 $17.64 - Frst Master Plan 2,500 $3,802 $26.43 $3,168 $22.03 $2,535 $17.62 _ - ~ 4,000 $4,1.98 $9.92 $3,499 $8.26 $2,799 $6.61 _ - 6,000 $,4,397 $69.44 $3,664 $57.86 $2,931 $46.29 _ - 8,000 $5,7$5 $29.79 $4,821 $24.83 $3,857 $19.86 10,000 $6,381 $63.81 $5,318 $53.18 $4,254 $42.54 R-3 Dwellings -Production Phase 1,000 $1,768 $1.31 $1,474 $1.09 • • $1,179 $0.87 - of Master Plan 2,500 $1,788 $1.32 $1,490 $1.10 $1,192 $0.88 - (repeats) 4,000 $1,808 $1.00 $1;507 $0.84 $1,205 $0.67 - - 6,000 $1,828 $31.73 $1,523 $26.44 $1,219 $21.15 _ - 8,000 $2,462 $9.93 $2,052 $8.28 $1,642 $6.62 10,000 $2,661 $26.61 $2,218 $22.18 $1,774 $17.74 R-3 Dwellings Alternate Ma#erials 1,000 $5,851 $52.89 $4,876 $44.08 $3,901 $35.26 _ - 2,500 $6,644 $52.89 $5,537 $44.08 $4,430 $35.26 - - 4,000 $7,438 $19.85 $6,198 $16.54 $4,958 $13.23 _ - 6,000 $7,835 $138.86 $6,529 $115.71 $5,223 $92.57 - - 8,000 $10,612 $59.52 $8,843 $49.60 $7,074 $39.68 10,000 $11,802 $118.02 $9,835 $98.35 $7,868 $78.68. R-3 Dwellings-Hillside -Custom, Models, 1,000 $6,347 $13.23 $5,289 $11.02 $4,231 $8.82 - First Master Plan 2,500 $6,545 $52.89 $5,454 $44.08 $4,364 $35.26 - - 4,000 $7,339 $9.95 $6,116 $8.29 $4,892 $6.63 - - 6,000 $7,538 $59.50 $6,281 $49.59 $5,025 $39.67 _ - 8,000 $8,728 $69.42 $7,273 $57.85 $5,818 $46.28 10,000 $10,116 $101.16 $8,430 $84.30 $6,744 $67.44 R-3 Dwellings-Hillside - Production Phas 1,000 $3,609 $6.60 $3,008 $5.50 $2,406 $4.40 - of Master Plan 2,500 $3,708 $28.18 $3,090 $23.48 $2,472 $18.78 - (repeats 4,000 $4,131 $4.95 $3,443 $4.12 $2,754 $3.30 - - 6,000 $4,30 S30.66 $3,525 $25.55 $2,820 $20.44 _ - 8,000 $4,843 $36.39 $4,036 $30.33 $3,229 $24.26 10,000 $5,571 $55.71 $4,643 $46.43 $3,714 $37.14 R-3 Dwellings-Hillside-AftemateMateria .1,000 $11,967 $26.45 $9,972 $22.04 $7,978 $17.63 _ - 2,500 $12,363 $105.82 $10,303 $88.18 $8,242 $70.54 _ - 4,000 $13,951 $19.82 $11,626 $16.51 $9,300 $13.21 _ - 6,000 $14,347 $119.06 $11,956 $99.21 $9,565 $79.37 _ - 8,000 $16,728 $138.83 $13,940 $115.69 $11,152 $92.55 10,000 $19,505 $195.05 $16,254 $162.54 ~ $13,003 $130.03 R-3.1 Grou Care 1,000 $12,482 $9.42 $10,402 $7.65 $8;321 .$6.28 _ - 5,000 $12,859 $25.82 $10,716 $21.51 $8,573 $17.21 - - 10,000 $14,150 $6.46 $11,791 $5.39 $9,433 $4,31 _ - 20,000 $14,796 $9.68 $12,330 $8.07 $9,864 $6.45 _ - 50,000 $17,700 $5.16 $14,750 $4,30 $11,800 $3.44 100,000 $20,280 $2028 $16,900 $16.90 $13,520 $13.52 R-4 Group Care 100 $8,399 $63.36 $6,999 $52.80 $5,599 $42.24 - 500 $8,653 $173.80 $7,210 $144.83 $5,768 $115.86 _ - 1,000 $9,522 $43.44 $7,935 $36.20 $6,348 - 8.96 12 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -New Construction Plan Check Fees • Construction Types: •1-A,1-B Construction Types: II-A, 111-A, V-A Construction Types: II-B, III-B, N, V-B UBC Class BC Occupancy Type Project S¢e Threshold Base Cost ~ Threshold Size Cost for Each Additional 100 sf * Base Cost (d1 Threshold Size Cost for Each Additional 100 sf * Base Cost ~ Threshold Size Cost for Each Additional 100 sf - - 2,000 $9,956 $65.18 $8,297 $54.31 $6,637 $43.45 - - 5,000 $11,911 $34.75 $9,926 $28.96 $7,941 $23.17 10,000 $13,649 $136.49 $11,374 $113:74 $9,099 $90.9 R R Occupancy Tenant Improvements 80 $3,639 $34.31 $3,033 $28.59 $2,426 $22.87 - - 400 $3,749 $94.14 $3,124 $78.45 $2,499 $62.76 - - 800 $4,126 $23.52 $3,438 $19.60 $2,750 $15.68 - - 1,600 $4,314 $35.30 $3,595 $29.41 $2,876 $23.53 - 4,000- $5,161 $18.84 $4,301 $15.70 $3,441 $12.56 8,000 $5,915 $73.93 $4,929 $61.61 $3,943 $49.29 S-1 Moderate-Hazard Storage 600 $8,223 $10.34 $6,853 $8.62 $5,482 $6.90 - 3,000 $8,472 $28.35 $7,060 $23.63 $5,648 $18.90 - 6,000 $9,322 $7.08 $7,769 $5.90 $6,215 $4.72 - - 12,000 $9,747 $10.65 $8,123 $8.87 $6,498 $7.10 - - 30,000 $11,664 $5.67 $9,720 $4.73 $7,776 $3.78 60,000 $13,365 $22.28 $11,138 $18.56 $8,910 $14.85 13 13.17 CITY OF CUPERTINO Resolution 08-044 Fees Effective Jaly 1, 2008 Schedule D -New Constmction Plan Check Fees Construction Types: I-A, I-B Construction Types: it-A, Ill-A, V-A Construction Types: II-B, III-B, N, V-B UBC Class • UBC Occupancy Type Project Size Threshold Base Cost ~ Threshold Sae Cost for Each Additional 100 sf ` Base Cost ~ Threshold Size Cost for Each Additional 100 sf' Base Cost ~ Threshold Size Cost for Each Additional 100 sf " S-2 Low-Hazard Storage 10,OOD $10,149 $0.77 $8,458 $0.64 $6,766 $0.51 - - 50,000 $10,455 $2.10 $8,713 $1.75 $6,970 $1.40 - - '100,000 $11,505 $0.52 $9,588 $0.44 $7,670 $0.35 - - 200,000 $12,030 $0.79 $10,025 $0.66 $8,020 $0.53 - - 500,000 $14,400 $0.42 $12,000 $0.35 $9,600 $0.26 1,000,000 $16,500 $1.65 $13,750 $1.38 $11,OD0 $1.10 S S Occupancy Tenant Improvements 600 $4,987 $6.27 $4,156 $5.23 $3,324 $4.18 - - 3,000 $5,137 $17.19 $4,281 $14.33 $3,425 $11.46 - - - 6,000 $5,653 $4.31 $4,711 $3.59 $3,769 $2.87 - - 12,000 $5,911 $6.46 $4,926 $5.38 $3,941 $4.31 - _ - 30,000 $7,074 $3.42 $5,895 $2.85 $4,716 $2.28 60,000 $8,100 $13.50 $6,750 $11.25 $5,400 $9.00 U Private Garage/Agricultural Bldg 40 $4,024 $75.90 $3,354 $63.25 $2,683 $50.60 - - 200 $4,146 $208.17 $3,455 $173.48 $2,764 $138.78 - - 400 $4,562 $52.04 $3,802 $43.36 $3,041 $34.69 - - 800 $4,770 $78.07 $3,975 $65.05 $3,180 $52.04 - - 2,000 $5,707 $41.63 $4,756 $34.69 $3,805 $27.75 4,OD0 $6,539 $763.49 $5,450 $136.24 $4,360 $108.99 - Deferred Submittal-Ali Except R-3 1,040 $5,803 $4.38 $4,836 $3.65 $3,869 $2.92 - - 5,000 $5,978 $12.02 $4,982 $10.01 $3,986 $8.01 - - 10,000' $6,579 $3.00 $5,483 $2.50 $4,386 $2.00 - - 20,000 $6,879 $4.50 $5,733 $3.75 $4,586 . $3.00 - - 50,0 $8,228 $2.42 $6,856 $2.01 $5,485 $1.61 100,000 $9,435 $9.44 $7,863 $7.86 $6,290 $629 - Deferred Submittal--R-3 1,000 $3,878 $7.79 $3,232 $6.49 $2,586 $5.19 - - 2,500 $3,995 $26.77 $3,329 $22.31 $2,664 $17.85 - - 4,000 $4,397 $10.02 $3,664 $8.35 $2,931 $6.68 - - 6,000 $4,597. $45.12 $3,831 $37.60 $3,065 $30.08 - - B,Q00 $5,500 $40.17 $4,583 $33.48 $3,666 $26.78 10,000 $6,303 $63.03 $5,253 $52.53 $4,202 $42.02 - Standard Comm. Foundation wo/Podi 500 X8;049 $12.15 $6,708 $'[0.13 $5,366 $8.10 - - 2,500 $8,292 $33.30 $6,910 $27.75 $5,528 $22.20 - - 5,000 $9,125 $8.34 $7,604 $6.95 $6,083 $5.56 - - 10,0 $9,542 $12.49 $7,951 $10,41 $6,361 $8.33 - - 25,000 $11,415 $6.66 $9,513 $5.55 $7,610 $4.44 50,000 $13,080 $26.16 $10,900 $21.80 $8,720 $17.44 - Standard Comm. Foundation 3,OD0 $9,216 $2.32 $7,679 $1.93 $6,144 $1.54 - w/Podium 15,000 $9,494 $6.35 $7,911 $5.29 $6,329 $423 - - 30,000 $10,446 $1.64 $8,705 $1.33 $6,964 $7.07 - - 60,000 ~ $10,926 $2.38 $9,105 $1.98 $7,284 $1.58 - - 150,000 $13,065 $1.27 $10,887 $1.06 $8,710 $0.85 300,000 $14,970 $4.99 $12,475 $4.16 $9,980 $3.33 SHELL B UILDINGS - Ail Other Shell Buildings 500 $10;499 $15.84 $8,749 $13.20 $6,999 $10.56 - - 2,500 $10,876 $43.44 $9,013 $3620 $7,211 $28.96 - - 5,000 $11,902 $10.88 $9,918 $9.06 $7,935 $7.25 - - 10,000 $12,446 $16.28 $10,371 $13.57 $8,297 $10.85 - - 25,000 $14,888 $8.70 $12,40fi $7.25 $9,925 $5.80 50,000 $17,063 $34.13 $14,219 $28.44 $11,375 $22.75 Each additional 100 square feet, or portion thereof, up to the next highest project sae threshold. 14 13 -18 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedu{e D -New Construction Inspection Fees Construction Types: -A, I-B Construction Types: fl-A, Ill-A, V-A Construction Types: II-8,111-8, N, V-B UBC Class BC Occupancy Type Project Size Threshold Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 104 sf * A-1 - 1,000 $1,940 $67.70 $1,617 $56.41 .$1,.294 $45.13 - ~ - 5,000 $4,648 $79.52 $3,874 $66.27 $3,099 $53.02 - - 10,000 $8,624 $81.16 $7,187 $67.63 $5,750 $54.10 - - 20,000 $16,740 $36.98 $13,950 $30.82 $11,160 $24.65 - - 50,000 $27,834 $24.20 $23,195 $20.17 $18,556 $16.14 100,000 $39,936 $39.94 $33,280 $33.28 $26,624 $26.62 A-2 - 250 $1,146 $159.88 $955 $133.23 $764 $106.59 - - 1,250 $2,744 $187.82 $2,287 $156.51 $1,830 $125.21 - - 2,500 $5,092 $191.69 $4,243 $159.74 $3,395 $127.79 - - 5,000 $9,884 $87.34 $8,237 $72.78 $6,590 $58.22 - - 12,500 $16,434 $57.94 $13,695 $47.61 $10,956 $38.09 25,000 $23,576 $94.31 $19,647 $78.59 $15,718 $62.87 A-3 - 1,000 $1,940 $67.70 $1,617 $56.41 $1,294 $45.13 - - 5,000 $4,648 $79.52 $3,874 $66.27 $3,099 $53.02 - - 10,000 $8,624 $81.16 $7,187 $67.63 $5,750 $54.10 - - 20,000 $16,740 $36.98 $13,950 $30.82 $11,160 $24.65 - - 50,OOQ $27,834 $24.20 $23,195 $20.17 $18,556 $16.14 100,000 $39,936 $39.94 $33,280 $33.28 $26,624 $26.62 A-4, A-5 ~ - 500 $1,214 $84.67 $1,011 $70.56 $809 $56.45 - - 2,500 $2,907 $99.48 $2,423 $82.90 $1,938 $66.32 - - 5,000 $5,394 $101.52 $4,495 $84.60 $3,596 $67.68 - - 10,000 $10,470 $46.26 $8,725 $38.55 $6,980 $30.84 - - 25,000 $17,409 $30.28 $14,508 $25.23 $11,606 $20.18 50,000 $24,978 $49.96 $20,815 $41.63 $16,652 $33.30 A A Occupancy Tenant Improvements 500 $760 $53.04 $633 $44.20 .$507 $35.36 - - 2,500 $1,821 $62.30 $1,518 $51.92 $1,214 $41.54 - - 5,000 . $3,379 $63.59 $2,816 $52.99 $2,252 $42.39 - - 10,000 $6,558 $28.98 $5,465 $24.15 $4,372 $19.32 - - 25,000 $10,905 $18.95 $9,088 $15.79 $7,270 $12.63 50,000 $15,642 $31.28 $13,035 $26.07 $10,428 $20.86 B Banks 500 $1,428 $99.61 $1,190 $83.01 $952 $66.41 - - 2,500 $3,420 $117.03 $2,850 $97.53 $2,280 $78.02 - - 5,000 $6,346 $119.45 $5,288 $99.54 $4,231 $79.63 - - 10,000 $12,318 $54.43 $10,265 $45.36 $8,212 $36.29 - - 25,000 $20,483 $35.61 $17,069 $29.68 $13,655 $23.74 50,000 $29,385 $58.77 $24,488 $48.98 $19,590 $39.18 8 Laundromat 200 $781 $136.15 $650 $113.46 $520 $90.77 - - 1,000 $1,870 $159.95 $1,558 $133.29 $1,247 $106.63 - - 2,000 $3,469 $163.26 $2,891 $136.05 $2,313 $108.84 - - 4,000 $6,734 $74:39 $5,612 $61.99 $4,490 $49.59 - - 10,000 $1,198 $48.68 $9,331 $40.56 $7,465 $32.45 20,000 $16,065 $80.33 $13,388 $6fi.94 $10,710 $53.55 B Medical Office 500 $1,376 $96.03 $1,147 $80.03 $918 $64.02 - - 2,500 $3,297 .$112.83 $2,748 $94.03 $2,198 $75.22 - - 5,000 $6,118 $115.16 $5,098 $95.96 $4,079 $76.77 - - 10,000 $11,876 $52.46 $9,896 $43.71 .$7,917 $34.97 - ~ - 25,000 $19,744 $34.34 $16,453 $28.61 $13,163 $22.89 50,000 $28,328 $56.66 $23,606 $47.21 $18,885 $37.77 15" 13 -19 CITY OF CUPERTINO Resolution 08-044 Foes Effective July 1, 2008 Schedule D -New Construction Inspection Fees Construction Types: I-A,1-B Construction Types: 11-A, 111-A, V-A Construction Types: II-B, III-B, N, V-B UBC Class ' ' UBC Occupancy Type Project Size Threshold Base Cost @ Thn~shold Size ~ Cost for Each Additional 1'00 sf " Base Cost ~ Threshold Size Cost for Each Additional 100 sf" Base Cost @ Threshold Size Cost for Each Additional ~ 100 sf B Offices 1,000 $2,339 $81.58 $1,949 $67.98 $1,559 $54.39 - - 5,000 $5,602 $95.84 $4,668 $79.86 $3,735 $63.89 - - 10,000 $10;394 $97.82 $8,661 $81.51 $6,929 $65.21 - - 20,000 $20,175 $44.58 $16,813 $37.15 $13,450 $29.72 - - 50,000 $33,548 $29.15 $27,956 $24.29 $22,365 $19.43 100,000 $48,120 $48.12 $40,100 $40.10 $32,086 $32.08 B B Occupancy Tenant Im rovements 300 $714 $82.98 $595 $69.15 $476 $55.32 - - 1,500 $1,709 $97.49 $1,424 $81.24 $1,140 $64.99 - - 3,000 $3,172 $99.51 $2,643 $82.93 $2,114 $66.34 - - 6,000 $6,157 $45.34 $5,131 _ $37.78 $4,105 $30.23 - - 15,000 $10,238 $29.67 $8,531 $24.73 $6,825 $19.78 30,000 $14,688 $48.96 $12,240 $40.80 $9.,792 $32.64 E Preschool/School 100 $541 $188.69 $451 $157.24 $361 $125.79 - - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77 - - _1,000 $2,404 $226.26 $2,003 $188.55 $1,603 $150.84 - - 2,000 $4,667 $103.08 $3,889 $85.90 $3,111 $68.72 - - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97 10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21 E E Occupancy Tenant Improvements 100 $541 $188.69 ~ $451 $157.24 $361 $125.79 - - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77 - - 1,000 $2,404 $226.26 $2,003 $188.55 $1,603 $150.84 - - 2,000 $4,667 $103.08 $3,889 $85.90 $3,111 $68.72 - - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97 10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21 F-1, F-2 Facto /Industrial 1,000 $2,3 8 $81.11 $1,938 $67.59 $1,550 $54.07 - ~ - 5,000 $5,570 $95.28 $4,641 $79.40 $3,713 $63.52 - - 10,000 $10,334 $97.28 $8,611 $81.06 $6,889 $64.85 - - 20,000 $20,061 $44.31 $16,718 $36.92 $13,374 $29.54 - - 50,000 $33,353 $29.00 $27,794 $24.16 $22,235 $19.33 100,000 $47,850 $47.85 $39,875 $39.88 $31,900 $31.90 F F Occupancy Tenant Improvements 1,000 $2,057 $71.78 $1,714 $59.81 $1,372 $47.85 - - 5,000 $4,928 $84.32 $4,107 $70.26 $3,286 $56.21 - - 10,000 $9,144 $86.07 $7,620 $71.73 $6,096 $57.38 - - 20,000 $17,751 $39.21 $14,793 $32.67 $11,834 $26.14 - - 50,000 $29,513 $25.67 $24,594 $21.39 $19,675 $17.11 100,000 $42,345 $42.35 $35,288 $35.29 $28,230 $28.23 H-1 H-1 Occupancies 100 $541 $188.69 $451 $157.24 $361 $125.79 - - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77 - - 1,000 $2,404 $226.26 $2,003 $188.55 $1,603 $150.84 - - 2,000 $4,667 $103.08 $3,689 $85.90 $3,111 $68.72 - - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97 10,000 $11,132 $111.32 $9,276 ~ $92.76 $7,421 $74.21 `::~ , , •. 16 13-20 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -New Construction Inspection Fees Construction Types: (-A, 1-B Construction Types: II A, III-A, V-A Construction Types: II-8, III-B, N, V-B UBC Class BC Occupancy Type Project Size Threshold Base Cost @ Threshold Size Cost for Each Additional 900 sf * Base Cost @ Threshold Size Cost for Each Additional 400 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf H-2 to Hazardous Rooms 100 $541 $188.69 $451 $157.24 $361 $125.79 H-5 - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77 - - 1,000 $2,404 $226.26 $2,003 $188,55 $1,603 $150.84 - - 2,000 $4,667 $'103.08 $3,889 $85.90 $3,191 $68.72 - - 5,000 $7,759 $67.46 $6,466 $5621 $5,173 $44.97 10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21 H H Occupancy Tenant Improvements 100 $541 $188.69 $451 $157.24 $361 $125.79 - - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77 - - 1,000 $2,404 $226.2fi $2,003 $188.55 $1,603 $150.84 - - 2,000 $4,667 $103.08 $3,889 $85.90 $3,111 $68.72 - - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97 10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21 I-1 to (-4 Institutional 500 $894 $62.38 $745 $51.99 $596 $41.59 - - 2,500 $2,142 $73.28 $1,785 $61.07 $1,428 $48.86 - - 5,000 $3,974 $74.80 $3,312 $62.33 $2,649 $49.86 - - 10,000 $7,714 $34.08 $6,428 $28.40 $5,142 $22.72 - - 25,000 $12,825 $22.31 $10,688 $18.59 $8,550 $14.87 50,000 $18,402 $36.80 $15,335 $30.67 $12,268 $24.54 [ I Occupancy Tenant Improvements 100 $d33 $150.95 $361 $125.79 $288 $100.63 - - 500 $1,037 $177.32 $864 $147.77 $691 $118.22 - - 1,000 $1,923 $181.01 $1,603 $150.84 $1,282 $120.67 - - 2,000 $3,733 $82.46 $3,111 $68.72 $2,489 $54.97 - - 5,000 $6,207 $53.96 $5,173 $44.97 $4,138 $35.98 10,000 $8,905 $89.05 $7,421 $74.21 $5,937 $59.37 M Market. 2,000 $2,860 $49.89 $2,383 $41.57 $1,907 $33.26 - - 10,000 $6,851 $58.60 $5,709 $48.83 $4,567 $39.06 - - 20,000 $12,710 $59.81 $10,592 $49.84 $8,474 $39.87 - - 40,000 $24,672 $27.26 $20,560 $22.72 $16,448 $18.17 - - 100,000 $41,028 $17.82 $34,190 $14.85. $27,352 $11.88 200,000 $58,848 $29.42 $49,040 $24.52 $39,232 $19.62 M M Occupancy Tenant Improvements 300 $686 $80.90 $580 $67.42 $464 $53.94 - - 1,500 $1,667 $95.06 $1,389 $79.21 $1,111 $63.37 - - 3,000 $3,092 $97.02 $2,577 $80.85 $2,062 $64.68 - - 6,000 $ ,003 $44.20 $5,003 $36.83 $4,002 $29.47 - - 15,000 $9,981 $28.92 $8,318 $24.10 $6,654 $19.28 30,000 $14,319 $47.73 $11,933 $39.78 $9,546 $31.82 R-2 Apartment Bld 800 $1,376 $60.00 $1,146 $50.00 $917 $40.00 - - 4,000 $3,296 $70.46 $2,746 $58.72 $2,197 $46.98 - - 8,000 $6,114 $71.94 $5,095 $59.95 $4,076 $47,96 - - 16,000 $11,869 $32.76 $9,891 $27.30 $7,913 $21.84 - - 40,000 $19,733 $21.44 $16,444 $17.87 $13,155 $14.30 80,000 $28,310 $35.39 $23,592 $29.49 $18,874 $23.59 R-2 Apartment Bldg -Repeat Unit 800 $1,376 $60.00 $1,146 $50.00 $917 $40.00 - - 4,000 $3,296 $70.4fi $2,746 $58.72 $2,197 $46.98 - - 8,000 $6,114 $71.94 $5,095 $59.95 $4,076 $47.96 - - 16,000 $11,869 $32.76 ~ $9,891 $27.30 $7,913 $21.84 - - 40,000 $19,733 $21.44 $16,444 $17.87 $13,155 $14.30 80,000 $28,310 $35.39 $23,592 $29.49 $18,874 $23.59 17 13 - 21 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -New Construction Inspection Fees Construction Types: i-A, I-B Construction Types: II-A, Ill-A, V-A Construction Types: II-B, III-B, N, V-B UBG Class BC Occupancy Type • '. Project Size Threshold Base_ Cdst Threshold Size Cost for Each Additional 100 sf' Base Cost (~ Threshold Size Cost for Each Additional 100 sf' Base Cost ~ Threshold Size Cost for Each Additional 100 sf' R-1 Hotels 8 Motels 3,000 $4,606 $53.57 $3,838 $44.64 $3,071 $35.71 - - 15,000 $11,034 $62.90 $9,195 $52.42 $7,356 $41.94 - - 30,000 $20,470 $64.22 $17,058 $53.52 $1.3,646 $42.82 - - 60,000 $39,737 $29.27 $33,114 $24.39 $26,491 $19.51 - - 150,000 $66,078 $19.14 $55,065 $15.95 $44,052 $12.76 300,000 $94,788 $31.60 $78;990 $26.33 $63,192 $21.06 R-3 Dwellings -Custom, Models, 1,000 $2,136 $94.82 $1,780 $79.01 $1,424 $63.21 - First Master f?lan 2,500 $3,558 $61.10 $2,965 $50.91 $2,372 $40.73 - - 4,000 $4,475 $78.17 $3,729 $65.14 $2,983 $52.11 - - 6,000 $6,038 $77.78 $5,032 $64.81 , $4,025 $51.85 - - 8,000 $7,594 $107.75 $6,328 $89.79 $5,062 $71.83 10,000 $9,749 $97.49 $8,124 $81.24 $6,499 $64.99 R-3 Dwellings -Production Phase . 1,000 $2,136 $94.82 $1,780 $79:01 $1,424 $63.21 - of Master Plan 2,500 $3,558 $61.10 $2,965 $50.91 $2,372 $40.73 - (repeats) ~ 4,000 $4,475 $78.17 $3,729 $65.14 $2,983 $52.11 - - 6,000 $6,038 $77.78 $5,032 $64.81 $4,025 $51.85 - - 8,000 $7,594 $107.75 $6,328 $89.79 $5,062 $71.83 10,000 $9,749_ $97.49 $8,124 $81.24 $6,499 $64.99 R-3 Dwellings~Aftemate Materials 1,000 $2,136 $94.82 $1,780 $79.01 $1,424 $63.21 - - 2,500 $x,558 $61.10. $2,965 $50.91 $2,372 $40.73 - - 4,000 ,475 $78.17 $3,729 $65.14 $2,983 $52.11 - - 6,000 $6,038 $77.78 $5,032 $64.81 $4,025. $51.85 = . ' - 8,000 $7,594 $107.75 $6,328 $89.79 $5,062. $71.83 10,000 $9,749 $97.49 $8,124 $81.24 $6,499 $64:99 R-3 ~ Dwellings-Hillside -Custom, 1,000 $2,434 $94.82 $2,029 $79.02 $1,623 $63.21 - Models First Master Plan 2,500 $3,857 $61.10 $3,214 $50.92 $2,571 $40.73 - - 4,000 $4,773 $78.15 $3;978 $65.13 $3,182 $52.10 - - 6,000 $6,336 $77.76 $5,280 $64:80 $4,224 .- $51.84 - - 8,000 $7,891 $107.79 $6,576 $89.83 $5,261 $71.86 10,000 $10,047 $100.47 $8,373 $83.73 $6,698 $66.98 R-3 Dwellings-Hillside -Production 1,000 $2,434 $94.82 $2,029 $79.02 $1,623 $63.21 - Phase of Master Plan 2,500 $3,857 $61.10 $3,214 $50.92 • _ $2,571 $40.73 - (repeats) 4,000 $4,773 $78.15 $3,978 $65.13 $3,"182 $52.10 - - 6,000 $6,336 $77.76 $5,280 $64.80 $4,224 $51.84 - - 8,000 $7,891. $107.79 $6,576 $89.83 $5,261 $71.86 10,000 $10,047 ~ $100.47 $8,373 $83.73 $6,698 $66.98 R-3 Dwellings--Hillside-AltemateMateria 1,000 $2,434 $94.82 $2,029 $79.02 $1,623 $63.21 - - 2,500 $3,857 $61.10 $3,214 $50.92 $2,571 $40.73 - - 4,000 $4,773 $78.15 $3,978 $65.13 $3,182 $52.10 - - 6,000 $6,336 $77.76 $5,280 $64.80 $4,224 $51.84 - - 8,000 $7,891 $107.79 $6,576 $89.83 $5,261 $71.86 10,000 $10,047 $100.47 $8,373 $83.73 $6,698 $66.98 R-3.1 Group Care 1,000 $2,550 $88.98 $2,125 $74.15 $1,700 $59.32 - ~ - 5,000 $6,x10. $104.52 $5,091 $87.10 $4,073 $69.68 - - 10,000 $11,336 $106.70 $9,446 $88.91 $7,557 $71.13 - - 20,000 $22,005 $48.60 $18,338 $40.50 $14,670 $32.40 - - 50,000 $36,585 $31.80 $30,488 $26.50 $24,390 $21.20 100,000 $52,485 $52.49 $43,738 $43.74 .$34;9 $34.99 R-4 Grou Care 100 $413 $144.10 $344 $120.08 $275 $96.07 - - 500 $989 $169.28 $825 $141,07 $660 2.86 ig CITY OF CUPERTINO Resolution 08-044 Fees Effective Jaly 1, 2008 Schedule D -New Construction Inspection Fees Construction Types: [-A,1-B Construction Types: I{-A, III-A, V-A Construction Types: II-B, 111-B, IV, V-B UBC Class BC Occupant Type Project Size Threshold Base Cost Threshold Size Cost for Each Additional 100 sf * Base Cost ~ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf - - 1,000 $1,836 $172.79 $1,530 $143.99 $1,224 $115.19 - - 2,000 $3,564 $78.73 $2,970 $65.61 $2,376 $52.49 - - 5,000 $5,926 $51.50 $4,938 $42.92 $3,950 $34.34 10,000 $8,501 $85.01 $7,084 $70.84 $5,667 $56.67 R R Occupancy Tenant Improvements 80 $410 $178.89 $342 $149.08 $273 $119.26 - - 400 $983 $210.14 $819 $175,12 $655 $140.10 - - 800 $1,823 $214.49 $1,519 $178.74 $1,215 $142.99 - - 1,600 ~ $3;539 $97.72 $2,949 $81.43 $2,359 $65.14 - - 4,000 $5,884 $63.95 $4,904 $53.29 $3,923 $42.63 8,000 $8,442 .$105.53 $7,035 $87.94 $5,628 $70.35 S-1 Moderate -Hazard Storage ~ 600 $1,367 $79.47 $1,139 $66.22 $911 $52.98 - 3,000 $3,274 $93.35 $2,728 $77.79 $2,183 $62.23 - 6,000 $6,074 .$95.27 $5,062 $79.39 $4,049 $63.51 - - 12,000 $11,790 $43.40 $9,825 $36.17 $7,860 $28.93 - - 30,Q00 $19,602 $28.41 $16,335 $23.68 $13,068 $18.94 60,000 $28,125 $46.88 $23,438 $39.06 $18,750 $31.25 ~ ;;: 19 13 -23 CITY OF CUPERTINO Resolution 08-044 Fees Effective duly 1, 2008 Schedule D -New Construction Inspection Fees Construction Types: • .~ `~I-A, I-B Construction Types: II-A, Ill-A, V~- Construction Types: I!-B, 111-8, N, V-e UBC Class BC Occupancy Type Project Sae Threshold Base cost ~ Threshold Size Cost for Each Additional 100 sf' Base Cost ~ Threshold Size Cost for Each Additional 100 sf • Base Cost @ Threshold Size Cost for Each Additional 100 sf S-2 Low- Hazard Storage 10,000 $13,205 $46.06 $11,004 $38.38 $8,803 $30.71 - - 50,000 $31,628 $54.14 $26,356 $45.11 $21,085 $36.09 - - 100,000 $58,695 $55,22 $48,913 $46.01 $39,130 $36.81 - - 200,000 $113,910 $25.18 $94,925 $20.98 $75,940 $16.79 - ~ - 500,000 $189,450 $16.47 $157,875 $13.73 $126,300 $10.98 1,000,000 $271,600 $27.18 $226,500 $22.65 $181,200 $18.12 S S Occupancy Tenant Im rovements 600 $1,152 ~ $67.00 $960 $55.83 $768 $44.67 - - 3,000 . §2,760 $78.72 $2,300 $65.60 $1,840 $52.48 - - 6,000 $5,122 $80.33 $4,268 $66.94 . $3,415 $53.55 - - 12,000 S9,941 $36.60 $8,285 $30.50 $6,628 $24.40 - - 30,000 $16,529 $23.96 $13,774 $19.96 $11,019 $15.97 60,000 $23,715 $39.53 _ $19,763 $32.94 $15,810 $26.35 U Private Garage/Agricultural Bld 40 $461 $402.05 $384 $335.04 $307 $268.03 - - 200 $1,104 $472.31 $920 $393.59 $736 $314.87 - - 400 $2,049 $482.07 $1,707 $401.73 $1,366 $321.38 - - 800 $3,977 $219.65 $3,314 $183.04 $2,651 $146.43 - - 2,000 $6,613 $143.72 $5,511 $119.76 $4,409 $95.81 • 4,000 $9,487 $237.18 $7,906 $197.65 $6,325 $158.12 - Deferred Submi#ta{-All Except R-3 1,000 .$358 $12:47 $298 $10.39 $238 $8.32 - - 5,000 $857 $14.64 $714 $12.20 $571 $9.76 - - .10,000 $'1;589 $14.96 $1,324 $12.46 $1,059 $9.97 - - 20,Q00 $3,084 $6.82 $2,570 $5.68 $2,056 $4.55 - - 50,000 $5,130 -$4.47 $4,275 $3.73 $3,420 ~ $2.98 100,000 $7,365 $7.37 $6,138 $6.14 $4,910 $4.91 - Deferred Sutxnittal-R-3 1,000 $0 $0.00 $0 $0.00 $0 $0.00 - - 2,500 $o $a.oo . $o $a.oo $o $a.oo - - 4,000 $0 $0.00 $0 $0.00 $0 $0.00 - - 6,000 $0 $0.00 $0 $0.00 $0 $0.00 - - 8,000 $0 $0.00 $0 $0.00 $0 $0.00 10,000 $0 $0.00 $0 $0.00 $0 $0.00 - Standard Comm. Foundation wo/Podi 500 $1,316 $91.82 $1,097 $76.52 $877 $61.22 - - 2,500 $3,153 $107.90 $2,627 $89.91 $2,102 $71.93 - - 5,000 $5,850 $110.10 $4,875 $91.75 $3,900 $73.40 - - 10,000 $11,355 $50.18 $9,463 $41.81 $7,570 $33.45 - - 25,000 $18,881 $32.84 $15,734 $27.36 $12,588 $21.89 50,000 $27,090 $54.18 $22,575 $45.15 $18,060 $36.12 - Standard Comm. Foundation 3,000 $3,340 $38.84 $2,783 $32.37 $2,227. $25.90 - w/Podium 15,000 $8,001 $45.62 $6,667 $38.02 $5,334 $30.41 - - 30,000 $14,844 $46.56 $12,370 $38.80 $9,886 $31.04 - - 60,000 $28,812 $21.22 $24,009 $17.68 $19,209 $14.15 - - 150,000. $47,910 $13,88 $39,923 $11.57 . $31,942 $9.25 300,000 $68,730 $22,91 $57,273 $19.09 $45,822 $15.27 SHELL BUILDINGS - All Other Shell Buildings 500 $1•;539 $107.40 $1,283 $89.50 $1,026 $71.60 - - 2,500 $3;687 $126.17 $3,073 $105.14 $2,458 $84.11 - - 5,000 $6,842 $128.79 $5,701 $107.33 $4,561 $85.86 - ~ - 10,000 $13,281 $58.66 _ $11,068 $48.68 $8,854 $39.11 - - 25,000 $22,080 $38,40 $18,400 $32.00 $14,720 $25.60 50,000 $31,680 $63.36 $26,400 $52.80 . $21,120 $42.24 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. 13 - 24 20 CITY OF CUPERTINO Resolution. 08-044 Fees EffectivcJuly 1, 2008 Schedule D -Consolidated Schedule of Total Construction Fees Construction Types: I-A, I-B Construction Types: II-A, III-A, V-A Construction Types: II-B, 111-8, N, V-B UBC Class BC Occupancy Type Project Size Threshold Base Cost .Threshold Size Cost for Each Additional 100 sf * Base Cost ~ Threshold Size Cost for Each Additional 100 sf * Base Cost ~ Threshold Size Cost for Each Additional 100 sf A-1 - 1,000 $8,846 $72.90 $7,372 $60.75 $5,898 $48.60 - - 5,000 $11,762 $93.82 $9,802 $78.18 $7,842 $62.54 - - 10,000 $16,453 $84.73 $13,711 $70.61 $10,969 $56.49 - - 20,000 $24,926 $42.35 $20,772 $35.29 $16,618 $28.23 - - 50,000 $37,632 $27.05 $31,360 $22.54 $25,088 $18.03 - - 100,000 $51,156 $51.16 $42,630 $42.63 $34,104 $34.10 A-2 - 250 $8,028 $180.63 $6,690 $150.53 $5,352 $120.42 - - 1,20 $9,834 $244.77 $8,195 $203.98 $6,556 $163.18 - - 2,500 $12,894 $205.95 $10,745 $171.63 $8,596 $137.30 - - 5,000 $18,043 $108.71 $15,036 $90.59 $12,029 $72.47 - - 12,500 $26,196 $68.54 $21,830 $57.11 $17,464 $45.69 - - 25,000 $34,763 $139.05 $28,969 $115.88 $23,175 $92.70 A-3 - 1,000 $8,846 $72.90 $7,372 $60.75 $5,898 $48.60 - - 5,000 $11,762 $93.82 $9,802 $78.18 $7,842 $62.54 - - 10,000 $16,453 $84.73 $13,711 $70.61 $10,969 $56.49 - - 20,000 ~$~d,J26 $42.35 $20,772 $35.29 $16,618 $28.23 - - 50,000 $37,632 $27.05 $31,360 $22.54 $25,088 $18.03 - - 100,000 $51,156 $51.16 $42,630 $42.63 $34,104 $34.10 A-4, A-5 - 500 $6,860 $93.20 . $5,716 $77.66 $4,573 $62.13 - - 2,500 $8,723 $122.83 $7,270 $102.36 $5,816 $81.89 - - 5,000 $11,794 $107.36 $9,829 $89.47 $7,863 $71.58 - - 10,000 $17,162 $55.02 $14,302 $45.85 $11,442 $36.68 - - 25,000 $25,4'16 $34.94 $21,180 $29.12 $16,944 $23.30 - - 50,000 $34,152 $68.30 $28,460 $56.92 $22,768 $45.54 A A Occupancy Tenant Improvemenfs 500 $3,887 $57.75 $3,239 $48.13 $2,591 ~ $38.50 - - 2,500 $5,042 $75.24 $4,202 $62.70 $3,361 $50.16 - - 5,000 $6,923 $66.84 $5,769 $55.70 $4,615 $44.56 - - 10,000 $10,265 $33.83 $8,554 $28.19 $6,843 $22.55 - - 25,000 $15,339 $21.54 $12,783 $17.95 $10,226 $14.36 50,000 $20,724 $41.45 $17,270 $34.54 $13,816 $27.63 B Banks 500 $8,223 $109.88 $6,852 $91.56 $5,482 $73.25 - - 2,500 $10,420 $145:13 $8,683 $120.94 $6,947 $96.75 - - 5,000 $14,048 $126.50 $11,707 $105.41 $9,366- $84.33 - - 10,000 $20,373 $64.96 $16,978 $54.13 $13,582 $43.30 - - 25,000 $30,11f $41.24 $25,097 $34.36 $20,078 $27.49 - - 50,000 $40,425 $80.85 $33,688 $67.38 $26,950 $53.90 B Laundromat 200 $7,225 $960.47 $6,021 $133.72 $4,817 $106.98 - - 1,000 $8,509 $226.62 $7,091 $188.85 $5,673 $151.08 - - 2,000 $10,775 $179.91 $8,980 $149.93 $7,184 $119.94 - - 4,000 $14,374 $99.39 $11,978 $82.83 $9,582 $66.26 - - 10,000 $20,337 $62.01 $16,948 $51.68 $13,558 $41.34 - - 20,000 $26,538 $132.69 $22,115 $110.58 $17,692 $88.46 B Medical Office 500 $9,425 $108.18 $7,855 $90.15 $6,284 $72.12 - - 2,500 $11,589 $146.13 $9,658 $121.78 $7,726 $97.42 - - 5,000 $15,242 $123.47 $12,702, $102.89 $10,162 $82.31 - - 10,000 $21,416 $64.96 $17,646 $54.13 $14,277 $43.30 - - 25,000 $31,159 $41.00 $25,966 $34.16 $20,773 $27.33. 50,000 $4'1,408 $82.82 $34,506 $69.01 $27,605 $55.21 21 13 - 25 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -Consolidated Schedule of Total Construction Fees Construction Types: I-A,1-B Construction Types: II-A, 111-A, V-A Construction Types: II-B, Ill-B, IV, V-B UBC Class BC Occupancy Type Project Size Threshold Base Cost ~ Threshold. Size ` ~ Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf" Base Cost ~ Threshold Slze Cost for Each Additional 100 sf B Offices 1,000 $10,008 $87.37 $8,340 $72.81 $6,672 $58.25 _ - 5,000 $13,503 $111.72 $11,253 $93.10 $9,002 $74.48 _ - 10,000 $19,089 $101.79 $15,908 $84.83 $12,726 $67.86 _ - 20,000 $29,268 $50.52 $24,390 $42.10 $19,512 $33,68 _ - 50,000 $44,423 $32.33 $37,019 $26.94 $29,615 $21.55 100,000 $60,585 $60.59 $50,488 $50.49 $40,390 $40.39 B B Occupancy Tenant Improvements 300 $3,148 $89.11 $2,623 $74.2fi $2,099 $59.41 _ - 1,500 $4,217 $114.26 $3,514 $95.21 $2,811 $76.17 _ - 3,000 $5,931 $103.71 $4,943 $86.43 $3,954 $69.14 _ - 6,000 $9,042 $51.63 $7,535 $43.03 $6,028 $34.42 _ - 15,000 $13,689 $33.03 $11,408 $27.53 $9,126 $22.02 - - 30,000 $18,644 $62.15 $15,536 $51.79 $12,429 $41.43 E PreschoollSchool 100 $7,569 $241.72 $6,308 $201.43 $5,046 $161.15 _ - 500 $8,536 $367.10 $7,113 $305.91 $5,691 $244.73 _ - 1,000 $10,371 $262.61 $8,643 $218.84 $6,914 $175.07 - - 2,000 $12,998 $157.63 $10;831 $131,35 $8,665 $105.08 - - 5,000 $17,726 $96.53 $14,772 $80.44 $11,818 $64.35 - - 10,000 $22,553 $225.53 $18,794 $187.94 $15,035 $150.35 E E Occupancy Tenant Improvements 100 $4,769 $220.60 $3,974 $183.83 $3,179 $147.07 _ - 500 $5,652 ~ $309.17 $4,710 $257.64 $3,768 $206.11 _ - 1,000 $7,197 $248.12 $5,998 $206.76 $4,798 $165.41 _ - 2,000 $9,679 $135.91 $8,066 $11325 $6,452 $90.60 ~- - 5,000 $13 756 $84.95 $11,463 $70.79 $9,171 $56.63 _ - 10,000 $18,003 $180.03 $15,003 $150.03 $12,002 $120.02 F-1, F-2 Factory/industrial 1,000 $10,870 $87.56 $9,058 $72.97 $7,247 $58.37 - - 5,000 $14,372 $112.97 $11,977 $94.14 $9,582 $75.31 - - 10,000 $20,021 $101.69 $16,684 $84.74 $13,347 $67.79 - - 20,000 $30,189 $50.95 $25,158 $42.45 $20,126 $33.96 _ - 50,000 $45,473 $32.54 $37,894 $27.11 $30,315 $21.69 - - 100,000 $61,740 $61.74 $51,450 $51.45 $41,160 . $41.16 F F Occu ancy Tenant Improvements 1,000 $8,327 $76.50 $6,939 $63.75 $5,552 $51.00 - - 5,000 $11,387 $97.28 $9,489 $81.06 $7,592 $64.85 - - 10,000 $16,251 $89.31 $13,543 $74.43 $10,834 $59.54 - - 20,000 525,182 $44.09 $20,985 $36.74 $16,788 $29.39 - - 50,000 $38,408 $28.25 $32,006 523.54 $25,605 $18.83 - - 100,000 $52,530 $52.53 $43,775 $43.78 $35,020 $35.02 H-1 H-10ccupancies 100 $7,890 $244.13 $6,575 $203.44 $5,260 $162.75 - - 500 $8,866 $373.73 $7,389 $311.44 $5,911 $249.15 - - 1,000 $10,735 $264.26 $8,946 $220.21 $7,157 ~ $176.17 _ - 2,000 $13,378 $160.11 $11,148 $133.42 ~ $8,918 $106.74 - - 5,000 $18,181 $97.88 $15,151 $81.56 $12,121 $65;25 - - 10,000 $23,075 $230.75 $19,229 $192.29 $15,383 $153.83 ~~ 13-26 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -Consolidated Schedule of Total Construction Fees. Construction Types: i-A, 1-B Construction Types: I!-A, III-A, V-A Construction Types: 11-B, III-B, N, V-B UBC Class BC Qccupancy Type Project Size Threshold Base Cost Threshold Size Cost for Each Additional 100 sf * Base Cost ~ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * H-2 to Hazardous Rooms 100 $6,402 $232.91 $5,335 $194.09 $4,268 $155.27 H-5 - 500 $7,334 $342.96 $6,112 $285.80 $4,889 $228.64 - - 1,000 $9,049 $256,56 $7,541 $213.80 $6,033 $171.04 - - 2,000 $11,615 $148.58 $9,679 $123.81 $7,743 $99.05 - - 5,000 $16,072 $91.69 $13,393 $76.41 $10,715 $61.13 10,000 $20,657 $206.57 $17,214 $172.14 $13,771 $137.71 H H Occupancy Tenant Improvements 100 $6,053 $230.27 $5,044 $191.89 $4,035 $153.51 - - 500 $6,974 $335.72 $5,811 $279.76 $4,649 . $223.81 - - 1,000 $8,652 $254.78 $7,210 $212.31 $5,768 $169.85 - - 2,000 $11,200 $145.85 $9,333 $121.54 $7,467 $97.23 - - 5,000 $15,575 $90.26 $12,979 $75.21 $10,384 $60.17 10,000 $20,088 $200.88 $16,740 $167.40 $13,392 $133.92 I-1 to I-4 Institutional 500 $7,193 . $71.88 $5,994 $59.90 $4,795 $47.92 - - 2,500 $8,630 $99.36 $7,192 $82.80 $5,754 $66.24 - _ - 5,000 $11,114 $81.31 $9,262 $67.76 $7,410 $54.21 - - 10,000 $15,180 $43.86 $12,650 $36.55 $10,120 $29.24 - - 25,000 $21,759 $27.52 $18,133 $22.93 $14,506 $18.34 50,000 $28,638 $57.28 $23,865 $47.73 $19,092 $38.18 I I Occupancy Tenant Improvements 100 $4,282 $179.99 $3,568 $149.99 $2,854 $119.99 - - 500 $5,002 $256.97 $4,168 $214.14 $3,334 $171.31 - - ~ 1,000 $6,286 $200.92 $5,239 $167.43 $4,191 $133.94 - - 2,000 $8,296 $112.34 $6,913 $93.62 $5,530 $74.89 - - 5,000 $11,666 $69.88 $9,722 $58.23 $7,777 $46.58 - - .10,000 $15,160 $151.60 $12,633 $126.33 $10,106 $101.06 M Market' 2,000 $9,066 $52.23 $7,555 $43.53 $6,044 $34.82 - - 10,000 $13,244 $65.03 $11,037 $54.19 $8,830 $43.35 - - 20,000 $19,747 $61.42 $16,456 $51.18 $13,165 $40.94 - - 40,000 $32,030 $29.66 $26,692 $24.71 $21,354 $19.77 - - 100,000 $49,824 $19.13 $41,520 $15.94 $33,216 $12.75 200,000 $68,952 $34.48 $57,460 $28.73 $45,968 $22.98 M M Occupancy Tenant Improvements 300 $A,34~ $90.08 $3,618 $75.07 $2,894 $60.06 - - 1,500 $5,423 $120.18 $4,519 $100.15 $3,615 $80.12 - - 3,000 $7,225 $103.29 $6,021 $86.08 $4,$17 $68.86 - - 6,000 $10,324 $53.64 $8,603 $44.70 $6,883 $35.76 - - 15,000 $15,152 $33.96 $12,626 $28.30 $10,101 $22.64 30,000 $20,246 ~ $67.49 $16,671 $56.24 $13,497 $44.99 R-2 Apartment Bldg 800 $8,654 $66.85 $7,212 $55.71 $5,770 $44.57 - - 4,000 $10,794 $89.29 $8,995 $74.41 $7,196 $59.53 - - 8,000 $14,365 $76.66 $11,971 $63.88 $9,577 $51.10 - - 16,000 $20,498 $39.83 $17,082 $33.19 $13,665 $26.55 - - 40,000 $30,058 $25.20 $25,048 $21.00 $20,038 $16.80 BO,p00 $40,138 $50.17 $33,448 $41.81 $26,758 $33.45 R-2 Apartment Bldg -Repeat Unit 800 $5,085 $63.50 $4,238 $52.92 $3,390 $42.33 - - 4,000 $7,117 $80.05 $5,931 $66.71 $4,745 $53.37 - - 8,000 $10,319 $74.34 $8,599 $61.95 $6,879 $49.56 - - 16,000 $16,266 $36.36 $13,555 $30.30 $10,844 $24.24 - - 40,000 $24,994 $23.36 $20,828 $19.47 $16,662 $15.58 80,000 $34,339 $42.92 $28,616 $35.77 $22,893 $28.62 23 13 - 27 CITY OF CUPERTINO Resolution 0&044 Fees Effective July 1, 2008 Schedule D -Consolidated Schedule of Total Construction Fees • Constriction Types: I-A, I-B Construction Types: II-A, III-A, V-A Construction Types: il-B, III-B. N, V-B UBC Class BC Occupancy Type Project Sae 'Threshold Base Cost ~ Threshold Size Cost for Each Additional 100 sf" Base Cost @ Threshold Sae Cost for Each Additional 100 sf" Base Cost ~ Threshold Sae Cost for Each Additional 100 sf • R_1 Hotels 8 Motels 3,000 $15,432 $56.29 $12,860 $46.91 $10,288 $37.53 - 15,000 $22,187 $70.39 $18,489 $58.66 $14,791 $46.93 _ - 30,000 $32,746 $66.10 $27,288 $55.08 $21,830 $44.06 _ - 60,000 $52,574 $32.06 $43,812 $26.72 $35,050 $21.38 _ - 150,000 $81,432 $20.64 $67,860 $17.20 $54,288 $13.76 300,000 $112,392 $37.48 $93,660 $31.22 $74,928 $24.98 R-3 Dwellings -Custom, Models, 1,000 •$5,541 $121.27 $4,618 $101.05 $3,694 $80.84 - First Master Plan 2,500 $7,360 $87.57 $6,133 $72.97 $4,907 $58.38 - - 4,000 $8,674 $88.05 $7,228 $73.38 $5,782 $58.70 - - 6,000 $10,435 $147.21 $8,696 $122.68 $6,956 $98.14 _ - 8,000 $13,379 $137.54 ,$11,149 $114.61 $8,919 $91.69 10,000 $16,130 $161.30 $13,441 $134.41 $10,753 ~ $107.53 R-3 Dwellings -Production Phase 1,000 $3,905 $96.15 $3,254 $80.13 $2,603 $64.10 - of Master Plan 2,500 $5,347 $62.43 $4,456 $52.03 $:1,565 $41.62 - (repeats) 4,000 $6,283 $79.14 $5,236 $65.95 $4,189 $52.76 - - 6,000 $7,866 $109.50 $6,555 $91.25 $5,244 $73.00 - - 8,000 $10,056 $117.68 $8,380 $98.06 $6,704 $78.45 . 10,000 $12,410 $124.10 $10,341 $103.41 $8,273 $82.73 R-3 Dwellings-Alternate Materials 1,000 $7,9$7 $147.73 $6,656 $123,11 $5,325 $98.49 _ - 2,500 $10,203 $114.00 $8,503 $95,00 $6,802 $76,00 _ - 4,000 $11,913 $97.98 $9,928 $81,65 $7,942 $65.32 _ - 6,000 $13,873 $216.63 $11,561 $180.53 $9,248 $144.42 _ - 8,000 $18,205 $167.27 $15,171 $139.39 $12,137 $111.51 10,000 $21,551 $215.51 $17,959 $179.59 $14,367 $143.67 R-3 Dwellings-Hillside - Cus#om, Models, 1,000 ~ ,$8,781 $108.05 $7,318 $90.04 $5,854 $72.03 - First Master Plan 2,500 $10,402 $113.99 $8,668 $94.99 $6,935 $75.99 _ - 4,000 $12,112 $88.10 $10,093 $73.41 $8,074 $58.73 _ ~ - 6,000 $13,874 $137.27 $11,561 $114.39 $9,249 $91.51 - - 8,000 $16,619 . _ $177.21 $13,849 $147.68 $11,079 $118.14 10,000 $20,163 $201.63 $16,803 $168.03 $13,442 $134.42 R-3 Dwellings-HIIlside -Production Phas 1,000 $6,043 $101.44 $5,036 $84.53 $4,029 $67.62 of Master Plan 2,500 $7,565 $89.28 $6,304 $74.40 $5,043 $59.52 - (repeats) 4,000 $8,904 $83.10 $7,420 $69.25 $5,936 , $55.40 _ - 6,000 $10,566 $108.42 $8,805 $90.35 $7,044 $72.28 _ - 8,000 $12,734 $144.18 $10,612 $120.15 $8,490 $96.12 10,000 $15,618 $156.18 $13,015 $130.15 $10,412 $104.12 R-3 Dwellings-Hillside -Alternate Materia 1,000 $14,401 $121.27 $12,001 $101.05 $9,601 $80.84 - - 2,500 $16,220 $166.92 .$13,517 $139.10 $10,813 $111.28 - - 4,000 $18,724 $98.01 $15,603 •$81.68 $12,482 $65.34 _ - 6,000 $20,684 $196.77 $17,237 $163.98 $13,769 $131.18 - - 8,000 $24 619 $246.62 $20,516 $205.51 $16,413 $164.41 10,000 $25;552 $295.52 $24,626 $246.26 $19,701 $197.01 R-3.1 Group Can: 1,000 $15,033 $98.39 „$12,527 $81.99 $10,022 $65.60 - - 5,000 $18,968 $130.37 $15,807 $108.64 $12,646 $86.91 - - 10,000 $25,487 $113.15 $21,239 $94.29 $16,991 $75.43 - - 20,000 $36,801 $58.28 $30,668 . $48.57 $24,534 $38.85 - - 50,000 $54,285 $36.99 .. $45,238 $30.83 $36,190 $24.66 100,000 $72,780 $72.78 $60,650 $60.65 $48,520 $48.52 R-4 Group Care 100 $8,812 $207.46 $7,343 $172.89 $5,875 $138.31 - - 500 $9,642 $343.08 $8,035 $285.90 $6,428 $228.72 - - 1,000 $11,357 $216.23 $9,465 $180.19 $7,572 .15 24 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -Consolidated Schedule of Total Construction Fees Construction Types: -A,1-B Construction Types: II-A, III-A, V-A Construction Types• II-B, Iii-B, N, V-B • UBC Class BC Occupancy Type Project Size Threshold Base Cost @ Threshold Size Cost for ~ Each Additional 100 sf' Base Cost @ Threshold Size Cost for Each Additional 700 sf * Base Cost @ Threshold S¢e Cost for Each Additional 100 sf' - - 2,000 $13,520 $143.90 $11,266 $119.92 $9,013 $95.94 - - 5,000 $17,837 $86.26 $14,864 $71.88 $11,891 $57.50 10,000 $22,150 $221.50 $18,458 $184.58 $14,766 $147.66 R R Occupancy Tenant Improvements 80 $4,050 $213.20 $3,375 $177.67 $2,700 $142.13 - - 400 $4;732 $304.26 $3,943 $253.55 $3,155 $202.84 - - 800 $5,949 $238.02 $4,957 $198.35 $3,966 $158.68 - - 1,600 $7,853 $133.03 $6,544 $110.86 $5,235 $88.69 - -- 4,000 $11,046 $82.75 $9,205 $68.96 $7,364 $55.17 8,000 $14,356 $179.45 $11,963 $149.54 $9,571 $119.63 S-1 Moderate-Hazard Storage 600 $9,590 $89.81 $7,992 $74.84 $6,393 $59.87 - 3,000 ~ $11,745 $121.70 $9,788 $101.41 $7,830 $81.13 - 6,000 $15,396 $102.38 $12,830 $85.31 $10,264 $68.25 - - 12,000 $21,539 $54.04 $17,949 $45.03 $14,359 $36.03 - - 30,000 $31,266 $34.08 $26,055 $28.40 $20,844 $22.72 60,000 $41,490 $69.15 $34,575 $57.63 $27,660 . $46.10 25 13 - 29 CITY OF CUPERTINO ' Resolution OS-044 Fees Effective July 1, 2408 Schedule D -Consolidated Schedule of Total Construction Fees Construction Types: I A, I-B Construction Types: II-A, III-A, V-A .Construction Types: 11-B, III-B, N, V-B UBC Class BC Occupancy Type Project Size Threshold Base Cost ~ Threshold Size Cost for Each Additional 100 sf * Base Cost oLD Threshold Size Cost for Each Additional 100 sf * Base Cost aLD Threshold Size Cost far Each Additional 100 sf * S-2 Low-Hazard Storage 10,000 $23,354 $46.82 $19,461 $39.02 $15,569 $31.22 - - 50,000 $42,083 $56.24 $35,069 $46.86 $28,055 $37.49 - - 100,000 $70,200 $55.74 $58,500 $46.45 $46,800 $37.96 - - 2,000 $125,940 $25.95 $104,950 $21.62 $83,960 $17.30 - - 500,000 $203,775 $16.91 $169,813 $14.09 $135,850 $11.27 9,000,000 $288,300 $28.83 $240,250 $24.03 $192,200 $19.22 S S Occupancy Tenant Improvements 600 $6,139 $73.27 $5,116 $61.06 $4,093 $48.85 - - 3,000 $7,898 $95.91 $6,581 $79.93 $5,265 $63.94 - - 6,000. $10,775 $84.63 $8,979 $70.53 $7,183 $56.42 - - 12,000 $15,853 $43.06 $13,211 $35.88 $10,568 $28.70 - - 30,000 $23,603 $27.38 $19,669 $22.81 $15,735 $18.25 60,000 $31,895 $53.03 $26,513 $44.19 $21,210 $35.35 U Private GaragelAgricultural Bldg 40 $4,485 $477.95 $3,738 $398.29 $2,990 $318.63 - - 200 $5 250 $680.48 $4,375 $567.06 $3,500 $453.65 - - 400 $6,611 $534.11 $5,509 $445.09 $4,407 $356.07 - - 800 $8,747 $297.71 $7,269 $248.09 $5,832 $198.47 - - 2,000 $12,320 $185.34 $10,267 $154.45 $8,213 $923.56 4,000 $16,027 $400.67 $13,356 $333.89 $10,684 $267.11 - peferred Submittal-All Except R-3 1,000 $6,161 $16.85 $5,134 $14.04 $4,107 $11.23 - - 5,000 $6,835 $26.66 $5,696 $22.21 $4,557 $17.77 - - 90,000 $8,168 $17.96 $6,806 $14.96 $5,445 $11.97 - - 20,000 $9,963 $11.32 $8,303 $9.43 $6,642 $7.54 - - 50,000 $13,358 $6.86 $11,131 $5.71 $8,905 $4.57 100,000 $16,785 $16.79 $13,988 $13.99 $11,190 $11.19 - Deferred Submittal-R-3 9,000 $3,878 $7.79 $3,232 $6.49 $2,586 $5.19 - - 2,500 $3,995 $26.77 $3,329 $22.31 $2,664 $17.85 - - 4,000 $4,397 $10.02 $3,664 $8.35 $2,931 $6.68 - - 6,000 $4,597 $45.12 $3,831 $37.60 $3,065 $30.08 - - 8,000 $5,500 $40.17 $4,583 $33.48 $3,666 $26.78 10,000 $6,303 $63.03 $5,253 $52.53 $4,202 $42.02 - Standard Comm. Foundation wo/Podi 500 $9,365 $103.97 $7,804 $86.64 $6,243 $69.32 - - 2,500 $11,445 $141.20 $9,537 $117.66 $7,630 $94.13 - - 5,000 $14,975 $118.44 $12,479 $98.70 $9,983 $78.96 - - 10,000 $20,897 $62.67 • $17,414 $52.22 $13,931 $41.78 - - 25,000 $30,296 $39.50 $25,247 $32.91 $20,198 $26.33 50,000 $40,170 $80.34 $33,475 $66.95 $26,780 $53.56 - Standard Comm. Foundation w/Podiu 3,000 . $12,556 $41.16 $10,463 $34.30 $8,371 $27.44 - - 15,000 $i 7,495 $51.97 $14,578 $43.31 $11,664 $34.65 - - 30,000 $25,290 $48.16 $21,074 $40.13 $16,861 $32.11 - - 60,000 $39,738 $23.60 $33,194 $19.66 $26,493 $15.73 - - 150,000 $60,975 $15.15 $50,810 $12.62 $40,652 $10.10 300,000 $83,700 $27.90 $69,747 $23.25 $55,803 $18.60 SHELL BUILDINGS - All Other 5he11 Buildings 500 $12,038 $123.25 $10,032 $102.71 $8,025 $82.17 - - 2,500 $14,503 $169.61 $12,086 $141.34 $9,669 $113.07 - - 5,000 $18,T43 $139.64 $15,619 $116.36 $12,496 $93.09 - - 10,000 $25,725 $74.98 $29,438 $62.48 $17,150 $49.98 - - 25,000 $36,971 $47.09 $30,809 $39.24 $24,648 $31.39 50,000 $48,743 $97.49 $40,619 $81.24 $32,495 $64.99 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. 26 13 - 30 CTTY OF CUPERTINO Resolution 08-044 Fees Effective•Jtily 1, 2008 Schedule D -Mechanical, Electrical & Plumbing Fee Types Fee ;ATNE AND MISC, FEES and Documentation Fees: $ 40.79 MECHANICAL. PERMIT FEES Mechanical Permit Fee $ 40.79 - Stand Alone Mechanical Plan Check (hourly rate) $ 122.38 UNIT FEES: Residential Appliance New mufti-faintly residen#ial buildings (apartmenfs and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per ' square foot • , ~ • $ p,07 New and single and iwafamiljr residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $ 0.08 _ New commercial buildings and completely remodeled spaces not including the area of garages, per square foot $ 0.13 For the repair of alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, VAV boxes, absorption unit, or each heating, cooling, absorption, or evaporative coaling system, including installation of controls regulated by this Code {Commercial) $ 61.19 For each air-handling unit, AlC units, heat pumps to and including 10,000 cubic feet per minute, inciuding ducts attached thereto. Does not apply to central type (Commercial) $ 122.38 For each air-handling unit, A/C units, heat pumps to and including 10,000 cubic feet per minute, including ducts attached thereto. Does not apply to central type (Residential) - ~ $ 61.19 Repair/Alteration/Addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporat[ve cooling system, including installation of controls regulated by this code. - (Commercial) $ 122,38 Repair/Ateration/Addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including instalation of controls regulated by this code. (Residential) $ 61.19 For each air-handling unit AIG unit, heat pump over 10,OOp cfmp to and including 3HP, or each absorption system up to and including 100,000. Btu/h. (Residential) $ 122.38 For the installation or relocation of each commercial or industrial-type hood '- ` ~ $ 122.38 For the installation of each residential hood that is served by a mechanical • exhaust, Including the ducts for such hood ~ $ 30.60 For the instalation or relocation of each forced-air orgravity-type fumace or bumer, including ducts and vents attached to such appliance, up to and Including 100,000 Btu/h $ 122.38 For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit $ 91.79 For each ventilation fan connected to a single duct $ 20.40 For the installation or relocation of each forced air or gravity type fumace or bumer, including ducts and vents attached to such appliance over 100,000 etu/h $ 122.38 For the installation or relocation of each floor fumace, including vent $ 61.19 13-31 27 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -Mechanical, Electrical & Plumbing Fee Types # Fee For the installation or relocation of each suspended heater, recessed wall heater orfloor-mounted unit heater (Commercial) ~ ~ $ 61.19 For the installation or relocation of each suspended hea#er, recessed wall heater or floor-mounted unit heater (Residential) $ 61.19 F'or the Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit (Commercial) $ 61.19 For the installation, relocation or replacement of each appliance vent installed and not included 1n an appliance permit (Residential) $ 61.19 For the installation or relocation of each boiler or compressor to and inGuding three horsepower, or each absorption system to and including 100,000 Btufi (29.3 kw) $ 91.79 For the installation or relocation of each boiler ar compressor over three horsepower to and inc[uding 15 horsepower, or each absorption system over 100,000 Btufi and including 500,000 Btu/h $ 112.1 B For the installation or relocation of each boiler or wmprQSSOr over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 i3tufi to and including 1,000,000 Btufi $ 132.58 For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system . over 1,000,000 Btu/h to and including 1,750,000 Btufi $ 152.98 For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btufi $ 173.37 For each appliance or piece of equipment regulated by this Cade but not classed in other appliance categories, or for which no other fee is listed in this Code $ 61.19 COTNER FEES: - ' ' -,•; ~;,;:';: ~ ~ 122.38 PLUMBING/GAS PERMIT FEES Plumbing Permft Fee $ 40.79 Stand Alone Plumbing Plan Check (hourly rate) $ 122.38 UNIT' FEES: New multi-famity residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same, per square foot $ .07 New single and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, er square foot $ 0.08 New commercial buildings and completely remodeled spaces not including the area of garages, per square foot $ 0.13 For installation, alteration or repair of water piping water treating equipment $ 40.79 For repair or alteration of drainage or vent piping, floor, area, condensate piping $ ~ 40,79 For each plumbing fixture or trap or set of fodures on one trap (including water, drainage ipng and backflow protection therefore) $~ 8.16 For each gas piping system of one (1) to four 4) outlets (Commercial) $ 61.19 For each gas piping system of one 1 to four (4) outlets (ResidentlaE) $ 61.19 For each gas piping system of five (5) or more, per outlet $ _ 61.19 13-32 2g CITY OX+' CUPERTINO Resolution OS-034 • Fees Effective July 1, 2008 Schedule D -Mechanical, Electrical & Plumbing Fee Types For each industrial waste pre-treatment interceptor, induding fts trap and vent Fee excepting kitchen type grease traps functioning as fixture traps $ 30.60 Kitchen type trap and/or system $ 8.16 For each building sewer, sanitary sewer, and each troller park sewer {Commercial) $ 20,40 For each building sewer, sanitary sewer, and each trailer park sewer (Residential) $ 2040 $torm/rainwatersgstems per drain $ 8.16 For each water heater and/or vent (Commercial) $ 24.48 For each water heater and/or vent {Residential) $ 24.48 Water service (Residential) ~ . ° $ 20.40 Re-pipe per fixture (Commercial) $ 6.12 Re-pipe per fixture (Residential) $ 10.20 For each lawn sprinkler system on any one meter, including backfiow protection devices therefore $ 61.19 For atmospheric type vacuum breakers/backfiow not included in item 1 1 to 5 $ 61.19 over 5 each additions! $ 61.'19 For each private sewage disposal system $ 122.38 For each cesspool $ 122.38 OTHER Other Plumbing and Gas Inspections (per hour) I $ 122.38 PERMIT FEES Electrical Permit Fee $ 40.79 Stand Alone Electrical Plan Check (hourly rate) $ 1,38 SYSTEM FEES: New multi-family residential buildings (apartments and condominiums) having three or more living units not Including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per square foot ' $ 0.07 New single and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $ ~ 4.08 New commercial buildings and completely remodeled spaces not including the area of garages, r square foot $ 0.13 UNIT FEES: Residential Appliances For faced residential appliances or receptade outlets for same, including wall- mounted electric ovens; taunter mounted coolting tops; electric ranges, self- contained room console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers washing machines; water heaters; dothes dryers; or other motor operated appliances not exceeding one horsepower (HP) in rating, each 20.40 Non-Residential Appliances 13-33 29 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -Mechanical, Electrical & Plumbing Fee Types Fee For residential appliances and self-contained factory-wired, non-residential appliances non exceeding one horsepower (HP), kilowatt (K11V), or . kilovotampere (kVA) In rating including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each 40.79 Services (Tempos Power) For services of 600 vatts or less and not over 200 amperes in rating, each (Commercial) $ 40.79 For services of 600 volts or less and over 200 amperes to 1,000 amperes In rating, each (Commercial) $ 61.19 For services over 600 volts over 1,000 amperes [n rating, each (Commercial) $ 71.3 For services of 600 volts or less and not over 200 amperes in rating, each (Residential) $ 40.79 For services of 600 volts or less and over 200 amperes to 1,000 amperes In rating, each (Residential) $ 61.19 For services over 600 volts over 1,000 amperes lri rating, each (Residential) $ 71.39 Signs, Outline Lighting and Marquees • For signs, outline lighting systems or marquees supplied from one branch circuit, each $ 40.79 For additional bsnch circuits within the same sign, outline lighting system or marquee, -each $ 20.40 Miscellaneous Apparatus, Conduits, Conductors, and Special Circuits For electrical appastus, conduits and conductors for which a permit is required but for which no fee is herein set brth $ 122.38 Power Device/Appastus For motors, genestors, tsnsformers, n+ctifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatuses, as follows: Rating in horsepower (HP), kilowatts {kW}, kilovolt-amperes (kVA), or kilovoR-amperes-reactive (KVAR): 122.38 1 unit $ ~ 30.60 Z through 5 units, each addftional $ 30.60 6 and over, each additional $ 30.60 Busways For trolley and plug-in-type liusways, each 100 feet or fsction thereof $ 20.40 Receptacle, Switch and Lighting Outlets For receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters follows: First 20 ~ $ 40.79 Additional outlets, each $ 2.04 Lighting Fixtures • For lighting fixtures, sockets or other lamp hiildin~j devices First 20 $ 61.19 Additional fixtures, each $ 3.06 For pole or platform-mounted lighting fixtures, each $ 12.24 For theatrical-type lighting fixtures or assemblies each $ 10.20 OTHER FEES: Other Electrical Inspections (per hour) $ 122.38 13-34 30 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -Mechanical, Electrical & Plumbing Fee Types Minutes Consumed:' Hours Consumed: Productive Hours per FTE: FTE Consumed: 4~., Note: This table would be used if, for example, someone just wants a'permit for a water~heater or electrical panel. Please review & revise the time requirements for the various fixture types. ' Fee 31 13 - 35 CITY OF CUPERTIlVO Resolution 08-04+4 Fees Eft'ective July 1, 2008 Schedule D -Miscellaneous Items Work Item Unk .Fee Standard Hourly Rate S 122 ust~al Review S - Sin le Famil HomelDu lex--New each S 551 Sin le Family Home/Du lex--Addition/AtteraUon each S 612 Multi-Fami /Commerclal each S 245 Address AS ' nment ~ ` er hour S 306 Antenna-Telecom Facili Radio each S 367 Celluiar/Mobile Phone, tree-standing each S 979 CellularlMobile Phone, attached to buildin each S 979 Application Meeti First Hour hou rate S 122 Each additional hour hou rate S 122 Arbor/Trellis Awnin Cano y (supported b buikiin each $ 306 Balcon Addition each S 673 Carport each S 551 Certifications ' Special Inspector Certificaton Application each S 4,161 Materials Testes Lab Certification each S 2,570 Chimne each S 490 Chimney Re it each $ 490 Close Existin Openings Interior wall each S 428 Exterior wall each $ 428 Commercial Coach ( ar unfi each unit $ ~ 734 Covered Porch each ~ 857 Deck ( each S ~ 428 Deck RaiG each S 428 Demolition Commercial to 3,000 Sf) each S 490 Commercial (each add'I 3,000 s each 3,000 of S 245 Residential u to 3,000 s ,each S 490 Resuiential (each add9 3,000 s each 3,000 sf S 122 Disabled Acxess Com !lance Fns ect'ron hour S 122 Door New door non stnictu each S 245 New door structural shear walUmason each S 367 Duplicate/Re lacement Job Card each S 61 Fence Non-mason ,over 6 feet in height up to 100 l.f. S 367 Non-masonry, each additional 100 K each 100 I.f. S 6i Masonry, over 6 feet in he' ht u to 100 I.f. S 612 -Mason ,each addkional 100 tf each 100 I.f. S 245 Fireplace Mason each S 612 Pre-Fabricated/Metal each S 42B Flag over 20 feet in height each S 337 Foundation Repair each S 734 Garage (detached Wood frame u to-1,000 sf each $ 1,101 Mason up to 1,000 sf each S 1,101 lnspecfions Outside of normal business hours, 0.2 Faults (minimum charge) to 2 hrs S 245 Each additional hour or portion !hereof 1 hour 5 122 Reins ion fa er hour 1 hour S ~ 122 Inspections for which no fee is speafically indicated-per hour (minimum charge = 112 hour) 1 hour S 122 Life Safety R each S 734 l.ightin ~ each S 367 each add'I le each $ 367 Modular Structures each S 734 32 13-36 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -Miscellaneous Items 1Nark item Unit Fee Standard Hourly Rate $ 122 Partition--Commercal, Interior up to 30 I.f. u to 30 I.f. $ 428 Additional partition each 30 I.f. $ 92 Partition-Residential, Interior {u to 30 I.f. up to 30 I.f_ S 428 Additional partition each 30 I.f. $ 92 Patio Cover! Sun Room Wood frame u to 300 sf $ 612 Metal freme up to 300 sf $ 612 Other frame u to 300 sf $ 612 Additional patio each 300 sf $ 490 Enclosed, wood frame u to 3D0 sf $ 734 Enclosed, metal frame u tq 300 sf $ 734 Enclosed, other frame up to 300 sf $ 734 Additional encbsed do each 300 sf $ 612 Photovoltaic System Residential each S 300 Commercial, up to 4 kilowatts u to 4 kW $ 612 Commercat, each additional 1 kilowatt each 1 kW $ 245 Plie Foundation Cast in Place Concrete (first 10 Iles) ,u to-10 $ 857 Additional Piles increments of 1D} each 10 $ 734 Driven (steel, pre-stressed concrete ~ up to 10 $ 857 Additional Piles increments of 10) ~ each 10 $ 734 Product Review er hour $ ~ 122 Remodel-Residential Kitchen u to 300 sf $ 551 Bath up to 300 sf $ 551 Other Remodel up to 300 sf $ 367 Additional remade! each 300 sf $ 61 Other Remodel 1000 sf $ 3,694 Additional remodel each 300 sf $ 242 Other Remodel 2500 sf ± S 4,907 Additional remodel each 300 sf $ 175 Re-reof Residential each 100 sf $ i3 Multi-Fami Dwelling each 100 sf $ 13 Corhmeraal Commercial first 5,000 s - each $ 337 Commercial (each add'I 2,500 sf) each 2,500 sf $ 153 Retaining Wall concrete or mason ) ~" Standard up to 50 If) up to 50 I.f. $ 734 Additional retaini wall each 50 I.f. $ 612 S 'al Design, 3-10' high u to 50 tf) up to 50 I.f. $ 857 Additional retaini welt each 50 I.f. $ 734 5 I Desi n, over 10' hi h (up to 50 I u to 50 I.f. S 918 Additional retaining wall each SO I.f. S 795 GravityJCrib Wali, 0-10' h' h u to 50 I u to 50 I.f. $ 918 Additional Grevi /Crib Wall each 50 I.f. $ 795 Grevi !Crib Wall, over 10' hi h (up to 501 up to 50 t.f_ $ 918 Additional Gravity/Crib Wall each 50 I.f. $ 795 Revisions Commercial New each $ 734 Tenant Im rovement each $ 734 SFDWL each $ 734 Addition each $ 612 Remodel each $ 612 Roof Structure Re ment u to 100 sf $ 612 Additional roof structure re lac~rrrent each 100 sf $ 490 Sauna-steam each $ 673 51di Stone and Brick Veneer ('mterbr or exterior) up to 400 sf $ 551 Ap Other u to 400 sf $ 367 Addtional sidin each 400 sf $ 184 33 13 - 37 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule D -Miscellaneous Items Work Item Unit Fee Standard Hourly Rate $ 122 Si ns Directional each $ 245 Each additional Diredional 5~ n, each S 122 GnwrxtlRoof/P ~ectin Si ns each $ 308 Master Plan Si n Cfiedt each $ 308 Rework of any existin Ground S' n each $ 306 Other Sign each $ 306 Rein dion Fee each $ 61 WalUAwn Sign, Non-Eledric each $ 245 Wall, Eledric each $ 245 Shed over 120 uarefeet each $ 366 Sk li ht Less than i0 sf each $ 367 Greater than 10 sf or structural each $ 673 Solar Panels s tem $ 300 Stairs-First Flight first fl' ht $ 306 • Each additional fli ht r night $ 184 Store a Rados 0-8' high u to 100 first 100 N S 306 each additonal 100 ff each 100 ff $ 61 over 8' huh u to 100 • • ~fvst 100 ff $ 337 each additonal 100 K ~~ each 100 H $ 92 Stucco A ications ~u to 400 sf S 428 Additional Stucco lication each 400 sf $ 31 Supplemental Inspection Fee~f a project requires significantly more inspections than average, the Building Official may charge additional inspection fees First 112 hour minimum first 30 min $ 61 Each Additional hour hour S 122 Supplemental Plan Check Fee after 2nd review) First 1I2 hour minimum first 30 min S 81 Each Additional hour per hour S 122 Swimmin PooUSpa Yn -lined ( to 800 s each S 857 Fiber lass each S 612 Gunite up to 800 sf) each S 1,346 Additional I over 800 s each 100 sf S 184 Commerdal I (u to 800 s each• S 1,713 Commercial pool over 800 s each S 214 S or Hot Tub (Pre-tabricated each S 3~ Tempos Permit (commercial onl each S. 366 Window or 5lidin Glass Door Re acement (each 8 windows each B S 367 New Window non structural each $ 428 New window (structural shear waNmason each $ 734 Ba Window structure each $ 734 34 13 - 38 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule E -Recreation Recreation classes and excursion fees shall be determined as follows: Classes 1. Determine the maximum hourly rate paid to instructor. 2. Multiply the instructor's hourly rate by the number of class meetings. 3. Determine the minimum number of participants and divide into the instructor's cost. 4. Add indirect overhead percent - 32%. 5. Add 20% to establish non-resident fee. 6. Add cost for specialized equipment or supplies. Special Condi#ions: For classes taught by contract instructors, the indirect overhead is only added to the City's percentage. Excursions 1. Transportation cost divided by the number of participants plus overhead transfer. 2. Add 20% #o establish non-resident fee. 3. Add any admission cost, supplies or leadership cost. Additional factors that may be used to determine the class or excursion user fee: The total number of participants in a given activity may generate additional revenue whereby the total program cost may be reduced. Classes that traditionally have waiting lists may have the user fee increased. Programs in competition with adjacent cities or the private sector may require fees to be increased or decreased to remain competitive. 35 13 - 39 CITY OF CUPERTINO Resolution 0&044 Fees Effective Jnly 1, 2008 Schedule E -Recreation Facility Use Fee Schedule (Staff Use Only) CLASSIFICATIONS: Group I: City of Cupertino activities that are open to the public. O~cia1 city sponsored programs. Group II: Clubs with 51% resident membership, recreation programs and events with full or affiliated city co-sponsorship and open to the public. Group III: Programs and events sponsored by Cupertino based non-profit recreation, education or community service organization with S I% resident participation. These organizations must show an official structure and status. Group IV: Private, special interest or business groups for functions not open to the public. These functions would include parties, banquets, receptions, industrial conferences, seminars, trade shows, etc. Group V: Cupertino businesses using the Cupertino Roam of the Quinlan Community Center for promotional and business related purposes other than negotiation or direct sale. 35 ~a-ao CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule E -Recreation Quinlan Community Center ROOM RENTAL SCHEDULE PER HOURS Cupertino Room Mon-Thurs Fri-Sun Group II $30 $80 Group III $30 $80 Group N $140 $230 Group V $50 $140 Group VI $265 $265 Classroom Group II $20 $60 Group III $20 $60 Group N ~ $45 $90 Group V $25 $75 Conference Room Group II $10 $25 Group III $10 $25 Group N $40 $60 Group V $25 $50 Securit~Staff Security staff is required when alcohol is served at any City facility. $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies to all City facilities. Securit~Deposit A security deposit shall be required for Groups.III, N, V, and VI. Security deposit is due at time of reservation. The Deparhnent Director may also require a deposit based on the nature of an event. The security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time. Quinlan Community Canter Cupertino Room -Groups N, VI $750 All Other Rooms - Group N $300 Group II, III, V -All Rooms $330 37 13 - 41 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule E -Recreation Monta Vista Recreation Center/Creekside Park Building Room Rental Schedule Per Hour Monta Vista Creekside Park Recreation Center Building Multi-Purpose Group III Group IV Group V Classroom Group II Group III Group IV Group V Conference RoomJKitchen Group II . Group III Group N Group V N/A N/A N/A N/A N/A N/A $25 $25 $25 $25 $SO $50 $35 $35 $25 N/A $25 N/A $50 N/A $35 N/A Security Staff Security Staff is required when alcohol is served at any City facility; $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation time sha[1 be charged $150.00 for any time up to the first half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies to all City facilities. Security Deposit A security deposit shall be required for Groups III, IV, V and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time. 3g 13-42 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule E -Recreation Senior Center Annual Membership End of Aug. to End of Oct. Membership Sale Day Pass Fee Resident $22 $17 $5 Non-Resident $27 $22 $5 Room Rental Schedule Fer Hour Reception Room Group II Group III Group N Group V Classroom, Conference Room, Arts & Crafts Room, Bad Group II Group III Group N Group V Evenings and Weekends $12 $80 $230 $l40 $12 $60 $90 $75 * Senior Center rooms are not available for rental Monday through Thursday $;00 a.m, to 10:00 p.m. and Friday, 8:00 a.m. to 5:00 p.m. Security Staff Security Staff is required when alcohol is served at any City facility: $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies to all City facilities. Security Deposit A security deposit shall be required for Groups III, N, V and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time. Cupertino Senior Center Reception Hall - Group N $750 All Other Rooms - Group N $300 Group II, III, V -All Rooms $300 39 ~ 13 - 43 CITY OF CUPERTIlITO Resolution 08-044 Fees Effective July 1, 2008 Schedule E -Recreation Outdoor Facilities Memorial Softball Field Cupertino residents/businesses only ~ $25.00 Non-Residents ~ $40 Field can be reserved for a maximum of 2 hours. THERE IS NO FEE FOR CURRENT SOFTBALL TEAMS PLAYING IN CUPERTINO LEAGUES Field preparation (includes dragging, watering, chalking, and bases) $36.50 Field Attendant (2 hour minimum). Field Attendant is required any time lights or field $8.25/hr preparation is requested. Lights (in the evening) $5.00/hr Memorial Park A~hitheater Cupertino resident/resident business $55.00 Non-Resident/Non-Resident business $75.00 Memorial Park Gazebo Cupertino resident/resident business $55.00 Non-resident/non-resident business $75.00 Picnic Areas {daily rate) Cupertino residents $55.00 Cupertino business $75.00 Non-residents $80.00 Non-resident business $100.00 Electricity at Memorial or Linda Vista Park $25.00 Snorts Field Fees Adult Leagues (two hour minimum) $50.00lhr Deposit $600.00 Youth Leagues (participant/season) Resident $11.00 Non-resident $22.00 40 ~ s - as CITY OF CUPERTINO Resolution 08-044 Fees Effective Juty 1, 2008 Schedule E -Recreation Blackberry Farm Golf Course Resident Non-Resident Resident 9-Holes $14.00 $16.00 $12.00 Junior & Senior $14.00 $16.00 $11.00 Second 9 Holes (all players) $12.00 $14.00 $11.00 All groups and tournaments pay the full rate (Cupertino resident still applies). Staff is authorized to set merchandise fees according to current cost. Annual Rate (Weekdays Only} Adults {17-61) Cupertino Residents $850 Non-Residents $1,000 Semi-Annual Rate (Weekdays Only) . - Cupertino Residents $4S5 Non-Residents- $540 • Super-Annual Rates (Goad on Weekends & Holidays) Cupertino Residents ~ $1,000 Non-Residents ~ $1,125 Super Semi-Annual Rates (Good on Weekends & Holidays) Cupertino Residents ~ $500 Non-Residents $600 Quick Passes (Ten-play card for the price of nine) Cupertino Resident Weekday $9g Cupertino Resident Weekend $l 17 Non-Resident Weekday ~ $117 Non-Resident Weekend $135 Green Fees Cupertino Resident Weekday $12 Cupertino Resident Weekend $14 Non-Resident Weekday $14 Non-Resident Weekend ~ _ $16 Non-Resident $14.00 $13.00 $13.00 Jr/Sr $775 $925 $415 $495 $ l,aoo $1,125 $500 $500 $90 $117 $108 $135 $11 $14 $13 $16 41 13 - 45 CITY OF CUPERTINO Resolution 08-044 Fees Effective July 1, 2008 Schedule E -Recreation Blackberry Farm Picnic Areas (Daily Rate 300 Person Picnic Area 200 Person Picnic Area 100 Person Picnic Area SO Person Picnic Area Pool Pass for Picnic Area Groups Day-Use Pass Only Weekday Tuesday -Friday Weekend Saturday -Sunday Resident Non-Resident $300 $450 $200 $300 $100 $150 $50 ~ $75 $2 per person $3 per person $4 $6 $6 $8 Deposit for Picnic Areas One half of fees will be due at time of reservation. The remainder will be due two weeks.prior to event. 42 13 - 46 CITY OF CUPERTINO Resolution 0&044 Fees Effective July 1, 2008 Schedule E -Recreation Sports Center/Child Watch/Teen Center . Tune Resident -Non-Resident Day Passes ~ $7.00 $10.00 Monthly Passes One Month Single $55.00 $65.00 One Month Couple ~ $75.00 $90.00 One• Month - Family $95.00 $115.00 Annual Passes One Year Juniors (<17} $300.00 $330.00 One Year Single $425.00 $455.00 One Year Couple $810.00 $880.00 One Year Family $905.00 $980.00 One Year ~ Senior $380.00 $405.00 Enrollment Fee All $50.00 $50.00 ADDITIONAL CONDITIONS - 1. The Cupertino Tennis Club. will be charged $10.00/hour during primetime and $ b.00/hour per court during non-primetime for all C.T.C. sponsored activities other than U.S.T.A. leagues and practices. 2. All competitors in C.T.C./CT.S.T.A. leagues participating at the Sports Center must purchase an annual pass. 3. Individuals may purchase a ten pack of day passes, $b0.00 Resident, $90.00 Non-Resident. 4. Specials will be offered on an on-going basis. Child Watch Fees One visit $5.00 Ten visits $45.00 One Month Pass $100.00 Teen Center Rental Rate - $200/3 hours Deposit $750.00 Overtime Rate: $100.00 first hour; $50.00 each half hour after. Resident - ~` ' ~ Non-Resident Daily Pass $0.00 $5.00 Annual Pass $0.00 - ~3 ~ 13 - 47 CITY OF CUPERTINO Resolution OS-044 Fees Effective Jnly 1, 2008 Schedule E -Recreation Community Hall ROOM RENTAL SCHEDULE PER HOUR Group II Group III Group N Group V . Group VI Mon-Thurs Fri-Sun $80 $250 $80 $250 $80 $250 $80 $250 $80 $250 Securit~Staff Security staff is required when alcohol is served at any City facility: $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation shall be charged $150.00 for any time up to the first half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies to all City facilities. Security Deposit A aecurity deposit shall be required for Groups III, N, V and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time. Community Hall Groups N, VI Groups II, III, V $700 $300 '~ 13 - 48