16. Planning Commission work programCity of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
(408) 777-3308
Fax: (408) 777-3333
CUPERTINO
Community Development
Department
Summary
Agenda Item No.
Agenda Date: Apri12, 2008
Application: Approve Planning Commission Work Program for 2008
RECOMMENDATION
The Planning Commission recommends that the City Council approve the 2008 Work
Program, with two modifications as described below.
BACKGROUND
The Planning Commission adopted its work program on March 25, 2008, which is
forwarded to the City Council for final approval. A matrix describing the proposed
Work Program is enclosed (Exhibit A). New projects are based on the adopted City
Council goals for 2008-2009 (Exhibit B). Other projects consist of those carried over
from 2007, as well as private developments.
DISCUSSION
A major new project this year is the required review of the General Plari s Housing
Element. Adoption of ABAG's regional housing allocation is required by June 2009.
Staff is currently reviewing proposals from consultants who will assist in preparing the
Housing Element; a draft will be available in the fall.
The Historic Preservation Policy was on last year's work program, but was initiated this
year. Members to serve on a Historical Preservation Advisory Committee are being
solicited at this time. The Committee will recommend non-residential structures/ sites
for historical consideration in terms of preservation or commemoration.
The Sustainability/Green Building project will continue throughout the year, with a
progress report to the City Council in May regarding the City's voluntary green
building program, options for the future and opportunities for other sustainability
programs.
A major new private development is Sand Hill Properties mixed-use proposal on the
17-acre site on Stevens Creek Boulevard in the South Vallco area. A community
outreach effort, related to the South Vallco Master Plan, will occur March -June.
~s-~
Planning Commission Work Program 2008 Apri12, 2008
Page 2
PLANNING COMMISSION DISCUSSION
The Planning Commission approved.the 2008 Work Program, with two additional
recommendations for the City Council's consideration:
Green Buildings/SustainabilitX
The Commission requests that the City be aggressive in implementing the green
building/ sustainability program, by including allocations in the budget for green
programming/staffing and training of planning and building staff. The Planning
Commission also requests that they be included in future public discussions, workshops
and hearings on this subject.
Single-Family Residential Floor Area Ratio (FAR)
The Planning Commission discussed the issue of the lack of certainty for the single-
family residential floor area ratio maximum of 45%, since the City Council recently
required a lower floor area ratio for a new residence on Vai Avenue. One point of view
was that, regardless of one's opinion of large homes, people prefer certainty over
uncertainty, and if lower FAR's are desired, a prescriptive approach should be taken.
Another point of view was that the problem of large homes isri t pervasive; opening up
the Rl ordinance to address the FAR is a large undertaking, and there are other
priorities for the City's limited resources.
The Planning Commission recommends, 3 yes, 2 no (Giefer and Rose), that the City
Council add a review of the Rl ordinance, with a focus on the Floor Area Ratio, to the
work program. There was a suggestion that this could be a low priority project, to be
undertaken as time and resources become available.
PUBLIC
One person spoke from the public, stating that the R1 ordinance already is prescriptive,
and City resources should be directed toward other priorities.
STAFF
Staff comments included the view that there are limited staff resources to bring this
issue forward, and that it can be dealt with on a case-by-case basis. The Council
decision on Vai Avenue can be treated as "case law" for the City, and staff can advise
applicants accordingly. Neighborhoods can come to the City for assistance in
developing unique regulations, as did the Fairgrove/Eichler neighborhood.
~s-z
Planning Commission Work Program 2008
Page 3
ENCLOSURES
Exhibit A: Planning Commission 2008 Work Program
Exhibit B: City Counci12008-2009~Work Program
Prepared by: Ciddy Wordell, City Planner
Submitted by: Approved by:
Steve Piasecki avid W. Knapp
Director, Community Development City Manager
Apri12, 2008
16-3
PLANNING COMMISSION WORK PROGRAM 2008
PLANNING COMMISSION HEARING ~
NEW 2003 PROJGCTS
EXHIBIT A
Jan Peb March April May Jiu,e July Aug Sept Oct Nov Dec Jan STAPP
PROGRAMMi;D
Historic Preservation LG
Polic
General Plan
Implementation
Monitoru,g - Aiuzual
Review
Heart of the City PG
S ccific flan
Crossroads ArIS/KK
Streetsca e Plan
'
'
1
rc~~ urcliirlncr
,,,,,~„~~,,,~„t, _t,•~~,
Cily Council only AHS
Cleo Avenue SP/VG
Affordable I-Iousu,g
(rczonu, ,use ern,it)
Green 13uildu,gs PG
Pro ram
~14~11 C~1'1L111.111C1' GC
n~ll~„~il,~~,l,t~
~'~l)US1114~ 1S~1'tlll'llt VG
IJ 7l~il tl'
PRIVATC
DCVCLOPMCNT
Public Hearin s
S~luth v,~llr~, n9~lstrr
~i Sandi Iill
t
.,l,
Pro .
C
~li
Vill
•
upw
n~~
~l};~ GC
fall I'cU March April May June July Aug Sept Oct Nov Dec sTArr
~.llll~~-1111 1~1'ul?CI'tlCti CC
l7 ac, 5CL
Vallco:
Rosebowl
Retail (Wolfe
Road/Vallco
Parkway
Flulcl
Nurlh Parr~`1, ,.l ,ir
Bacildin Pcrrn"its
Vill~l 5~rr~l
L~ls Palmas
(Stcllin r (~d.)
Cll17l'Ctilll) ~ll, Ill'N'
ll'n~llltti
Nul•tll '1"~ultau c)l7ic~`
G:plaruling/inisc/work program taUle 2008
2008 - 2009 Work Program IXHIBIT B
Project Status Comments
1. Major Developments (for a'full list of development activity go to ww:w.cupertirib.org/developmentactivity)
A. Cupertino Square (formerly Vallco Fashion Owners of Cupertino Square are Use permit and site and architectural approval
Park) pursuing the private revitalization of for the Wolfe Road and Vallco Parkway
1. Periodic updates to City Council from the center as follows: frontages and the Rose Bowl mixed-use building
~
Annroved but construction hasn t was granted in the Spring of 2005 and the
property owners.
started ownership expected to be under construction in
2. Periodic reports regarding development 1. Retail adjacent to Penney's 2007. The Evershine Group acquired the Rose
approvals. 2. Rose Bowl 140,000 square Bowl and two other "out-parcels" and Orbit
3. Adherence, if possible, to artist foot commercial and 204 acquired the mall portion of Cupertino Square
renderings presented to Council. residential condominiums resulting in a delay of the planned construction.
3. CPK restaurant in the Sears
4. Analyze the impacts of the parking lot Evershine has met with staff regarding changes
development agreement's expiration. Future Development to the plans while maintaining consistency with
4. Hotel pursuant to the the Council approval. Staff is reviewing the
development agreement changes and expects to bring the amended plans
5. Development on the parcel back to City Council as an information item in
north of Macy's the first quarter of 2008.
Cupertino Square General Manager Orbit is preparing refined elevations of the Wolfe
Mike Rohde has provided periodic Road and Vallco Parkway retail which will be
updates to the City Council. brought to the Council as an informational item
to ensure your agreement that they conform to
the approvals.
Awaiting hotel application from the Evershine
Group and eventual development of plans for the
parcel north of Macy's.
2008/2009 Wo*U Program (Approved February 19, 2008) Page ' ~f 20
2008 - 2009 Work Program
Project ~ Status ~ Comments
B. HP Property
C. The Oaks
D. Rose Bowl
E. North Vallco Parkway Retail
V
Use Permit application filed for a
121-room hotel and 47,000 square
foot retaiUconference center.
Projected public hearings before the
Planning Commission and City
Council in Spring 2008.
Evershine, new owners of the
Rosebowl parcel, are developing
slightly modified plans with 204
residential units and 100,000 square
feet of retail.
Plans are being developed for
31,400 square feet of multiple-tenant
retail space facing Wolfe Road and
Vallco Parkway, adjacent to the new
garage in front of Penney's.
Developer is required to fund and implement a
South Vallco Plan on a parallel track.
LUU~/lUUy Work Program (Approved February 19, 2008) Page 2 of 20
2008 - 2009 Work Program
~ Project ~ ~ Status ~ Comments ~
F. California Pizza Kitchen This 6,000 square foot restaurant Islands restaurant, approved at the same time,
was approved in 2006 and building will not be moving forward. The property owner
permits were issued. The time limit is seeking another restaurant in its place.
on the implementing the permit was
extended, but the extension has
expired. New building fees, and
possibly an amended building plan
to conform to the new building code,
' will have to be submitted to reinstate
the building permit.
2:~ Capital ImpXovement5~,and plans
,~
A. Bridge
Mary Avenue Pedestrian Footbridge Phase I completed (grading, fencing
and utility relocation)
Construction contract awarded Nov.
2007. Contractor is underway and
will begin actual construction Feb.
2008.
Bridge completion date is Dec. 2008 Groundbreaking was Jan. 24, 2008.
Final completion Mar. 2009
B. Parks
1. Stevens Creek Corridor Park (Phase 1 - Project assigned to Public Works for PS&E at 80% and project transferred from Parks
McClellan Road to BBF Golf Course construction. & Recreation to Public Works for construction.
;, maintenance building) Public outreach regarding environmental
' im rovements was successful.
2008/2009 Work Program (Approved February 19, 2008) Pav^ ~ of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
a. This project includes park and trail
improvements.
b. City will enhance outreach efforts in
regards to environmental improvements
and tree replacement.
2. Stevens Creek Corridor Park (Phase 2 -
Golf Course maintenance building to
Stevens Creek Blvd.)
Develop Conceptual Plan
3. Rancho Rinconada Park
a. Work with County to come up with a
plan to move the County Roads and
Airports activity off the site and
develop a park.
Tentative Schedule:
Status, scope and budget report to
Council March 2008.
Completion of final PS&E -- March
2008
Final reviews /permits -Mar. 2008
Advertise for bids -Mar. 2008
Award Contract -May 2008
Construction Complete- Apri12009
Park and Trail Open -May 2009
Following the Award and Start of construction of
the Phase 1-A (Creek restoration) and 1-B
Blackberry Facilities Projects, staff will begin to
devlop the scope and budget for the Phase 2
Project. This generally consists of extending the
trail from the existing golf maintenance Building
(to be demolished in Phase 1-B) across a new
bridge to the west side of Stevens Creek through
the Stockelmeir Orchard, past the Stockelmeir
house and ending at Stevens Creek Boulevard.
Staff will provide a preliminary scope and
projected budget expected for design and
construction in the 2009-2010 CIP.
Santa Clara County owns a parcel Staff has approached the Real Estate Manager
next to Lawrence Expressway for the San Jose Water Company to inquire about
currently used by the Department of the potential for acquiring land immediately
Roads and Airports as a materials adjacent to the Roads & Airports corporation
2008/2009 Work Program (Approved February 19, 2008) Page 4 of 20
2008 - 2009 Wdrk Program
~ Project ~ Status ~ Comments ~
storage site. County Roads &
Airports staff have maintained that
this site is critical to their operation.
County Parks has received Board of
Supervisors approval for the San
Tomas Aquino trail master plan,
which identifies this site as
greenbelt.
b. Pursue Grants
c. Sterling Barnhart parcels
0
At this point the timing is uncertain
for acquisition and funding most
likely to be carried over to 2009.
Acquisition of two parcels at
Sterling and Barnhart is underway
The improvements have been
included in the CIP.
4. Neighborhood Park in the Homestead area This area was identified during the
General Plan process as an area
deficient in neighborhood parks.
yard at Doyle and Lawrence Expressway. The
1+-acre San Jose Water Company parcel if
available, could be purchased for a Roads &
Airport yard expansion, freeing up the creekside
parcel for park development and the extension of
the San Tomas Aquino trail. County park
acquisition funds may support this effort.
Staff will endeavor during the 2008-2009 Fiscal
Year to seek grant funding for acquisition and
design and construction as maybe available.
Agreement reached with San Jose Water Co.
Purchase approval to Council Feb. 2008
Planning staff worked with developers of the
Villa Serra project to require a small
neighborhood park approved in conjunction with
the planned expansion of the development. A
preliminary park concept has been developed
and will be presented to the Parks and Recreation
Commission on February 7, 2008.
2008/2009 ~"~Tk Program (Approved February 19, 2008) - Pa^'° 5 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ ~ Comments ~
C. Sports Center Upgrade
Develop a strategy for upgrading the Sports It has been determined that the cost The multipurpose court (for basketball,
Center pool and bath house. to bring the pool up to code exceeds badminton, etc.) project was funded in the
its value to the community. 2007/2008 CIP.
D. Quinlan Fountain
Propose project to replace the fountain. A plan to replace the fountain with This project was added to the CIP in May 2007 -
plaza/event space was presented to in the 2007/2008 CIP, though the Council has
the City Council in May 2007. not yet determined the final use of the space.
($250,000).
E. Civic Center Fountain
Investigate Cryptosporidiuxnprntection Staff, as directed by Council will seek
alternatives to the reconstruction retrofit of the
Fountain and report back to Council during the
Budget discussions for FY 2008-2009
2008/2009 Work Program (Approved February 19, 2008) Page 6 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
g ~
3. Or anizationalIm rovements ,
'
A. E-Services
Bring City Hall to the customer and improve Applications in process: Applications completed:
efficiency of service delivery. • On-line permits -May, 2008 E-mail notification of services
1. E-Services • Sports Center tennis court/Golf • City Mapguide
Course tee-times -June, 2008 - . Mapguide Inquirer
deemed undesirable per golf
• City public records -Aug.
2006
survey & will not be pursued. ,
• Staff continues to work with
• Webcasting -Sept., 2006
Pentamation to fully implement ~ On-line Elections page -Oct., 2006
online permitting. Pentamation is • Economic Development -Dec, 2006
developing applications to better ~ Access Cupertino -May, 2006
coordinate financial and building
permit data. This is the current • On-line job application -July, 2006
critical path project for the • City projects, bids & RFP's -May, 2007
continued expansion of online • Street sweeping notification -May, 2007
building permitting and
inspection scheduling. . parking Citation Inquiries
• Parks & Rec on-line registration -Feb, 2007
• Community Outreach Program -Feb., 2007
• Neighborhood Watch eCap -Mar., 2007
• On-line business licenses -April, 2007
• On-line Muni Code -June, 2007
• Digital signage -June, 2007
• 3N -Enables City to communicate with tens
°' or tens of thousands of people
anywhere
N ,
,
anytime and on any device.
2008/2009 W^*k Program (Approved February 19, 2008) Pa~~ 7 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
The City of Cupertino provides abundant public
access to many meetings and city records using
state-of--the-art software programs available
through the City's website.
Through a digital records management program
and an integrated document and video-streaming
program, all users have access to all public
document and video records.
2. Redesign the website Completion scheduled for Dec. 2008 Will include but not limited to:
• Attractive design
• Intuitive navigation
• Content management solution
• Integrated interactive components
• Integration of third-party tools and
databases
w
2008/2009 Work Program (Approved February 19, 2008) Page 8 of 20
2008 - 2009 Work Program
Project Status Comments
B. Provide Support for City Attorney Transition Letter of Engagement signed with
Public Management Advisors LLC
to review and analyze the operations
of the. City Attorney's office. Firm
will provide recommendations to
Council in recruiting and filling the
position and other options for
providing legal services. Initial recommendations scheduled to be
available for the proposed FY 2008/2009 budget
deliberations.
C. Fiscal Strategic Plan
Develop along-term solution to reposition the City Reviewed May 2006 and adopted in Substantial progress has been made in the area
to ensure services can be fully supported by conjunction with the 2006/07 of:
revenues collected. budget. • Passage of AB 117 resulted in additional
3. Pursue correction of ERAF percent for TEA The Plan: TEA property tax of $1.35 M/year. Second
funding by Dec., 2007 • defines the financial problem phase of State legislation in process.
4. Schedule a public hearing to adopt safes as a • analyzes the structure of the
organization . Council elected not to pursue November
standard condition on residential development.
• identifies opportunities for ballot measures for business license Quarry
category; UUT Ordinance changes &
5. Prepare ballot issues for business license decreasing expenses and areas of Entertainment tax in July, 2007.
(Quarry) and utility tax ordinance changes for risk exposure New Reserve Policy adopted in October
November, 2007 election for Aug., 2007 ballot
• identifies opportunities for ,
2007.
submission. stabilizing our revenue
6. Perform analysis on entertainment tax and resources.
bring back to Council June, 2007.
A
2008/2009 Work Program (Approved February 19, 2008) Pang 9 Of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
~_
4 Public. Safety '
,.
,.
..
_.
, ~, ,,
A. Law Enforcement
Continue emphasis on Neighborhood Currently have 183 active Presented introductory Neighborhood Watch
Watch Neighborhood Watch Leaders information to 16 Neighborhood Watch groups
Provide quarterly Neighborhood Watch maps supporting 138 groups. that included 7 new groups and 9 inactive
starting March, 2007. groups. All other groups remain active by
participating in city sponsored Block Parties,
Emergency drills, and other activities that
promote a spirit of community in a neighborhood
twice a year.
B. Emergency Preparedness
Continue emphasis on Emergency
Response (ER) and Preparedness
1. Continue expanding of the outreach Increased from four to five 750 residents trained in CERT.
programs CERT classes/yr.
• Conducted six first aid and 726 residents trained in First Aid and 799 trained
seven CPR classes in CPR.
• Implemented a Disaster Enables community members to participate in
CounciUCitizen Corps Council emergency planning. -
• Organized two new Total of 12 neighborhoods trained.
neighborhood CERT teams.
• Established Medical Reserve Completed
Corp through Federal grant.
• Conducts on-going EOC drills Provide communication services at community
' with Amateur Radio events and established county-wide mutual aid
`~ plan for amateur radio.
2008/2009 Work Program (Approved February 19, 2008) Page 10 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
• Offer Kaleidoscope Program 3 Total of 367 students trained to date.
. times/year .
2. Ensure ER Training for City staff • Providing mandated _
SEMS/NIMS/ICS training;
First Aid and CPR to staff.
3. Master database update/custom program . One database for Eliminates redundancy for outreach efforts to be
• Neighborhood Watch, Block completed Jan., 2007.
Leaders and Sheriff
4. Pandemic Flu • Provided education to the .
public to prepare citizens for
disaster response.
5. Mass Immunizations • Marsha chairing County
committee to work on plan via
committee process only
6. Managing spontaneous volunteers • Revise standard forms for city-
wide use June, 2008
C. Traffic Safety
1. Walkability
Implement "walkable city" concept. Ensure that the concept is present in Examples of recently approved walkable
all City development/redevelopment developments include:
projects. Oak Park (North De Anza Blvd.)
• Tantau office building
• Whole Foods
~, ~ Las Palmas (Stelling Road)
• Rockwell Homes Stevens Canyon Road)
2008/2009 ~"^Tk Program (Approved February 19, 2008) Page ~ 1 of 20
2008 - 2009 Work Program
Project ~ Status ~ Comments
• Mary Avenue Bicycle Pedestrian
Footbridge
• Stevens Creek Corridor
V
$250,000 added for sidewalk improvements.
2. Review traffic safety issues
a. Safe routes to school program Garden Gate safe routes grant funding approved
for $393,000. Design and CEQA underway.
Construction expected Summer 2009.
b. Tri-schooUR.egnart Traffic The Sheriff's Office, the City, the
Improvements School District, and the residents
continue to work together to
improve the safety of vehicle,
pedestrian, students and reduced
. traffic congestion on the primary
roadways around the school.
c. Bring proposal to Council on best use Staff will consider and recommend proposals for
for $300,000 earmarked for traffic traffic safety around schools and present a report
safety around schools (e.g. red light to Council during budget discussions for the FX
running ,lighted crosswalks, flashing 2008-2009 CIP.
speed limit signs, public education,
etc.)
3. Provide pedestrian ramps at required There are two locations that will require
intersections pedestrian ramps and the work will proceed
under the City's current curb and gutter contract
once the sites have been reviewed by the City's
contract attorney for compliance. Estimated
Completion by June 2008.
2008/2009 Work Program (Approved February 19, 2008) Page 12 of 20
2008 - 2009 Work Program
~ Project ( Status I Comments
' S ~ Housing
...
,.
A. Provide housing opportunities for Cupertino The 2005 GP update and Housing The Santa Clara County Housing Trust Home
workers Element identified sites for Ownership Assistance Program is applicable to
additional housing units. Cupertino teachers and other public service
employees.
The Cupertino Below Market Rate (BMR)
program also gives priority to Cupertino
teachers, public service employees and
Cupertino workers.
B. Teacher housing assistance program
BMR eligibility requirements for Cupertino In May 200.6, the Council amended The Commission found the existing fee is
Union School District (CUSD) teachers. the BMR program to give teachers insufficient to offset the impacts of development
in CUSD 2 points credit regardless and recommended increasing housing fees for
of whether they currently work non-residential developments, including
within the Cupertino city limits. commercial development and residential
developments that are too small (6 or fewer
units) to require a BMR unit.
C. Cleo Avenue Affordable Housing In Feb. 2005, the City Council The site can accommodate up to 4 units.
authorized staff to purchase a %4 acre Preliminary design developed in Spring, 2007.
site on Cleo Avenue from Cal Trans. RFP issued in October 2007. Rezoning of
Staff completed negotiations and the property initiated in January 2008. Use permit
site has been purchased. expected in March 2008. Construction to begin
in late 2008.
°' ~ In October 2007, staff issued a
Request for Proposals and received
one ro osal from Habitat for
2008/2009 u' ~~k Program (Approved February 19, 2008) Pag' ' 3 of 20
2008 - 2009 Work Program
Project ~ Status Comments
. BMR Manual Update Humanity. The City Council
reviewed and accepted the proposal
at its December 18, 2007 meeting .
Review and update is scheduled for
Spring 2008.
taff is in discussion with a consultant to begin
work on the updates.
' 6. Economic DevelopmentlRedevelopment,
;, .
A. Encourage, retain and support healthy Fourteen retail openings including • Recognizing new businesses in new
environment for retail growth Whole Foods, Strike, Cupertino Quarterly electronic newsletter. Summer and
Bakery, Arya, Zales, Harvest, and Fall issues distributed to list of over 200 real
Visique. On track for over 20 estate professionals and community
openings by fiscal year end. stakeholders.
• Sending "New Business Welcome Package"
in partnership with the Chamber of
Commerce. 130 packages mailed for 2007.
• Assisting new businesses with
planning/building facilitation - signage, etc.
• Introducing new restaurants to city
employees
E.D. Committee is meeting regularly 10 key initiatives identified with corresponding
and providing input on E.D. work action plan.
plan.
Active outreach to Landlords and • Re-tenanting successes include: Harvest,
brokers to facilitate re-tenanting, and Great Buffet
Pizza My Heart
the leasing of new mixed use space. ,
,
Marukai/Daiso, and T.S. Stew House.
2008/2009 Work Program (Approved February 19, 2008) Page 14 of 20
2008 - 2009 Work Program
~ Project ~ ~ Status ~ ~ Comments ~
• New leases for Civic Park, Metropolitan, and
Adobe Terrace projects, and lease
negotiations at Montebello.
B. Consider retail in reviewing new development.
Retention efforts include active Initiated Cupertino Restaurant Association
outreach to business owners through beginning with Flint Center marketing
direct meetings, and Chamber collaboration. First meeting on 1/15/08.
participation..
Beginning preliminary work on • Reviewing plan for conformity with Heart of
Crossroads Streetscape Plan. the City.
• Bringing planning consultant onboard.
• Conducting preliminary outreach and
developing plan for stakeholder input.
Advise on/facilitate new
development projects.
• Worked with over 30 development firms
expressing interest in the 17-acre HP site.
• Provided input into planning process for
Cupertino Village and Oaks expansion
projects, and Marketplace re-tenanting.
• Advised on Furniture 2000 project.
o~
N
O
2008/2009 "',Tk Program (Approved February 19, 2008) ~ PaPn ~ 5 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
7
Planning _
A. Review the Heart of the City In fall of 2007, staff prepared update Technical revisions to the Heart of the City plan
report to City Council in December are being prepared for Planning Commission
2007. review in Spring 2008, then on to Council June
of 2008.
B. Develop Green Building Standards First phase (audit) to be finished Walker Wells worked with Global Green to
Sept, 2007. Estimate completion complete the audit. First phase completed. City
June, 2008 Council adopted a voluntary Green Building
program and will consider mandatory program in
May 2008. New developed has been encouraged
to "go-green" including Tantau office building
and Cleo Drive Habitat for Humanity project.
C. Prepare a historic preservation policy In fall of 2007, staff began Staff has met with Helene Davis of the Cupertino
preliminary review and scheduled Historical Society and met with the Board in
meetings with the Cupertino January 2008.
Historical Society.
D. Propose policy for tree topping under property Begin discussion Sept., 2007 and The ordinance amendment is expected to be
maintenance standards ordinance wording is in preparation. heard by the City Council in spring 2008.
E. Put sign code review (to look at being more
business friendly) on the Planning Commission
work program
N
2008/2009 Work Program (Approved February 19, 2008) Page 16 of 20
2008 - 2009 Work Program
Project Status Comments
F. Update the General Plan Housing Element RFP's will be sent to consultants in
February 2008 to prepare the
Housing Element. Community
outreach, preparation of the draft
Housing Element and the beginning
of public hearings will occur
throughout 2008. State law requires that the new Housing Element
be adopted by June 2009.
.. r
8. Building ;Community
,..
L
~,
A. Continue to offer opportunities and Neighborhood block leader program Disaster reporting, search & rescue, and
programs to promote cultural supports 2401eaders. communication training were among those
understanding and address the needs of our offered to Block Leaders this year.
diverse community The block leaders annual gathering
and recognition is planned for Jan.
24, 2008.
Database to streamline community
outreach program participants
(Block Leaders, Neighborhood
Watch Leaders, CERT grads, etc.) is -
completed.
A new project to survey neighbors Block Leaders coordinated supplies checks
basic emergency supplies was during neighborhood block parties and meetings.
administered by the OES with About 10 neighborhoods participated.
assistance from a high school
service club.
N Anew city-sponsored Community Three grants were awarded in 2007.
Improvement Grants program
2008/2009 ~" -k Program (Approved February 19, 2008) PagA ~ 7 of 20
2008 - 2009 Work Program
Project ~ Status ~ Comments
awards neighborhoods up to $300
for new beautification projects,
neighborhood participation
activities, and other projects that
build community and bring
neighbors together. Grants are given
to neighborhoods represented in the
Block Leader program.
B. Beautification Program Council authorized a Community
Service Day on May 17th. Don Allen
and Barbara Nunes are directing the
effort.
C. Leadership Cupertino
Bring proposals for restarting program to
Council as. part of 2008/2009 budget. Compare Leadership Cupertino with other local
leadership programs.
9. Commuriity.Organizations: '
,,
_, „
.~,
,,,
: ,
. ,.
A. Support the Cupertino Historical Society in Staff and the Parks and Recreation The City re-roofed the Stocklmeir house. The
its effort to create a Center for Living Commission met with the Historical Historical Society has sent a letter to the City
History Society to define a project a majority Manager expressing support for the trail
of the Cupertino Historical Society connecting to Stevens Creek Blvd. so long as the
Board will endorse. multi use trail is kept close to the creek with a
footpath through the orchard.
;, Cupertino Historical Society is no longer
W pursuing the Center for Living History.
2008/2009 Work Program (Approved February 19, 2008) Page 18 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
B. Pursue partnership opportunities with the The Safe Routes to Schools projects
three school districts: have proceeded with excellent
1. Traffic and parking cooperation between the City and
2. Teacher housing Monta Vista, Cupertino and Garden
Gate.
We use the new Cupertino field
house as available.
Added two crossing guards.
3. School Resource Officers
4. Juvenile Prevention Program
C. Cupertino Day
N
A
De Anza/City recycling program -
the City gives De Anza used
computers and De Anza refurbishes
them.
City is sponsoring pilot project television
coverage of sports at Cupertino high schools on
public access.
Added second SRO in FY 2004/05 CUSD & FUHSD now contributes $10,000 each
to this program. in addition to School Resource
Officer, Sheriff's Office has added a School
Enforcement Officer.
Contracted with Linda Rios for
Outreach Services
Proposal presented to Council as
part of the 2007/08 budget.
CUSD contributes 50% of the cost of this
program.
Cupertino Day is scheduled for Sunday, May 4th
and will include open houses at several Parks
and Recreation facilities and the golf course.
2008/2009 Work Program (Approved February 19, 2008) Page i 9 of 20
2008 - 2009 Work Program
Project ~ Status ~ Comments
D. Tank House Renovations began in Summer, Phase One in process to weatherproof structure.
2007. Numerous volunteers have Includes new roof and siding
come forward .to participate
including Rotary, Terry Brown, Los
Gatos Roofing, San Jose Water
Company, & Los Altos Garbage
Company.
10 Go--Green
. , ,;,.,
,
;..
Develop list of possible projects The voluntary Green Building
program is underway, whereby
anyone getting a building permit has
the opportunity to voluntarily
implement green building practices.
The City Council will evaluate the
voluntary program in May 2008, and
can consider a mandatory program
at that time. Other green programs
identified in the General Plan, or
from other sources, can also be
considered.
2008/2009 Work Program (Approved February 19, 2008) Page 20 of 20