07120154 SIGNET
Testing Labs, Inc.
March 02,2011
F1 F
c� (i
IV-1-11
COPY TO: .. ^. _.. -
CUPERTINO BLDG INSP DEPT
10300 TORRE AVENUE
CUPERTINO, CA 95014
PROJECT: 46225650 VILLA SERRA APARTMENTS BLDG 73
20800 HOMESTEAD ROAD — Y
CUPERTINO, CA 95014 �1
PERMIT NO: 07120154�� J�
CONTRACT NO:
SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING
Special inspections were performed for the above referenced project. The inspections were performed as described
in the attached report(s)as of week ending 02/18/2011.
CTR REPORTS
01/21/11: CIP CONCRETE COMPRESSION TEST
The work completed or in progress for this report is in accordance with the approved plans, specifications, and/or
any approved change orders. This is a progress report of our special inspections&testing. A final report will be
issued upon request at the completion of the special inspection/testing requirements provided that all outstanding
issues have been resolved and/or corrected.
Respectfully submitted,
Signet Testing Laboratories,Inc.
Michael Everson
Division Manager
TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT
CC: *FILE COPY
3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295
SIGNET
Testing Labs, Inc.
February 18,2011 ,_.. _...._._
FILE
f
t
COPY TO: _.
CUPERTINO BLDG INSP DEPT
10300 TORRE AVENUE
CUPERTINO, CA 95014
PROJECT: 46225650 VILLA SERRA APARTMENTS BLDG 73
20800 HOMESTEAD ROAD —
CUPERTINO, CA 95014
PERMIT NO: 07120154
CONTRACT NO:
SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING
Special inspections were performed for the above referenced project. The inspections were performed as described
in the attached report(s)as of week ending 02/11/2011.
SPECIAL INSPECTION REPORTS
02/09/11:WITNESS DOWEL/ANCHOR INSTALLAT 02/10/11:CONCRETE SAMPLING ONLY
The work completed or in progress for this report is in accordance with the approved plans,specifications,and/or
any approved change orders. This is a progress report of our special inspections&testing. A final report will be
issued upon request at the completion of the special inspection/testing requirements provided that all outstanding
issues have been resolved and/or corrected.
Respectfully submitted,
Signet Testing Laboratories,Inc.
Michael Everson
Division Manager
TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT
CC: 'FILE COPY'
3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295
��� SI GNE T AHe UlmElm
Testing Labs, Inc. mom
DATE: `L.- — I ( * 0 0 0 0 0 0 0 1
DSA FILE/APPL.N0.
PROJECT NO. 't' — - OSHPD NO.
PROJECT. U t ( 5�e fY S PERMIT NO.
LOCATION: 2Q 91b4y.y� , , WEATHER: TEMP:
❑ PROOF LOAD ❑ TORQUE ❑ WITNESSING
❑ Testing was performed on the following items. All tests were performed with the following calibrated equipment:
RAM: GAGE: TORQUE WRENCH:
RAM: GAGE: TORQUE WRENCH:
LOCATION OF TEST TYPE/SIZES
%of (PSI)TESTLOAD Ib GAGE
ED TOTAL or Ft Lbs ) ACC. REJ. RETEST
❑ Type of epoxy/grout used: "'
Meth tk`of applf on/�cle ing:
❑ Visual inspection was performed on L k V r, -7 3
❑ Show up/Stand by time. Job Canceled/Delayed due to:
❑ All non-compliance items were brought to the attention of: at the job site.
❑ NON-COMPLIANCE REPORT ATTACHED ❑ ADDITIONAL TESTS ATTACHED
VOTES:
o the best of my knowledge, the above)WS/WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements.
;uperintendenVRepresentative: Inspector:
r 0G-,L I /V(
3121 Diablo Avenue 4741 Pell Drive#8 520 Mercantile Drive#A 1320 Simpson Circle
Hayward CA 94545 Sacramento CA 95838 f^,n►ati rn odoa, .__I_._. .,.
SI GNE T
Testing Labs, Inc.
DATE: DSA FILEIAPPL.NO. * n n n n n n n
PROJECT N0. 0SOSHPD N0.
PROJECT: �}t l�� r f-�,�-��-- PERMIT N0;
LOCATION: 2-�1 q(;,p J-�pc�.��� � WEATHER: TEMP:
a"REBAR ❑ TENDON ❑ TENDON STRESSING
2 Inspected the placement ofARFINFORriNr= STEFITENDONS
^�/AB' /'% -S,/TIE DOWNS for the following location:
/ 11
❑ Observed post-tensioning operations, measured and recorded elongations of tendons for the following location:
CONCRETE clP ❑ Pc ❑ PT ❑ SHOTCRETE ❑ NS GROUT
❑ Inspected the batch plant operations. Batch Plant/ Location:
Er Observed placement of CONCRETE/SHOTCRETE/NON-SHRINK GROUT at the following location:
❑ Cast ( set(s)of compressive strength samples. Mix# I' 1 Total cu. yds. placed
Slump(s): %Air: Unit wt(s):
❑ Show up/Stand by time. Job Canceled/Delayed due to:
❑ All non-compliance items were brought to the attention of: at the job site.
NOTES:
To the best of my knowledge, the above WAS/WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements.
❑ Except As Noted
Superintendent/Representative: Inspector/Technician:
3121 Diablo Avenue 1417 No.Market Blvd. #1 520 Mercantile Dri #A/ 1320 Simpson Circle 7580 Metropolitan Dr. #205
Hayward CA 94545 Sacramento CA 95834 Cotati CA 94931 Anaheim, CA 92806 San Diego CA 92108
(510)887-8484 (916)568-5858 (707) 665-3950 (714)399-1500 (619)682-3820