Loading...
07120154 SIGNET Testing Labs, Inc. March 02,2011 F1 F c� (i IV-1-11 COPY TO: .. ^. _.. - CUPERTINO BLDG INSP DEPT 10300 TORRE AVENUE CUPERTINO, CA 95014 PROJECT: 46225650 VILLA SERRA APARTMENTS BLDG 73 20800 HOMESTEAD ROAD — Y CUPERTINO, CA 95014 �1 PERMIT NO: 07120154�� J� CONTRACT NO: SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING Special inspections were performed for the above referenced project. The inspections were performed as described in the attached report(s)as of week ending 02/18/2011. CTR REPORTS 01/21/11: CIP CONCRETE COMPRESSION TEST The work completed or in progress for this report is in accordance with the approved plans, specifications, and/or any approved change orders. This is a progress report of our special inspections&testing. A final report will be issued upon request at the completion of the special inspection/testing requirements provided that all outstanding issues have been resolved and/or corrected. Respectfully submitted, Signet Testing Laboratories,Inc. Michael Everson Division Manager TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT CC: *FILE COPY 3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295 SIGNET Testing Labs, Inc. February 18,2011 ,_.. _...._._ FILE f t COPY TO: _. CUPERTINO BLDG INSP DEPT 10300 TORRE AVENUE CUPERTINO, CA 95014 PROJECT: 46225650 VILLA SERRA APARTMENTS BLDG 73 20800 HOMESTEAD ROAD — CUPERTINO, CA 95014 PERMIT NO: 07120154 CONTRACT NO: SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING Special inspections were performed for the above referenced project. The inspections were performed as described in the attached report(s)as of week ending 02/11/2011. SPECIAL INSPECTION REPORTS 02/09/11:WITNESS DOWEL/ANCHOR INSTALLAT 02/10/11:CONCRETE SAMPLING ONLY The work completed or in progress for this report is in accordance with the approved plans,specifications,and/or any approved change orders. This is a progress report of our special inspections&testing. A final report will be issued upon request at the completion of the special inspection/testing requirements provided that all outstanding issues have been resolved and/or corrected. Respectfully submitted, Signet Testing Laboratories,Inc. Michael Everson Division Manager TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT CC: 'FILE COPY' 3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295 ��� SI GNE T AHe UlmElm Testing Labs, Inc. mom DATE: `L.- — I ( * 0 0 0 0 0 0 0 1 DSA FILE/APPL.N0. PROJECT NO. 't' — - OSHPD NO. PROJECT. U t ( 5�e fY S PERMIT NO. LOCATION: 2Q 91b4y.y� , , WEATHER: TEMP: ❑ PROOF LOAD ❑ TORQUE ❑ WITNESSING ❑ Testing was performed on the following items. All tests were performed with the following calibrated equipment: RAM: GAGE: TORQUE WRENCH: RAM: GAGE: TORQUE WRENCH: LOCATION OF TEST TYPE/SIZES %of (PSI)TESTLOAD Ib GAGE ED TOTAL or Ft Lbs ) ACC. REJ. RETEST ❑ Type of epoxy/grout used: "' Meth tk`of applf on/�cle ing: ❑ Visual inspection was performed on L k V r, -7 3 ❑ Show up/Stand by time. Job Canceled/Delayed due to: ❑ All non-compliance items were brought to the attention of: at the job site. ❑ NON-COMPLIANCE REPORT ATTACHED ❑ ADDITIONAL TESTS ATTACHED VOTES: o the best of my knowledge, the above)WS/WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. ;uperintendenVRepresentative: Inspector: r 0G-,L I /V( 3121 Diablo Avenue 4741 Pell Drive#8 520 Mercantile Drive#A 1320 Simpson Circle Hayward CA 94545 Sacramento CA 95838 f^,n►ati rn odoa, .__I_._. .,. SI GNE T Testing Labs, Inc. DATE: DSA FILEIAPPL.NO. * n n n n n n n PROJECT N0. 0SOSHPD N0. PROJECT: �}t l�� r f-�,�-��-- PERMIT N0; LOCATION: 2-�1 q(;,p J-�pc�.��� � WEATHER: TEMP: a"REBAR ❑ TENDON ❑ TENDON STRESSING 2 Inspected the placement ofARFINFORriNr= STEFITENDONS ^�/AB' /'% -S,/TIE DOWNS for the following location: / 11 ❑ Observed post-tensioning operations, measured and recorded elongations of tendons for the following location: CONCRETE clP ❑ Pc ❑ PT ❑ SHOTCRETE ❑ NS GROUT ❑ Inspected the batch plant operations. Batch Plant/ Location: Er Observed placement of CONCRETE/SHOTCRETE/NON-SHRINK GROUT at the following location: ❑ Cast ( set(s)of compressive strength samples. Mix# I' 1 Total cu. yds. placed Slump(s): %Air: Unit wt(s): ❑ Show up/Stand by time. Job Canceled/Delayed due to: ❑ All non-compliance items were brought to the attention of: at the job site. NOTES: To the best of my knowledge, the above WAS/WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. ❑ Except As Noted Superintendent/Representative: Inspector/Technician: 3121 Diablo Avenue 1417 No.Market Blvd. #1 520 Mercantile Dri #A/ 1320 Simpson Circle 7580 Metropolitan Dr. #205 Hayward CA 94545 Sacramento CA 95834 Cotati CA 94931 Anaheim, CA 92806 San Diego CA 92108 (510)887-8484 (916)568-5858 (707) 665-3950 (714)399-1500 (619)682-3820