Loading...
07120156 SIGNET Testing Labs, Inc. i - February 18,2011 FlawM COPY TO: CUPERTINO BLDG INSP DEPT 10300 TORRE AVENUE CUPERTINO, CA 95014 PROJECT: 46225652 VILLA SERRA APARTMENTS BLDG 76 20800 HOMESTEAD ROAD x CUPERTINO, CA 95014 PERMIT NO: 07120156 CONTRACT NO: SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING Special inspections were performed for the above referenced project. The inspections were performed as described in the attached report(s)as of week ending 02/11/2011. SPECIAL INSPECTION REPORTS 02/09/11:WITNESS DOWEL/ANCHOR INSTALLAT 02/10/11:CONCRETE SAMPLING ONLY CTR REPORTS 01/11/11: CIP CONCRETE COMPRESSION TEST The work completed or in progress for this report is in accordance with the approved plans,specifications,and/or any approved change orders. This is a progress report of our special inspections&testing. A final report will be issued upon request at the completion of the special inspection/testing requirements provided that all outstanding issues have been resolved and/or corrected. Respectfully submitted, Signet Testing Laboratories,Inc. Michael Everson Division Manager TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT CC: 'FILE COPY 3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295 SIGNET Testing Labs, Inc. DATE: �, (C) DSA FILEIAPPL.NO. n n n n n n n PROJECT N0. ' ? ` Y�S Z - OSHPD N0. PROJECT: 0 t l�� �r-�- PERMIT NO. Ute ) Z`d LOCATION: 20 C7(}� �AtM1L'���s�e� XJP WEATHER: TEMP: REBAR-+ ❑ TENDON ❑ TENDON STRESSING Inspected the placement of REINFORCINGS-TEEL/TENDONS/AB'S/HD'S/TIE DOWNS for the following location: ^-__-- ❑ Observed post-tensioning operations, measured and recorded elongations of tendons for the following location: CONCRETEIP ❑ Pc ❑ PT ❑ SHOTCRETE ❑ NS GROUT ❑ Inspected the batch plant operations. Batch Plant/Location: Observed placement of CONCRETE/SHOTCRETE/NON-SHRINK GROUT at the following location: ❑ Cast f set(s)of compressive strength samples. Mix# 't��S�L-1 Total cu. yds. placed Slump(s): %Air: Unit wt(s): ❑ Show up/Stand by time. Job Canceled/Delayed due to: ❑ All non-compliance items were brought to the attention of: at the job site. NOTES: To the best of my knowledge, the above WAS/WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. ❑ Except As Noted Superintendent/Representative: Inspector/Technician: v G 3121 Diablo Avenue 1417 No.Market Blvd. #1 520 Mercantile Dr' e#A 1320 Simpson Circ "�le 0 Metropan Dr. #205 Hayward CA 94545 Sacramento CA 95834 Cotati CA 94931 Anaheim, CA 92806 San Diego CA 92108 (510)887-8484 (916)568-5858 (707)665-3950 (714)399-1500 (619)682-3820 �S I G NE T SIGNET TESTING LABS,INC -Testing Labs, Inc. 3121 DIABLO AVENUE HAYWARD,CA 94545 PHONE(510)887-8484 FAX(510)783-4295 CONCRETE COMPRESSION TEST REPORT PROJECT NO.: 46225652 PERMIT#: 07120156 PROJECT: VILLA SERRA APARTMENTS BLDG 76 APPL#: LOCATION: 20800 HOMESTEAD ROAD File No: CUPERTINO,CA 95014 MIX DATA Lab Number 109029 Aggregate Size 1.00 Material Type 3111-CIP CONCRETE COMPRESSION TEST Cement factor 6.50 Supplier STAR Spec Strength 3000 psi at 28 Days Admixture WR Spec.Slump Mix number F6534WRP Spec.Air Content SAMPLE DATA(ASTM C31) Set number 1 of 1 Slump(ASTM C143) 4.00 Sample Date 01/11/2011 9:59 am Ambient Temperature 52 Fid Inspector ROBERT BIGFORD Sample Temperature(ASTM C1064) 67 Ticket 235349 Air content(ASTM C1 731C231) Truck 76 Unit Weight Fresh(ASTM C138) Placement Location: BLDG.#76 NEW STAIR FOUNDATIONS ON THE WEST SIDE OF THE BLDG. Comments: TEST DATA(ASTM C39) SAMPLE TEST AGE DIMESIONS(in.) AREA LOAD CORR CURE FRACTURE TYPE COMPRESS NO DATE (sq in) (Ibs) FACT TYPE STR(psi) 1 01/18 07 6.00 x 12.00 28.27 59250 1.00 LAB 4-SHEAR 2,100 2 02/08 28 6.00 x 12.00 28.27 135500 1.00 LAB 4-SHEAR 4,790 3 02/08 28 6.00 x 12.00 28.27 138750 1.00 LAB 4-SHEAR 4,910 Average 28 day Compressive Strength: 4,850 4 H MATERIAL 21 WAS ❑ WAS NOT SAMPLED IN ACCORDANCE WITH THE APPROVED PROJECT DOCUMENTS. MATERIAL 0 MEETS ❑ DOES NOT MEET THE APPROVED PROJECT DOCUMENTS. RESPECTFULLY SUBMITTED, SIGNET TESTING LABS,INC 4�� 02/14/11 Concrete Lab Manager Date