Loading...
11030047 - SI SIGNET Testing Labs, Inc. May 09,2011 COPY TO: CUPERTINO BLDG INSP DEPT q 10300 TORRE AVENUE CUPERTINO, CA 95014 PROJECT: 46226631 VILLA SERRA APARTMENTS CARPORT 10800 N. STELLING ROAD CUPERTINO, CA 95014 PERMIT NO: 11030047 CONTRACT NO: SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING Special inspections and/or testing were performed for the above referenced project. The inspections and/or testing were performed as described in the attached report(s)as of week ending 04/29/2011. CTR REPORTS 03/31/11: CIP CONCRETE COMPRESSION TEST The work completed or in progress for this report is in accordance with the approved plans,specifications,and/or any approved change orders. This is a progress report of our special inspections&testing. A final report will be issued upon request at the completion of the special inspection/testing requirements provided that all outstanding issues have been resolved and/or corrected. Respectfully submitted, Signet Testing Laboratories,Inc. Michael Everson Division Manager TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT CC: *FILE COPY 3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295 SIGNET Testing Labs, Inc. i April 14, 2011 s 1 s a l 2 COPY TO: CUPERTINO BLDG INSP DEPT 10300 TORRE AVENUE CUPERTINO, CA 95014 PROJECT: 46226631 VILLA SERRA APARTMENTS CARPORT 10800 N. STELLING ROAD CUPERTINO, CA 95014 PERMIT NO: 11030047 CONTRACT NO: SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING Special inspections were performed for the above referenced project. The inspections were performed as described in the attached report(s)as of week ending 04/08/2011. CTR REPORTS 03/31/11: CIP CONCRETE COMPRESSION TEST The work completed or in progress for this report is in accordance with the approved plans,specifications,and/or any approved change orders. This is a progress report of our special inspections&testing. A final report will be issued upon request at the completion of the special inspection/testing requirements provided that all outstanding issues have been resolved and/or corrected. Respectfully submitted, Signet Testing Laboratories,Inc. Michael Everson Division Manager TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT CC: *FILE COPY 3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295 S I G NE T SIGNET TESTING LABS,INC Testing Labs, Inc. 3121 DIABLO AVENUE HAYWARD,CA 94545 PHONE(510)887-8484 FAX(510)783-4295 CONCRETE COMPRESSION TEST REPORT PROJECT NO.: 46226631 PERMIT#: 11030047 PROJECT: VILLA SERRA APARTMENTS CARPORT APPL#: LOCATION: 10800 N.STELLING ROAD File No: CUPERTINO,CA 95014 MIX DATA Lab Number 107655 Aggregate Size Material Type 3111-CIP CONCRETE COMPRESSION TEST Cement factor 6.50 Supplier STAR Spec Strength 3000 psi at 28 Days Admixture Spec.Slump Mix number F6534WRP Spec.Air Content SAMPLE DATA(ASTM C31) Set number 1 of 1 Slump(ASTM C143) 4.00 Sample Date 03/31/2011 10:15 am Ambient Temperature 79 Fld Inspector ROBERT BIGFORD Sample Temperature(ASTM C1064) 72 Ticket 240353 Air content(ASTM C173/C231) Truck Unit Weight Fresh(ASTM C138) Placement Location: CARPORT POLE FOUNDATION(REPAIR)(2)@ UNITS 384 8385 ON THE SOUTH SIDE OF BLDG.#79 Comments: TEST DATA(ASTM C39) SAMPLE TEST AGE DIMESIONS(in.) AREA LOAD CORR CURE FRACTURE TYPE COMPRESS NO DATE (sq in) (Ibs) FACT TYPE STR(psi) 1 04/07 07 6.00 x 12.00 28.27 207500 1.00 LAB 4-SHEAR 7,340 2 04/28 28 3 04/28 28 Average 28 day Compressive Strength: 4 H MATERIAL Q WAS ❑ WAS NOT SAMPLED IN ACCORDANCE WITH THE APPROVED PROJECT DOCUMENTS. RESPECTFULLY SUBMITTED, SIGNET TESTING LABS,INC 414 04/07/11 Concrete Lab Manager Date - ----------- SIGNET Testing Labs, Inc. April 14,2011 r -'i COPY TO: CUPERTINO BLDG INSP DEPT 10300 TORRE AVENUE CUPERTINO, CA 95014 PROJECT: 46226631 VILLA SERRA APARTMENTS CARPORT 10800 N. STELLING ROAD CUPERTINO, CA 95014 PERMIT NO: 11030047 CONTRACT NO: SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING Special inspections were performed for the above referenced project. The inspections were performed as described in the attached report(s)as of week ending 04/01/2011. SPECIAL INSPECTION REPORTS 03/30/11:REBAR PLACEMENT INSPECTION 03/31/11:CONCRETE PLACEMENT INSPECTION The work completed or in progress for this report is in accordance with the approved plans,specifications,and/or any approved change orders. This is a progress report of our special inspections&testing. A final report will be issued upon request at the completion of the special inspection/testing requirements provided that all outstanding issues have been resolved and/or corrected. Respectfully submitted, Signet Testing Laboratories,Inc. Michael Everson Division Manager TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT CC: "FILE COPY" 3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295 Emu "N. SIGNE T Testing Labs, Inc. * 0 0 0 0 0 0 0 1 DATE: DSA FILEIAPPL.NO. PROJECT NO. I OSHPD NO. �c .w PROJECT: PERMIT N0. �� LOCATIONIOS 00 &1-r4JJWt,,_ WEATHER: _ TEMP: I<REBAR ❑ TENDON ❑ TENDON STRESSING Inspected the placement orREINFORCING STEE�I. /TENDONS B'S/HD'S/TIE DOWNS for the following location: V N1 f177 " ❑ Observed post-tensioning operations, measured and recorded elongations of tendons for the following location: ❑ CONCRETE ❑ ciP ❑ Pc ❑ PT ❑ SHOTCRETE ❑ NS GROUT ❑ Inspected the batch plant operations. Batch Plant/Location: ❑ Observed placement of CONCRETE I SHOTCRETE/ NON-SHRINK GROUT at the following location: ❑ Cast set(s)of compressive strength samples. Mix# Total cu. yds. placed Slump(s): %Air: Unit wt(s): ❑ Show up/Stand by time. Job Canceled/Delayed due to: ❑ All non-compliance items were brought to the attention of: at the job site. NOTES: t To the best of my knowledge, the abov WAS/WAS NOT performed in accordance with the approved pl ns, s e ifica s, an I Egul tory requirements. ❑ Except As Noted Superintendent/Representative: Inspector/Technician: v ---_-------------- �/,W 1) ------ 3121 Diablo Avenue 1417 No. Market Blvd. #1 520 Mercantile Drive#A 1320 Simps n Circle' 0v44etropolitan Dr. #205 Hayward CA 94545 Sacramento CA 95834 Cotati CA 94931 Anaheim, CA 92806 an Diego CA 92108 (510)887-8484 (916)568-5858 (707) 665-3950 (714)399-1500 (619) 682-3820 SIGNET Testing Labs, Inc. DATE. _:3A q I 31 Al DSA FILEIAPPL.NO. PROJECT 0. OSHPD NO. PROJECT: ____Ma-, PERMIT NO. 1 L� LOCATION: Q k!kD j M& WEATHER:� TEMP: ❑ REBAR ❑ TENDON ❑ TENDON STRESSING ❑ Inspected the placement of REINFORCING STEEL/TENDONS/AB'S/HD'S/TIE DOWNS for the following location: ❑ Observed post-tensioning operations, measured and recorded elongations of tendons for the following location: IQ�CONCRETE iP ❑ Pc ❑ PT ❑ SHOTCRETE ❑ NS GROUT ❑ Inspected the batch plant operations. Batch Plant/Location: Obs rved placement cl CONCRETE/SHOTCRETE/ ON-SHRI K GROUT at the following loca ion: AT- fil • Cast set(s)of compressive strength samples. Mix# �t0Total cu. yds. placed Slump(s):- %Air: Unit wt(s): ❑ Show up/Stand by time. Job Canceled/Delayed due to: ❑ All non-compliance items were brought to the attention of: at the job site. NOTES: To the best of my knowledge, the ab ve WAS I WAS NOT performed in accordance with the approv d pla s eci c on nd regulatory requirements_ ❑ Except As Noted Superintendent/Representative: Inspector/Technicia -------__._.... .-_._-...-....—.......-_--.-._ 205 3121 Diablo Avenue 1417 No. Market Blvd. #1 520 Mercantile Drive#A 1320 Si pson Circ 7580 Metropolitan Dr. # Hayward CA 94545 Sacramento CA 95834 Cotati CA 94931 Anahei , CA 9280 San Diego CA 92108 (510)887-8484 (916)568-5858 (707) 665-3950 (714)399-1500 (619)682-3820