11030047 - SI SIGNET
Testing Labs, Inc.
May 09,2011
COPY TO:
CUPERTINO BLDG INSP DEPT q
10300 TORRE AVENUE
CUPERTINO, CA 95014
PROJECT: 46226631 VILLA SERRA APARTMENTS CARPORT
10800 N. STELLING ROAD
CUPERTINO, CA 95014
PERMIT NO: 11030047
CONTRACT NO:
SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING
Special inspections and/or testing were performed for the above referenced project. The inspections and/or testing
were performed as described in the attached report(s)as of week ending 04/29/2011.
CTR REPORTS
03/31/11: CIP CONCRETE COMPRESSION TEST
The work completed or in progress for this report is in accordance with the approved plans,specifications,and/or
any approved change orders. This is a progress report of our special inspections&testing. A final report will be
issued upon request at the completion of the special inspection/testing requirements provided that all outstanding
issues have been resolved and/or corrected.
Respectfully submitted,
Signet Testing Laboratories,Inc.
Michael Everson
Division Manager
TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT
CC: *FILE COPY
3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295
SIGNET
Testing Labs, Inc.
i
April 14, 2011
s
1
s
a
l
2
COPY TO:
CUPERTINO BLDG INSP DEPT
10300 TORRE AVENUE
CUPERTINO, CA 95014
PROJECT: 46226631 VILLA SERRA APARTMENTS CARPORT
10800 N. STELLING ROAD
CUPERTINO, CA 95014
PERMIT NO: 11030047
CONTRACT NO:
SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING
Special inspections were performed for the above referenced project. The inspections were performed as described
in the attached report(s)as of week ending 04/08/2011.
CTR REPORTS
03/31/11: CIP CONCRETE COMPRESSION TEST
The work completed or in progress for this report is in accordance with the approved plans,specifications,and/or
any approved change orders. This is a progress report of our special inspections&testing. A final report will be
issued upon request at the completion of the special inspection/testing requirements provided that all outstanding
issues have been resolved and/or corrected.
Respectfully submitted,
Signet Testing Laboratories,Inc.
Michael Everson
Division Manager
TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT
CC: *FILE COPY
3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295
S I G NE T SIGNET TESTING LABS,INC
Testing Labs, Inc. 3121 DIABLO AVENUE
HAYWARD,CA 94545
PHONE(510)887-8484
FAX(510)783-4295
CONCRETE COMPRESSION TEST REPORT
PROJECT NO.: 46226631 PERMIT#: 11030047
PROJECT: VILLA SERRA APARTMENTS CARPORT APPL#:
LOCATION: 10800 N.STELLING ROAD File No:
CUPERTINO,CA 95014
MIX DATA
Lab Number 107655 Aggregate Size
Material Type 3111-CIP CONCRETE COMPRESSION TEST Cement factor 6.50
Supplier STAR Spec Strength 3000 psi at 28 Days
Admixture Spec.Slump
Mix number F6534WRP Spec.Air Content
SAMPLE DATA(ASTM C31)
Set number 1 of 1 Slump(ASTM C143) 4.00
Sample Date 03/31/2011 10:15 am Ambient Temperature 79
Fld Inspector ROBERT BIGFORD Sample Temperature(ASTM C1064) 72
Ticket 240353 Air content(ASTM C173/C231)
Truck Unit Weight Fresh(ASTM C138)
Placement Location: CARPORT POLE FOUNDATION(REPAIR)(2)@ UNITS 384 8385 ON THE SOUTH SIDE OF BLDG.#79
Comments:
TEST DATA(ASTM C39)
SAMPLE TEST AGE DIMESIONS(in.) AREA LOAD CORR CURE FRACTURE TYPE COMPRESS
NO DATE (sq in) (Ibs) FACT TYPE STR(psi)
1 04/07 07 6.00 x 12.00 28.27 207500 1.00 LAB 4-SHEAR 7,340
2 04/28 28
3 04/28 28
Average 28 day Compressive Strength:
4 H
MATERIAL Q WAS ❑ WAS NOT SAMPLED IN ACCORDANCE WITH THE APPROVED PROJECT DOCUMENTS.
RESPECTFULLY SUBMITTED,
SIGNET TESTING LABS,INC
414
04/07/11
Concrete Lab Manager Date
- ----------- SIGNET
Testing Labs, Inc.
April 14,2011
r
-'i
COPY TO:
CUPERTINO BLDG INSP DEPT
10300 TORRE AVENUE
CUPERTINO, CA 95014
PROJECT: 46226631 VILLA SERRA APARTMENTS CARPORT
10800 N. STELLING ROAD
CUPERTINO, CA 95014
PERMIT NO: 11030047
CONTRACT NO:
SUBJECT: WEEKLY SUMMARY OF SPECIAL INSPECTIONS&TESTING
Special inspections were performed for the above referenced project. The inspections were performed as described
in the attached report(s)as of week ending 04/01/2011.
SPECIAL INSPECTION REPORTS
03/30/11:REBAR PLACEMENT INSPECTION 03/31/11:CONCRETE PLACEMENT INSPECTION
The work completed or in progress for this report is in accordance with the approved plans,specifications,and/or
any approved change orders. This is a progress report of our special inspections&testing. A final report will be
issued upon request at the completion of the special inspection/testing requirements provided that all outstanding
issues have been resolved and/or corrected.
Respectfully submitted,
Signet Testing Laboratories,Inc.
Michael Everson
Division Manager
TO: PROMETHEUS REAL ESTATE GROUP I CC: CUPERTINO BLDG INSP DEPT
CC: "FILE COPY"
3121 DIABLO AVENUE HAYWARD,CA 94545 MAIN:(510)887-8484 FAX:(510)783-4295
Emu
"N.
SIGNE T
Testing Labs, Inc.
* 0 0 0 0 0 0 0 1
DATE: DSA FILEIAPPL.NO.
PROJECT NO. I OSHPD NO.
�c .w
PROJECT: PERMIT N0. ��
LOCATIONIOS 00 &1-r4JJWt,,_ WEATHER: _ TEMP:
I<REBAR ❑ TENDON ❑ TENDON STRESSING
Inspected the placement orREINFORCING STEE�I. /TENDONS B'S/HD'S/TIE DOWNS for the following location:
V N1 f177 "
❑ Observed post-tensioning operations, measured and recorded elongations of tendons for the following location:
❑ CONCRETE ❑ ciP ❑ Pc ❑ PT ❑ SHOTCRETE ❑ NS GROUT
❑ Inspected the batch plant operations. Batch Plant/Location:
❑ Observed placement of CONCRETE I SHOTCRETE/ NON-SHRINK GROUT at the following location:
❑ Cast set(s)of compressive strength samples. Mix# Total cu. yds. placed
Slump(s): %Air: Unit wt(s):
❑ Show up/Stand by time. Job Canceled/Delayed due to:
❑
All non-compliance items were brought to the attention of: at the job site.
NOTES:
t
To the best of my knowledge, the abov WAS/WAS NOT performed in accordance with the approved pl ns, s e ifica s, an I Egul tory requirements.
❑ Except As Noted
Superintendent/Representative: Inspector/Technician:
v
---_-------------- �/,W 1) ------
3121 Diablo Avenue 1417 No. Market Blvd. #1 520 Mercantile Drive#A 1320 Simps n Circle' 0v44etropolitan Dr. #205
Hayward CA 94545 Sacramento CA 95834 Cotati CA 94931 Anaheim, CA 92806 an Diego CA 92108
(510)887-8484 (916)568-5858 (707) 665-3950 (714)399-1500 (619) 682-3820
SIGNET
Testing Labs, Inc.
DATE. _:3A q I 31 Al
DSA FILEIAPPL.NO.
PROJECT 0. OSHPD NO.
PROJECT: ____Ma-,
PERMIT NO. 1 L�
LOCATION: Q k!kD j M& WEATHER:� TEMP:
❑ REBAR ❑ TENDON ❑ TENDON STRESSING
❑ Inspected the placement of REINFORCING STEEL/TENDONS/AB'S/HD'S/TIE DOWNS for the following location:
❑ Observed post-tensioning operations, measured and recorded elongations of tendons for the following location:
IQ�CONCRETE iP ❑ Pc ❑ PT ❑ SHOTCRETE ❑ NS GROUT
❑ Inspected the batch plant operations. Batch Plant/Location:
Obs rved placement cl CONCRETE/SHOTCRETE/ ON-SHRI K GROUT at the following loca ion:
AT- fil •
Cast set(s)of compressive strength samples. Mix# �t0Total cu. yds. placed
Slump(s):- %Air: Unit wt(s):
❑ Show up/Stand by time. Job Canceled/Delayed due to:
❑ All non-compliance items were brought to the attention of: at the job site.
NOTES:
To the best of my knowledge, the ab ve WAS I WAS NOT performed in accordance with the approv d pla s eci c on nd regulatory requirements_
❑ Except As Noted
Superintendent/Representative: Inspector/Technicia
-------__._.... .-_._-...-....—.......-_--.-._
205
3121 Diablo Avenue 1417 No. Market Blvd. #1 520 Mercantile Drive#A 1320 Si pson Circ 7580 Metropolitan Dr. #
Hayward CA 94545 Sacramento CA 95834 Cotati CA 94931 Anahei , CA 9280 San Diego CA 92108
(510)887-8484 (916)568-5858 (707) 665-3950 (714)399-1500 (619)682-3820