10070193 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10730 N BLANEY AVE CONTRACTOR:MT2 TELECOM,LLP PERMIT NO: 10070193
OWNER'S NAME: CUPERTINO MINI WAREHOUSE PARTN 3780 COMMERCE DR DATE ISSUED:07/292010
OWNER'S PHONE: 4082572900 W SACRAMENTO,CA 95691 PHONE NO:(916)376-8555
❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG r ELECT r PLUMB
/.� r
License Class ` Lie.H f 0� `
MECH r RESIDENTIAL r COMMERCIAL r
Contractor M-1 Z- 'TEk-vL0f64% 4P.Dalc 'Z to
1 hereby affirm that I am licensed under the provisions o Chapter 9 JOB DESCRIPTION: INSFALLAI'ION OP A FIBER MODFM 13OX INTO AN
(commencing with Section 7000)of Division 3 of the Business&Professions I:XIS'rING
Code and that my license is in full force and effect.
LEASE AREA OF AN FXIS'IING Cl'u.Sloth
I hereby affirm under penally of perjury one of the following Iwo declarations:
I have and will maintain a ceniticate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this Sq.FI Floor Area: Valuation:54000
permit is issued.
APPLICANT CERTIFICATION APN Number:31643009.00 Occupancy Type:
I certify that 1 have read this application and state that the above information is
correct I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned properly for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR
grantingof nn d I tt Dalc the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION.
wish all m-p fdls�u •reg and er the Cupertino Municipal Code,Section
g
Kq
pIssued ' Dale:
nalu
❑ OWNER-BUILDER DECLARATION
RE-ROOFS:
1 hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed If a roof is
the following two reasons: installed without first obtaining an inspection,I agree to remove all new materials for
1,as owner of the property,or my employees with wages as their sole compensation, inspection.
will do the work,and the structure is not intended or offered for sale(Sm.7044,
Business&Professions Code) Signature of Applicant: Date:
1,as owner of the property,am exclusively contracting with licensed contractors to
consimct the project(See.7044,Business&Professions Code)- ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three
declarations:
I have and will maintain a Certificate of Consent to self-insum for Worker's HAZARDOUS MATERIALS DISCLOSURE.
Compensation,as provided for by Section 3700 of the Labor Code,for the 1 have read the hazardous materials requirements under Chapter 6.95 of the
performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. 1 will maintain
I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
Section 3700 of the Labor Code,Iitr the performance of the work for which this Safety Code,Section 25532(x)should 1 store or handle hazardous material.
Additionally,should I use equipment or devices which emit hazardous air
permit is issued. contaminants as defined by the Bay Arca Air Quality Management District 1 will
I certify that in the performance of the work for which this permit is issued,1 shall maintain compliance in the Cupertino Municipal Code,Chapter 9.12 and the
not employ any person in any manner so as to become subject to the Worker's H Safely C dc, t ons 25505,25533,and 25534.
Compensation laws of Cali fomia If,after making this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must Ownc o rzcd
forthwith comply with such provisions or this permit shall be deemed revoked. Dale.
APPLICANT CERTIFICATION CONSTRUCTION LENDING AGENCY
1 certify that I have read this application and stale that the above information is I hereby affirm that them is a construction lending agency for the performance of work's
correct I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sero.3097,Civ C.)
to building construction,and hereby authorize representatives of this city to enter Lender's Name
upon the above mentioned property for inspection purposes.(We)agree to save
indemnify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address
costs,and expenses which may accrue against said City in consequence of the
granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION
with all non-point source regulations per the Cupertino Municipal Code,Section
9-18. 1 understand my plans shall be used as public records.
Signature Datc Licensed Professional
i V
CITY OF CUPERTINO
5 ITEMS OF 5 PERMIT RECEIPT OPERATOR:. patg
COPY # 1
Sec: Twp: Rng: Sub: Blk: Lot:
APN • . . . . . . . . : 31643009.00
DATE ISSUED. . . . . . . : 07/29/2010
RECEIPT #. . . . . . . . . : BS000011016
REFERENCEID # . . . : 10070193
SITE ADDRESS . . . . . : 10730 N BLANEY AVE
SUBDIVISION . . . . . . .
CITY CUPERTINO_
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . ..: CUPERTINO MINI WAREHOUSE PARTN
ADDRESS . . . . . . . . . . : 10730 N BLANEY AVE
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
RECEIVED FROM . . . . : CHAD D CHRISTIE
CONTRACTOR . . . . . . . : JON MORENO LIC # 31419
COMPANY . . . . . . . . . . : MT2 TELECOM, LLP
ADDRESS. ... . . . . . . . . : 3780 COMMERCE DR
CITY/STATE/ZIP . . . : W SACRAMENTO, CA 95691
TELEPHONE . . . . . . . . : (916) 376-8555
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
- -------- ------- ---------- ---------- ---------- - ----------
1BCBSC VALUATION 4, 000 . 00 1 .00 0 . 00 1. 00 0 .00
1BREMMISC EACH 1. 00 126 .00 0. 00 126 . 00 0 .00
1ELECINSP HOUR 1. 00 126.00 0. 00 126 . 00 0 . 00
1EPERMITFE FLAT RATE 1. 00 42 .00 0. 00 42 . 00 0 . 00
1TRAVDOC FLAT RATE 1. 00 42 .00 0. 00 42 . 00 0 .00
TOTAL PERMIT 337 . 00 0 . 00 337 . 00 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 337.00 VISA
---------------
TOTAL RECEIPT 337.00
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
------------------------- -------- ----- --------
304 ROUGH ELECTRICAL 505 FINAL ELECTRICAL
CITY OF CUPERTINO
FEE ESTIMATOR- BUILDING DIVISION
ADDRESS: 10730 N. Blaney DATE: 07/29/2010 REVIEWED BY: jsg
APN: BP#: 'VALUATION: $4,000
°PERMIT TYPE: Electrical Permit PLAN CHECK TYPE: Alteration /Addition/ Repair
PRIMARY Commercial Buildin10TAL APPLICATION 10EAP7
g
USE: FLOOR AIU.-1I: TYPE:
z ww Installation of a fiber modem box into an existing lease area of an existing cell site.
00
vVi
APPLIANC QUIP TYPE CAPACITY FEE ID QTY BP FEES
Appar s 1BREMMISC 1 $126
TOTALS: $126.00
I A,h. iYm; ( ho 1, Phunh. /'I'm Cperk Elec. Plan Cheek 0.0 1 hrs $0.00
Numb I""roil l-rr: Elect. Permit Fee: LEPER
Othdr/'/uu,h. /uy,, Other Flee. Insp. 1.0 h 5 $16$.00
NOTE: Thesefees are based on lire preliwnain ormation available and are only an estimate. Contact the Det 4r addn7 in o.
FEE ITEMS (1•ee Resvilurion 09-051 /,/JLLl091 FEE QTY/FEE MISC ITEM
l'lnn ( hr, l, l• 't.
Srq,l,l, PC/er
PME Plan Check: $0.00
l S•rurir l ,• •;
.err/,/�(. lriep l�rr
PME Unit Fee: $126.00
PME Permit Fee: $168.00
C„rrrirm:rinn Tu.c
:Irnaeiiru! Krri •ir herr:
Work Without Permit? Q Yes 0 No $0.00
Travel Documentation Fee: ITRA VDOC $42.00
SOi-h;rion / 11 . Select an Administrative Item
131J, Stds Commission Fee: IBCBSC $1.00
SUBTOTALS: $337.00 $0.00 TOTAL FEE: 1 $337.00
Revised: 7/27/2010
CITY OF
CITY OF CUPERTINO
GENERAL BUILDING
CUPERTINO PERMIT APPLICATION FORM
APN # Date:
Building Address: _
1O T36
Mailing Ads (ifdiffe�rent from building address):
Are Hazardous Materials being used as part of this project? Yes ❑ No
HOA: Exterior work only) Yes ❑ No 21-�If yes, provide letter from HOA
Owner's Name: CHIb7 80wfEt.:J, ►n6.9— Phone #: ,
eu tr► tN aaC �� foe-25-1- V ov
Contractor: Pa1ZTNE45 Phone: 9 1 e-`i t 7-
r2- r e 1 E� 0.+1 . L. Fax:
Contractor License#: q2.7001
Cupertino Business License#: c3 `
Contact: C N A a c LA a, f Phone: q Ib-34s
Fax:
Residential ❑ Commercial
Job Description: 1
INTJ C- LEASE A2G.4 Gc-
Building Permit Info: /
BldgEl Elect 3- Plumb ❑ Mech ❑
Type of Construction (Usage Class): Occupancy Type:
1-A, 1-B ❑ 11/111N-A ❑ II/III B, IV-HT, V-B 9`- S
Valuation: Square
Square Footage:
1V 4 0n0 � -
Project Size: Express �Standard ,❑ Lare ❑ Major ❑
Green Building: Please complete relevant portion of the Green Building/LEED Checklist& attach it
to the application or if applicable, include in plan set& the sheet index.
Points Achieved:
For help,contact Build it Green at www.builditarccn.or ,
Revised 07/14/09
SITE ID: SF04579a
\ ) ) ) ) WORK ORDER#: 731175
2SITE
: SF579 Ortega Park
Mr TELECOM, L.R ADDRESS: 10730th Blaney Avenue
Co
pn#erce DVye CITY: Cupertino
378 �
oWRCtept4, CK95691 STATE: CA
ms
ZIP CODE 95014
aeg44A4927b090 T v WALKED BY: MT2 TELECOM,L.P.
T MOBILE PM: TERRY BUCK 916-420-3566
xm AT&T CONTACT: UNKNOWN
9 m
N o R OZZ NOTES:
m 8 m. � z T-Mobile I MT2 Telecom will provide a Gear path for the new fiber optic cable from the existing AT&T
Point of Feed/Meet Point,as determined from the field visit,to the T-Mobile site.
AT&T will route new fiber optic cable to the new DMARC located in the T-Mobile lease area as shown
In attached photos and site sketch.
• T-Mobile I MT2 Telecom will coordinate and manage the construction of the fiber path,equipment
\ installation and all other necessary conduit routing,rodding and roping within the lease area.
AT&T will terminate the fiber optic cable at the FTP or JAM at their MPOE per design.
All bends to conduim need to be at least 18'unless specified.
For all aerial leads,conduit run from weather head to MPOE assumed unobstructed and suitable for
i t _ new Fiber Optic cable installation.
" I q 4 MT2 has utilized AT&T provided rod and rope footeges from Point of Feed to MPOE.
'0 -
Sow:
Meet Point AT&T to meet at existing Utility Pole 200'from site.
_ r Install new 18'x1B'x10'tOFDT
L r # Install 220'of%:'mule tape In existing 2'conduit from Meet Point to existing Telco box.
Install 15'of 1-%:candue from existing Telco Box through new OFOT to new UAM.
Unistrut Mount UAM on new H-frame(20'of P1000 Unisbul&connectors).
7 �C 5:(4)runs of 15'each(60'total)in 20'of new 1%'conduit
y ��� JI
_
CID �/� _t_ Power.(1)run of 15'each Red and Black#14 in 10'of new%:'conduit
CG;i1 Ground:(1)run of 2046 Ground in 15'of new%:'conduit to MGB adjacent to cabinet.
o ppb Note: GC will make all necessary digital labeling to newly installed lines and conduits.
1 l-
1\l i
rorlk f
iF2 i \
�14 ?
r
,11
f ��H QTY .1� m i��l .�•.r`3. : �,�r ''I
{ c f
,P
1:'a �'. ` �r 1 ��, , !0 •.' Irl' . � " �{ - Ci r
4 4I r =J
-
� �.•'* �y tit.. " 1 I �.� �N. ' � I�� 1 1 - fy` �!.�4 h�' H '�.. �'� `•� u
1
} �1
try
f
j �'rIW
s wee- y�• " �..:• �ali._.?� :��� -.r..a.J:� � � �-ct .'4
.ev.
1-1/4- CONDUIT /d
FROM (E) TELCO BOX L(E) DUILDING
TO (N) OFDT W/ 1/2-
MULE TAPE
1
`> (i) A6 GROUND MGB
—
0101 6Z r IN 1/2" CO.W7UIT
PROPOSED CERA BOX I ��
(AT&T INSTALL) '& UA_M l
BOX PER CONTRACT 4 (E) sis (E) BTS
(AT&T IN ON LEFT &
T–MOBILE OUT ON. RIGHT)
ON NEW P1000.UN'ISTRUT
PEDESTAL (AS NEEDED)
(N) 18"X18" OFDT
1-1/4° CONDUIT '1 '
FROM (E) TELCO BOX
TO (N) UAM W/ 1/2'
MULE TAPE
(1) RUN EACH OF '
RED AND BLACK #14 (2) CAT-5 CABI.ES
IN 1/2" CONDUIT PER ChB/BTS IN (N)
1-1/4' CONDUIT
FROM (E) TELCO BOX
PROVIDE 1/2' MULE TAPE IN
(E) 2" TELCO CONDUIT TO
MEET POINT POLE 1200'-0-
1 FROM SfTE �� Mo ROHAV
u
I
SCALE: 3/8- = T-0'
SITE lata IMAMBy
SF04579A aAaC A= T . .Mobile•
SF579 ORTEGA PARK DAMIra o�cm[arRe ora
10730 N BLANEY AVE art lx
CUPERTINO. CA 95014 9.16.10 �"'m`m"-'�u•,..
rAc (zla)eAremo
RFym 6r.
SITELAYOUT 6AL MAR^NEZ JR. 1 2) ) l \ 11 irnB [ou�cece na
Rii�790N: 6ACRAYEMTD. CA 06601
(6181 :rte-eBea
A-0 - TELECOM, I.
d IN- T
y5
p} tt i}r�Yi� If...s .Ce�_..�� •u_
r
t. .•4�71�'i'�_It ; +..'zit .;
PROJECT DESCRIPTION
T-Mobile West Corporation is a telecommunications carrier with a growing
wl eles's1gce and data network in and around the San Francisco Bay Area. With its
1 growing number of customers and increasing competition, the necessity exists to provide
0107 &more robust 3G coverage. T-Mobile West Corporation is currently undertaking a project
C,SJ4,gtonsIJ*Ir at each of its existing wireless;communications facilities in the Bay Area.
TMSNpgrade will greatly enhance both bandwidth and speed of its 3G services to T-
Mobile West Corporation's customers.
Proposed Utility Upgrade:
The proposed utility upgrade will involve the following:
1) Add one (1) small Fiber Box (CIENA CNU3911/UAM) within EXISTING
approved T-Mobile West Corp equipment Lease area.
2) CIENA/UAM Fiber Box Dimensions: 27.2"H x 16.2"W x 6.4"D
3) Weight: 32.8 Lbs
4) Power: 7 Watts
'�✓ 5) Sound: 3db
6) Fiber Box Attachment:
a) Indoor Solution= Wall mounted
b) Outdoor Solution=H-Frame-Unistrut stand
q 7) The Fiber will run in EXISTING conduit
For additional information regarding the CIENA Fiber Box and the H-Frame Equipment
C stand, please see the attached spec sheets and pictures detailing the exact specifications.
T-MOBILE WEST CORPORATION REPRESENTATIVE
If there are any questions regarding this T-Mobile West Corporation proposal,
please do not hesitate to contact Chad Christie at 916-396-1470 or chadegr@yahoo.com
O
CUM
CIV 3911 Service Delivery Switch ,Iyp'. _ D
Carrier Ethernet Service Switching Family
rT 9Lrr D
Ciena's CN 3911 Service Delivery The core of the CN 3911 is high- Features & Benefits
Switch (SDS)is a next-generation performance switching platform that
ext-
Ethernet access system that cost-effectively incorporates the latest innovations in Provides high-capacity,
delivers business,transport,and residential Ethernet switching technology,Ethernet generation Gigabit Ethernet
Ethernet services via fiber or copper control lane protocols,and Carrier (GbE)service delivery for
PP P P business,residential,and
connections.The CN 3911 features an Ethernet Operations,Administration,and transport applications
environmentally hardened and physically Maintenance(OAM)mechanisms.The (including wireless backhaul)
secure enclosure suitable for deployment result is a state-of-the-art design that
outdoors or in unconditioned indoor enables the CN 3911 to deliver the = hardens environmentally
environments,enabling support for a wide sophisticated Quality of Service(QoS) hardened and physically secure
enclosure and electronic
variety of service application scenarios and capabilities,superior Virtual LAN(VLAN)
(-00'C to+65'C),providing
network topologies,as shown in Figure 1. and virtual switching functions,and robust flexible deployment options
The CN 3911 is based on Cieria's fele- management and performance monitoring
coven True Carrier Ethernet'"technology, features required to support tamer-grade - Supports B GbE 10/100/1000
P gy Layer 2 Virtual Private Networks(L2 VPNs),
BaseTX subscriber UNI ports
deployed by dozens of network operators mission-critical data,high-speed Internet, with RJ45 connectors
in tens of thousands of homes and and high-qualityIPN and VoIP services.
businesses.It combines the low cost and - Supports 2 GbE NNVUNI
.yas high capacity of Ethernet with the reliability, The advanced design and service-rich Ports with dual connectors:
RJ-05 10/100/1000BaseTX and
management,and service quality usually architecture of the CN 3911 enable network
Small Form-factor Pluggable
associated with SON ET/SDH networking operators to deploy reliable and scalable (SFP)Optical 100/10008aseX
L•'•07?t. systems.The CN 3911 software architecture offerings that leverage the inherent high
- V is based on a common service-aware capacity and cost-effectiveness of Ethernet 4 Features state-of-the-art
c'-1 operating system, used in all Ciena Service technology to generate maximum revenue. hardware design and field-
.,y',• proven,modular service-aware
=— Delivery and Service Aggregation Switches Ethernet business and transport services
to provide consistent system and service can be rolled out quickly and reliably,with operating system for reliability
attributes and operational efficiency. scalable performance that ensures reduced and resiliency Provides advanced Ethernet
�.� switching,control,and VLAN
features with comprehensive
ra Aggregation Access Customer Edge QoS and Ethernet OAM,for
c-. rripp - - a guaranteed SLAB
1_!tom: Aggregmim and
A..Handoff r, - = Ensures future-proof
O investment protection with
i cess Xing ••+%T all ports GbE ready for easy
' H — upgrade from 100 Mb/s
ethernet
...�II to GbE
y Supports diverse network
® ' O topologies,including fiber
♦1 ..ra, rings,point-to-point fiber,
Ed,emn A9gre9+twn dual-homed network uplinks,
�e O fiber or copper network
uplinks,fiber or copper to
Q`QZ 6 Servat Aggregation sw iJn iSAS) seraee Dere,rySvtth(MS) subscriber
Ethernet Sorv,x,s Managor(ESM) Provides a complete'"System-
Sory
ko Awam Operating Sysmm(SAOS) in-a-Boz'including switching
�.+ module,interface connectors,
Figure 1.CN 3911 deplayment options
fiber management,optional
UPS power system and
Ow O
[D o O Data Sheet optional Voice Module