Loading...
12030104 - SIBIGGS CARDOSA ASSOCIATES INC STRUCTURAL ENGINEERS 6S5 The Aiomoda San Jose, CA 9512e-3133 Telephone 406-296-5515 Faccimilc 406-296-9114 ICOM Mechanical 477 Burke Street San Jose, CA 95112 Attention: Al Aramburu 1;I'R 2 6 '[012 Subject: Special Inspections and Materials Testing — Final Report Apple DA03 — DCW Skid 10500 N. De Anza Boulevard Cupertino, CA Permit # 12030104 Gentlemen: April 24, 2012 2012071 In accordance with Section 1701.1 of the California Building Code and as specified in the structural contract drawings, Biggs Cardosa Associates, Inc. has performed the following special inspections. Expansion anchor installation and testing The completed inspections were performed under the supervision of the undersigned Registered Engineer. Based both upon inspections performed and our substantiating reports, it is our professional judgement that, to the best of our knowledge, the inspected work was performed in accordance with the applicable workmanship provisions of the California Building Code and the approved plans and specifications. Should you have any questions, please do not hesitate to call. Sincerely, BIGGS CARDOSA ASSOCIATES, INC. --'" 6uESQ Mark A. Cardosa Vice President cc: Building Division; City of Cupertino M12012\071Unsp=ti=%p lisp Final Ur Apple DA3 DCW Skid.dm BIGGS CARDOSA ASSOCIATES INC STRUCTURAL ENGINEERS BBS The AI.,odo Son Jose. CA 95126-3133 T.I.Phono 406-296-5515 Facsi,ilo 406-296-8994 - SUMMARY OF SPECIAL INSPECTION April 24, 2012 2012071 Page 1 PERFORMED FOR: ICOM' -Mechanical PROJECT: Apple DA03 — DCW Skid 477 Burke Street 10500 N. De Anza Boulevard San Jose, CA 95112 Cupertino, CA Attu:, ALAramburu Permit # 12030104 Project History REPORT No. I TYPE OF VISIT DATE INSPECTOR LOCATION Expansion Anchor Installation & 4/17 Michael Wong Job Site Testing Expansion Anchor Installation & 4/23 Michael Wong Job Site Testing ITEMS OF NON-COMPLIANCE/ PENDING: None. 1, .- REMARKS: Biggs Cardosa Associates, -Inc. has performed special inspections for the above referenced project and the daily reports have been enclosed for your records. All expansion anchors were installed and tested to the best of our knowledge in general conformance: with the intent of the approved plans and specifications. This is a.pro&m,report of our special inspections. A final report will be issued upon request at the completion of the special inspection/testing requirements provided that all outstanding issues have been resolved and/or corrected. cc: City of Cupertino d Attn: Building Division' MA\2012\071\Inspenion\Report0l Apple DA3 DCW Skid.doc REVIEWED BY: v —� Qoa.�. Mark A. Cardosa, P.E. l `ter ? I i BIGGS CAROOSA ASSOCIATES INC STRUCTURAL ENGINEERS 9 B 5 The A l s m e d e Sen Jose. CA 95126-3133 Telephone 408-296-5615 F eceimile 40(3-298.6114 JOB #: 26,to77 Page 1 of SPECIAL INSPECTION DAILY REPORT Project Name: 4010WdA3- &!* ".v Date: ARA, rC /7, b iz Project Address: /Q%o A14,V64 Swo- Time Arrived: /f,'J-*rl 4Pt, —r0VJ C4 Location of Inspection: ' A? a7W' Time Departed: 'f2/*r%7 Inspections made: /NJf4%C4T0N &P t 0 r,.PJ,,v drtPuw/F, Bot? -2 - Samples Taken: H Items Complete: - Jl4,A swai >w r Deficiencies/Items Pending: Comments: AF / / GU N / c%),Z 4:r 4,v ,<:.. & ffr rte, '� xrB2 To the best of my knowledge, the work completed or in progress for this report was done in general conformance with the intent of the approved design documents and specifications and applicable workmanship provisions of the C.B.C. except as noted above. INSPECTOR: BIGGS CAROOSA ASSOCIATES 'INC STRUCTURAL ENGINEERS 885 The A l e m e d e Sen JDee. CA 95128-3133 Telephone 408-298-5515 Feoeim lle 408-299-8114 SPECIAL INSPECTION DAILY REPORT JOB #: & "20 7/ Page 1 of 4 Project Name: /9i0'W 613 - btW g •A Date: Aim 23. &1 Z. - Project Address: /+Seo A/•JVAwanBiwa, Time Arrived: /2-"27 _luo :.lro: Q Time Departed: /:30 0�✓1 Location of Inspection: Inspections made: /,VJf U4r-o.J cF •j' t6 aGmF/n J�i�u (� Ba[t z gag ,t.vc.a6pf e - Samples Taken: Items Complete: Deficiencies/Items Pending: Comments: -i V x S y To the best of my knowledge, the work completed or in progress for this report was done in general conformance with the intent of the approved design documents and specifications and applicable workmanship provisions of the C.B.C. except as noted above. INSPECTOR: '