12010174Page: 1
VERKIC ENGINEERING
1749 Ellen Av., San Jose, Ca 95125' Tel: (408) 464-3911 ' Fax: (408)677-4838
City of Cupertino
Building Departmant
10300 Torre Avenue
Cupertino, CA 95014
04.12.12
RE:
Structural Observation at job site:
Remodeling:
22273 N De Anza Circle ). 2 O 10 / 74/
Cupertino, CA 95014
I did framing inspection per inspector request.
-Location and size of ceiling jst and ceiling beam is according the plan, structural
calculation and details.
-Location and size of post is adequate and according the plan.
-Connections between beams and post are adequate.
-Length of new shear wallis according the plan and cafe.
-Existing and new, framing is O.K. and ready for closing.
If you should have any questions or concerns please do not hesitate to contact me at (408) 464-3911
Sincerely:
Verkic Engineering:
Stana Verkic, PE
ATE OF Cp���"
WATER COMPANY
San Jose Water
SAY AREA a?&O/ 71V
BACKFLOW
C. CEp
JAN 2 2���
Phone 800-400-1008 or email: customerserviceC&bayareabackfiowinc.com
BY
CUSTOMER NAME: Deep Cliff
MAILING ADDRESS: CITY, STATE, ZIP:
ACCT NO: METER NO.: 10053097
SERVICE ADDRESS: 22273 De Anza Cir., Cuperdno
BACKFLOW LOCATION:
TYPE: RP SIZE: I" MANUFACTURER. FEBCO MODEL NO.: 825YA SERIAL NO.: J000098
New Device ❑ (check box)
TYPE: SIZE: MANUFACTURER: MODEL NO.: SERIAL NO.:
THIS TEST IS CERTIF ED TO BE TRUE
Initial Test By: vel/ q/ci v Certification No: /%f 93�' Date: / - 21-/5— Time:
Final Test By: Certification No: Date: Time:
Technician: Miiauel Salcido Midwest Kit No.: 02120997 Line Pressure: i¢4
Comment:
ee
Device Test Information
Passed Failed
DCV
RPP
PRESSURE VACUUM
BREAKER
#1 Check Valve
#2 Check Valve
Pressure Relief Valve
Air Inlet
Check Valve
Closed Tight
17 Closed Tight
Opened At�. C
Opened At
❑ Closed Tight
57-00
PSID
PSID
z
PSID
PSID
❑ Opened Under 2.0 PSID
❑ Opened Under 2.0 PSID
PSID
~
® Leaked
❑ Leaked
Did Not Open
Did Not Open
13 Leaked
Cleaned
Cleaned
Cleaned
Cleaned
Cleaned
Replaced
Replaced
Replaced
Replaced
Replaced
a
Q
Held at
Held at
z
PSID
PSID
Opened at
Opened at
Check Valve
Closed tight
Closed tight
PSID
PSID
PSID
THIS TEST IS CERTIF ED TO BE TRUE
Initial Test By: vel/ q/ci v Certification No: /%f 93�' Date: / - 21-/5— Time:
Final Test By: Certification No: Date: Time:
Technician: Miiauel Salcido Midwest Kit No.: 02120997 Line Pressure: i¢4
Comment:
ee
Page: 1
VERKIC ENGINEERING
1749 Ellen Av., San Jose, Ca 95125 * Tel: (408) 464-3911 * Fax: (408)677-4838
City of Cupertino
Building Departmant
10300 Torre Avenue
Cupertino, CA 95014
03.08.12
RE: J
Epoxy Anchors Inspection for: — �a
Remodeling: Lj
22273 N De Anza:Circle_ .4.L 0 L 0,1 *7
Cupertino, CA 95014
I did special inspection for drilled epoxy anchors (for holdowns) during installation.
Threaded rods (dam") as holdowns anchors are installed properly.
-Location of anchor's,holes are according the foundation plan.
-Holes is 12" deep min. in existing concrete foundation and dry.
-Before anchors installation holes are clined from dust with nylon brush and compresses air.
-After inserting the anchors the holes are completely full of epoxy (Simpson SET -XP)
If you should have any questions or concerns please do not hesitate to contact me at (408) 464-3911
Sincerely:
Verkic Engineering:
Stang Veerrk�ic,,/PE