Loading...
12010174Page: 1 VERKIC ENGINEERING 1749 Ellen Av., San Jose, Ca 95125' Tel: (408) 464-3911 ' Fax: (408)677-4838 City of Cupertino Building Departmant 10300 Torre Avenue Cupertino, CA 95014 04.12.12 RE: Structural Observation at job site: Remodeling: 22273 N De Anza Circle ). 2 O 10 / 74/ Cupertino, CA 95014 I did framing inspection per inspector request. -Location and size of ceiling jst and ceiling beam is according the plan, structural calculation and details. -Location and size of post is adequate and according the plan. -Connections between beams and post are adequate. -Length of new shear wallis according the plan and cafe. -Existing and new, framing is O.K. and ready for closing. If you should have any questions or concerns please do not hesitate to contact me at (408) 464-3911 Sincerely: Verkic Engineering: Stana Verkic, PE ATE OF Cp���" WATER COMPANY San Jose Water SAY AREA a?&O/ 71V BACKFLOW C. CEp JAN 2 2��� Phone 800-400-1008 or email: customerserviceC&bayareabackfiowinc.com BY CUSTOMER NAME: Deep Cliff MAILING ADDRESS: CITY, STATE, ZIP: ACCT NO: METER NO.: 10053097 SERVICE ADDRESS: 22273 De Anza Cir., Cuperdno BACKFLOW LOCATION: TYPE: RP SIZE: I" MANUFACTURER. FEBCO MODEL NO.: 825YA SERIAL NO.: J000098 New Device ❑ (check box) TYPE: SIZE: MANUFACTURER: MODEL NO.: SERIAL NO.: THIS TEST IS CERTIF ED TO BE TRUE Initial Test By: vel/ q/ci v Certification No: /%f 93�' Date: / - 21-/5— Time: Final Test By: Certification No: Date: Time: Technician: Miiauel Salcido Midwest Kit No.: 02120997 Line Pressure: i¢4 Comment: ee Device Test Information Passed Failed DCV RPP PRESSURE VACUUM BREAKER #1 Check Valve #2 Check Valve Pressure Relief Valve Air Inlet Check Valve Closed Tight 17 Closed Tight Opened At�. C Opened At ❑ Closed Tight 57-00 PSID PSID z PSID PSID ❑ Opened Under 2.0 PSID ❑ Opened Under 2.0 PSID PSID ~ ® Leaked ❑ Leaked Did Not Open Did Not Open 13 Leaked Cleaned Cleaned Cleaned Cleaned Cleaned Replaced Replaced Replaced Replaced Replaced a Q Held at Held at z PSID PSID Opened at Opened at Check Valve Closed tight Closed tight PSID PSID PSID THIS TEST IS CERTIF ED TO BE TRUE Initial Test By: vel/ q/ci v Certification No: /%f 93�' Date: / - 21-/5— Time: Final Test By: Certification No: Date: Time: Technician: Miiauel Salcido Midwest Kit No.: 02120997 Line Pressure: i¢4 Comment: ee Page: 1 VERKIC ENGINEERING 1749 Ellen Av., San Jose, Ca 95125 * Tel: (408) 464-3911 * Fax: (408)677-4838 City of Cupertino Building Departmant 10300 Torre Avenue Cupertino, CA 95014 03.08.12 RE: J Epoxy Anchors Inspection for: — �a Remodeling: Lj 22273 N De Anza:Circle_ .4.L 0 L 0,1 *7 Cupertino, CA 95014 I did special inspection for drilled epoxy anchors (for holdowns) during installation. Threaded rods (dam") as holdowns anchors are installed properly. -Location of anchor's,holes are according the foundation plan. -Holes is 12" deep min. in existing concrete foundation and dry. -Before anchors installation holes are clined from dust with nylon brush and compresses air. -After inserting the anchors the holes are completely full of epoxy (Simpson SET -XP) If you should have any questions or concerns please do not hesitate to contact me at (408) 464-3911 Sincerely: Verkic Engineering: Stang Veerrk�ic,,/PE 7