11080098 ALLIED•: ENGINEERING COMPANY"°:7 April 17, 2012 File No. 1008 City of Cupertino Building Department, . 10300 Torre Avenue B Cupertino, CA 95014-3255_ Re: Foundation Verification L Tract No. 10088—'16t14 20626 Cleo Avenue Cupertino, CA 95014 Bldg. Permit No.4.10800' APN: 362-31-004 Dear Sirs/Madams: On April 2, 2012, Allied•-Engidee ing;Company checked the position of the foundation forms for the building on Lot 4 ofTracv - '30088 and•fouad them to be in conformance with the setbacks shown on the approved Architectural,,Site�Pliih,did;the pad elevation to be in substantial conformance with the design grades ofthe.appcovediGrading Plan: If you have questions.or,commen.ts regarding any,of the above, please don't hesitate to call. Sincerely, ALLIED ENGINEERING COMPANY ' �� ��i�rVy�'--• QRpFESS/p h �g y� 2 Lester Ikegami RCE 30520 C30520 p Expires: 3-31-14 a t mp CNll. 4)F OF CAt.1E�P Li:pi cc: B. Koontz, Habitat For Hiiinanity Silicon Valley Allied Engineering CompanyA'Divisbn-of IK-GM , 3170 Williams Road (406)241-1960 allied@ alliedengccom Cor sullied Engineers,Ini. San Jose,CA 95117 (406)241-3047 Fax i T.MAKDISSY CONSULTM,INC. EmigCsa hnical Comhan s IBM Project No. E127-I April 20, 2012 Mr. Brent Koontz Construction Manager Habitat for Humanity 513 Valley Way Milpitas, CA 95035 Subject: Building Pad, Lot 4 20626 Cleo Ave,Permit No. 11 08009t) Cupertino, CA REPORT OF TESTING AND D OBSERVATION SERVICES DURING PAD GRADING OPERATIONS References: 1) Geotechnical Investigation By: T. Makdissy Consulting, Inc. Dated: Feb 4, 2011 Dear Mr. Koontz: In accordance with your authorization T. Makdissy Consulting, Inc., has provided engineering consultation, observation and testing services during pad grading operations for the Lot 4, building pad of the subject project. This letter is a summary of our observations and test results. Grading on the subject lots commenced by stripping, clearing the area of all existing vegetation and debris and removing 18 to 24 inches from the building site. The native material was then scarified, moisture conditioned, then compacted to a minimum relative compaction of 90%. Fill material consisting of quarry fines was imported and placed on the building pads to bring it to design grade. 23 Las Colinas Lane,Suite 106 I San Jose,California 95119 Phone:(408)227-8595 1 Fax(408)227-1672 The satisfactory placement of fill was determined by field observation and performance of in-place field density and.laboratory,compaction;dests. •The.laboratory compaction tests were performed to i determine the maximumA.l y;density and the optimum moisture content of the soil used for fill. i Compaction tests were;:performed in,accordance with Laboratory Test Procedures ASTM D1557- 94. The results of these tests are summaiized on Tablet I. A nuclear gauge was used to determine the in-situ percentage of dry-density and moisture content. Nuclear gauge density methods were generally in accordance with ASTM D2922-91 and D3017-88. The in place test results along with the achieved relative compaction are included in Tables I & 1I. Pad grading operations for.the building-pad-were generally performed in accordance with the recommendations contained in the aforegentioned reference. The pad is ready to receive building improvements; Surface•drainage must�be.provided as designed by the project Civil Engineer and Jinaintained:by the property.=owners at all-.times. The building pads are ready to receive foundation improvements. :'Should you hay.e,any questions relating to the contents of this letter or should additional info'r"iion be required; 016ase contact our'office at your earliest convenience. Very truly yours, TMakdissy Consulting,In ApFE 810 _ Q��6'•MAI(p�s�Fy No.559 m Tom MakdissyiRE., Exp:, (L¢ Principal Engineer *'srp�0TEC1iN`�P�`P OE CAUF� I I ' i I Copies:4 to addressee i •Project No.El 27-1 E.Cleo Ave Habitat For Humanity TABLE .SUMMARY OF,LABORATORY TEST RESULTS Maximum Optimum Dry .,Moisture Density Content Curve N .Description _ (p.c.f.) (%) 1 Brown Sandy,Silty Material with trails of gravel 128.0 12.1 2 'Gray quarry fine to medium coarse 142.0 6.7 TABLE II SUMMARY.OF,FIELD DENSITY.TEST RESULTS Depth Moisture Dry Max.Dry Relative ! and/or I Content Density j Density Compaction Date Test Elev. Area _ "., . .Location % PCF Curve i PCF % i t 2123/12 4 405.0 M, Lot#4, 15.5 115.3 1 128.0 90% 3/6/12 8 294.5 '•Lot#4 10.8 130.0 2 142.0 92% 3/11/12 12 F.G Lot#4 12.4 137.7 2 142.0 97% i Notes: 1) Curve numbers refer to SoilType from TABLE I 2) M=mass grading 3) Depth/Elevation established from grade stakes and/or grading plan provided 4) FG=Finished Grade 5) P= Pavement 6) AB=Agregate Base i 7) AC=Asphalt Concrete .I 8) JT=Joint Trench 9) S= Sewer Llne 10)SD=Storm Drain 11)W=Water Line I it i i T.Makofissy Consulting,Inc. i i tr / V G w info %U1en ineers.com V a`J' mlo®baggonginoors.com � 0 o phone:650.852.9133 fax:650.852.9138 o,ENGo 847 West Maude Ave,Sunnyvale,California 94085-2911 DSA FILE# SPECIAL INSPECTION REPORT DSA APPL# DSA/LEA# Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection. Reports of non-compliant conditions must be distributed immediately.Separate reports shall be prepared for each type of special inspection,on a daily basis.Each report shall be completed and signed by the special inspector conducting the inspection. Project Name: `j o /a f J, ,,meq t„ �L. / Date/Day: - Z-5-1 /L. Client Project #: Time Arrived: Project Location: Z-G> Cp T Time Departed: Contractor: Bldg Permit#: //Q Travel Time: Inspection Coverage: ❑concrete ❑Masonry ❑Welding-Shop Co ❑Prestressed Concrete ❑High Strength Bolting ❑Welding-Field 103 Periodic Reinforcing Steel ❑Expoxy Bolts/Dowel Tbs t DSA Approved Documents: Describe inspections made, including locations: 7/Fv. t°(.rct�li1t-N� ri rt' (_ 1�,, �S I✓] G,n l r, /� G/t�,,� �FZr r ft p, / .J"r)&_A6 14r . E Tests made: Items requiring correction,corrections of previously listed items,and previously listed uncorrected items: List changes to approved plans by architect or engineer: IVi7 /C Comments: The Work tAS ❑WASNOT J-- Inspected in accordance with the requirements of the DSA/Building ,, Department approved documents ��.1.4 Material Sampling ❑WAS ❑WAS NOT XN/A Signature of Special Inspector Performed in accordance with DSA approved documents g t( t.6 ) _1/l�c A• t / _1 1 The Work inspected *MET ❑DIDNOTMEET Print Name/Title The requirements of the DSA/Building Official Approved Documents 41y, z S414110 a, Pf.jo,1 ArCh,nid Certification # structural Engineer Protect Inspector DSA Regional Office/Building Donartmenl ff- elLIE Wednesday, October 10, 2012 Norman Habitat for Humanity Silicon Valley 513 Valley Way Milpitas, CA 95035 Scheel Re: Cleo Avenue Job # 11101 Inspection Clarification 20bUP 0-leo A✓e //0800lj$ This letter is to clarify that we have reviewed the conditions at the roof and floor level regarding the following options. In our opinion the as-built conditions are Structural adequate. �yy( 1. Shear transfer at roof,The l "M r1 shear transfer at the girders n ; i n e e r truss is adequate the diaphragm shear at this area is 13' 50212 Sunrise Blvd small. G•. )'�'�_ Fair Oaks,CA 95626 (916)536-9585 (916)536-0260(fax) ` ' 1989-3013 ^'r - ¢,�• Q.. 33 yem3 oJrsccllence --� J"`�ss� r • 11 2. The floor trusses over the bearing walls may be drilled _Norman Scheel,S.L. to allow plumbing vents to — - - LEED AP BD+C LEED AP Homes pass thru floor area. - Fellow-SEAOC Fellow-ASCE _- E-mail:nnnmumssc.cnm Rab Coon i General Manager E-mail:mhcnnaamssccnm ' r ..meg ':Slj Steve Smith P.L. Pmjed Manage - ��+�...- : • r E-mall:s+cresmilhianar.com - StevenCuo CAD Supervisor If you have any questions,please call Rob Coon. CAD Suor E-mail:smvnFnnssa.cmn Q¢OFESS/O Jacide Winslow OR=Managerhist' PN E-mail:incl:icmmssc.anm 'F /Norman Scheel `P Structural Engineer ¢ No. z 1 P LP lA'(/crUaP�a1P lF OF CAO1 OCT 17 2012