April 17, 2012
File No. 1008
City of Cupertino
Building Department
10300 Torre Avenue-,
Cupertino, CA 95014-3253
Re: Foundation Verification -
Tract No. 10088,-:Lot-2,
20624 Cleo Avenue
Cupertino, CA 95014
Bldg. Permit No: 11080096; ..
APN: 362-31-004
Dear Sirs/Madams:
On April 2, 2012, Allied Engineering Company checked the position of the foundation forms for the
building on Lot 2 of Tract No.'10088 and found them to be in conformance with the setbacks shown on
the approved Architectural S' itc'-Plan and,the;gad elevation to be in substantial conformance with the
design grades of the approvgd.Grading Plan.
If you have questions or'coininentsliegarding any of the above, please don't hesitate to call.
Sincerely,
ALLIED ENGINEERING COMPANY
QµOFESSlO�
fPA IrcFCO %
Lester Ikegami J C20520
RCE 30520 ,r
Expires: 3-31-14 s CIV0. P
ryrfOF
Li:pi
cc: B. Koontz, Habitat-ForHumanity Silicon Valley
Allied Engineering Company A Division of IK-GMS ' 3170 Williams Road (408)241-1980 allied@ alliedengr.com
Coniulting Engineers,Inc. San Jose,CA 95117 (408)241-3047 Fax
,
OEM
T.MAKDISSY CONSULTING,INC.
Geotechnical Consul=U
Project No. E127-1
April 20 2012
Mr. Brent Koontz
Construction Manager
Habitat for Humanity
513 Valley Way
Milpitas, CA 95035
A2S--
Subject: Building Pad, Lot 2
20624 Cleo Ave,Permit No. 11080096
Cupertino,CA
REPORT OF TESTING AND OBSERVATION SERVICES
DURING PAD GRADING OPERATIONS
References: 1) Geotechnical Investigation
By: T. Makdissy Consulting,Inc.
Dated: Feb 4,2011
Dear Mr. Koontz:
In accordance with your authorization T. Makdissy Consulting, Inc, has provided engineering
consultation, observation and testing services during pad grading operations for Lot 2 building pad
of the subject project. This letter is a summary of our observations and test results.
Grading on the subject lots commenced by stripping, clearing the area of all existing vegetation and
debris and removing 18 to 24 inches from the building site. The native material was then scarified,
moisture conditioned, then compacted to a minimum relative compaction of 90%. Fill material
consisting of quarry fines was imported and placed on the building pads to bring it to design grade.
23 Las Colinas Lane,Suite 106 I San Jose,California 95119
Phone:(408)227-8595 1 Fax(408)227-1672
The satisfactory placemenbof fill was determihed by field observation and performance of in-place
field density and laboratory compaction t'e'sts:;The laboratory compaction tests were performed to
determine the maximum dry'.density:and the optimum moisture content of the soil used for fill.
i
Compaction tests.were:.performed in.accordance with Laboratory Test Procedures ASTM D1557-
94. The results ofthese tests are sumniarized'on Tablet-I. A nuclear gauge was used to determine
the in-situ percentage=of dry,:density,and;moisturc content. Nuclear gauge density methods were
generally in accordance.,with�AS,'IM.D2922-91.and D3017-88. The in place test results along with
the achieved relative compaction are included in:Tables I & Il.
Pad grading operafions,for the building-pad were generally performed in accordance with the
recommendations^contained in the,aforementioned reference. The pad is ready to receive building
improvements. Surfacedrainage must be-provided as designed by the project Civil Engineer and
maintained by the property'owners at all'timM The building pads are ready to receive foundation
improvements.
I
Should you have any questions, relating to the contents of this letter or should additional
information be required;please contact our office at your earliest convenience.
I
Very truly yours;
TMakdissy Consuhing,Inc.
QPpFE89/°,y9
Tom Makdissy,'P:E,. (�E. d No.556LU
m j
Principal Engineer., q Cr. ExP x
?s CrM`�a`P
FCA
Copies:
i
I �
Copies:4 to addressee
j
Project No.E127-1 E-0leo Ave Habitat For Humanity
TABLE
SUMMARY OF,LABORATORY TEST RESULTS
Maximum Optimum
Dry Moisture
Density Content
Curve# Description ().c.f.) (%)
1 Brown Sandy Silly Material with trails of gravel 128.0 12.1
2 Gray quarry fine to medium coarse 142.0 6.7
TABLE II
SUMMARY OF..FIELD DENSITY TEST RESULTS
Depth Moisture Dry Max.Dry Relative
and/or Content Density Density Compaction
Date Test# Elev. Area Location % PCF Curve PCF %
2/23/12 2 405.0 M Lot#2 14.1 117.6 1 128.0 92%
3/6/12 6 294.0 Lot#2 11.2 134.3 2 142.0 95%
3/11/12 10 F.G Lot#2'' 9.9 - 133.3 2 142.0 94%
Notes:
1) Curve numbers refer to Soil Type from TABLE I
2) M=mass grading
3) Depth/Elevation established from grade stakes ano/orgrading plan provided
4) FG=Finished Grade
5) P= Pavement
6) AB=Agregate Base
7) AC=Asphalt Concrete
8) JT=Joint Trench
9) S= Sewer Line
10)SD=Storm Drain
11)W=Water Line
T.Makdissy Consulting,Inc.
I
www.baggengineers.com
tE �
info®haggengineers.com
phone:650.852.9133 fax:650.852.9138G 847 West Maude Ave,Sunnyvale,California 94085-2911
DSA FILE#
SPECIAL INSPECTION REPORT DSA APPL#
DSA/LEA#
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection. Reports of non-compliant conditions
must be distributed immediately.Separate reports shall be prepared for each type of special inspection,on a daily basis.Each report shall be
completed and signed by the special inspector conducting the inspection.
Project Name: Date/Day:
Client Project #: /Y f-/" Ict-1 V _ 1 L —O/'-- Time Arrived:
Project Location: ' b _� Z y ��En '4V'e Time Departed:
Contractor: Bldg Permit#: //OQ�.00 Il Travel Time:
Inspection Coverage: ❑Concrete ❑Masonry ❑Welding-Shop
❑Conbnuou ❑Prestressed Concrete ❑High Strength Bolting ❑Welding-Fie_Id _ *
I`❑Periodic �Beinforcing Steel ❑Expoxy Bolts/Dowel (, �GiLiy6n JC
DSA Approved Documents:
Describe inspections made, including locations:
1,1 r n�" sP� J 6L�. �DI� cr�tc vv�- o j TSN t►� r'1. (�
IN
C- /�rl 411245-
Tests
11245-Tests made:
'ea�tip
Items requiring correction,corrections of previously listed items, and previously listed uncorrected items:
List changes to approved plans by architect or engineer:
it/O>r/C
Comments:
The Work AI `WAS ❑WAS NOT
Inspected in accordance with the requirements of the DSA/Building
Department approved documents
Material Sampling ❑WAS ❑WAS NOT 2N/A Signature of Special Inspector
Performed in accordance with DSA approved documents
tcN�f1 art L.�e
The Work inspected MET ❑DID NOT MEET _ Print Name/Title
The requirements of the DSA/Building Official Approved Documents
cc:Project Architect Certification #
Svunural Engineer
Project Inspector
DSA Regional 011icelBuilding Department
FILE
2z-
Wednesday,
Wednesday, October 10, 2012
Nortatin Habitat for Humanity Silicon Valley
513 Valley Way
Milpitas,CA 95035
Scheel Re: Cleo Avenue Job# 11101 Inspection Clarification 2.0&;-q Cje0 AVC
//0900u,
This letter is to clarify that we have reviewed the conditions at the roof and floor
level regarding the following options. In our opinion the as-built conditions are
Structural adequate.
1. Shear transfer at roof, The
shear transfer at the erIP—d
n ;i o e e r truss is adequate the
diaphragm shear at this area is
50212 Sunrise Blvd. small.
Fair Oala,CA 956_n 6
(916)536-9585
(916)536-0260(Tax)
1989-2012
33 years of erccAa¢a �31'
IiJsailir?:.S�i±. i•:_Yq- •:lZ,`.�;4i�1
2. The floor trusses over the
bearing walls may be drilled
Norman Scheel,S.E. to allow plumbing vents to
LEED AP aD+C
I PFn AP Homes pass thru floor area.
Fellow—SEAOC ,•
Fellow-ASCE --^- - �'=---�^'--
E-mall:nnrmmm.cs .xnm
Rob Coon
General Manager
E-mail:mhcnndiimccecnm
Steve Smith P.E.
Pmjccl Maaagc
E-mail:alaaesmilhi_-M smc om - -
Steven Cooksey
CAD Supervisor you If have any questions,p u tilease call Rob Coon.
E-moil:wevanirsse.emn
�(tOFESS(0�
Jnclde WinslowQUO J. Cy.S
Office Manager �(G _ te"
E-mail:ineladnmsse.enrpr y 'taco
Norman Scheel
Structural Engineer o
U't7 IRUCTUPL
rFOF CALIF
OCT 17 2012