Loading...
11080096 ,-- ENAWE—61Y, GINEERING co April 17, 2012 File No. 1008 City of Cupertino Building Department 10300 Torre Avenue-, Cupertino, CA 95014-3253 Re: Foundation Verification - Tract No. 10088,-:Lot-2, 20624 Cleo Avenue Cupertino, CA 95014 Bldg. Permit No: 11080096; .. APN: 362-31-004 Dear Sirs/Madams: On April 2, 2012, Allied Engineering Company checked the position of the foundation forms for the building on Lot 2 of Tract No.'10088 and found them to be in conformance with the setbacks shown on the approved Architectural S' itc'-Plan and,the;gad elevation to be in substantial conformance with the design grades of the approvgd.Grading Plan. If you have questions or'coininentsliegarding any of the above, please don't hesitate to call. Sincerely, ALLIED ENGINEERING COMPANY QµOFESSlO� fPA IrcFCO % Lester Ikegami J C20520 RCE 30520 ,r Expires: 3-31-14 s CIV0. P ryrfOF Li:pi cc: B. Koontz, Habitat-ForHumanity Silicon Valley Allied Engineering Company A Division of IK-GMS ' 3170 Williams Road (408)241-1980 allied@ alliedengr.com Coniulting Engineers,Inc. San Jose,CA 95117 (408)241-3047 Fax , OEM T.MAKDISSY CONSULTING,INC. Geotechnical Consul=U Project No. E127-1 April 20 2012 Mr. Brent Koontz Construction Manager Habitat for Humanity 513 Valley Way Milpitas, CA 95035 A2S-- Subject: Building Pad, Lot 2 20624 Cleo Ave,Permit No. 11080096 Cupertino,CA REPORT OF TESTING AND OBSERVATION SERVICES DURING PAD GRADING OPERATIONS References: 1) Geotechnical Investigation By: T. Makdissy Consulting,Inc. Dated: Feb 4,2011 Dear Mr. Koontz: In accordance with your authorization T. Makdissy Consulting, Inc, has provided engineering consultation, observation and testing services during pad grading operations for Lot 2 building pad of the subject project. This letter is a summary of our observations and test results. Grading on the subject lots commenced by stripping, clearing the area of all existing vegetation and debris and removing 18 to 24 inches from the building site. The native material was then scarified, moisture conditioned, then compacted to a minimum relative compaction of 90%. Fill material consisting of quarry fines was imported and placed on the building pads to bring it to design grade. 23 Las Colinas Lane,Suite 106 I San Jose,California 95119 Phone:(408)227-8595 1 Fax(408)227-1672 The satisfactory placemenbof fill was determihed by field observation and performance of in-place field density and laboratory compaction t'e'sts:;The laboratory compaction tests were performed to determine the maximum dry'.density:and the optimum moisture content of the soil used for fill. i Compaction tests.were:.performed in.accordance with Laboratory Test Procedures ASTM D1557- 94. The results ofthese tests are sumniarized'on Tablet-I. A nuclear gauge was used to determine the in-situ percentage=of dry,:density,and;moisturc content. Nuclear gauge density methods were generally in accordance.,with�AS,'IM.D2922-91.and D3017-88. The in place test results along with the achieved relative compaction are included in:Tables I & Il. Pad grading operafions,for the building-pad were generally performed in accordance with the recommendations^contained in the,aforementioned reference. The pad is ready to receive building improvements. Surfacedrainage must be-provided as designed by the project Civil Engineer and maintained by the property'owners at all'timM The building pads are ready to receive foundation improvements. I Should you have any questions, relating to the contents of this letter or should additional information be required;please contact our office at your earliest convenience. I Very truly yours; TMakdissy Consuhing,Inc. QPpFE89/°,y9 Tom Makdissy,'P:E,. (�E. d No.556LU m j Principal Engineer., q Cr. ExP x ?s CrM`�a`P FCA Copies: i I � Copies:4 to addressee j Project No.E127-1 E-0leo Ave Habitat For Humanity TABLE SUMMARY OF,LABORATORY TEST RESULTS Maximum Optimum Dry Moisture Density Content Curve# Description ().c.f.) (%) 1 Brown Sandy Silly Material with trails of gravel 128.0 12.1 2 Gray quarry fine to medium coarse 142.0 6.7 TABLE II SUMMARY OF..FIELD DENSITY TEST RESULTS Depth Moisture Dry Max.Dry Relative and/or Content Density Density Compaction Date Test# Elev. Area Location % PCF Curve PCF % 2/23/12 2 405.0 M Lot#2 14.1 117.6 1 128.0 92% 3/6/12 6 294.0 Lot#2 11.2 134.3 2 142.0 95% 3/11/12 10 F.G Lot#2'' 9.9 - 133.3 2 142.0 94% Notes: 1) Curve numbers refer to Soil Type from TABLE I 2) M=mass grading 3) Depth/Elevation established from grade stakes ano/orgrading plan provided 4) FG=Finished Grade 5) P= Pavement 6) AB=Agregate Base 7) AC=Asphalt Concrete 8) JT=Joint Trench 9) S= Sewer Line 10)SD=Storm Drain 11)W=Water Line T.Makdissy Consulting,Inc. I www.baggengineers.com tE � info®haggengineers.com phone:650.852.9133 fax:650.852.9138G 847 West Maude Ave,Sunnyvale,California 94085-2911 DSA FILE# SPECIAL INSPECTION REPORT DSA APPL# DSA/LEA# Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection. Reports of non-compliant conditions must be distributed immediately.Separate reports shall be prepared for each type of special inspection,on a daily basis.Each report shall be completed and signed by the special inspector conducting the inspection. Project Name: Date/Day: Client Project #: /Y f-/" Ict-1 V _ 1 L —O/'-- Time Arrived: Project Location: ' b _� Z y ��En '4V'e Time Departed: Contractor: Bldg Permit#: //OQ�.00 Il Travel Time: Inspection Coverage: ❑Concrete ❑Masonry ❑Welding-Shop ❑Conbnuou ❑Prestressed Concrete ❑High Strength Bolting ❑Welding-Fie_Id _ * I`❑Periodic �Beinforcing Steel ❑Expoxy Bolts/Dowel (, �GiLiy6n JC DSA Approved Documents: Describe inspections made, including locations: 1,1 r n�" sP� J 6L�. �DI� cr�tc vv�- o j TSN t►� r'1. (� IN C- /�rl 411245- Tests 11245-Tests made: 'ea�tip Items requiring correction,corrections of previously listed items, and previously listed uncorrected items: List changes to approved plans by architect or engineer: it/O>r/C Comments: The Work AI `WAS ❑WAS NOT Inspected in accordance with the requirements of the DSA/Building Department approved documents Material Sampling ❑WAS ❑WAS NOT 2N/A Signature of Special Inspector Performed in accordance with DSA approved documents tcN�f1 art L.�e The Work inspected MET ❑DID NOT MEET _ Print Name/Title The requirements of the DSA/Building Official Approved Documents cc:Project Architect Certification # Svunural Engineer Project Inspector DSA Regional 011icelBuilding Department FILE 2z- Wednesday, Wednesday, October 10, 2012 Nortatin Habitat for Humanity Silicon Valley 513 Valley Way Milpitas,CA 95035 Scheel Re: Cleo Avenue Job# 11101 Inspection Clarification 2.0&;-q Cje0 AVC //0900u, This letter is to clarify that we have reviewed the conditions at the roof and floor level regarding the following options. In our opinion the as-built conditions are Structural adequate. 1. Shear transfer at roof, The shear transfer at the erIP—d n ;i o e e r truss is adequate the diaphragm shear at this area is 50212 Sunrise Blvd. small. Fair Oala,CA 956_n 6 (916)536-9585 (916)536-0260(Tax) 1989-2012 33 years of erccAa¢a �31' IiJsailir?:.S�i±. i•:_Yq- •:lZ,`.�;4i�1 2. The floor trusses over the bearing walls may be drilled Norman Scheel,S.E. to allow plumbing vents to LEED AP aD+C I PFn AP Homes pass thru floor area. Fellow—SEAOC ,• Fellow-ASCE --^- - �'=---�^'-- E-mall:nnrmmm.cs .xnm Rob Coon General Manager E-mail:mhcnndiimccecnm Steve Smith P.E. Pmjccl Maaagc E-mail:alaaesmilhi_-M smc om - - Steven Cooksey CAD Supervisor you If have any questions,p u tilease call Rob Coon. E-moil:wevanirsse.emn �(tOFESS(0� Jnclde WinslowQUO J. Cy.S Office Manager �(G _ te" E-mail:ineladnmsse.enrpr y 'taco Norman Scheel Structural Engineer o U't7 IRUCTUPL rFOF CALIF OCT 17 2012