12050139 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 20288 NORTHWEST SQ CONTRACTOR:FOUR SEASONS PERMIT NO: 12050139
ROOFING
OWNER'SNAME: HENDRICKSON HERBERT C AND SYDN PO BOX 1668 DATE ISSUED:05/172012
OWNER'S PHONE: 4083952633 SAN JOSE,CA 95109 PHONE NO:(408)278-0330
Jir LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL 11
COMSIFRCLU.�
License Class C-31 Lic q 1'('12 l08 RE-ROOF 14 SQ-TEAR OFF EXISTING,CAL SHAKE
n ROOFING SYSTEM, INSTALL 30# FELT UNDERLAYMENT
Contractor FS 1` Date r' ?'CZ &
1 hereby affirm that 1 am licensed under the provisionsof Chapter9 INSTALL GAF GRAND CANYON SHINGLES,COLOR
(commencing with Section 7000)of Division 3 of the Business&Professions STONEWOOD
Code and that my license is in full force and effect.
I hereby affirm under penally of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for whichthis permit is issued. Sq.Ft Floor Area: \'alualion:$6500
1 have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for die performance of the work for which this
APN Number:31639042.00 Occupancy Type:
permit is Issued.
APPLICANT CERTIFICATION
I certify that 1 have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct.I agree to comply with all city and county ordinances and slate laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned properly for inspection purposes. (We)agree to save 180 DAYS FROM LAST CALLED INSPECTION.
indemnity and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of theDale.
granting of this permit. Additionally,the applicant understands and will comply Issued by:
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18.
RF:ROOFS:
Signature Date All roofs shall be inspected prior to any roofing material heng installed.11-a roof is
installed without first obtaining an inspection.I agave to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION
Signature of ApplicantDale
1 hereby affirm that 1 am exempt from the Contractor's License Law for one of
the following two reasons: ALL ROOF COYERI O BF.CLASS"A"OR BETTER
h as owner of the property,or my enployms with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCI.OSURF:
construct the project(Sec.7044.Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505.25533,and 25534. 1 will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safely Code,Section 25532(x)should 1 store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally.should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District
performance of the work for whichthis permit is issued- will maintain compliance with the Cupertino Municipal Cade.Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safely Code,Sections 25504;,;6' and 25534.
Section 3700 of the Labor Code,for die performance of the work for which this
permit is issued. Owner or authorized agent: Dale:
1 certify that in the performance of the work for which this permit is issued.I shall 61
not employ any person inany manner so as to become subject to the Worker's
Compensation laws of California If,alter making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and stale that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes-(We)agree to save ARf.I11TF.(T'S DECLARATION
and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code.Section Licensed Professional
9.18.
Signature Date
REROOF TEAR-OFF POLICY
0 COMMUNITY DEVELOPMENT DEPARTMENT- BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE-CUPERTINO, CA 95014-3255
CUPERTINO
(408)777-3228- FAX(408)777-3333-buildina(cDcupertino.org
PROJECT ADDRESS ,Z C, , I,r W ^t
e5,I— � , APN-
OWNER NAME rt 1VQ^ r CT^ `+ PHO\E' E-MAIL
STREET ADDRESS T CITY, STATE,ZIP I FAX
>?-U• QycAC 2396 SU/S, ucT e_ CA
CONTRACTOR NAME LICENSE NUMBER LICENSE TYPE BUS,LICe
47'7—i08 1 G_ ?1'
COMPANY NAME F vV r E-MAIL FAX
STREET ADDRESS CITY.STATE,ZIP PHO\E
U e 4e
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes.
2. An inspection request can be scheduled up to the day before the inspection date. Please call (408)777-
3228 from 7:30 - 3:30pm (Mon-Thurs) or 7:30 - 2:30pm (Friday) to schedule the next day inspection.
For Tear-Off and Nailing Inspections, you must also call on the day of the inspection only after that
phase of the work is completed. The building inspector will be available within one hour. Progress
and Final Inspections will be given a two hour window.
3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either
completely knocked-down or removed prior to this inspection.
4. If plywood is installed, a plywood Nailing Inspection is required.
5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the
building inspector. Any roofing which is applied without first obtaining an approved inspection will
require the removal of all new material down to the sheathing so a proper inspection can be performed.
6. Progress Inspection is required when approximately 50% of roof covering is installed.
7. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is
completed. To receive a final sign-off, the following items will be verified:
a. Flat roofs shall have a minimum of/" per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre-manufactured products used shall be
available on-site to review at the time of the inspection.
c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed.
8. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be
charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection
can be scheduled.
By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the
property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand ilia(
smoke detectors and carbon monoxide detectors are required to be installed in accordance with Sections 8314 and R315 of
the 2010 California Residential Code.
Signature of Applicant/Agent: Date:
Rr•ruu17'oh v 201 Ldnr revim-,102/16111
RE-ROOF PERMIT,APrUCATION ^7
Coh.1MUNIIY DE\/ELOPMENT DEPARTMENT• BUILDING DM&ON
10300 TORRE AVENUE�LUPERTINO,CA 95014-3255
I '
( 08.: r33�
• bulldincu(408)777-32 FAX 477C UPERTI NO nertnu.oro
--- NOf1nweST
-- - - �4er�is � llenr�rt�IGso� . j 1.11 :;y�b8 3G5- �6 LA1.,11.
:.::: : ...c. ii __ t'll i, til L.ZII• .' _-.._
I
pA ,
.0K 239
_ga6 C _ —
.•.....•._... —❑ U'A]I:N 1r�LN: y�CU.�10.{C'IUN ❑('uM1U1'1ux,wCNr ❑ ANCHIM-1 ❑IJ:rI:.Lr;t ❑ I;Y::(.L,n•Ii5 ❑ :F.i':i
LICIiI:SE SU.\NCR LICES'SE TI'Pli IIUS IC a
E.nun.
FA.
cm,11A LI' Iq 0.L,yi
no
,:'-n:o"; i'. '•✓p%•:,,.,�„ (J('IiS51!:;❑?Inlill • bU$ IJC
------------------
---------
. :: . ..:..•`.:>: CII,',ifXl$"LII'
Si !)or DUI)le.v \Itlhl-I'JIIIII}' RWFAk1iA: TVALUA PION' /`— p' i --
ii
0 0
--„_—
OUT.I L;'RWI ❑ASNLA::riul:•.a.rs ❑wuuuSILAxrs ❑{ca,nsw::cl.11s `r'onu'RIa11'CH. 'I AL S){p
I'Ll'WOOD w ❑ II.1,PU
_. ❑__�} �I! \YI'Ni' .— 1111fA]rC5' ❑ lR” ly�:. y cuy I_ _ r :\
: l �.,
_.
.�:-�LUIJ:;11'Nli)I' rp5Hl1.\I:I SIIIY.GLL' ❑N'(%IU SILOLL, ❑\\dill Sl11\(il.l!> Dimwit �l( L31U:IVA:'e
�.(A r'(1O'r 1 exI , r6c in I
� atoll ..
to eaeu ai Jm Ibllua'ills I un die progeny uuncr or audio,i4cd agent to act un die pluluny uw:c:->i�li:. i:a,c•xx li::> —_
LV V:Ir_::un!IL\'e p:u\'IdcJ U Correct, I IIA\T rt td the Dcliaipuo0 0f Wolk d114 YCnfy it is mcu,'ll(L I Yg:fe iil:drill)Y l�::a::I JppIG::O C I,�o:
._.._...._.J...,_:_Ia::S relJtia,w building couS Aluu. :holrm •nxnwuta of CuFpl Jno w en4r the en
..—._.c rell
..____— el ��s
SI ITLEMENTM,INFOR%IATION RE,- -p' - - ok'PICE Use Usn
.. >-o:a-.::!cJ vi:b'd l lunrc O:::ic:'S:lssucidtion,protide
cur PLAN CHECK TYPE HUL'1'ISC SI.IP
mw r
_, 1 TUZCOVNT!'Jt ❑ UUIILISCJ'LAV NI:VIL,t
❑.yam,RISS
❑ runNLvc 1'1_\.S KLcIcIY
❑ STANUARU ❑ t'ilck[n1:Y l'
.'. ....- _ _:. __ ;i�L;rnin,is'Ec;:r-UI'PuGcy. ❑
uf6G::
1
CITY OF CUPERTINO
3 ITEMS OF 12 PERMIT RECEIPT OPERATOR: SylviaM
COPY # 1
Sec: Twp: Rng: Sub_: Elk: Lot:
APN . . . . . . . . : 31639042.00
DATE ISSUED,. . . : . . . : 05/17/2012
RECEIPT #.:. . . . . . . . : BS000016846
REFERENCE ID # 12050139
SITE ADDRESS' . . . . . : 20288 NORTHWEST SQ
SUBDIVISION . . . . . . .
CITY . . . . . . . . . . . . . . CUPERTINO
IMPACT AREA . . . . .
OWNER . . . . . . . . . . . . : HENDRICKSON HERBERT C AND SYDN
ADDRESS . . . . . . . . . . : P.O. BOX 2396
CITY/STATE/ZIP . . . : SUNNYVALE, CA 94088
RECEIVED •FROM . . ._ : FOUR SEASONS
CONTRACTOR . . . . . . . : DIAZ, ALFRED LIC # 21323
COMPANY FOUR SEASONS ROOFING
ADDRESS . . . . . . . . . . : PO BOX 1668
CITY/STATE/ZIP . . . : SAN JOSE, CA 95109
TELEPHONE . . . . . . . . : (408) 278-0330
FEE ID UNIT QUANTITYAMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ------- -- ---------- ---------- ---------- ----------
1BCBSC VALUATION 6, 500 .00 1. 00 0. 00 1 .00 0. 00
1BSEISMICR VALUATION 6, 500 .00 0.65 0. 00 0 .65 0. 00
1REROOFRES SQ FEET 14 .00 196. 00 0. 00 196 .00 0. 00
---------- ---------- ---------- ----------
TOTAL PERMIT 197.65 0. 00 197 .65 0. 00
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ---------------------
309 EXTERIOR LATH 311 SCRATCH COAT
601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS 605 FINAL REROOF