Loading...
11080129 - SI i j � EYCO RESIDENTIAL DESIGN 325 Union Avenue, Suite 323, Campbell,CA 95008 Phone: (408)879-0100 Fax: (408)369-8100 j Email: eycodesign@cs.com �Z PLAN REVISIONS - TEXT SCANNED TO ADOBE PDF SENT TO: TARIQ ARMED TODAY: MAY-21-2012 —_ t _ PLAN CHECK #: UNKNOWN J: JOB ADDRESS: 010.659-MINETTE DRIVE, CUPERTINO, CA JOB NAME: AHMED #i PLANS DATED: 9-23-11 (REV-4 DATED 3-19-12)' Z TO WHOM IT MAY CONCERN: THIS LETTER RELATES TO SUPPORT FOR THE GARAGE DOOR HEADER. SUBJECT TO FULL APPROVAL BY BUILDING DEPARTMENT AND ALL CLIENTS) THE FOLLOWING IS AN OWNER OPTION: 1) ALL ITEMS LISTED BELOW MUST BE PROVIDED AT BOTH ENDS OF THE GARAGE DOOR HEADER. 2) PROVIDE OVER THE GARAGE DOOR HEADER A SUFFICIENTLY EFFECTIVE PRE-FAB ENGINEERED AND FULLY APPROVED ROOF TRUSS THAT CARRIES ALL ROOF LOADS FULL SPAN WITHOUT PUTTING ANY LOAD ON THE HEADER. 3) PROVIDE AT THE EXTERIOR SIDE OF THE HEADER A HEAVY DUTY 24" MINIMUM LONG METAL STRAP FROM THE HEADER ONTO 4X4 (MINIMUM) BLOCKS BETWEEN STUDS AT THE "WING" WALL. 4) PROVIDE AT THE INTERIOR SIDE OF THE HEADER AN MST60 STRAP FROM THE HEADER ONTO 4X4 (MINIMUM) BLOCKS BETWEEN STUDS AT THE "WING" WALL. 5) PROVIDE 10d@3" O.C. STAGGERED THRU EXTERIOR PWD INTO ALL 4X BLOCKS. 6) PROVIDE ONE 2X4 JACK STUD UNDER THE HEADER. 7) PROVIDE .A FULL HEIGHT 4X4 STUD DIRECTLY AGAINST JACK STUD. 8) PROVIDE, ON THE DOOR SIDE, ONE 2X4 CLEAT "STUD" DIRECTLY AGAINST THE JACK STUD. 9) PROVIDE 1/4" DIAMETER WOOD SCREWS AT 6" ON CENTER STAGGERED THROUGH BOTH 2X41S AND THEN 3" MINIMUM INTO 4X4. 10) PROVIDE A SIMPSON 1212HL L-STRAP ON HEADER NEAR BOTTOM OF HEADER (AND PER SIMPSON) AND ONTO 4X4 STUD AND USE 5/8" DIAMETER LAG BOLTS 3" MINIMUM INTO HEADER AND 3" INTO 4X4 STUD. SINCERELY OWNER DESIGNER e EYCO RESIDENTIAL DESIGN I � i STATEMENT OF SPECIAL INSPECTIONS, 2010 CBC COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O.,BUILDING OFFICIAL CUPERTINO 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 (408)777-3228•FAX(408)777-3333•building(cDcuoertino.org SITE ADDRESS 1065 I N T7� Art , APN 3�S_ �� _ �3J BPS 0$01.-- Owner.....Tf?t+2!�A .....A-f• ——b.\............................................ Contractor.5 ...�..........t.�.................................................................... Address.10.6 -1....4"��N T�r1� ................ ... I. ....5'.I". .+Q S T.....GT,...............................­­ City/St-c" .... ............. Address. cit /St... .P ���T. y �%-15 y ......��D.....Zip...R.:�.�............Phone...... --.. City/StS .�r/..F�—/.�......Zip."�9 Phoheg - ©.... . Applicant..7'. RA.0.....Arr". I.D).................................................. Engineer/Architect......................................... ............................ .. Address...�C%S5...i -3.).��z�T :..A....................... Address..... City/St... .......Zip....S?...4.......Phone..... .�.-. Cit /St..........................................Zi Y P...............Phone.................... PROJECT DESCRIPTION: Sf&QA4--M1gTf?G-C-Cf R3K A� 7 3� T Ilel This"STATEMENT OF SPECIAL INSPECTIONS"is submitted in fulfillment of the requirements of CBC Sections 1704 and 1705. This form is structured after and used by permission from the Structural Engineer Association of Northern California's(SEAONC)mode statement of Special Inspections. Also, included with this form is the following: ❑ "LIST OF SPECIAL INSPECTION AGENCIES(page 2). A list of testing agencies and other special inspectors that will be retained to conduct the tests and inspections for this project ❑ "SCHEDULE OF SPECIAL INSPECTION"(page 3-6). The Schedule of Special Inspections summarizes the Special Inspections and tests required. Special Inspectors will refer to the approved plans and specifications for detailed special inspection requirements. Any additional tests and inspections required by the approved plans and specifications shall also be performed. Special Inspections and Testing will be performed in accordance with the approved plans and specifications,this statement and CBC Sections 1704, 1705, 1706, 1707,and 1708. Interim reports will be submitted to the Building Official and the Registered Design Professional in Responsible Charge in accordance with CBC Section 1704.1.2. A Final Report of Special Inspections documenting required Special Inspections,testing and correction of any discrepancies noted in the inspections shall be submitted prior to issuance of a Certificate of Use and Occupancy(Section 1704.1.2).The Final Report will document: • Required special inspections. • Correction of discrepancies noted in inspections. The Owner recognizes his or her obligation to ensure that the construction complies with the approved permit documents and to implement this program of special inspections. In partial fulfillment of these obligations,the Owner will retain and directly pay for the Special Inspections as required in CBC Section 1704.1. This plan has been developed with the understanding that the Building Official will: • Review and approve the qualifications of the Special Inspectors who will perform the inspections. • Monitor special inspection activities on the job site to assure that the Special Inspectors are qualified and are performing their duties as called for in this Statement of Special Inspection. • Review submitted inspection reports. • Perform inspections as required by the local building code. I have read and agree to comply with the terms and conditions of this statement Prepared By: Project ❑ Engineer ❑ Architect Registered Design Professional in Charqe Si nature...............................................................................Lic.#..............................................Date: .............................. Owner Name: Owner's Authorization Signature................................................ ........................ ...Lic.#..............................................Dale: .............................. Inspection ncy/ LJ Inspector Name: A-1,rtw Si nature................ , ................ ... .. . . . Building Official. Building Official's Acceptance Signature...............................................................................Lic.#..............................................Dale: .............................. SpecinhispectionFornt_2012.doc revised 03/20/12 i d , DSA File # L INSPECTIONS DSA Appl. # ' - 690 SUNOL STREETf BUILDING H•SAN,LOSE,CA 95126 OSHPD # (408) 288-8460 FAx:(408) 271-0902 ANCHOR INSTALLATION INSPECTION REPORT City of: C-A) Date: --I 22 •2orZ t �v� S � lM ��t � �. Proect# Cvt7 - C, G,2- Project Name: , I 1 Address: < <' M '�C�- Permit# y n f�- Inspectors Name: J ► �'ti l ID# 77 ----------------------------------------- Installation ---------------------------------------- Installation Inspection of: ❑Epoxied Reinforcing Steel Dowels Wpoxied Allthread Anchors OExpansion Anchors OWitnessed the drilling of the holes and verified proper diameter and depth. (or) b]Inspected predrilled holes and verified proper diameter and depth. '80bserved the cleaning of the holes and the•nje o/I sertion of > "'vt c't S u,.n 2 Z Cep�o;y 11 epoxy eapsules /,grout, ICC ER# Expiration Date bWitnessed the proper insertion of: G (No.) f) iameter allthread anchor / reinforcing steel dowels / expansion anchors, j � p inches in length,embedded G t inches,at the following location` ei f v''� IL/1 _'1"l Tri i Ce VI G�L 0 u 1 e. �n t i,o,i � 1 1<n l �1 I (No.) diameter allthread anchors / reinforcing steel dowels / expansion anchors inches in length,embedded inches,at the following location: (No.) diameter allthread anchors / reinforcing steel dowels / expansion anchors inches in length, embedded inches, at the Following location: '- ----------------------------------------- ,1 Notes: o ct,11 OVIA G�e�a.� Ct of (U.,. ✓ k,/L o OV . - r � ' ctJ� , I U,I ,'' fin` ,vil C1L ��L 3 � -----------------------------------.-------- To the best of my knowledge,work inspected was in accordance with the building department approved design drawings, specifications and applicable workmanship provisions of the C.B.C.except as noted above: Inspectors' signature: JUV Prr, ,} EYCO RESIDENTIAL DESIGN 325 Union Avenue, Suite 323, Campbell, CA 95008 Phone: (408)879-0100 Fax: (408)369-8100 Email: eycodesign@cs.com PLAN REVISIONS SENT TO: TARIQ AHMED TODAY: APR-25-2012 PLAN CHECK # : UNKNOWN JOB ADDRESS : C10.659—MINET-T-E—DRIVES CUPERTINO, CA JOB NAME : AHMED #3 PLANS DATED: 9-23-11 REV-4 DATED 3-19-12 TO WHOM IT MAY CONCERN: SUBJECT TO FULL APPROVAL BY BUILDING DEPARTMENT AND ALL CLIENTS) THE FOLLOWING ARE OWNER OPTIONS : 1) USE STUCCO AT EXTERIOR WALLS . 2) USE LIGHT WEIGHT MANUFACTURED "STONE" VENEER AT COLUMNS AND WALLS AT FRONT OF HOUSE. 3) USE COMPOSITION SHINGLES AT ENTIRE HOUSE 2 : 12 MIN SLOPE. 4) ADD (1) 2020 SKYLIGHT IN KITCHEN. 5) USE TOTAL OF (2) 2040 SKYLIGHTS IN FAMILY ROOM, AT LEAST ONE 2040 SKYLIGHT SHALL BE OPERABLE. 6) USE TOTAL OF (2) 2040 SKYLIGHTS IN DINING ROOM OR USE TOTAL OF (3) 2020 SKYLIGHTS IN DINING ROOM OR USE TOTAL OF (4) 2020 SKYLIGHTS IN DINING ROOM. SINCERELY, M66"M OWNER/DESIGNER EYCO RESIDENTIAL DESIGN