Loading...
12020125 SI Page: l VERKIC ENGINEERING 1749 Ellen Av., San Jose, Ca 95125 * Tel: (408)464-3911 * Fax: (408)6774838 City of Cupertino Building Departmant 10300 Torre Avenue Cupertino, CA 95014 03.08.12 1 ,2 012-0 12,S F RE: Epoxy Anchors Inspection for: First Floor Addition and Remodeling: Secondary Unit 2� 2YOWRae Lane Cupertino, CA 95014 I did special inspection for drilled epoxy anchors (for holdowns)during installation. Threaded rods (d==9") as holdowns anchors are installed properly. -Location of anchor's holes are according the foundation plan. -Holes is 12" deep min. in existing concrete foundation and dry. -Before anchors installation holes are clined from dust with nylon brush and compresses air. -After inserting the anchors the holes are completely full of epoxy (Simpson SET-XP) If you should have any questions or concerns please do not hesitate to contact me at(408)464-3911 Sincerely: Verkic Engineering: Stana Verkic, PE �\O, ENG , �* A 5 KIC, 9 oQ c cc STA.�iO�.;