Loading...
10100063 Earth Investigations. Consultants February 28, 2012 Job 2410.01.00 Mr. Barre Barnes. President Vette Investments & Property Management, Inc. 2175 de la Cruz Boulevard, Unit C Z Z,� 13n/ ?7 5- ti Santa Clara, California 95050 RE: GEOTECHNICAL REVIEW Retaining Wall Backdrain Proposed Residence (under.construction) 430.Cordova Road Cupertino. California Z • •�L �l�l"moo e3 Dear Mr. Barnes: This letter is to confirm that we observed the installed backdrainage system for the foundation retaining walls: It consisted of'a perforated, 4-inch diameter PVC pipe at the base of the wall with crushed rock separated from the adjacent soil by filter fabric. The rock was brought to within a foot of the ground surface and covered with filter fabric before, placing backfill soil. It is our opinion that the backdrainage system was installed in general:conformance with the geotechnical recommendations. Please.allow the same_inspectibaopportunity for all site walls prior to rock placement: We trust this report provides you.with the information you require at this time. Please.contact the undersigned if you�have any questions. Very trul ours, �0 c ro E Inve igations-Consultants. 0 t `���. RALD}��'YQCi ? No.6G 113 CERiiF1ED FNGINEERING 1 Joel E. Baldwin; II GEOLQG15 _ si Engineering Geologist 1132(renewal date 212811OF CA',_ JEB:jb-pr/co Distribution: electronic copy and paper copy to addressee; electronic copy to City of Cupertino (chadm@cupertino:org) Geologists & Engineers P.U. Box 795 0 Pacifica,CA 94044 0(650)557-0262 40 Fax(650)557-0264