Loading...
11060134 AOL TESTING ENGINEERS, INC. 2811 Teagarden St. 510-835-3142 510-834-3777 fax San Leandro,CA 94577 800-660-3142 San Leandro • San Jose • Martinez INSPECTION REPORT Week Ending: 1/13/12 PROJECT#55340 TYPE OF INSPECTION: Visual Welding PROJECT: PLACE OF INSPECTION: Apple-#-8 TA082� Jobsite FEB 2 ;3 21,11 0900 North-Tar taUL] - Cupertino,CA _ — -- - — -- -- -- -- — ----By Permit#11149 DATE 1/13/12 HOURS 4 INSPECTOR F.Hernandez Reported to Jack of Devcon Construction at the jobsite as requested. Performed periodic visual inspection of previously completed welding. Weldments consist of 1/4"fillet welds joining 4"x 4"x 1/4" x 6" angle to existing W beams for new MC9 on line 3 from H to J at roof level. The preceding work was,to the best of my knowledge,in compliance with approved plans and specifications,including revisions by engineer,and Drawing S-2.Revision 2,dated 12/14/11. Reviewed by: 9` 2t Ai RJ,-- avid Chippero Special Inspection Division Manager 1cc: Apple Computer Inc. / L.Kim City of Cupertino/ Bldg.Inspection Dept. This report can be reproduced only in its entirety unless written permission from TEI is obtained. Page 1 of 1