Loading...
09030039hoc U F'LL eeF- #a'e �yL i tr,1- �o gggyggy— ipC =e �Z> F=C 0 Z �i Ow.d ►'7 U w U CITY OF CUPERTINO PERMITil`+TI�cTf?��� BUILDING DIVISION BUILDING ADDRESS: PERMIT NO. 20005 NORTHWIND SQ FOUR SEASONS ROOFING nqn*inn-�q OWNER'S NAME: PERMIT ISSUE DATE t0 SA CONTROL NO. ARCHITECT/ENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH ADDITIIONAL ADDRESS D D D D LICENSED CONTRACTOR'S DECLARATION ATTACHED, 20015, 2 0 0 3bb D&Qiil ton 1 hereby affirm that I am I=d under procions of Chapter 9 (commencing with Section 7000) of Division 3c o�f the Business f a ode, and m cnse is in full fora and eff//l� License Lle. N Date Contracw — '-- ARCHTTECf SDEC ANON I understand my plans shall be used as public records Licensed Professional OWNER -BUILDER DECLARATION � I hereby affirm that 1 am exempt from the Contractor's License Law for the following mason. (Section 7031.5, Business and Professions Cale: Any city or county which requires a permit to construct. alter, improve, dcmolLsh, or repair any structure Sq. Ft. Floor Area Valuation ! prior to its issuance, also requites the applicant for such permit to rile a signed statement i that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of APN Number Occupancy Type not mora than five hundred dollars (5500). ❑ 1, as owner of the property, or my employees with wages as their sole compensation, Required Inspections q P will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If. however, the building or improvement is sold within one year of completion, the owner - builder will have the burden of proving that he did not build or improve for purpose of sale.). [11. as owner of the property, am exclusively contracting with licensed contractors to convect the project (Sec. 7044, Business and Professions Code:) The Contractor's Li. cense Law does not apply to an owner of property who builds or improves thereon, and, who contracts for such projects with a contractor(s) licensed pursuant to the Contractor's License Law. ❑ I am exempt under Sec B & P C for this reason Owner Date WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ❑ 1 have and will maintain a Certificate of Consent to self -insure for Workees compen- sation, as provided for by Section 3700 of the Labor Code, for the performance of the wgrk for which this permit is issued. have and will maintain Worker's Compensation Insurance, as required by Section 3700 of the Labor Cafe, for the performance of the work for which this permit is issued. My Workees co cation Inti tics carrier and Policy num Cartier Policy No.. CERTIFICATE 9F EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (This section need riot be completed if the permit is for ane hundred dollars ($100) or less) I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. Date Applicant NOTICE TO APPLICANT: If, after making this Certificate of Exemption, you should become subject to the Worker's Compensation provisions of the Labor Code, you must forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY 1 hereby affirm that there is a construction lending agency for the performance of > the work for which this permit is issued (Sec. 3097, Civ. C.) ~ Lender's Name Lender's Address I certify that I have read this application and state that the above information is totem. I agree to comply with all city and county ordinances and state laws relating to ~ building convection, and hemby authorize representatives of this city to enter upon the above-mentioned property for inspection purposes (We) agree to save, indemnify and keep harmless the City of Cupertino against jliabilities, judgments, costs and expenses which may in any way accrue against said City in consequence of the granting of this permit. APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL N N -POINT Issued b:/: Date SOU LATION �?1111rL 3�0 09 / Re -roofs Signature of Applicant/Coaractor Date HAZARDOUS MATERIALS DISCLOSURE Type of ' Zoof Will the applicant or future building occupant store or handle hazardous material as defined by the Cupertino Municipal Code, Chapter 9.12, and the Health and Safety Code, Section 25532(a)? All roof., shall be inspected prior to any roofing material being installed. ❑ Yes XN. If a roof is installed without first obtaining an inspection, I agree to remove Will the applicant or future building occupant use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Manascmcnt all new I naterials for inspection. District? ��(( C3 Yes 1 have read the hazardous materials requirements under Chapter 6.95 of the Califor- nia Health & Safety Cade, Sections 25505.25533 and 25534.1 understand that ifft building docs not currently have a tenant, that it is my responsibility to notify the occupant of the reyu' whit m o�o'suanaofaCertificatc Signator: of Applicant Date All roof coverings to be Class'nj ' or better Owner or authorized agent Date F Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 CITY OF Fax (408) 777-3333 „UPEkTINO Building Department JOB ADDRESS: 20 00,3` —' ?.°O �c� �1v+6� : �- • PERMIT # OWNER'S NAME: PHONE # GENERAL CONTRACTOR: FAX # I am not using any subcontractors: ;Z�=-- 3 ��,q Signature Date Please check applicable subcontractors and complete the following information Owner/Contractor Signature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date Community Development Department Building Division City of Cupertino 10300 Torre Avenue Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department Subj ct: Re -roofing policy for the City of Cupertino 1. Prior to permit issuance, you must agreE to comply with 1997 UBC Standards and manufacturers specifications on re -i oofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the bui-ding inspector when the re -roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. from the City, the following steps are 4. To receive a final sign off required: 1) Pre -inspection and/or tear off apprc val. 2) In -progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without i first obtaining an inspection, will require the removal of all new mai erial down to the sheathing, so a proper City inspection can be perf armed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re -inspection feE of $176.18. The re -inspection fee must be paid before another inspection carp be scheduled. IMP KYAl�l i : 1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be or the job site at the time on inspection. I un erstand and will comply with the abo- a stated policy on re -roofing. Ho eowner's Name: Job to Address: Roofnng Company Name: f csvr App 'cant's Signature: ix_:� --- Date: 3 /� �% Casteel ing Official Re,,ised 11/2/04 FOUR R January 16, 2004 SEASONS ROO Sinoe 1985 Ms. Linda Stances North Point Homeowners Association 10880 North point 'Way Cupertino, CA 95014 Re- NORT HPOINT HDA 20005-20035 North wind Sq. Dear Ms. Starnes; 'G INC, caga�� As requested, I have prepared cost ro remc ve the existing Cal Shake roofing and install a new OAF Grand Canyon shingle roof system. The following proposal is for all (4) units and a separate cost for gutters and downspouts. SCOPE OF 'WOE 1. SURFACE PREPARATION - Remove and dispose of existing rcofing, garters and sheet metal components. - Carefully inspect all dealt surfaces to check for deteriorated or delaminated wood (This would be done on a tirie and material basis). 2. GAF SHINGLE APPLICATION 80 39Vd TO 39Vd - Install new 301b felt underlayment using mechanical fasteners. - Install new aluminum exhaust ven: flashings. - Install now 26 gauge galvanized plumbing pipe flashings. - Install Neoprene storm collars on .ill pipe flashings. - Install (2) new attic eyebrow vents per unit. - Install now GAF Grand Canyon per manufacturer specification. - Color to be: Stonawood_. - Install new sheet metal step shingle t'lashing as needed. -Apply Weather Guard peal & Stici, at vent penetrations, skylighis and ehimneys. 502 Horning St. (408) 278-0330 San Jas o, CA 93112 dOH 1NIWH160P 9NI30MJ SNOSb3S ano.:l Llaanse# 472108 9ZZ096680V Z9:8z 600Z/06/10 66608LZ80b TO:6T 60OZ/OT/60 Page Two January 16, 2009 3. SIDING FFR SLASONS ROOFING, INC. Al Diaz SCOPE OF WORK (Ca ntinued ) - Remove approximately 6" of exis Ing siding Along the entire wall. - Install new 2 -bar counter flashing to accommodate new step flashings. - Install paint to match existing as close as possible. 4. GUTTERS -Remove and dispose of existing gL.tters and downspouts. -itlstall new pre-paintod 71/41126 gauge smnle3s steel gutters. -Install new pre -painted 2"x3" downspouts at existing locations. s. mnvrING - All new flashings will be cleaned and primed with one coat of sheat metal primer and a final coat of paint to match the shingle color. - Paint all stucco to match as close as possible. 6. CLEAN UP Clew up is to be done on a daily basis. - Final clean up will be done upon completion. 7. BUILDING PERMITS - Four Seasons Roofing will provide for the building permits and schedule all necessary inspections. S. CONTRACTOR SPECIFICS Four Seasons Roofing is availabie: to begin wort: within (3 0) days. The building would be completed in approx (7-8) days. ,Project to be billed upon completi on. 9. WARRANTY - Four Seasons Roofing warranties all workmanship for a period of (ten 10) years. (408) 278-0330 50214orning St. S.an Joee, CA 93112 60 39ad VOH 1N10dH161)N ZO 39dd ONIAOMJ SNOSa3S df1U3 Lloensa# 472108 9ZZ0966800 Z6:EZ 66OZ/ac/10 EEE08LZ80b TO:ET 600Z/0T/E0 Page three FOUR SEASONS ROOFING, INC. January 16, 2009 Al Diaz SCOPE OF'V OkK ( Co atinued ) PROPOSED COST FOR ALL (4) UNITS GAF Grand Canyon Shingle System .................$28,890.00 Gutters andDownspouts..... ...................... S 2,640.00 3 Thm* you once again for this opportunity :0 be of service. Please call if you have any questions. Best regards,- L� Al Mftwz President ACCEPT TY.k t1� &7� &rw-n 502 ljorning St, (408) 278.0330 Son J >se, CA 95112 License# 412108 0 3Jad VOH iNI4dH1?101N 9ZZ09666GO CO 39VJ 0NI30MJ SNOSV3S dnoj EEE08LZ80b 44 (S Uq A.Tr ZS;EZ 6802/0E/10 TO:F-T 6OOZ/Oi/60 --- CITY OF (_UPERTINO REROOF CUPERTINO PERMIT APPLICATION .)a03 003 '1 APN #Date: Ito 3R_noI_C) �3 S Building A dress: Owner's Name: J Rjj�y�. OA Phone #: S PVj t, - 9, - 3 Contractor: Phone #: (,08) ,2 7 Cupertino I 3usiness License #. Contractor License #: Type of Roof Covering: Existing: Proposed: ❑ Built -Up roof ❑ Bui ❑ Asphalt t=Up Roof Shingles ❑ Asphalt Shingles ❑ Wobd Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles r (Specify) o Other (Specify) ,0--Oth Number of existing coverings ❑ Provide I.C.B.O. Report # ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: ,+.esu. (; J CJ 5 Residenti 1 Commercial Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the there are any restrictions: application or if applicable, include in plan set & the sheet index. Valuations I Have Rad, Understand and Will Comply wit, Cupertino's Tear -Off Policy: Signature, CITYOF CUPEI TINT CITY OF CUPERTINO REROOF FEE SCHEDULE Number of Squares Fee ID Fee Description Fee Group Permit Type 1REROOFCOM Re -roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B 1 REROOFRES Re -roof Re iidential B 1 SFDWLROOF 1BSEISMICRE Seismic Residential B 3 1 1REROOFMRES Re -roof M-Ati-Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B