09030039hoc
U
F'LL
eeF-
#a'e
�yL
i tr,1-
�o
gggyggy—
ipC
=e
�Z>
F=C
0
Z
�i
Ow.d
►'7
U
w
U
CITY OF CUPERTINO
PERMITil`+TI�cTf?���
BUILDING DIVISION
BUILDING ADDRESS:
PERMIT NO.
20005 NORTHWIND SQ
FOUR SEASONS ROOFING
nqn*inn-�q
OWNER'S NAME:
PERMIT ISSUE DATE
t0
SA CONTROL NO.
ARCHITECT/ENGINEER:
BUILDING PERMIT INFO
BLDG ELECT PLUMB MECH
ADDITIIONAL ADDRESS
D D D D
LICENSED CONTRACTOR'S DECLARATION
ATTACHED, 20015, 2 0 0 3bb D&Qiil ton
1 hereby affirm that I am I=d under procions of Chapter 9 (commencing
with Section 7000) of Division 3c o�f the Business f a ode, and m cnse is
in full fora and eff//l�
License Lle. N
Date Contracw —
'--
ARCHTTECf SDEC ANON
I understand my plans shall be used as public records
Licensed Professional
OWNER -BUILDER DECLARATION
�
I hereby affirm that 1 am exempt from the Contractor's License Law for the
following mason. (Section 7031.5, Business and Professions Cale: Any city or county
which requires a permit to construct. alter, improve, dcmolLsh, or repair any structure
Sq. Ft. Floor Area
Valuation
! prior to its issuance, also requites the applicant for such permit to rile a signed statement
i that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code) or
that he is exempt therefrom and the basis for the alleged exemption. Any violation of
Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of
APN Number
Occupancy Type
not mora than five hundred dollars (5500).
❑ 1, as owner of the property, or my employees with wages as their sole compensation,
Required Inspections
q P
will do the work and the structure is not intended or offered for sale (Sec. 7044, Business
and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and who does such work himself or through his
own employees, provided that such improvements are not intended or offered for sale. If.
however, the building or improvement is sold within one year of completion, the owner -
builder will have the burden of proving that he did not build or improve for purpose of
sale.).
[11. as owner of the property, am exclusively contracting with licensed contractors to
convect the project (Sec. 7044, Business and Professions Code:) The Contractor's Li.
cense Law does not apply to an owner of property who builds or improves thereon, and,
who contracts for such projects with a contractor(s) licensed pursuant to the Contractor's
License Law.
❑ I am exempt under Sec B & P C for this reason
Owner Date
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
❑ 1 have and will maintain a Certificate of Consent to self -insure for Workees compen-
sation, as provided for by Section 3700 of the Labor Code, for the performance of the
wgrk for which this permit is issued.
have and will maintain Worker's Compensation Insurance, as required by Section
3700 of the Labor Cafe, for the performance of the work for which this permit is issued.
My Workees co cation Inti tics carrier and Policy num
Cartier Policy No..
CERTIFICATE 9F EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
(This section need riot be completed if the permit is for ane hundred dollars ($100)
or less)
I certify that in the performance of the work for which this permit is issued, I shall not
employ any person in any manner so as to become subject to the Workers' Compensation
Laws of California. Date
Applicant
NOTICE TO APPLICANT: If, after making this Certificate of Exemption, you should
become subject to the Worker's Compensation provisions of the Labor Code, you must
forthwith comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
1 hereby affirm that there is a construction lending agency for the performance of
> the work for which this permit is issued (Sec. 3097, Civ. C.)
~ Lender's Name
Lender's Address
I certify that I have read this application and state that the above information is
totem. I agree to comply with all city and county ordinances and state laws relating to
~ building convection, and hemby authorize representatives of this city to enter upon the
above-mentioned property for inspection purposes
(We) agree to save, indemnify and keep harmless the City of Cupertino against
jliabilities, judgments, costs and expenses which may in any way accrue against said City
in consequence of the granting of this permit.
APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL N N -POINT
Issued b:/: Date
SOU LATION �?1111rL 3�0 09
/
Re -roofs
Signature of Applicant/Coaractor Date
HAZARDOUS MATERIALS DISCLOSURE
Type of ' Zoof
Will the applicant or future building occupant store or handle hazardous material
as defined by the Cupertino Municipal Code, Chapter 9.12, and the Health and Safety
Code, Section 25532(a)?
All roof., shall be inspected prior to any roofing material being installed.
❑ Yes XN.
If a roof is installed without first obtaining an inspection, I agree to remove
Will the applicant or future building occupant use equipment or devices which
emit hazardous air contaminants as defined by the Bay Area Air Quality Manascmcnt
all new I naterials for inspection.
District? ��((
C3 Yes
1 have read the hazardous materials requirements under Chapter 6.95 of the Califor-
nia Health & Safety Cade, Sections 25505.25533 and 25534.1 understand that ifft building
docs not currently have a tenant, that it is my responsibility to notify the occupant of the
reyu' whit m o�o'suanaofaCertificatc
Signator: of Applicant Date
All roof coverings to be Class'nj ' or better
Owner or authorized agent Date
F Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
CITY OF Fax (408) 777-3333
„UPEkTINO
Building Department
JOB ADDRESS:
20 00,3` —' ?.°O �c� �1v+6� : �- •
PERMIT #
OWNER'S NAME:
PHONE #
GENERAL CONTRACTOR:
FAX #
I am not using any subcontractors: ;Z�=-- 3 ��,q
Signature Date
Please check applicable subcontractors and complete the following information
Owner/Contractor Signature
Date
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature
Date
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408) 777-3228
Fax: (408) 777-3333
Building Department
Subj ct: Re -roofing policy for the City of Cupertino
1. Prior to permit issuance, you must agreE to comply with 1997 UBC Standards
and manufacturers specifications on re -i oofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the bui-ding inspector when the re -roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
from the City, the following steps are
4. To receive a final sign off
required:
1) Pre -inspection and/or tear off apprc val.
2) In -progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without i first obtaining an inspection,
will require the removal of all new mai erial down to the sheathing,
so a proper City inspection can be perf armed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re -inspection feE of $176.18. The re -inspection fee must
be paid before another inspection carp be scheduled.
IMP KYAl�l i :
1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be or the job site at the time on inspection.
I un erstand and will comply with the abo- a stated policy on re -roofing.
Ho eowner's Name:
Job to Address:
Roofnng Company Name: f csvr
App 'cant's Signature: ix_:�
--- Date: 3 /� �%
Casteel
ing Official
Re,,ised 11/2/04
FOUR
R
January 16, 2004
SEASONS ROO
Sinoe 1985
Ms. Linda Stances
North Point Homeowners Association
10880 North point 'Way
Cupertino, CA 95014
Re- NORT HPOINT HDA
20005-20035 North wind Sq.
Dear Ms. Starnes;
'G INC,
caga��
As requested, I have prepared cost ro remc ve the existing Cal Shake roofing and install a
new OAF Grand Canyon shingle roof system. The following proposal is for all (4) units
and a separate cost for gutters and downspouts.
SCOPE OF 'WOE
1. SURFACE PREPARATION
- Remove and dispose of existing rcofing, garters and sheet metal components.
- Carefully inspect all dealt surfaces to check for deteriorated or delaminated
wood (This would be done on a tirie and material basis).
2. GAF SHINGLE APPLICATION
80 39Vd
TO 39Vd
- Install new 301b felt underlayment using mechanical fasteners.
- Install new aluminum exhaust ven: flashings.
- Install now 26 gauge galvanized plumbing pipe flashings.
- Install Neoprene storm collars on .ill pipe flashings.
- Install (2) new attic eyebrow vents per unit.
- Install now GAF Grand Canyon per manufacturer specification.
- Color to be: Stonawood_.
- Install new sheet metal step shingle t'lashing as needed.
-Apply Weather Guard peal & Stici, at vent penetrations, skylighis and ehimneys.
502 Horning St.
(408) 278-0330 San Jas o, CA 93112
dOH 1NIWH160P
9NI30MJ SNOSb3S ano.:l
Llaanse# 472108
9ZZ096680V Z9:8z 600Z/06/10
66608LZ80b TO:6T 60OZ/OT/60
Page Two
January 16, 2009
3. SIDING
FFR SLASONS ROOFING, INC.
Al Diaz
SCOPE OF WORK
(Ca ntinued )
- Remove approximately 6" of exis Ing siding Along the entire wall.
- Install new 2 -bar counter flashing to accommodate new step flashings.
- Install paint to match existing as close as possible.
4. GUTTERS
-Remove and dispose of existing gL.tters and downspouts.
-itlstall new pre-paintod 71/41126 gauge smnle3s steel gutters.
-Install new pre -painted 2"x3" downspouts at existing locations.
s. mnvrING
- All new flashings will be cleaned and primed with one coat of sheat metal
primer and a final coat of paint to match the shingle color.
- Paint all stucco to match as close as possible.
6. CLEAN UP
Clew up is to be done on a daily basis.
- Final clean up will be done upon completion.
7. BUILDING PERMITS
- Four Seasons Roofing will provide for the building permits and schedule all
necessary inspections.
S. CONTRACTOR SPECIFICS
Four Seasons Roofing is availabie: to begin wort: within (3 0) days.
The building would be completed in approx (7-8) days.
,Project to be billed upon completi on.
9. WARRANTY
- Four Seasons Roofing warranties all workmanship for a period of (ten 10) years.
(408) 278-0330
50214orning St.
S.an Joee, CA 93112
60 39ad VOH 1N10dH161)N
ZO 39dd ONIAOMJ SNOSa3S df1U3
Lloensa# 472108
9ZZ0966800 Z6:EZ 66OZ/ac/10
EEE08LZ80b TO:ET 600Z/0T/E0
Page three FOUR SEASONS ROOFING, INC.
January 16, 2009 Al Diaz
SCOPE OF'V OkK
( Co atinued )
PROPOSED COST FOR ALL (4) UNITS
GAF Grand Canyon Shingle System .................$28,890.00
Gutters andDownspouts..... ...................... S 2,640.00
3
Thm* you once again for this opportunity :0 be of service. Please call if you have any
questions.
Best regards,-
L�
Al Mftwz
President ACCEPT TY.k
t1� &7� &rw-n
502 ljorning St,
(408) 278.0330 Son J >se, CA 95112
License# 412108
0 3Jad VOH iNI4dH1?101N 9ZZ09666GO
CO 39VJ 0NI30MJ SNOSV3S dnoj EEE08LZ80b
44 (S Uq
A.Tr
ZS;EZ 6802/0E/10
TO:F-T 6OOZ/Oi/60
--- CITY OF (_UPERTINO
REROOF
CUPERTINO PERMIT APPLICATION
.)a03 003 '1
APN #Date:
Ito 3R_noI_C)
�3 S
Building A
dress:
Owner's Name:
J Rjj�y�. OA
Phone #:
S PVj
t, -
9, - 3
Contractor:
Phone #: (,08) ,2 7
Cupertino I
3usiness License #.
Contractor License #:
Type of Roof Covering:
Existing:
Proposed:
❑ Built -Up roof
❑ Bui
❑ Asphalt
t=Up Roof
Shingles ❑ Asphalt Shingles
❑ Wobd
Shakes ❑ Wood Shakes
❑ Wood
Shingles ❑ Wood Shingles
r (Specify) o Other (Specify)
,0--Oth
Number
of existing coverings ❑ Provide I.C.B.O. Report #
❑ To
be Removed ❑ Provide Mfgr. Installation Specs.
Job Description:
,+.esu. (; J CJ 5
Residenti
1 Commercial
Green Building:
Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the there are any restrictions:
application or if applicable, include in plan
set & the sheet index.
Valuations
I Have Rad, Understand and Will Comply wit, Cupertino's Tear -Off Policy:
Signature,
CITYOF
CUPEI TINT
CITY OF CUPERTINO
REROOF
FEE SCHEDULE
Number of
Squares
Fee ID
Fee Description
Fee
Group
Permit Type
1REROOFCOM
Re -roof Commercial
B
1COMMLROOF
1BSEISMICO
Seismic Commercial
B
1 REROOFRES
Re -roof Re iidential
B
1 SFDWLROOF
1BSEISMICRE
Seismic Residential
B
3
1
1REROOFMRES Re -roof M-Ati-Family B 1MFDWLROOF
1BSEISMICRE Seismic Residential B
1BUSLIC Business License B