07120237 T24 Submittal 1 LD" LP CONSERVATION FOR THE CALIFORNIAJob #9245
TITLE 24 COMPLIANCE - ~CALIFORNIA ENERGY OMPLIANCE
RESIDENTIAL, ROOM TO ROOM CFM
NONRESIDENTIAL LIVING & ENERGY., INSULATION.INSPECTION
MODEL ENERGY CODE ,�- A Division of William Lily&Associates,Inc. &CERTIFICATION
ENERGY STAR HOME TME z4eo,K -ResoonuuNOwRes�
-3015.Dale Court, Ceres, CA 95307 :5� c�
www.califliving.coni
TITLE-24,2005-COMPLIANCE FORMS,; '
PREPARED'-FOR, L'andmarkNDevelo ment
PROJECTNAME Las Palmas h f
SQUARE FOOTAGE 81d— /1986/1986 . ��
LOCATION Cure�Tiflo-GA � j
ZONE 4 3 / DEC 17 2007
Percentage Above Code:%
'Orientation: (N,S,E,WWWW�
:
INSULATION w/3 Coat Stucco
Attic/Vault R-30/R-30 Radiant Barrier Ng (S// ousewrap NO
Wall-2x4 R'-13 Wall-2x6 R-1 9 v ) ewall R=19
Sub Floor N/a 'Floor @ 2n• Fir OH R=19 Raised Frd�r��� Slab
HVAC 4
SEER Value 13:0 EER Value N/a AFUE 0.80
Duct Insulation R4.2 ,Sensible,Min. BTU 34912 Designed Cooling Capacity �0010�
Heating Min. BTI 0383' Suggested 4.0
Tonnage
HERS Verifications
Fan Wattage Verification' No Duct Testing No TXV Valve Inspection NO
EER Verification NO Infiltration No Max Cooling C� NO
Airflow Verification No Buried Ducts Verification No Surface Area Verification. No
Insulation Inspection No �II�
a
WATER HEATER
Pipe Insulation NO Energy Factor(Tank Size) 0.60 (40)
Distribution .:Standard H2O Blanket No
PLAN RmEW ACCEPTANCE 'FENESTRATION
U-Value SHGC
MG 05 2008 Operable .39 .35 4�'J
Fixed .35 .37
BUREAU vERIT6NORTH AMERICA,INC- Sliding'GlassDoor .36 .35 -�
French Doors .37 .36
Sky Light .44 .35
Please Note: Data is taken from worslcase odentalion.:,Each of the items stated here,the MF-1 R page and the signed CF-1 R pages must be clearly
listed on the plans and a copy is to be 'given to the homeowners upon assuming occupancy.
Disclaimer: This cover sheet is designed as a summary for the convenience of builders and their subcontractors. However,if a discrepancy e>asts
between this coversheet and the CF-1 R.the CF-1 R takes precedence.
EXPLANATION OF TITLE-24 COVERSHEET
PREPARED FOR: The company/contractor who ordered the documentation.
PLAN: The square footage of plan and/or plan name used by the General Contractor.
FACING: The direction the front door faces expressed in degrees or North, South, East, West (N/S/E/W).
ZONE: California is divided into 16 climate zones each having different weather conditions. Your home's
energy efficiency requirements are determined by whether your house is in a hot, cold, or mild climate zone.
*HEATING/FURNACE: Minimum amount of energy that the equipment is required to produce to heat the
house.
*COOLING/SENSIBLE: Minimum amount of energy that the equipment is required to produce to cool the
house.
LATENT: Latent represents the additional load imparted on a cooling system due to the moisture in the air.
"(No cooling equipment is designed to cool 100%of time and in all situations.The loads shown are only one of the criteria affecting the selection of equipment.Other
relevant design factors such as airflow requirements;outdoor design temperatures,coil sizing,availability of equipment,oversi zing safety margin,etc.,must also be
considered. It is the I IV AC contractor responsibility to consider all factors when selecting the I I VAC equipment.)
AFUE: A measure of the minimum furnace efficiency. A measure of the heating efficiency of furnaces. The
higher the number, the better.
SEER: Minimum cooling equipment efficiency.
DUCT R-VALUE: Minimum insulation R-value of air ducts, except in conditioned space.
ATTIC: R-value of insulation in accessible/open attic area.
VAULT: R-value of insulation in vaulted areas with no attic access.
WALL: R-value of insulation between wall studs.
KNEEWALL: R-value of insulation in walls adjacent to open attics.
SUBFLOOR: R-value of insulation in subfloor.
OVERHANG: R-value of insulation over garage or exterior.
MANUAL D DESIGNANSPECTION: Indicates if a design of the duct system is required for building
department submittal. If required,the ducts must be inspected by an independent HERS Rater to verify they
meet compliance requirements.
DUCT TESTING: Indicates whether or not the duct system is to be airtight. If required, an independent
HERS Rater has to test the ducts to ensure they leak no more than 6% and provide verification to CHEERS and
building department.
TXV Valve/Inspection: The TXV Valve regulates the charge and airflow to increase air conditioner
efficiency. If used for compliance, an independent HERS Rater must verify the TXV Valve is installed.
W/H BLANKET: External water heater blanket R-value.
WATER HEATER E.F. (Gal.): The energy factor or the efficiency rating and the number of minimum
gallons required for the water heaters. The E.F. number is usually listed on a separate tag beside the yellow
EnergyGuide label. The higher the Energy Factor, the more efficient the water heater.
PIPE INSULATION: R-4 or greater insulation applied to all 3/4" or larger, non-recirculating hot water
mains.
FENESTRATION U-VALUE: Minimum U-value of all installed windows.
SHGC: Solar Heat Gain Coeffiencent. A measure of how well your shade-creating products (such as interior
drapes, tinted windows, etc.) stop solar heat from entering your home. A SHGC value of.65 means 65% of the
heat is getting into your home and 35% of the heat is being blocked. Fixed refers to fixed windows. XO/SH
refers to sliding windows. SGDoor refers to sliding glass door. FRDoor refers to French doors.
BUYER BUYER
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 1
Project Title . . . . . . . . . . Bldg E/1986 Date . . 11/26/07 08 :27 :44
Project Address . . . . . . . . Las Palmas *******
Cupertino, CA *v7 . 10*
Documentation Author. . . D. Penaranda ******* Building Permit
California Living & Energy
3015 Dale Court Plan- Check / Date
Ceres, CA 95307
209-538-2879 Pleid Check/ Date
Climate Zone . . . . . . . . . . . 04
Compliance Method. . . . . . MICROPAS7 v7 . 10 for 2005 Standards by Enercomp, Inc .
MICROPAS7 v7 . 10 File-LD1986LP Wth-CTZ04S05 Program-FORM CF-1R
User#-MP1439 User-California Living & Energ Run-Bldg E/1986
MICROPAS7 ENERGY USE SUMMARY
Energy Use Standard Proposed Compliance
(kTDV/sf-yr) Design Design Margin
Space Heating. . . . . . . . . . 18 . 46 16 . 68 1 . 76
Space Cooling. . . . . . . . . . 7 . 12 5 . 93 1 . 19
Water Heating. . . . . . . . . . 12 . 05 11 . 53 0 . 52
North Total 37 . 63 34 . 14 3 .49
Space Heating. . . . . . . . . . 18 . 46 16 . 36 2 . 10
Space Cooling. . . . . . . . . . 7 . 12 6 . 41 0 . 71
Water Heating. . . . . . . . . . 12 . 05 11 . 53 0 . 52
East Total 37 . 63 34 . 30 3 . 33
Space Heating. . . . . . . . . . 18 .46 16 . 23 2 . 23
Space Cooling. . . . . . . . . . 7 . 12 6 . 75 0 . 37
Water Heating. . . . . . . . . . 12 . 05 11 . 53 0 . 52
South Total 37 . 63 34 . 51 3 . 12
Space Heating. . . . . . . . . . 18 . 46 16 . 55 1 . 91
Space Cooling. . . . . . . . . . 7 . 12 6 . 62 0 . 50
Water Heating. . . . . . . . . . 12 . 05 11 . 53 0 . 52
West Total 37 . 63 34 . 70 2 . 93 t
a
*** Building complies with Computer Performance ***
GENERAL INFORMATION
HERS Verification. . . . . . . . . . Not Required
Conditioned Floor Area. . . . . 1986 sf
Building Type . . . . . . . . . . . . . . Multifamily
Construction Type . . . . . . . . . New
Fuel Type . . . . . . . . . . . . . . . . . NaturalGa =NESW Building Front Orientation. Cardinal X
Number of Dwelling Units . . . 1
Number of Building Stories . 3
Weather Data Type. . . . . . . . . . FullYear
r
d
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 2
,Project Title . . . . . . . . . . Bldg E/1986 Date . . 11/26/07 08 : 27 :44
MICROPAS7 v7 . 10 File-LD1986LP Wth-CTZ04S05 Program-FORM CF-1R
User#-MP1439 User-California Living & Energ Run-Bldg E/1986
Floor Construction Type. . . . Slab On Grade
Number of Building Zones. . . 1
Conditioned Volume . . . . . . . . . 15888 cf
Slab-On-Grade Area. . . . . . . . . 431 sf
Glazing Percentage . . . . . . . . . 21 . 7 % of floor area
Average Glazing U-factor. . . 0 . 39 Btu/hr-sf-F
Average Glazing SHGC. . . . . . . 0 . 35
Average Ceiling Height . . . . . 8 ft
BUILDING ZONE INFORMATION
Floor # of # of Cond- Thermo- Vent Vent Verified
Area Volume Dwell Peop- it- stat Height Area Leakage or
Zone Type (sf) (cf) Units le ioned Type (ft) (sf) Housewrap
Residence 1986 15888 1 . 00 4 . 0 Yes Setback 8 . 0 Standard No 9i
OPAQUE SURFACES
U- Sheath- Solar Appendix
Frame Area fact- Cavity ing Act Gains IV Location/
Surface Type (sf) or R-val R-val Azm Tilt Reference Comments
1 Wall Wood 90 0 . 102 13 0 0 90 Yes IV. 9 A3 3 Coat Stucco 1
2 Wall Wood 329 0 . 074 19 0 0 90 Yes IV. 9 A5 3 Coat Stucco
3 Wall Wood 160 0 . 102 13 0 0 90 No IV. 9 A3 Garage Wall
4 Wall Wood 14 0 . 074 19 0 0 90 No IV. 9 AS Garage Wall
5 Wall Wood 480 0 . 102 13 0 90 90 Yes IV. 9 A3 3 Coat Stucco
6 Wall Wood 112 0 . 074 19 0 90 90 Yes IV. 9 A5 3 Coat Stucco
7 Wall Wood 281 0 .102 13 0 180 90 Yes IV. 9 A3 3 Coat Stucco
8 Wall Wood 32 0 . 074 19 0 180 90 Yes IV. 9 A5 3 Coat Stucco
9 Wall Wood 106 0 . 102 13 0 270 90 Yes IV. 9 A3 3 Coat Stucco
10 Wall Wood 520 0 . 074 19 0 270 90 Yes IV. 9 AS 3 Coat Stucco
11 Roof Wood 7500 . 032 30 0 n/a 0 Yes IV. 1 A7 Attic Space
12 Roof Wood 30 0 . 048 19 0 n/a 0 Yes IV. 1 A14 Under HVAC
13 Door Other 24 0 . 500 0 0 0 90 Yes IV. S A4 Entry Door
14 Door Other 18 0 . 500 0 0 0 90 No IV. S A4 Garage Entry
15 F1oorExt Wood 349 0 . 048 19 0 n/a 0 No IV. 20 A4 2nd Floor OH
PERIMETER LOSSES
Appendix
Length F2 Insul Solar IV Location/
Surface (ft) Factor R-val Gains Reference Comments
16 S1abEdge 60 0 . 730 R-0 No IV. 26 Al Slab Edge
I
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 4
Project Title . . . . . . . . . . Bldg E/1986 Date . . 11/26/07 08 : 27 :44
MICROPAS7 v7 . 10 File_LD1986LP Wth-CTZ04S05 Program-FORM CF-1R
User#-MP1439 User-California Living & Energ Run-Bldg E/1986
Winter Outside Design. . . . . . 28 F
Winter Inside Design. . . . . . . 70 F
Summer Outside Design. . . . . . 86 F
Summer Inside Design. . . . . . . 75 F
Summer Range . . . . . . . . . . . . . . . 30 F
DUCT SYSTEMS
Verified Verified Verified
System Duct Duct Duct Surface Buried
Type Location R-value Leakage Area Ducts
Furnace Attic R-4 . 2 No No No
ACSplit Attic R-4 . 2 No No No
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R-value
1 Storage Gas Standard 1 0 . 60 40 R- n/a
SPECIALL' FEATURES AND MODELING ASSUMPTIONS
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and, ***
*** verified during plan check and field inspection. ***
This is a multiple orientation building. This printout is for the front
facing North.
REMARKS
MANDATORY MEASURES SUMMARY: RESIDENTIAL (Page I of 2) MF-1R
Instructions: Check or initial applicable boxes when completed or check NA if not applicable.
DESCRIPTION NA Designer
Enforcement
Building Envelope Measures: X X X
§150(a):hl inimum R-19Inwood frame telling Insulation or equivalent U-faclor in metol frame ceiling. X
§150(b): Loose fill Insulation manufacturer's labeled R-Value: X
•§150(e):Minimum R-13 wall insulation in wood framed walls or equivalent U-fnclor In metal frame walls(does not apply X
to exterior muss walls).
•§I50(d):Minimum R-13 raised Boor insulation In framed Doors or equivalent 1.1-factor. X
§150(e):Installation of Fireplaces,Decorative Gas Appliances and Gas Logs.
1.Masonry and factory-built fireplaces have:
a.closeable metal or glass door covering the entire opening of the firebox X
b,outside air intake with damper and control,Due damper and control X
2.No continuous burning gas pilot lights allowed. X
§150(r): Air retarding wrap Installed to comply with§151 meets requirements specified in the ACM Residential Manual. X
§150(g):Vapor barriers mandatory In Climate Zones 14 and 16 only. Xr
§150(1):Slab edge Insulation-water absorption rate for the insulation material alone without facings no greater than X
03%,water vapor permeance rate no greater than 2.0 perm/inch.
§118:Insulation specified or installed meets Insulation Installation quality standards. X
Indicate type and include CF-611 Form:
§116-17: Fenestration Products,Exterior Doors,and lnDllralion/ExMiralion Coal MIS.
1.Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. X
2.Fenestration products(except Deld-fabricated)have label with certified U-faclor,certified Solar(lent Gain Coefficient X
SHGC and infiltration certification.
3.Exterior doors and windows wealhentrlpped;all joints and penetralluns caulked and sealed. X
Space Conditioning,Water Heating and Plumbing System Measures:
§110-§113: HVAC equipment,water heaters,showerheads and faucets certified by the Energy Commission. X
§150(h):Healing and/or cooling loads calculated In accordance with ASIIRAE,SMACNA or ACCA. X
§150(1):Setback thermostat on all applicable beating and/or cooling systems. X
§150(j):Water system pipe and lank Insulation and cooling systems line Insulation. X
I.Storage gas water healers rated with an Energy Factor less than 0.59 must be externally wrapped with insulation having X
an installed thermal resistance of R-12 or greater.
2.Back-up tanks for solar system,unfired storage tanks,or other indirect hot water tanks have R-12 external Insulation or Xr
R-16 internal insulation and Indicated on the exterior of the tank showing the R-value.
3.The following piping Is insulated according to Table 150.A/B or Equation 150-A Insulation Thickness:
1.First 5 feet of hot and cold water pipes closest to water heater tank,non-recirculating systems,and entire length of X
recirculating sections of hot water pipes shall be Insulated to Table 1508.
2.Cooling system piping(suction,chilled water,or.brine lines),piping insulated between heating source and indirect hot X
water lank shall be insulated to Table 150.8 and Equation 150-A.
4.Steam hydronic heating systems or hot water systems>15 psi,meet requirements of Table 123-A. X
I I I I
INSTALLATION CERTIFICATE (Page 1,2, &3 0(12 CF-6R
Sita Address Permit NumEer
An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is
required)After completion of final Inspection,a copy must be provided to the building department(upon request)and the building owner at occupancy,per Section
10-103(a)
WATER HEATING SYSTEMS:
Distribution Tank Exlemal
Heater CEC Certified Mfr Name Type(Std, If Recirculation, #Identical Rated-Input Volume Efficiency Standby Insulation
Type 8 Model Number Point-of-Use) ControlType Systems kW or Btu/hr (gallons) EF,RE' Loss M2 R-value'
1.For small gas storage(rated input of less than or equal to 75,000 Btu/hr),electric resistance and heat pump water heaters,list Energy Factor. For large gas
storage water heaters rated input of greater than 75,000 Btulhr),list Recovery Efficiency,Standby Loss and Rated Input. For instantaneous gas water heaters,
list Recovery Efficiency and Rated Input.
2.R-12 external insulation is mandatory for storage water heaters with an energy factor of less than 0.58.
Kitchen Piping:
If indicated on the CF-11R,all hot water piping a%inches in diameter that runs from the hot water source to the kitchen fixtures is insulated.
Faucets 8 Shower Heads:
All faucets&showerheads installed are certified to the Commission,pursuant to Title,24,Part 6,Section 111.
I,the undersigned,verify that equipment listed above my signature is:1)the actual equipment installed;2)equivalent to or more efficient than that specified in the
certificate of compliance(Form CF-1 R)submitted for compliance with the Energy Efficiency Standards for residential buildings;and 3)equipment that meets or
exceeds the appro riate requirements for manufactured devices from the Appliance Efficiency Re Maligns or Part 6),where applicable.
InstallingSubcontractor Co.Name OR General Contractor Co.Name OR Owner
Signature: Date:
COPY TO: Building Department HERS Provider(if applicable) Building Owner at Occupancy
FENESTRATION/GLAZING: (Group Like Products
Total Qty. Exterior
of like Area Shading
Manufacturer/Brand Name Product U-Factor Product SHGC If of product Square Device or Comments/Location/
Item (Group Like Products sCF-1R value' sCF-1R value° Panes (Optional) Feel Overhanq Special Features
1.
2.
3.
1)Use values from a fenestration product's NFRC label.For fenestration products without an NFRC label,use the default values from Section 116 of the Energy
Efficiency Standards.
2)Installed U-value must be less than or equal to values from CF-1 R. Installed SHGC must be less than or equal to values from CF-1 R.or a shading device
(exterior or overhang)is installed as specified on the CF-1 R. Alternatively,installed weighted average U-values for the total fenestration area are less than or equal
to values from CF-1 R.If using default table SHGC values from 116 identify whether tinted or not.
❑I,the undersigned,verify that the fenestration/glazing listed above my signature 1)is the actual fenestration product installed;2)is equivalent to or has a lower
U-Factor and lower SHGC than that specified in the certificate of compliance(Form CF-1 R)submitted for compliance with the Energy EKciency Standards for
residential buildings;and 3)the product meets or exceeds the appropriate requirements for manufactured devices(from Part 6),where applicable.
Installinq Subcontractor Co.Name OR General Contractor Co.Name OR Owner
Signature: Dale:
An installation certificate is required to be posted at the building site or made available for all appropriate inspections.(the information provided on this forth is
required)After completion of final Inspection,a copy must be provided to the building department(upon request)and the building owner at occupancy,per Section
10-103(a).
HVAC SYSTEMS:
Heating'Equipment
Equip.Type I CEC Certified Mfr #Identical Efficiencyt(AFUE,etc.) Ducl Location Duct or Piping Heating Load Heating Capacity
(okg heat pump) Name 8 Model Number Systems [>=CF-1 R Value] attic etc. R-Value Btu/hr (Btu/hr)
Cooling Equipment
Equip.Type CEC Certified If Identical Efficiency'(AFUE,etc.) Duct Location Duct or Cooling Load Cooling Capacity
(pkg.,heat pump) Compressor Unit Mfr Systems [>=CF-IR Value] (attic,etc.) R-Value (Btu/hr) (Btu/hr)
Name&Model Number
1.z reads greater than or equal to.
❑I,the undersigned,verify that the equipment listed above is: 1)is the actual equipment installed,2)is equivalent to or more efficient than that specified in the
certificate of compliance(Form CF-1 R)submitted for compliance with the Energy Efficiency Standards for residential buildings;and 3)equipment that meets or
exceeds the appropriate requirements for manufactured devices(from the Appliance Efficiency Regulations or Part 6),where applicable.
Installin Subcontractor Co.Name OR General Contractor Co.Name OR Owner
Signature: Date:
COPY TO: Building Department,HERS Provider(if applicable),Building Owner at Occupancy
Residential Complinncc Forms April 2005
INSTALLATION CERTIFICATE (Page 12 of
P12 12NCF-6R
see Atlerese umber
Caunly$ubtlivision Lot Number
Description of Insulation(Formerly IC-1 Form)
I. RAISED FLOOR
Material Brand Name
Thickness(inches) Thermal Resistance(R-Value)
2. SLAB FLOOR/PERIMETER
Material Brand Name
Thickness(inches) Thermal Resistance(R-Value)
Perimeter Insulation Depth(inches)
3. EXTERIOR WALL
Frame Type
a.Cavity Insulation Material Brand Name
Thickness(inches) Thermal Resistance(R-Value)
b. Exterior Foam Sheathing
Material Brand Name
Thickness(inches) Thermal Resistance(R-Value)
4. FOUNDATION WALL
Material Brand Name
Thickness(inches) Thermal Resistance(R-Value)
5.CEILING
Balt or Blanket Type Brand Name
Thickness(inches) Thermal Resistance(R-Value)
Loose Fill Type Brand
Contractor's min installed weight/R' Ib Minimum thickness inches
Manufacturer's installed weight per square foot to achieve_Thermal Resistance(R-Value)
6. ROOF
Material Brand Name
Thickness(inches) Thermal Resistance(R-Value)
Declaration
❑ 1 hereby certify that the above insulation was installed in the building at the above location in conformance with the current Enerp,
Efficiency Standards for residential building(Title 24,Part 6,California Code of Regulations)as indicated on the Certificate of Compliance,
where applicable.
Item Hs Signature Date Installing Subcontractor(Co.Name)OR
l(if applicable) General Contractor(Co. Name)OR Owner
Item tis Signature Date Installing Subcontractor(Co.Name)OR
I(if applicable) General Contractor(Co. Name)OR Owner
Item #s Signature Date Installing Subcontractor(Co. Name)OR
l(if applicable) General Contractor(Co. Name)OR Owner
Rcsid.liel Compliance Farms April 2005
HVAC SIZING HVAC Page 1
ProjectTitle . . . . . . : . . . Bldg,-E/1986 Date . . 11/26/07 08 : 27 :44
Project Address . . ., . . .. . Las Palmas *******
Cupertino, :CA *v7 . 10*
Documentation Author. . . ,D. Penaranda ******* Building Permit
California Living & Energy
3015 Dale Court Plan Check Date
,Ceres, . CA 95307
209-538-2879 Field Check/ Date
Climate Zone . . . . . . . . . . . 04
Compliance Method. . . . . . MICROPAS7 v7 . 10 for 2005 Standards by Enercomp, Inc.
MICROPAS7 v7 . 10 File-LD1986LP Wth-CTZ04So5 Program-HVAC SIZING
User#-MP1439 User-California Living & Energ Run-Bldg E/1986
GENERAL INFORMATION
Floor. Area. . . . ... . . . . . . . . . ., . 1986 sf
Volume. ; . . . . . . . . . . . . . . . . . . . 15888 cf
Front Orientation. . . . . . . . . . Front Facing 0 deg (N)
Sizing Location. . ... . . . . . . . . CUPERTINO
Latitude. . . . . . : . . . . . . . . . . . . 37 . 3 degrees
Winter Outside Design. . . . . . 28 F
Winter Inside Design. . . . . . . 70 F
Summer Outside Design. . . . . . 86 F
Summer Inside Design. . . . . . . 75 F
Summer Range, . ; ; . . . . . . . . . . . 30 F
Interior• Shading Used. . . . . . Yes
Exterior Shading Used. . . . . . Yes
overhang Shading Used. . . . . . Yes
Latent Load Fraction. . . . . . . 0 . 14
HEATING AND COOLING LOAD SUMMARY
Heating Cooling
Description (Btu/hr) (Btu/hr)
Opaque Conduction. and Solar. . . . . . 14568 8120
Glazing :Conduction and Solar. . . . . 6989 16392
Infiltration. . . . . . . . . . . . . . . . . . . . . 11596 1540
Internal Gain. ... .:. . . . . . . . . . . . . . . . n/a 2120
Ducts . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7231 4947
Sensible' Load.. . . . . . . . . . . . . . . . . . . . 40383 33118
Latent Load. . .:. ..... . . . . . . . . . . . . . . . n/a 4835 ?
Minimum Total Load 40383 37954
Note : The loads shown-, are only one .of the criteria affecting the selection
of HVAC equipment .' -, Other relevant design factors such as air flow
requirements, outside ; air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc. , must also be
considered. It is the HVAC designer' s responsibility to consider all
factors when selecting the HVAC. equipment . �
Q
s
t
- E
5
HVAC SIZING HVAC Page 2
Project Title . . . . . ... . Bldg 'E/1986 Date . . 11/26/07 08 :27 :44
MICROPAS7 v7 . 10 . File-LD1986LP Wth-CTZ04S05 Program-HVAC SIZING
User-MP1439-. User-California Living & Energ Run-Bldg E/1986
GENERAL INFORMATION
F1oor ,Area... ... . . . . . . . . . . . . . 1986 sf
Volume 15888 cf
Front Orientation. . . . . . . . . . Front Facing 90 deg (E)
Sizing Location. . . . . . . . . . . . CUPERTINO
Latitude .,..:. . . . . . . . . . . . . . . . 37 . 3 degrees
Winter Outside Design. . . . . . 28 F
Winter 'Inside 'Design. . . . . . . 70 F
Summer Outside Design. . . . . . 86 F
Summer Inside Design. . . . . . . 75 F
Summer Range. . . . . . . . . . . . . . . 30 F
Interior Shading: Used. . . . . . Yes
Exterior Shading Used. . . . . . Yes
OverhaAg. Shading Used. . . . . . Yes
Latent Load Fraction. . . . . . . 0 . 14
HEATING AND" COOLING LOAD SUMMARY
Heating Cooling
Description (Btu/hr) (Btu/hr)
Opaque Conduction and Solar. . . . . . 14568 7557
Glazing :
HVAC SIZING HVAC Page 3
Project Title . . . . . . . .:. ., Slag E/1986 Date . . 11/26/07 08 :27 :44
MICROPAS7 x7 .10 .File,-L1)1986LP Wth-CTZ04S05 Program-HVAC SIZING
User#-MP1439 Uder-:Califcirnia Living & Energ Run-Bldg E/1986
GENERAL INFORMATION
Floor Area. . . . : . . . . . . . . . . . . 1986 sf
Volume_ . . : . . . . . . . . . . . . . . . . . 15888 cf
Front Orientation. . . . . . . . . . Front Facing 180 deg (S)
Sizing ,Lccation: . . . . . . . . . . . CUPERTINO
Latitude. . . . . . . . . . _ . . . . . . . . 37 . 3 degrees
Winter Outside Design. . . . . . 28 F
Winter .Inside• Design. . . . . . . 70 F
Summer Outside, Design. . . . . . 86 F
Summer:.. Inside .Design. . . . . . . 75 F
Summer Range. . : . . . . . . . . . . . . 30 F
Interior -Shading Used. . . . . . Yes
Exterior Shading Used. . . . . . Yes
Overhang Shading Used. . . . . . Yes
Latent Load Fraction. . . . . . . 0 . 14
HEATING AND COOLING LOAD SUMMARY
Heating Cooling
Description (Btu/hr) (Btu/hr)
Opaque Conduction- and Solar. . . . . . 14568 8412
Glazing Conduction ,and Solar. . . . . 6989 16893
Infiltration. ... . ..': . . . . ... . . . . . . . . 11596 1540
Internal Gain. . . . . . . . . . . . . . . . . . . . n/a 2120
Ducts. . . . . . . :. -:,,. . . . . . . . . . . . . . . . . . 7231 5086
Sensible Load. . . :. . . : : . . . . . . . . . . . 40383 34051
Latent Load. . . . . . .;. . .. . . . . . . . . . . . n/a 4971
Minimum Total Load 40383 39022
Note : The loads shown •are' only' one of the criteria affecting the selection
of HVAC equipment . Other relevant design factors such as air flow j
requirements, outside -air, outdoor design temperatures, coil sizing,
availability of equipment., oversizing safety margin, etc . , must also be
considered. It . is ,the HVAC designer' s responsibility to consider all
factors when selecting the HVAC equipment .
i
t
a
HVAC SIZING HVAC Page 4 T
Project Title. . . . . . . . .:. Bldg E/1986 . Date . . 11/26/07 08 : 27 :44
MICROPAS7 v7 . 10': 'File'-LD1986LP Wth-CTZ04S05 Program-HVAC SIZING
User#-MP1439'. User-'California Living & Energ Run-Bldg E/1986
GENERAL INFORMATION
Floor Area. . . . . . . . . . . . . . . . . 1986 sf
Volume. .,. ... ... . . . . . . . . . . . . . . 15888 cf
Front'. Orientation. . . . . . . . . . Front Facing 270 deg (W)
Sizing Location. . . . . . . . . . . . CUPERTINO
Latitude. . . . . . . . . . . . . . . . . . . 37 . 3 degrees
Winter 0utside• Design. . . . . . 28 F
Winter Inside Design. . . . . . . 70 F
Summer Outside Design. . . . . . 86 F
Summer• Inside 'Design. . . . . . . 75 F
Summer Range.. .,.. . . . . . . . . . . . 30 F
Interior Shading Used. . . . . . Yes
Exterior-Shading- Used. . . . . . Yes
Overhang Shading. Used. . . . . . Yes '
Latent Load Fraction. . . . . . . 0 . 14
HEATING .AND COOLING LOAD SUMMARY
Heating Cooling
Description .- (Btu/hr) (Btu/hr)
opaque Conductiom and, Solar. . . . . . 14568 7662
Glazing Conduction and Solar. . . . . 6989 18376
Infiltration. ... ... . . . . . . . . . . . . . . . . 11596 1540
Internal Gain. . . . . . . . . . . . . . . . . . . . n/a 2120
Ducts . . ... . . . . . . . . . . . . . . . . . . . . . . . . 7231 5215
Sensible Load. . . . : . . . . . . . . . . . . . . . 40383 34912
Latent Load. : . .:: . . . . . . . . . . . . . . . . . n/a 5097
MinimumTotalLoad 40383 40010
Note : The loads 'shown are 'only one of the criteria affecting the selection
of HVAC equipment'. ' Ot-her relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of 'equipment, oversizing safety margin, etc . , must also be
considered. It is the HVAC designer' s responsibility to consider all
factors when selecting.. Ehe. HVAC' equipment .