09030115 CITY OF CUPERTINO PERMIT BUILDING DI,vISION PL
PERMIT NO.
BUILDING ADDRESS:
10882 WILKINSON AVE JIM KRAJSE R00
PERMIT ISSUE DATE
OWNER'S NAME:
g AgU
2009 CONTROL NO.
-'TONE:
(408) 779-0704
BUILDING P£RMIT INFO
ARCHITECT/ENGINEER: BLDG ELECT PLUMB MECH
u O p LICENSED CONTRACTOR'S DECLARATION Job Description
U1 hereby affirm that I am licensed under provisions of Chapter 9(commencing
Z with Section 70(X0)of Division 3 of the Business and professions Code,and my license is RE—RF T/O EXT wD S HK 1 LYR RE S HE ET 7/16 0 S B 3 0 LB FLT
n H in full fore and cft C /
jvnz License Class 3 Lic.N ' S PRES TL CMPSHING CLS A 31SQ
t-in Date 1- `/ Contractor
ARCHITECTS DECLARATION
4�< I understand my plans shall be used as public records
15yU
Oy Licensed Professional
rn OWNER-BUILDER DECLARATION
1 hereby affirm that 1 am exempt from the Contractor's License Law for the
in O following reason.(Section 7031.5,Business and Professions Code:Any city or county
K which requires a permit to construct,alter,improve,demolish,or repair any structure
y >. prior to its issuance•also requires the applicant for such permit to file a signed statement Ft.Floor Area Valuation
Z
£=G that he is licensed pursuant to the provisions of the Contractor's License Law(Chapter 9 Sq
>t F$ (commencing with Section 7000)of Division 3 of the Business and Professions Codc)or $21700
y .. that he is exempt therefrom and the basis for the alleged exemption.Any violation of APN Number Occupancy Type
Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of
not more than five hundred dollars(6500)• 3 5 613 0 E 0 . 00
❑I,as owner of the property,or my employees with wages as their sole compensation,
will do the work and the structure is not intended or offered for sale(Sec.7044,Business Required Inspections
and Professions Code:The Contractor's License Law does not apply to an owner of
property who builds or improves thereon,and who does such work himself or through his
own employees,provided that such improvements are not intended or offered for sale.If,
however,the building or improvement is sold within one year of completion,the owner-
builder will have the burden of proving that he did not build or improve for purpose of
sale.).
❑1,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business and Professions Code:)The Contractor's Li-
cense Law does not apply to an owner of property who builds or improves thereon,and.
who contracts for such projects with a contractor(s)licensed pursuant to the Contractor's
License Law.
C]I am exempt under Sec. B&P C for this reason
Owner Date
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a Certificate of Consent to self-insure for Workers Compcn-
�on,as provided for by Section 3700 of the Labor Code,for the performance of the
work Cor which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as required by Section
3700 of the Labor Code,for the performance of the work for which this permit is issued.
My Workeees Compensation Insurance carrier and Policy number arc: Z Yz J
Carrier. �TAr .Col)6 PolicyNo.:72 l3 —60 1
CERTIFICATE F EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
(This section need not be completed if the permit is for one hundred dollars($100)
or Icss.)
I certify that in the performance of the work for which this permit is issued.I shall not
employ any person in any manner so as to become subject to the Workers'Compensation
Laws of California.Date
Applicant
NOTICE TO APPLICANT:If,after making this Certificate of Exemption,you should
become subject to the Worker's Compensation provisions of the Labor Code,you must
,J z forthwith comply with such provisions or this permit shall be deemed revoked.
Z CONSTRUCTION LENDING AGENCY
[.�hN+ I hereby affirm that there is a construction lending agency for the performance of
a 5 the work for which this permit is issued(Sec.3097,Civ.C.)
W Q lenders Name
0 Lenders Address
I certify that I have ad this application and state that the above information is
LUL 0 correct.I agree to comply with all city and county ordinances and state laws relating to
0 building construction,and hereby authorize representatives of this city to enter upon the
UWabove-mentioned property for inspection purposes
Ia. (We)agree to save,indemnify and keep harmless the City of Cupertino against
„Fh l) liabilities,judgments,costs and expenses which may in any way scenic against said City �T y
U Z in consequence of the granting of this permit. Date `� /
APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued b`r:
SOURCE REGULATI S.
9-2-7-J 1 Re-roofs -
SignatureoCAppicant/Contrac Dare T of Roof
HAZARDOUS MA ERIALS DISCLOSURE Type
Will the applicant or future building occupant store or handle hazardous material
as defined by the Cupertino Municipal Code,Chapter 9.12,and the Health and Safety
Code,Section 25532(a)? All roofi shall be inspected prior to any roofing material being installed.
❑Yes /106
If a roof is installed without first obtaining an inspection,I agree to remove
Will the applicant or future building occupant use equipment or devices which
t hazardous air contaminants as defined by the Bay Area Air Quality Management all new materials for inspection.
Act?
❑yes o
1 have read the It materials requirements under Chapter 6.95 of the Cali(or-
nia Health&Safety Code,Sections 25505.25533 and 25534.I understand that if the building
docs currently have a terhan4 that it is my respohhsihility to notify the occupant of the
re _ cnts which Must be met prior to issuance of a Ccnificate of Occupancy. S Ignatur%of Applicant Date
All roof coverings to be Class I. or better
Owner or authorize nt Date
CITY OF CUPERTINO
REROOF
CUPEkTINO PERMIT APPLICATION
APN # Date:
Building Address: 4 y
/D 8 ,z f,�" lI 4,5�fc `�
Owner's Name: Phone #:
Contractor: Phone #: yo S'- 2
Fax #: 779�-
Cupertino Business License M Contractor License #:
v7 / ` , J 55- 9/33-/
Type of 1Zoof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ Asphalt Shingles X Asphalt Shingles
Wood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
❑ Other(Specify) ❑ Other(Specify)
Number of existing coverings ❑ Provide I.C.B.O. Report#
�C To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description: 71>, .r g 13 4i S14 k t / L yy e., V-4
Sollo 4Z14 TL 0
Residential Commercial ❑
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet inclex.
Valuation:P/7 OL)
I Have Read, Understand and Will Comply witti Cupertino's Tear-Off Policy:
Signature
Revised 6/16/08
CITY OF ('UPERTINO
*OF
REROOF
CUPEkTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1REROOFCOM Re-roof Commercial B 1COMMLROOF
1BSEISMICO Seismic Commercial B
1RER00FRES Re-roof Residential B 1SFDWLR00F
J 1BSEISMICRE Seismic Residential B
1REROOFMRES Re-roof Mu"ti-Family B 1MFDWLROOF
1 BSEISMICRE Seismic Residential B
1 BUSLIC Business License B
Revised 6/16/08
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408)777-3228
•� Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agi ee to comply with 2007 IBC Standards
and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the buildir g inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to ar y roofing installation.
4. To receive a final sign off from the City,the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fe,� of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4 "per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O.report is required to be or.the job site at the time on inspection.
I understand and will comply with the abo-ve//stated policy on re-roofing.
Homeowner's Name: L 4' G4
Job Site Address: j
Roofing Company Name: J
Applicant's Signature: Date: 2C S
Greg Casteel
Building Official
Revh ed 07/30/08
Green Buillding Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that mutt be
shown and referenced on the Proj:ct
Plans See below
B. Site 9. Install H.E. Irrigation, (details/spe.-)' L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.i A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Sp,:c.) P-1 2:points
ts
5. Tankless W.H., (Note/Spec.) A-2 2
11. A 2500 Gal.Tank, Note/S ec L-1 1ts
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, Note/,pec.) A-3 1Lint
P. Other 1. List Green Features on Plans A-1 1 point
; TOTAL POINTSr 1 40 points
z M
Plan Review Process Work Book Page-12-Revised 3/250
8 l Kilt&>_t Au-e_
�-
e for Remodeling Projects
Green Points Rating System o g 1
Due to the diversity of remodeling project types,assigning au total Points'
value to a project to be considered environmentally friendly is
not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures cE.n be used as a starting point for"greening"your project.
INPUT Resources Energy AO
A.Site
65%=I pct 76= 2 points 80%=4 points up to 4 Resource pts 0
2.Salvage Reusable�Bu�ng Materials 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
6.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
■ t 1 1
B.Foundation
1.Incorporate Recycled Flyash in Concrete e
25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate Resource pts y=yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0
■ 1 1 1
C.Structural Frame r
1.Substitute Sid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPs)
a.Floors 3 Energy pts y=yes 0
b,Wall 3 Energy pts y=yes 0
c.Roof 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
12.Use OSB
a.Subfloors 1 Resource pt y=yes 0
b.Sheathing 1 Resource pt y=yes 0
1 1 !
M.Indoor Air Quality and Finishes
1,Use LowlNo-VOC Pain IAQ/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes IAQ/Health pts y=yes. 0
3.Use LowMo VOC Adhesives IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes :;Resource pts y=yes
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 6IAQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses IAQ/Health pts y=yes 0
7.Seal all Exposed P,arfioleboaid of MDF 4 IAQ/Health pts y=yes 01
B.Use FSC Certified Materials for Interior Finish f Resource pts y=yes
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes
10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 1 0
N.Flooring
1.Select FSC Certified Wood Flooring E Resource pts y=yes 0
2.Use Rapidly Renewable Flooring Materials I Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles I Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl i IAQ/Health pts y=yes
5.Use Exposed Concrete as Finished Floor Resource pts y=yes
6.Install Recycled Content Carpet with Low VOCs Resource pts y=yes
Total Points Available: 1 1401 130 57
Total Points Project Received:1 1 0 T 0
r�
G:datalprogslgre+nbuildingguidelines/remodelers/greenpointslinal2.12.D4protected.xls
� 9
j ;. Community Development
10300 Torre Avenue
It
Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
CUPEKTINO
Building Department
JOB ADDRESS: l f PERMIT #/0 e92- _
Ale- o 7
OWNER'S NAME: ee-- PHONE # &61 6S7% Z
GENERAL CONTRACTOR: t,t 4 FAX # _ _ JO PC);
I am not using any subcontractors. a j-zx�
CignaturW Date
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass/ Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing i A
Septic Tank
Sheet Metal
Sheet Rock
Tile
"4 - r QI
Owner Contra or Si e Date