Loading...
07120237 T24 LD' LP CONSERVATION FOR THE CALIFORNIAJob#9245 } TITLE 24 COMPLIANCE RESIDENTIAL, CALIFORNIA ENERGY COMPLIANCE NONRESIDENTIAL LIVINGk-ENERGY. ROOM TOROOMgFM MODEL ENERGY CODE A Division of William Lit &Associates,Inc. INSULATION INSPECTION `ENERGY STAR HOME , N &CERTIFICATION �1 _ TOLE 24 CO LN E-RE51004MLIN NREADE '�Y 3015 Dale Court, Ceres, CA 95307 l pp1 eJ I www:califlivine.com TITLE-24 2005 COMPLIANCE FORMS? oma` -_�py PREPARED FOR Landmark Development Jr � PROJECT NAME La=_F1, 981§__4/Palmas SQUARE FOOTAGE Bid _F/ 981 \ LOCATION _Cugerti , ej�' ZONE 4. i, Percentage Above Code, % 04, Orientation: Cardinal (N,S ) 1 ➢Zp0) INSULATION W/3 Coat Stucco Attic/Vault R-30/R-30 Radiant Barrier No _ Housewrap :No Wall—2x4 R-13 Wall—2x6 R-19 Kneewall R-19 Sub Floor N/a Floor@'2"d Fir OH R-19 Raised Floor or Slab Slab HVAC SEER Value 1310 = EER ValueN/a AFUE 0.80 Duct Insulation 2 Sensible Min. BTU `�3g848 Designed Cooling Capac' 38790 Heating Min. BT 41135 Suggested 4.0 -tonnage HERS Verifications, Fan Wattage Verification No Duct Testing No TXV Valve Inspection No EER Verification No. Infiltration No Max Cooling Capacity No Airflow Verification No Buried Ducts Verification No Surface Area Verification No 1 Insulation Inspection .,No WATER HEATER' Pipe Insulation No Energy Factor(Tank Size) 0.60 (40) Distribution Standard H2O Blanket No PLAN REVIEW ACCEPTANC€ENESTRATION U-Value SHGC AUG 0 5 2008 . operable .39 .35 Fixed .35 .37 BUREAU VERUAS NORTH AMERICA,111 - Sliding Glass Door .36 .35 French Doors .37 .36 Sky bight .44 .35 Please Note: Data is taken from worst-case orientation. Each of the itims stated here,the MF-IR page and the signed CF-IR pages must be clearly listed on the plans and a copy is to be given to the homeowners upon4ssuming occupancy. Disclaimer: This cover sheet is designed as a summary for the convenience ofbuilders and their subcontractors. However,if a discrepancy wrists between this coversheet and the CF-IR,the CF-IR takes precedence. , EXPLANATION OF TITLE-24 COVERSHEET _PREPARED FOR: The company/contractor who ordered the documentation. PLAN: The square footage of plan and/or plan name used by the General Contractor. FACING: The direction the front door faces expressed in degrees or North, South, East, West (N/S/E/W). ZONE: California is divided into 16 climate zones each having different weather conditions. Your home's energy efficiency requirements are determined by whether your house is in a hot, cold, or mild climate zone. *HEATING/FURNACE: Minimum amount of energy that the equipment is required to produce to heat the house. *COOLING/SENSIBLE: Minimum amount of energy that the equipment is required to produce to cool the house. LATENT: Latent represents the additional load imparted on a cooling system due to the moisture in the air. "(No cooling equipment is designed to cool 100%of time and in all situations.The loads shown are only one of the criteria affecting the selection of equipment.Other relevant design factors such as airflow requirements,outdoor design temperatures,coil sizing,availability of equipment,oversizing salety margin,etc.,most also be considered It is the I IVAC contractor responsibility to consider all factors when selecting the I IVAC equipment) AFUE: A measure of the minimum furnace efficiency. A measure of the heating efficiency of furnaces. The higher the number, the better. SEER: Minimum cooling equipment efficiency. DUCT R-VALUE: Minimum insulation R-value of air ducts, except in conditioned space. ATTIC: R-value of insulation in accessible/open attic area. VAULT: R-value of insulation in vaulted areas with no attic access. WALL: R-value of insulation between wall studs. KNEEWALL: R-value of insulation in walls adjacent to open attics. SUBFLOOR: R-value of insulation in subfloor. OVERHANG: R-value of insulation over garage or exterior. MANUAL D DESIGN/INSPECTION: Indicates if a design of the duct system is required for building department submittal. If required, the ducts must be inspected by an independent HERS Rater to verify they meet compliance requirements. DUCT TESTING: Indicates whether or not the duct system is to be airtight. If required, an independent HERS Rater has to test the ducts to ensure they leak no more than 6% and provide verification to CHEERS and building department. TXV Valve/Inspection: The TXV Valve regulates the charge and airflow to increase air conditioner efficiency. If used for compliance, an independent HERS Rater must verify the TXV Valve is installed. W/H BLANKET: External water heater blanket R-value. WATER HEATER E.F. (Gal.): The energy factor or the efficiency rating and the number of minimum gallons required for the water heaters. The E.F. number is usually listed on a separate tag beside the yellow EnerUGurde label. The higher the Energy Factor, the more efficient the water heater. PIPE INSULATION: R-4 or greater insulation applied to all 3/4" or larger, non-recirculating hot water mains. FENESTRATION U-VALUE: Minimum U-value of all installed windows. SHGC: Solar Heat Gain Coeffiencent. A measure of how well your shade-creating products (such as interior drapes, tinted windows, etc.) stop solar heat from entering your home. A SHGC value of.65 means 65% of the heat is getting into your home and 35% of the heat is being blocked. Fixed refers to fixed windows. XO/SH refers to sliding windows. SGDoor refers to sliding glass door. FRDoor refers to French doors. BUYER BUYER CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 2 Project Title . . . . . . . . . . Bldg F/1981 Date . . 11/26/07 08 : 28 : 11 MICROPAS7 v7 . 10 File-LD1981LP Wth-CTZ04S05 Program-FORM CF-1R User#-MP1439 User-California Living & Energ Run-Bldg F/1981 Floor Construction Type. . . . Slab On Grade Number of Building Zones . . . 1 Conditioned Volume . . . . . . . . . 15848 cf Slab-On-Grade Area. . . . . . . . . 426 sf Glazing Percentage . . . . . . . . . 20 . 2 °s of floor area Average Glazing U-factor. . . 0 . 39 Btu/hr-sf-F Average Glazing SHGC. . . . . . . 0 . 35 Average Ceiling Height . . . . . 8 ft BUILDING ZONE INFORMATION Floor # of # of Cond- Thermo- Vent Vent Verified Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type (sf) (cf) Units le ioned Type (ft) (sf) Housewrap Residence 1981 15848 1 . 00 4 . 0 Yes Setback 8 . 0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments 1 Wall Wood 20 0 . 102 13 0 0 90 Yes IV. 9 A3 3 Coat Stucco 2 Wall Wood 432 0 . 074 19 0 0 90 Yes IV. 9 A5 3 Coat Stucco 3 Wall Wood 160 0 . 102 13 0 0 90 No IV. 9 A3 Garage Wall 4 Wall Wood 62 0 . 074 19 0 0 90 No IV. 9 A5 Garage Wall 5 Wall Wood 621 0 . 102 13 0 90 90 Yes IV. 9 A3 3 Coat Stucco 6 Wall Wood 112 0 . 074 19 0 90 90 Yes IV. 9 A5 3 Coat Stucco 7 Wall Wood 261 0 . 102 13 0 180 90 Yes IV. 9 A3 3 Coat Stucco 8 Wall Wood 32 0 . 074 19 0 180 90 Yes IV. 9 A5 3 Coat Stucco 9 Wall Wood 82 0 . 102 13 0 270 90 Yes IV. 9 A3 3 Coat Stucco 10 Wall Wood 572 0 . 074 19 0 270 90 Yes IV. 9 A5 3 Coat Stucco 11 Roof Wood 750 0 . 032 30 0 n/a 0 Yes IV. 1 A7 Attic Space 12 Roof Wood 30 0 . 048 19 0 n/a 0 Yes IV. 1 A14 Under HVAC 13 Door Other 24 0 . 500 0 0 0 90 Yes IV. S A4 Entry Door 14 Door Other 18 0 . 500 0 0 0 90 No IV. S A4 Garage Entry 15 FloorExt Wood 354 0 . 048 19 0 n/a 0 No IV. 20 A4 2nd Floor OH PERIMETER LOSSES Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments 16 SlabEdge 66 0 . 730 R-0 No IV. 26 Al Slab Edge CERTIFICkTE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 3 y Project Title . . . . . . . . . . Bldg F/1981 Date . . 11/26/07 08 :28 : 11 MICROPAS7 v7 . 10 File-LD1981LP Wth-CTZ04S05 Program-FORM CF-1R f User#-MP1439 User-California Living & Energ Run-Bldg F/1981 H FENESTRATION SURFACES Exterior Area U- Act Shade Orientation (sf) factor SHGC Azm Tilt Type Location/Comments 1 Wind Front (N) .50 . 0 0 . 390 0 . 350 0 90 Standard FGLASS/Vinyl/Wood Operab 2 Wind Front (N) 50 . 0 0 . 390 0 .350 0 90 Standard F2/Vinyl/Wood Operable L 3 Wind Left (E) 15 . 0 .0". 390 0 . 350 90 90 Standard LGLASS/Vinyl/Wood Operab 4 Wind Left (E) 20 . 0 0 . 390 0 . 350 90 90 Standard L2/Vinyl/Wood Operable L 5 Wind Left (E) 6 . 0 0 . 390 0 . 350 90 90 Standard L3/Vinyl/Wood Operable L 6 Wind Left (E)r;?l 8 . 0 0 . 390 0 . 350 90 90 Standard L4/Vinyl/Wood Operable L 7 Wind Left (E) 1 0 0 . 390 0 . 350 90 90 Standard L5/Vinyl/Wood Operable L 8 Wind Back (S) 24 . 0 0 . 390 0 . 350 180 90 Standard BGLASS/Vinyl/Wood Operab 9 Wind Back (S) JZ 54 . 0 0 . 390 0 . 350 180 90 Standard B2/Vinyl/Wood Operable L 10 Wind Back (S) 45 . 0 0 . 390 0 . 350 180 90 Standard B3/Vinyl/Wood Operable L p 11 Wind Right (W) 0 . 0 0 . 390 0 . 350 270 90 Standard RGLASS/Vinyl/Wood Operab 12 Wind Right (W) 54 . 0 0 . 390 0 . 350 270 90 Standard R2/Vinyl/Wood Operable L 13 Wind Right (W) A 18 . 0 0 . 390 0 . 350 270 90 Standard R3/Vinyl/Wood Operable L 14 Wind Right (W) 16 . 0 0 . 390 0 . 350 270 90 Standard R4/Vinyl/Wood Operable L p SLAB SURFACES 4' Area Slab Type (sf) Standard Slab 426 s HVAC SYSTEMS ti Verified Number Verified Verified Verified Verified Maximum System of Minimum Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity 1,3' Furnace 1 0 . 800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13 . 00 SEER No No No No No S. HVAC SIZING Verified Total Sensible Design Maximum Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr) Furnace 41135 n/a n/a n/a ACSplit n/a 33848 38790 n/a Orientation of Maximum. . . . . Front Facing 270 deg (W) Sizing Location. . . . . . . . . . . . CUPERTINO Winter Outside Design. . . . . . 28 F r' 4� CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 4 Project Title . . . . . . . . . . B1d4F/1981 ', Date . . 11/26/07 08 :28 : 11 MICROPAS7 v7 . 10 File-LD19.81LP Wth-CTZ04S05 Program-FORM CF-1R User#-MP1439 User-California Living & Energ Run-Bldg F/1981 Winter Ins de--Design. . . . . . . 70 F Summer• Outside Design. . . . . . 86 F - Summer Inside Design. . . . . . . 75 F Summer Range: .: . . . . . . . . . . . . 30 F DUCT SYSTEMS Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R-value Leakage Area Ducts Furnace Attic R-4 . 2 No No No ACSplit Attic R-4 . 2 No No No WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type type Distribution Type System Factor (gal) R-value 1 Storage Gas . Standard 1 0 . 60 40 R- n/a SPECIAL 'FEATURES AND MODELING ASSUMPTIONS *** Items in -this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan .check and field inspection. *** This is a multiple orientation building. This printout is for the front facing North. REMARKS CERTIFICATE OF COMPLIANCE: •RESIDENTIAL COMPUTER METHOD CF-1R Page 5 Project Title. . . . . . . . .: Bldg ,F/.1981 Date . . 11/26/07 08 :28 : 11 MICROPAS7 v7 . 10 File-LD1981LP` Wth-CTZ04S05 Program-FORM CF-1R User#-MP1439 -User-California Living & Energ Run-Bldg F/1981 COMPLIANCE STATEMENT This certificate of compl-fiance' lists the building features and performance specifications needed to comply with Title-24 , Parts 1 and 6 of the California Code 'of Regulations,, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility: IGIk,NER r 'OWNER DOCUMENTATION AUTHOR Name. . . . P-s-►�N I at . Name. . . . D. Penaranda Company. Landmark Deve opment• Company. C ornia iv' g & Energy Address . 1307 South Mary Ave # 120 Address . 015 ale/ le court Sunnyvale, CA .940 1 Ce r CA 9530 Phone . . . 4 73 9 93 Phone . . . 2 9-53 2879 License. Signed -e7 Signed. . Le 161 i ate ate 5� ENFORCEMENT .AGENCY Name . . . . Title. . . Agency. . Phone . . . Signed. . ate J 'M J G t s - S 5 . .r 4 , MANDATORY MEASURES SUMMARY: RESIDENTIAL (Page 1 of 2) MF-1R Instructions: Check or initial applicable boxes when completed or check NA if not applicable. DESCRIPTION NA Designer Fnlorcemenl Building Envelope Measures: X X X •§150(a):Minimum R-19 in wood frame ceiling Insulation or equivalent U-factor in metal frame ceiling. X §150(b): Loose fill insulation manufacturer's labeled R-Value: X •§150(c):Minimum R-13 wall insulation Inwood framed walls or equivalent 1.1-factor in metal frame walls(does not apply X to exterior mass walls). •§150(d):Minimum R-13 raised Boor Insulation In framed Boors or equivalent U-factor. X §150(e):Installation of Fireplaces,Decorative Gas Appliances and Gas Logs. I.Masonry and factory-built fireplaces have: a.closeable metal or glass door covering the entire opening of the firebox X b.outside air intake with damper and control,flue damper and control X 2.No continuous burning gas pilot lights allowed. X §150(1): Air retarding wrap installed to comply with§151 meets requirements specified in the ACM Residential Manual. X §150(g):Vapor barriers mandatory in Climate Zones 14 and 16 only. X §150(1):Slab edge insulation-water absorption rate for the insulation material alone without facings no greater than X OJ%,water vapor permeance rate no greater than 2.0 permAncb. §118:Insulation specified or installed meets Insulation Installation quality standards. X Indicate type and Include CF-6R Form: §116.19: Fenestration Products,Exterior Doors,and Infiltratlon/F.xfillralion Controls. 1.Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. X 2.Fenestration products(except field-fabricated)have label with certified U-faclor,certified Solar heat Gain Coefficient X SIIGC,and infiltration certification. 3.Exterior doors and windows weetherstripped;all joints and penetrations caulked and scaled. X Space Conditioning,Water Heatlng and,Plumbing System Measures: §110.§113: HVAC equipment,water heaters,showerheads and faucets certified by the Energy Commission. X §150(h):Heating and/or cooling loads calculated In accordance with ASHRAE,SMACNA or RCCA. X §150(1):Setback thermostat on all applicable healing and/or cooling systems. X §150(1):Water system pipe and lank Insulation and cooling systems line insulation. X 1.Storage gas water healers rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having X an installed thermal resistance of R-12 or greater. 2.Back-up tanks for solar system,unfired storage tanks,or other Indirect hot water tanks have R-12 external insulation or X R-16 internal insulation and indicated on the exterlor,of the tank showing the R-value. 3.The following piping is Insulated according to Table 150-AIB or.Equation 150-A Insulation Thickness: 1.First 5 feet of hot and cold water pipes closest to water healer lank,non-recirculating systems,and entire length of X recirculating sections of hot water pipes shall be Insulated to Table 150B. 2.Cooling system piping(sucllon,chilled water,or brine lines),piping Insulated between heating source and Indirect hot X water tank shall be Insulated to Table 150-B and Equation 150-A. 4.Steam hydronic heating systems or hot water systems>15 psi,meet requirements of Table 123-A. X MANDATORY MEASURES SUMMARY: RESIDENTIAL (Page 2 of 2) MF-IR Space Conditioning,Water Heating and Plumbing System Measures:(continued) NA Designer Enforcement 5.Insulation must be protected from damage,including that due to sunlight,moisture,equipment maintenance,and wind. X 6.Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in X conditioned space. 7.Solar water-heating systems/collectors are certified by the Solar Rating and Certification Corporation. X •§150(m): Ducts and Fans I.All ducts and plenums installed,sealed and insulated to meet the requirement of the C6IC Sections 601, 602,603,604,605 ]{ and Standard 6-5;supply-air and return-air duels and plenums are insulated to a minimum installed level of R4.2 or enclosed entirely in conditioned space.Openings shall be sealed with mastic,tape or other duct-closure system[hot meets the applicable requirements of UI.181,UI,181 A,or Ul.181 B or aerosol sealant that meets the requirements of UI.723. If mastic or tape is used to seal openings greater than 1/4 inch,the combination of mastic and either mesh or tape shall be used. 2.Building cavities,support platforms for air handlers,and plenums defined or constructed with materials other than sealed X sheet metal,duct board or flexible duct shall not be used for conveying conditioned air.Building cavities and support platforms may contain ducts.Ducts installed in cavities and support platforms shall not he compressed to cause reductions in the cross-seclianal area of the ducts. 3.Joints and scams of duet systems and their components shall not be scaled with cloth back rubber adhesive duel tapes X unless such tape is used in combination with mastic and draw bonds. 4.Exhaust fan systems have back draft or automatic dampers. X S.Gravity ventilating systems serving conditioned space have either automatic or readily accessible,manually operated X dampers. 6.Protection of Insulation.Insulation shall be protected from damage,Including that due to sunlight,moisture,equipment X maintenance,and wind.Cellular foam insulation shall be protected as above or painted with a Coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. 7.Flexible ducts cannot have parous inner cores. X 114:Pool and Spa HC21ing Systems and Equipment. 1.A thermal efficiency that complies with the Appliance Efficiency Regulations,on-off switch mounted outside of the heater, X weatherproof operating instructions,no electric resistance healing and no pilot light. 2.System is installed with: a.at least 36"of pipe between filter and heater for future solar heating X b.cover for outdoor pools or outdoor spas X 3.Pool system has directional inlets and a circulation pump time switch. X §I I5:Gas fired fan-type central furnaces,pool healers,spa healers or household cooking appliances have no continuously X burning pilot light. (Exception:Non-electrical cooking appliances with pilot<150 Btu/hr) §1 18(1):Cool Roof material meets specified criteria X Residential Lighting Measures: §150(k)l: IIIGII EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID:contain only high Cmeacy lamps as outlined in Table 150-C,and do not contain a medium screw base socket(E24/F.26). Ballast for lamps 13 watts or greater are X electronic and have an output Frequency no less than 20 kHz §I50(k)I:IIIGII EF'F'ICACY LUMINAIRES-OUTDOOR HID:contain only high efficacy lamps as outlined in'I'able 150- X C,hardwired ballasts and if the ballast is electromagnetic has a medium screw base socket. §150(k)2:Permanently installed luminaires In kitchens shall be high efficacy luminaires.Up to 50 percent of the total rated wattage of permanently installed luminaires(based on nominal rated wattage of high efficacy lamps)in kitchens may he in X luminaires that are not high efficacy luminaires,provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires. §150(k)3: Permanently installed luminaires in bathrooms,garages,laundry rooms utility rooms shall be high efficacy luminaires.OR are controlled by an occupant sensor(s)certified to comply with Section 119(d)that does not turn on X automatically or have an always ono tion. §1511(k)4: Permanently installed luminaires located other than in kitchens,bathrooms,garages,laundry rooms,and utility rooms shall he high efficacy luminaires(except closets less than 70ftt):OR are controlled by a dimmer switch OR are X controlled by an occupant sensor that complies with Section 119(d)that does not turn on automatically or have an always on option. §150(k)5:Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover HQ and are X rated to ASTM E283 and labeled as air tight(KI)to less than 2.0 CFM 2175 Pascals. §150(k)6:Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the some lot shall he high emcacy luminaires(not Including lighting around swimming pools/water features or other Article X 680 locations)OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d). §150(k)7:Lighting for parking lots for 8 or more vehicles shall have lighting that complies with See.130,132,and 147. X Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec.130,131,and 146. §150(k)8:Permanently installed lighting in the enclosed,non-dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by occupant sensor(s)certified to comply with X Section 119(d). INSTALLATION CERTIFICATE (Page 1, 2, & 3 of 12 Cl Site Address Permit Numher An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required)After completion of final inspection,a copy must be provided to the building department(upon request)and the building owner at occupancy,per Section 10-103(a), WATER HEATING SYSTEMS: Distribution Tank External Healer CEC Certified Mfr Name Type(Std, If Recirculation, N Identical Rated'Input Volume Efficiency Standby Insulation Type &Model Number Point-of-Use) Control T e S stems kW or Btu/hr (gallons) EF,RE ' Loss %' R-value' 1.For small gas storage(rated input of less than or equal to 75,000 Btu/hr),electric resistance and heat pump water heaters,list Energy Factor. For large gas storage water heaters rated input of greater than 75,000 Blu/hr),list Recovery Efficiency,Standby Loss and Rated Input. For instantaneous gas water heaters, list Recovery Efficiency and Rated Input. 2.R-12 external insulation is mandatory for storage water heaters with an energy factor of less than 0.56. Kitchen Piping: If indicated on the CF-11R,all hot water piping?%inches in diameter that runs from the hot water source to the kitchen fixtures is insulated. Faucets 8 Shower Heads: All faucets&showerheads installed are certified to the Commission,pursuant to Title 24,Part 6,Section 111. I,the undersigned,verify that equipment listed above my signature is:1)the actual equipment installed;2)equivalent to or more efficient than that specified in the certificate of compliance(Form CF-1 R)submitted for compliance with the Energy Efficiency Standards for residential buildings;and 3)equipment that meets or exceeds heappropriate re uirements for manufactured devices from the Appliance Efficiency Re ulations or Part 6),where applicable. Installin Subcontractor Co.Name OR General Contractor Co.Name OR Owner Signature: Dale: EEI COPY TO: Building Department HERS Provider(if applicable),Building Owner at Occupancy FENESTRATION/GLAZING: (Group Like Products Total Oty. Exterior of like Area Shading Manufacturer/Brand Name Product U-Faclof Product SHGC N of product Square Device or Comments/Location/ Item (Group Like Products) sCF-1R value' 5CF-1R value' Panes (Optional) Feel Overhang Special Features 1. 2. 3. 1)Use values from a fenestration product's NFRC label.For fenestration products without an NFRC label,use the default values from Section 116 of the Energy Efficiency Standards. 2)Installed U-value must be less than or equal to values from CF-1R. Installed SHGC must be less than or equal to values from CF-11R,or a shading device (exterior or overhang)is installed as specified on the CF-1R. Alternatively,installed weighted average U-values for the total fenestration area are less than or equal to values from CF-1 R.If using default table SHGC values from 116 identify whether tinted or not. ❑I,the undersigned,verify that the fenestration/glazing listed above my signature 1)is the actual fenestration product installed;2)is equivalent to or has a lower U-Factor and lower SHGC than that specified in the certificate of compliance(Form CF-1 R)submitted for compliance with the Energy Efficiency Standards for residential buildings;and 3)the product meets or exceeds the appropriate requirements for manufactured devices(from Part 6),where applicable. Installin Subcontractor Co.Name OR General Contractor Co.Name OR Owner Signature: Date: An installation certificate is required to be posted at the building site or made available for all appropriate inspections.(the information provided on this form is required)After completion of final inspection,a copy must be provided to the building department(upon request)and the building owner at occupancy,per Section 10-103(a). HVAC SYSTEMS: Heating Equipment Equip.Type CEC Certified Mfr N Identical Efficiency'(AFUE,etc.) Duct Location Duct or Piping Healing Load Heating Capacity (pkq.heal pump) Name&Model Number Systems l>=CF-1R Value) (attic,etc.) R-Value (Btu/hr) (Btu/hr) Cooling Equipment Equip.Type CEC Certified N Identical Efficiency'(AFUE,etc.) Duct Location Duct or Cooling Load Cooling Capacity (pkg.,heal pump) Compressor Unit Mfr Systems [>=CF-1R Value) (attic,etc.) R-Value (Btu/hr) (Btu/hr) Name 8 Model Number 'I.2 reads greater Phan or equal to. ❑I,the undersigned,verify that the equipment listed above is: 1)is the actual equipment installed.2)is equivalent to or more efficient than that specified in the certificate of compliance(Form CF-1 R)submitted for compliance with the Energy Efficiency Standards for residential buildings;and 3)equipment that meets or exceeds the appropriate requirements for manufactured devices(from the Appliance Efficiency Regulations or Part 6),where applicable. Installin Subcontractor Co.Name OR General Contractor Co.Name OR Owner Signature: Date: COPY TO: Building Department,HERS Provider(if applicable),Building Owner at Occupancy Rcsidcmial C'ompliancc Foms April 2005 INSTALLATION CERTIFICATE (Page 12 of 12 CF-611 Sim Address PartnO Number CouM,u.ba'A.'. Lot Number Description of Insulation(Formerly IC-1 Form) f.RAISED FLOOR Material Brand Name Thickness(inches) Thermal Resistance(R-Value) 2. SLAB FLOOR/PERIMETER Material Brand Name Thickness(inches) Thermal Resistance(R-Value) Perimeter Insulation Depth(inches) 3. EXTERIOR WALL Frame Type a.Cavity Insulation Material Brand Name Thickness(inches) Thermal Resistance(R-Value) b. Exterior Foam Sheathing Material Brand Name Thickness(inches) Thermal Resistance(R-Value) 4. FOUNDATION WALL Material Brand Name Thickness(inches) Thermal Resistance(R-Value) 5.CEILING Batt or Blanket Type Brand Name Thickness(inches) Thermal Resistance(R-Value) Loose Fill Type Brand Contractor's min installed weight/fl' Ib Minimum thickness inches Manufacturer's installed weight per square foot to achieve Thermal Resistance(R-Value) 6. ROOF Material Brand Name Thickness(inches) Thermal Resistance(R-Value) Declaration ❑ 1 hereby certify that the above insulation was installed in the building at the above location in conformance with the current Energy Efficiency Slanr/nrdr for residential building(Title 24,Part 6,California Code of Regulations)as indicated on the Certificate of Compliance, where applicable. Item#s Signature Date Installing Subcontractor(Co. Name)OR I(if applicable) General Contractor(Co.Name)OR Owner Item its Signature Date Installing Subcontractor(Co.Name)OR I(if applicable) General Contractor(Co.Name)OR Owner Item Ns Signature Dale Installing Subcontractor(Co. Name)OR I(if applicable) General Contractor(Co. Name)OR Owner Rcsid.tiel Compliance Forms - April 2005 HVAC SIZING HVAC Page 1 Project Title . . . . . . . . . . Bldg F/1981 Date . . 11/26/07 08 :28 : 11 Project Address . . . . . . . . Las Palmas ******* Cupertino, CA *v7 . 10* Documentation Author. . . D. Penaranda ******* Building Permit California Living & Energy 3015 Dale Court Plan Check Date Ceres, CA 95307 209-538-2879 Field Check/ Date Climate Zone . . . . . . . . . . . 04 Compliance Method. . . . . . MICROPAS7 v7 . 10 for 2005 Standards by Enercomp, Inc. MICROPAS7 v7 . 10 File-LD1981LP Wth-CTZ04S05 Program-HVAC SIZING User#-MP1439 User-California Living & Energ Run-Bldg F/1981 GENERAL INFORMATION Floor Area. . . . . . . . . . . . . . . . . 1981 sf Volume. . . . . . . . . . . . . . . . . . . . . 15848 cf Front Orientation. . . . . . . . . . Front Facing 0 deg (N) Sizing Location. . . . . . . . . . . . CUPERTINO Latitude. . . . . . . . . . . . . . . . . . . 37 . 3 degrees Winter Outside Design. . . . . . 28 F Winter Inside Design. . . . . . . 70 F Summer Outside Design. . . . . . 86 F Summer Inside Design. . . . . . . 75 F Summer Range. . . . . . . . . . . . . . . 30 F Interior Shading Used. . . . . . Yes Exterior Shading Used. . . . . . Yes Overhang Shading Used. . . . . . Yes Latent Load Fraction. . . . . . . 0 . 14 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar. . . . . . 15650 8727 Glazing Conduction and Solar. . . . . 6552 15901 Infiltration. . . . . . . . . . . . . . . . . . . . . 11567 1536 Internal Gain. . . . . . . . . . . . . . . . . . . . n/a 2120 Ducts . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7365 4967 Sensible Load. . . . . . . . . . . . . . . . . . . . 41135 33250 Latent Load. . . . . . . . . . . . . . . . . . . . . . n/a 4855 Minimum Total Load 41135 38105 Note : The loads shown are only one of the criteria affecting the selection of HVAC equipment . Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc . , must also be considered. It is the HVAC designer' s responsibility to consider all - factors when selecting the HVAC equipment . HVAC SIZING HVAC Page 2 Project Title . . . . . . . . . . Bldg- F%1981 Date . . 11/26/07 08 . 28 : 11 MICROPAS7 v7 . 10 File-LD1981LP ,Wth-CTZ04S05 Program-HVAC SIZING User#-MP1439 User-California Living & Energ Run-Bldg F/1981 Y GENERAL INFORMATION F1oor- Area..... . . .... . . . . . . . . . . . 1981 sf Volume.% .... . . . .. . . . . . . . . . . . . 15848 cf Front Orientation. ,.-. ,. . . . . . . Front Facing 90 deg (E) Sizing .Lobatibn. ... . . . . . . . . . CUPERTINO Latitude. ., . : : : . . . .... . . . . . . . . 37 . 3 degrees Winter Outside :Desgn. . . . . . 28 F Winter Inside- Design. . . . . . . 70 F Summer ,outside,�Design. . . . . . 86 F Summer Inside Design. . . . . . . 75 F Summer- Range . . ... . . . . . . . . . . . 30 F Interior Shading •Used. . . . . . Yes Exterior Shading Used. . . . . . Yes Overhang, Shading Used. . . . . . Yes Latent' Load.:Fraction. . . . . . . 0 . 14 HEATING AND COOLING LOAD SUMMARY i Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction, and Solar. . . . . . 15650 7992 Glazing Conduction and Solar. . . . . 6552 16652 Infiltration... . . ... ... . . ... . . . . . . . . . 11567 1536 Internal Gain.. . . . . . ... . : . . . . . . . . . n/a 2120 Ducts . . . . . . . . . . . . . : . . . . . . . . . . . . . . 7365 4970 Sensible Load. . . . . . . . . : . . . . . . . . . . 41135 33270 Latent Load. . ... . : . . . . . . ... . . . . . . . . n/a 4857 Minimum Total Load 41135 38128 Note : The loads shown are- orly_ one of the criteria affecting the selection of HVAC equipment . r. Other relevant design factors such as air flow requirements, outside. air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc . , must also be considered. It is the HVAC de'signer' s responsibility to consider all factors when selecting the -HVAC equipment . HVAC SIZING HVAC Page 3 Project Title . . . . . . i-... .- .Bldg F/1981 Date . . 11/26/07 08 :28 : 11 MICROPAS7 v7.. 10- .File-LD19,81LP Wth-CTZ04So5 Program-HVAC SIZING User#-MP1439 User-California Living & Energ Run-Bldg F/1981 GENERAL INFORMATION Floor Area: . . . . .. . . . . . . . . . . 1981 sf Volume.':_.'. . . . . : : . . . . . . . . . . . 15848 Cf Front Orientation. . . . . . . . . . Front Facing 180 deg (S) Sizing Location. : . . . . . . . . . . CUPERTINO Latitude. ; . . . . . ... . . . . . . . . . . 37 . 3 degrees Winter. dutside Design,. . . . . . 28 F Winter inside Design. . . . . . . 70 F Summer, Outside 'Design. . . . . . 86 F Summer Inside Design. . . . . . . 75 F Summer. Range . . . ... .. . . . . . . . . 30 F Interior, Shadirig Used. . . . . . Yes Exterior Shading-Used. . . . . . Yes Overhang 'Shading- Used. . . . . . Yes t Latent Load, Fraction. . . . . . . 0 . 14 i HEATING AND COOLING LOAD SUMMARY Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar. . . . . . 15650 9264 Glazing Conductiori 'and Solar. . . . . 6552 14689 Infiltration: : . : . . . . . . . . . . . . . . . . . 11567 1536 Internal Gain. .: . . . . . . ... . . . . . . . . . n/a 2120 Ducts . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7365 4848 Sensible -Load. .. . . . . . . . . . . . . . . . . . 41135 32457 Latent Load. . . . . . . . . . . . . . . . . . . . . . n/a 4739 r Minimum Total Load 41135 37196 c Note : The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other .-relevant design factors such as air flow requirements, outside air', outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc . , must also be considered. It is the HVAC designer' s responsibility to consider all ti factors when selecting the. HVAC equipment . j t E (J i¢ A 'r HVAC SIZING HVAC Page 4 Project Title . . . . .. . . .. . Bldg`'F/1981 Date . . 11/26/07 08 :28 : 11 MICROPAS7 v7 . 1:V :F Ie-LD1981LP Wth-CTZ04S05 Program-HVAC SIZING User#-MP1439 User-'California Living & Energ Run-Bldg F/1981 GENERAL INFORMATION Floor Area . . . . . . . . 1981 sf Volume . . : * I . . . . . . . . 15848 cf Front Orientation. . . . . . . . . . Front Facing 270 deg (W) Sizing, Location. . . . . . . . . . . . CUPERTINO Latitude. . . . . . . . . . ... . . . . . . . 37 . 3 degrees Winter Outside Design. . . . . . 28 F Winter. Inside -Design. . . . . . . 70 F Summer .Outside Design. . . . . . 86 F Summer Inside Design. . . . . . . 75 F Summer_ Range. . . . . . . . . . . . . . . 30 F Interior Shading .Used. . . . . . Yes Exterior Shading Used. . . . . . Yes Overhang;'Shading Used. . . . . . Yes Latent Load Fraction. . ., . . . . 0 . 14 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction- and Sol'ar. . . . . . 15650 7971 Glazing Conduction and Solar. . . , . 6552 17165 Infiltration. . i . . . . . . . . . . . . . . . . . . 11567 1536 Internal_ Gain. . . . . . ... . . . . . . . . . . . . n/a 2120 Ducts . . . . . . . . ... . . . . . . . . . . . . . . . . . . 7365 5056 Sensible Load. . . . . . . . . . . . . . . . . . . . 41135 33848 Latent Load. ... . : . . . . . . . . . . . . . . . . . n/a 4942 Minimum Total Load 41135 38790 Note : The loads shown are,- only. one of the criteria affecting the selection of HVAC equipment : ., Other relevant design factors such as air flow requirements, outside :air,. outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc . , must also be considered. It is the 'HVAC 'designer' s responsibility to consider all factors when selecting the. HVAC -equipment .