Loading...
ERC 05-03-2012 Community Development Department Cupertino,CA 95014 (408) 777-3308 APPROVED MINUTES OF THE SPECIAL MEET[NG OF THE ENVIRONMENTAL REVIEW COMMITTEE HELD ON May 3,2012 Committee Members: Aarti Shrivastava Glenn Goepfert Marty Miller Interim City Manager, Amy Chan Committee Members absent: Barry Chang Timm Borden Staff present: Colin Jung Staff absent: none APPROVAL OF MINUTES: April 19, 2012 ACTION: Approval of minutes from April 19, 2012 MOTION: Amy Chan SECOND: Mary Miller ABSTAIN: none VOTE: 4-0 ORAL COMMUNICATIONS (Reserved for persons wishing to address the Committee on issues that are not already included in the regular Order of Business) NEW ITEMS: 1. Application No.: EXC-2011-11,V-2011-03 (EA-2011-17) Applicant: Barre Barnes (Holiday Drive, LLC) Location: 21740 Rainbow Drive Hillside Exception to allow a 4,478 square foot single family residence plus a 840 square foot basement to be constructed on slopes of 30% or greater; Variance to allow an attached first story deck more than 18 inches above grade to be setback 0 feet from the property line where 10 feet is required ❑ Geologic o There were 2 different geologic studies done by consulting firms o To abate seismic concerns, the foundation piers will need to be imbedded into the bedrock o To abate potential concerns of a debris flow caused by storm water runoff, a "diversion wall" will be constructed o The flattest part of the lot is about .5 acres, the proposed home is approximately 4,400 square feet on a slope greater than 30% o 569 cubic feet of cut, 252 cubic feet of fill ❑ Trees/Landscaping o There is a 20" Oak tree in the proposed residential footprint o The replacement plan is consistent with the City's Tree Ordinance ❑ Additional Discussion o The retaining and diversion walls will be stone faced o The requested 0 foot setback abuts the Mid-Peninsula Open Space area o The applicant has already met with Public Works to design a storm water run-off plan o The deck will be built using fire retardant material ACTION: Recommendation for approval of a Mitigated Negative Declaration for EA-2011-17 MOTION: Aarti Shrivastava SECOND: Glenn Goepfert NOES: none VOTE: 4-0 2. Application No.: CP-2012-01 (EA-2012-03) Applicant: City of Cupertino Location: Citywide Review of the five-year Capital Improvements Program (FY 2012-13 to 2016-17) for conformity to the City of Cupertino's General Plan 0 Additional Discussion o Review limited to first year funded projects: o One project has already had a separate environmental review -Stevens Creek Corridor Park, Phase II. o Repairs/renovations and minor maintenance of existing facilities projects- (street,curbs & gutter upgrades, resurfacing of trails and parking lots, storm drain improvements, traffic signal and intersection improvements, etc.),would be CEQA exempt o Minor City infrastructure projects - (construction of an all-weather, multipurpose court at the Sports Center, construct of a stand-alone shelter at McClellan Ranch, create a signage program for the parks, conduct planning and feasibility studies for facilities at the Stocklmeir/McClellan corridor, Blackberry Farm Golf Course and Stevens Creek Trail, etc.),would be CEQA exempt o Repairs/renovations and minor maintenance of existing facilities projects - (rehabilitation of irrigation systems at Wilson Park and McClellan corridors, renovation of the McClellan Ranch Barn and Blacksmith Shop, renovations to Quinlan Center and City Hall to meet current ADA requirements and building codes, etc), would be CEQA exempt o Overall projects in total will not pose any significant environmental impacts o The Mary Avenue fenced dog park project will require additional environmental review due to the changes in the scope or location of the project ACTION: Recommendation for approval of a Negative Declaration for EA-2012-03 MOTION: Amy Chan SECOND: Aarti Shrivastava NOES: none VOTE: 4-0 OLD BUSINESS None Respectfully submitted; &71A Beth Ebben Administrative Clerk G/planning/erc/actionminutes050312