08050056 CALCSDAEDALUS
Structural Engineering
December 29, 2008
Attention: City Inspector
City of Cupertino
Building Department
10300 Torre Ave.
Cupertino, CA 95014-3202
C/O Don Ortega
BSM Construction Inc.
to q
Project: 10983 Wolfe Road— Revised - New 5 Ton Split System
Project No. 08011a
Subject: Response to Inspection request
Plan Check Number 08199.CUP
Permit No. 08050056
Dear Sir,
This letter responds to your request that I, as the Engineer of Record for the subject project, review the support
condition of the typical roof beam support at the exterior wall. We have reviewed the support condition based
on our own earlier site investigation and confirmation of the support condition in question based on photos
provided by Mr. Don Ortega of BSM Construction. The existing support condition is more than adequate to
support the existing roof plus the added weight of the new hung unit supported by these existing roof beams.
Should you have any further questions or need further clarification please give me a call at 408-517-0373 ext.
10.
Sincerely,
DAEDALUS
Doug Robertson
Principal
S.E. No. 3424
19172 De Havilland Drive, Saratoga, California 95070 T: 408.517.0370 F: 408.877.1686 www.daedalus-eng.com
WD. WALL WALL SHT'&.
-2X SOLID BLK'6.
X --2X SILL PL. W/ I&d �D
A35 CLIPS & 16" O.G. -� ® 4" O.G. TYP.
(E) OR (K) FLR. SHT'&.
(N)-2 x FLR. JST.
`fl Z 2 X 6 PRESSURE —�
TREATED MUD 51LL
W/ A.B. PER FOUNDATION
PLAN
'04 X VERT. ® 32" O
(2) 04 ® 8 BTTM.
E.N.
T.O. FLR. 5HT'G
— FLOOR E.N.
— (5) 16d EA. J5T.
ADD 4x4x REQUIRED SHAPED BLK'6. AT EA GAP.
AND NAIL W/(4) 16d TOE NAILS AT EA. CONN.
E.N.
P• #4 & TOP.
a
IL
a Z
a
FIX FOR FLOOR JST. SUPPORT ALONG LINE 114"
FIRST FLOOR ADDITION: � RE6�JEsr LD ��gElo DRAWIN6� s.V.
22045 Wallace: Dr:. DATE, I2t2an° 7Sm4K"'—
Cup, CA 951040����� „o
P + SGALE� 3/4 I -O