Loading...
12070208 CITY OF CUPERTINO BUILDING PERMIT BUILDINGADDRESS: 20670 GARDENSIDIi CIR CONTRACI'OR:BRADSIIAW ROOFING PFRMITNO: 12070208 O\w'NE.R'S NAME: YU-WEN KAO 1821 S BASCOM AVE 1'\IR 160 DATE ISSUED:07/272012 O\w'NER'S PHONE: 4082469930 CAMPBELL.CA 95008 PHONE NO:(408)2169930 ❑ LICENSED CO\I"RACI'OR'S DECLARATION �:�-Sf(��—f' BUILDING PERPIIT INFO: BLDG ELECT PLUMB " License Class J l Lie.N :s,9 �� l_ — I 1 NIECf1 r RESIDENTIAL r' COMMERCIAL r. Contractor�Z'f,L�1�j`I�.J Dalc hereby affirm that I am licensed under the provisions of Chapter') JOB DESCRIPTION: RE-ROOF- 12 SQ-REMOVE EXISTING WOOD SHAKE (coil]mencing with Section 7000)of Division 3 of the Rusiness R Professions ROOFING Code and that nnlicense is in full force and effect. AND INSTALL NEW CLASS A ASPHALT SHINGLES (CERTAINTEED-AGED DARK) herehy nffinn under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of One work for which this permit is issued Sq.Ft Fluor Area: Valuation:$6000 APPLICAN f CERTIFICATION I certify that I have read this application and state that the above informtion is AI;N Number:36232029.00 Occupancy Type: correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save indemnify and keep harmless the City of Cupeninoagainslliabilities,judgments, PERMIT EXPIRES IF WORK IS NOT STARTED costs,and expenseswhich may accme against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply WITHIN 180 DAYS OF PERMIT ISSUANCE OR with allnon-point source regulations per the Cupertino Municipal Code,Section 180 DAYS FROM LAST CALLED INSPECTION. 9.18. t Signatures/(/ /1 ate /��2 Issued by: : Date: / '97/�L— ❑ OWNER-BUILDER DECLARATION 1 herehy affirm that I:un exempt from the Contractor's License Law fur one of RF.-ROOFS: the following two reasons: All roofs shall be inspected prior to any roofing material being installed.If a roof is I,as owner of the property,or my employees with wages as their sole compensation, installed without first obtaining an inspection,I agree to remove all new materials for will do the work,and the structure is not intended or o0cred for sale(Sec.7044, inspection. Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to Signature of Applicant: Date: construct the project(Sce.7044,Business&Professions Cade). hereby affirm under penalty of perjury one of the following three ALL ROOF COVERINGS TO RE CLASS"A"OR BE'FI ER declarations: I have and will maintain a Certificate of Consent to self insure for Worker's IL\%ARDOUS\LVITRIALS DISCLOSURE' Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued I have read the hazardous materials requirements under Chapter 6.95 of the I have and will maintain Worker's Compensation Insurance,as provided for by California Ilealth S Safety'Code.Sections 25505,25533,and 25534. 1 will maintain Section 3700 of the Labor Code,for the performance of the work for which this compliance with the Cupertino Municipal Cade,Chapter 9.12 and the Health S Safety Code.Section_553_(a)should I store or handle hazardous material. permit is issued Additionally,should I use equipment or devices which emit hazardous air I cenify that in lire performance of the work for which this permit is issued,I shut] contaminants us defined by the Bay Arca Air Quality Nlanagemen(District 1 will not employ any person in any manner so as to become subject to the Worker's maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the Compensation laws of California. If,after making this certificate of exemption,I Beallb&Safety Code,Sections 25505,25533,and 25534. become subject to the Worker's Compensation provisions of the Labor Code,I must / ` forthwith comply with such provisions or this permit shall be deemed revoked. O ner m lhorq agaaC But7// e APPLICANT CER'T'IFICATION CONS'1-RUCTION LENDING AGENCY I cenify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances aid state laws relating I hereby affirm that there is a construction lending agency for the performance of work's to building construction,and hereby authorize representatives of this city to enter for which this permit is issued(Sec.3097,Civ C.) upon the above mentioned property for inspection purposes.(We)agree to save Lender's Name indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence ofthe Lender's Address granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Sectio, 9.18. ,\RQI VISCI"S DECLARATION I understand my plans shall be used as public records. Signature Dale Licensed Professional Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 C U P E RT I N O Fax: 408-777-3333 CONTRACTOR / SUBCONTRACTOR LIST JOB ADDRESS: C2,0,670 1 PERMIT# e?, a7D dG�' OWNER'S NAME: S Cir - PHONE# aL{ 0 GENERAL CONTRACTOR: BUSINL'SS LICENSE # ADDRESS: f A3XpV CITY/ZIPCODE: n p -25 *Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO 13UILDING FINAL OR FINAL OCCUPANCY INSPECTIONS) WILL 13E SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO 13USINESS LICENSE. 1 am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAVE BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring/ Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile p Owner/ Contractor Signature Date CITY OF CUPERTINO FEE ESTIMATOR - BUILDING DIVISION ADDRESS: 20670 Gardenside Cir DATE: 07/26/2012 REVIE'*VED BY: Sean APN: BP#: 'VALUATION: IS6,000 *PER,MIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof PRIMARY PENTAMATI ON USE: SFD or Duplex PERMIT TYPE: 1SFDWLROOF woRK Remove existing wood shake roofing and install new class A asphalt shingles. SCOPE FEE ID ROOF AREA s.f. 1REROOFFRES 1,200 Alech. Plan Check Plumb.Plan Check Elec.Plan Check Mech.Penna Fee: Plumb. Permit Fee: Elec.Permit Fee: Other A4cch.Lisp. Other Phtntb 1, Other Elec..Lisp. :tech.Insp.Fee: Plumb.Insp.Fee: Elea Lisp.Fee: NOTE: This estimate does not include fees due to other Departments(i.e.Planning, Public N'orks, Fire,Sanitaq•Sewer District,School District,eta). These ees are based on the prelintinarl•information available and are only an estimate Contact the De t or addn't info. FEE ITEMS (Fee Resolution 11-053 Elf 7/1/11) FEE QTY/FEE MISC ITEMS Plan Check Fee: Suppl. PC Fee Plumb./Mech./Elec Permit Fee: $180.00 Suppl. Insp Fee Plumb.Afech./Elec PlumbJMech./Elec Pernnii Fee: Construction Tax: Administrative Fee: Work without Permit? O Yes (F) No S0.00 Advanced Planning Fees: Travel Documentation Fees: Strong Motion Fee: IBSEISMICR S0.60 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC S1.00 1 I SUBTOTALS: 1 $181.60 $0.00 TOTAL FEE: F$181.60 Revised: 07/01/2012 REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O.. BUILDING OFFICIAL 10300 TORRE AVENUE •CUPERTINO,CA 95014-3255 CUPERTINO (408)777-3228• FAX(408)777-3333•buildingecupertino.orD PROJECT ADDRESS O APN N !o?o r. - -t OWNER NAME w 1,C PHONE E-MAIL u — \ 111 STRE ADD ` CITY STATE 21PQ A FA% C CIO NA, E T LICENSE NUcMBE LICENSE TYP BUS.LIC. (. ' i COMPANY NAME E-MAI FAX -7-2 - _ STREETADORFSS ` , ; CG CITY,STATE LP2141 1 ONE 993 0 I UNDERSTAND AND AGREE TO THE FOLLOWING: I. The re-roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled up to the day before the inspection date. Please call (408)777- 3228 from 7:30 - 3:30pm (Mon-Thurs) or 7:30 - 2:30pm (Friday) to schedule the next day inspection. For Tear-Off and Nailing Inspections, you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. Progress and Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or removed.prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. Progress Inspection is required when approximately 50%of roof covering is installed. 7. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of I/<" per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. 8. NOTE: .If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. 1 understand and agree to comply with the re-roof policy stated above. I also understand that smoke detectors and carbon monoxide detectors are required to be installed in accordance with Sections R314 and 8315 of the 2010 California Residential Code Signature of Applicant/Agent: Date. -7 ReroofPo1icv_201/.dot revised 02/16111 _Yrovide Copy or manufacturer instaltatlon Speciricactons. ❑ STANDARD ❑ FIRE DEPT —Provide signed copy of Cupertino's Tey--Off Policy. ❑ OTTER: