Loading...
08090026 (2) CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10351 S TANTAU AVE CONTRAC'MR:TBD-TO BE PERMIT No:08090026 DETERMINED OWNER'S NAME: MINDY NGUYEN DATE ISSUED:05/18/2009 OWNERS PHONE: 7023707755 PI ION NO: ❑ LICENSED CONIRACI'OR'S DECLARATION 131111,DIN'G I'EKdll'1"INFO: BI,DC r' ELECT r' rLtDtlt r License Class Lic.q n F7 r x1EC11 HESIUEVI'1,\I, COMMEHCI,\I, Contractor Due 1 hereby affirm that 1 am licensed under the provisions of Chapter 9 JOB DESCRIPTION: IIOUS17 DEMO 1,179' (commencing with Section 7000)of Division 3 of(hBusiness usiness&Professions SCANNI:D Code and that my license is in full force and effect. hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Fluor Area: Valuation:510000 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this \PN Number.37508017.00 Occu ane "I' permit is issued. p y )pe: APPLICANT CERTI FIC TION I ccnify that l have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.l agree to comply with all city and county ordinances and state Imes relating WITHIN 18U DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FROM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said Cit'in consequence of the granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. RE-ROOFS: Signature Date All roofs shall be inspected prior to any roofing material being installed If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION hereby affirm That 1 am exempt from the Contractor's License I,aw for one of Signature of Applicant: Date: the fallowing two reasons: ALL ROOF CO\'P;RINGS'I'O BF,CLASS \"OR RE'I'1'EIt I,as owner of the propcny,or my employees hrith wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,.am exclusively contracting with licensed contractors to IIA%ARDOUS MATEIRIALS DISCLOSURE construct the project(See.7044,Business K Professions Code). 1 have read the hazardous materials requirements under Chapter 6.95 of the California Ilealth&Safety Code,Sections 25505.25533.and 25534. 1 will 1 hereby affirm.under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code.Section 25532(x)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should 1 use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air conlammants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit i5 issued will maintain compliance with the Cupertino Municipal Code.Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code.Sections 25505.25533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Owner or authorized agent: Date. I ccnify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to dhe Worker's Compensation laws of Cnlifomia. If,after making this certificate of exenhption.I CONSTRUCHON LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby afTmn that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be devoted revoked w'ork's for which this permit is.issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and stale that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned properly for inspection purposes.(We)agree to save indemnify and keep harmless the City of Cupenino against liabilities,judgments, ARCI IITECI"S DECLARA'T'ION costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-paint source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature Date CITY OF CUPERTINO 4'(-L�- DEMO fCUPERTINO` PERMIT APPLICATION FORM " cab oacP APN#3 7 5- 0 F/O 17 Date: g a � Q t Buildine Address: _ I Ga SI s. -7_An/T -C1 C UPC 4e T IAJO Mailing Address (if different from building address): X67 TG,llt (� QST A-S V /3 Owner's Name: Phone: 1,1)t4Dy NC10Yt N) -70 a70 - -17ss Contractor: Phone Fax: Contractor License #: Cupertino Business License #: Contact: CJ AR TO-N Phone: 51cJ-"01 —3 q(J 3 Fax: Residential ® Sq Footage: Commercial ❑ Sq Footage Job Description: Tia St � _ S31--;Xr Valuation: f or poo i Project Size: Express ❑ Standard ❑ Large N Major ❑ Please complete relevant portions of the Green Building Checklist & attach it to the application or if applicable, include on the plan set & the sheet index. Quantity Fee ID Fee Description Fee Group Permit Type IDEMORES Demo-Residential B ISFDWL-DEM IDEMOPRES Pool Demo Residential B 1SFPOOL-DEM 1BSEISMICRE Seismic Residential B Revised 6/16/08 !EE-` A RVScRV ETrI__ j-31 0)8 3 4_4 7.7 2 F_� 'STEL (31�0):8 3*4�,68.-",FA?�� h IS Envimnm�=l R�cllati� V" --5 - .' Date Keceiveo, 08 09 �AmenScitJobl# r; 909051182= _ ) Environmental Iv lDbWExaffilneb Attn: QominckiFanelfi ' 6472;lZamden,Ave- rII',.,. 'SteN1026'­ WE 0 9O 5: ino CA_ 'S a 3 n,ose- ICk 95120 .�vww. -,F':(;4'0 8-),, 18 6 6r-4:1.4 inTd@e3�tir�c �com­-, k�p Ez. r IAMWO.-i �HGA, 909051,182-Ol'- -;Ix- OWN! '6vr -0 ' '` Locatwn ;Wall Material 1;,lnteho'r_eWaIl'v Z n a-v; --k bj,'Artum A�Alda 4 I- �I �Ijt Ic Ij7, F `k4� b re W i P ipt! n:G yL hte k Materiafi T �,fibro-u:s­'Od Asbost or, Er / -6 L. t 9�r. H I:N6n MA"02z r'.KZITN7-_": 1�sl: 9_0051182'-0,2'- ., ValliMaterial7.1h1eirior Wall- y:C •ilr Location ,V iylw - oF -�n - 4, �:� '�, - .1, - -- I,, , , �7 J _-1 V UlkI i ;97AfiSiy'stDgcriotioh:Off-Whit6;;H6t6rodeneoCisNon-Fibrou4, ,100,.jwr� F 4909051.182 03 'INAD 3 T z 6n'05/08/09 White,,Hetiar6genecus�.NonFibroiusyte-i�6niit66s.'-duik'- nalyst Descr!oti6n7:C)ff t0 her M feriae-Aoh7fibr'o qT��V`ntg 77777T777I77777-­­­ :gr ;o i- 90905,102404. -�,L- �Ye7s i:1, -04%�, � 4 1 -,t , ",�, :.; t, b CVE Location Black Black'Mist-ic'/AFloor,,Throughou C� '.p, U X-Ndana n� ' 'MAY j 4 200S.. OF i�i i!?�iiilysxi6is�i-riptibn:'Bia-cW,-IHomo�geneous.-Non-Fibrpps7.Bulk' teria , BY: ;&],ZlMjte�a fib 5 Yes - a"z 2%r �7 ;90905V82-0 -CVES)I. (by !'�-',Location:.�,Winbov�Put_y, Ce tm`iA L alystMescrpton: ateH5, bestosTypes:ChFy64 -2.0% t&iMate nlast,-,pagSi*._­, -,--., ea'Repwting noteV 7 Ame'riSci!Job#: 909051182; -Page"2ibf.2� C1len4'Name:, Environmental'Rernedlation'iech'.. J n PLM` Bulk AsbestosjRbport 090542;,Gharile,Tran; '1'6351 S Tantau`Ave Cu'p'ertlno;-CAY Client,No_ ! HG& , Cabe: No. Asb"estos Present _ Total;/e Asbestos •_ ... 'Sal 909051182-06 No'4 NAD Loaa_tlon: 'Stucco/.Exterior Siding (by CCVESj by°Arturo'A:Altla a, o_m05108_109' Analyst``DDesdriptioni,Grey Heterogeneous;Non_-Fibrous,,CemenlitioustBu'lk Mate'rial, A_sb'Atos Types:" O tfier Mate pial t"Noir-fitiious'100'% CRS-07 9090511182=07 No' NAD' ILodki' :'Comp:.,Roof Shingle:/,Ekteflor Roof, 7by'Arturo'AsAldana on 05/08109 Analystr6lescriptlon IBlack Homogeneous; FiSrous 66VWt&1r 1 'Asbestos Types I (Other r4ai&1 I Fibrous glass Non-fibrous,98';e/a� F?'Ot3} "909051182-08 No NA0 ' Locatl n:dFeltPaper/EzterlorR`oof (by r, �CVES)i u^ b`y,Arluro,A.Alilanar .an 05/08/09 rAnalyst Description Black ,ko"mogeneeus_Fibrous,_Bulk Materlal ''Asbestos: ypes:' � ,Other Mate%ialtCellulosell2,°/d,-Norr-6brous_BB'0/a _ I)y The black mastic on floor throughout the interior residence, plus the exterior window putty was found to contain asbestos . These materials must be removed from the structure prior to renovation or demolition activity. The handling, work practices, and disposal of asbestos is regulated and restricted by certain governmental agencies such as Cal-OSHA, BAAQMD, EPA, and DISC. All work must be performed by a licensed asbestos abatement contractor. Please give this report to the licensed asbestos abatement contractor of your choice. The chosen contractor shall remove the asbestos from the residence prior to renovation or demolition as required by BAAQMD. ,ReportingAotes: �t ��r NAD eno'Jasbestos de ectad Dete_c6on Limd<1.6 Re mn Date Analyietl 5(8/2009. ir. - n y I - ° po g..Limits:CVES-jt . 400,Pt Ct y 0 25%SZ1000 P1 Cwt 0 1/° NA not'analyzetl__IJWPS =p"t /ppsrtwe stop NVA='No Vslble Asbestos PLM(polar,zed.light m,croscopy)Bulk Asbestos Anaiyss'b7 EPA 6001M4 82-020 per 40 q CFR;763(NVLAP Lab#200346-0°,CP.ELAP lati N23�2) Note:'PLM,snot corisatenlly reliable In detectlng asbestos in floor, and Simi ar,NOB �matedals. TEM s$urrenUy the only methotl that can be used'to'determine it tAti material can be considered or treated as nonasbeslos-containing In Newar Yk_State(also see EPA Advisory for 0cdrthe 38 FR 59}146, 970 B%1/94) NISTAcc , reditat,on requirements mandate that I is repoitmuustnotbe- j reproduced except m full w h e" 'al of the'.abora }y uC P M report relates ONLYito the items tested. tRevlewedlDy r " >/ SOS P=C ONTRM May 5, 2009 To Whom It May Concern: The property at 1041 antau Ave, Cupertino, California, 95014, was inspected today for any infestation of rodents. No active infestation was found. �Mike Stadmiller, Field Representative V Mc( t 408-866-6609 RECEIVED MAY 14 2009 BY: 2432 DeneA Ddve, Son Jose, CA 95130-2104, (408) 866-6609 and.P.ieCtl'iC.faciliues.bave.be-n.Cel7noved.and/n r,abandoned,3.i:: City of Cupertino Public Works Department 10300 Torre Ave. Cupertino CA 95014 (408)777-3354 Debris Bins Debris from a project in Cupertino can be collected and disposed of in either: 1. a Los Altos Garbage Co. bin (call 725-4020 to order), OR 2. a bin owned by the project's general contractor or demolition contractor, and hauled by a vehicle owned and registered to that contractor (contractor should be prepared to prove ownership), OR 3. a private truck with a bed, but no bin The Los Altos Garbage Company is the only debris bin service provider franchised to do business in Cupertino. Bins from other leasing companies may not be used in Cupertino. Please check all that apply: ❑ I will use a Los Altos Garbage Company.bin I will use a bin and truck owned by the general contractor or the demolition contractor. ❑ I will use a private truck, and not drop a bin. Recyclable Materials . Recyclable materials may be collected in private debris bins or containers leased from ANY company, as long as the materials are both: 1. separated by type of material into separate containers, AND 2. are not contaminated by garbage. Separated recyclable materials are materials that are separated into individual containers, each containing just one type of recyclable material. Typical examples of recyclable materials include: metal, wood, concrete, steel-reinforced concrete, asphalt, tree trimmings, white goods, toilets (hardware'removed), rocks and clean fill dirt. Separated recyclables must ultimately be recycled or otherwise reused, and not disposed of in a landfill. Contractor should be prepared to provide the name and phone number of any recycling companies being used on the project. A list of loran recycling companies can be found at: www.recyclestuff.org. A . ................................................ Signature: Date: 5-18 09 _ Name (printed): �'H(Jhl G D. Title: _'fiOME C� YJIIIF.I? Phone: UI-5 — 63 3 — 18 883 Project address: 1035/ S° T-gN I'AL) -/i-1/C 0_0 Ilek NoG GA 950 This form to remain in the project's building permit file for the dutadon of the pmj=L Revised 1103 CITY OF • Building Department 10300 Torre Avenue Cupertino, CA 95014 Phone (408)777-3228 Fax (408) 777-3333 CUPERTINO PROCEDURE FOR DEMOLITION PERMITS The demolition application should be applied for before or at the same time as the new construction permit application (these are separate permit applications & fees). Plan check fees are due at the time of application/plan submittal. The new construction permit will not be issued until the demolition permit is issued. BEFORE DEMOLITION PERMITS CAN BE ISSUED,THE FOLLOWING STEPS MUST BE COMPLETED: SIGN TURIVDATI:: 1. A demolition/plot plan will be required showing any trees 10 inches in diameter at 3 feet above grade on the subject property, and what means will be taken to protect same. Three copies of this plan are required for review by the Planning Department. These need to be submitted at the time of permit application, to the Building Department. 2. P.C.& E. must be contacted AS EARLY AS POSSIBLE prior to demolition to schedule the abandonment. Contact P.C.& E. at (408) 725-3325. A letter from P.C.& E. shall be provided to the City, stating that all gas and electric has been disconnected. (This step can be time ons ming, so it is important to begin the process immediately) f-o ➢I Provide a current preliminary title report,which shows ownership of property, open deeds of trust,any liens, taxes, and a legal description. All taxes must be current and paid in full. t �[S(i/l 7 I II I• Any hens(This excludes mortgages) must be taken care of. This report is to be issued within (30)days prior to issuance of the demolition permit. Allow 5 working days for review. V 4. Fill out e Demolitio Request Fo m( with the names and addresses(correspondence address) 0� of any lending institutions,banks, lease holders, partnerships, lines of equity, or any other II Ing persons having entitlement to the property. We will send the form(s) advising interested I p" parties that there is a request for demolition, and they have 15 business days to respond to our office if they object to the demolition. kaS 5. Provide a letter of inspection, tests,and abatement of any Hazardous Materials. Letter to be initiated by person(s)certified in asbestos, mercury and/or hazardous material examination. 6. Check to see if the building is considered an historical landmark. Obtain clearance from the —�f�f'��� Community Development Planning Department. Allow 10 working days. S/L/ 7. Provide a letter of clearance of all vermin from a licensed pest control contractor. 8. Important: Prior to the issuance of the demolition permit, the applicant must call the Public Works Department at (408)777-3104 and arrange a "habitable dwelling" inspection. —G 9. Debris bin and Recycling sheet: read,sign and date. The sheet will remain in the project's / building permit file for the duration of the project. �10. Prior to issuance of the demolition permit, the Fire Department must review the plans for fire Suppression/alarm systems that shall remain in service or be modified diving demolition or that shall be replaced with the new construction. Revised 9/03/08