Loading...
12030017CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10148 PRADO VISTA AVE I CONTRACTORR: MAMA GENERAL I PERMIT NO: 12030017 OWNER'S NAME: PARVATHANENI CHAKRAVARTHY AND LANKA 1839 TAMPA WAY I DATE ISSUED: 05/31/2012 OWNER'S PHONE: 4083933645 1 SAN JOSE, CA 95122 ! PHONE NO: (408)375-4288 01-7- LICENSED CONTRACTOR'S DECLARATION License Class) Lic. # ez� lo �Contractor M00% �KklM_Ctl Date 1-5 (all I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION certify that 1 have read this application and state that the above information is correct, i agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non- . ource regulations per the Cupertino Municipal Code, Section 9.18. Signature9 J1' tiVDate t�hI I�- ❑ OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). I hereby affirm undcr penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 ofthe Labor Code, for the performance ofthe work for which this permit is issued. I certify that in the performance ofthe work for which this permit is issued, l shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, atter making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, 1 must forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence ofthe granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. BUILDING PERMIT INFO: BLDG r ELECT r PLUMB T MECH T RESIDENTIAL f- COMMERCIAL I - JOB DESCRIPTION: CONSTRUCT NEW TWO STORY SINGLE FAMILY DWELLING(3427 SQFT-LIVING) & ATTACHED GARAGE(692 SQFT) Sq. Ft Floor Area: I Valuation: $700000 APN Number: 34214093.00 1 Occupancy Type: PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROLAST CALLED INSPECTION. Issued by: Date 3 RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant: Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505,25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District [will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Wicty Code, Sections 25505, 25533, and 25534. Own49�� Dale. CONSTRUCTION LENDING AGENCY 1 hereby affirm that there is a construction lending agency for the performance of rwrk's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's Address ARCHITECT'S DECLARATION 1 understand my plans shall be used as public records. Signature Date I Licensed Profcssiona CONSTRUCTION PERMIT APPLICATION"SMl) COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ff 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • buildin cu ertino.or CUPERTINO NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION 1 TI ❑ REVISION I DEFER1tED ORIGINAL PERMIT # PROJECT ADDRESS D R AS- 4E-� OWNERN PHONEu` � N S' c . STREET ADDRESS CTrr. STATE. ZIP FAX O Ui S i O O 2 ` CONTACT NAME' PHONE Z -MAIL. -15ct T sx. D S C STREET ADDRESS 1, STATS ZEP FAX 11a.1-gol-wo AV-� C> ❑ OWNER ❑ OWNER -BUILDER ❑ OWNERAGENT ❑ CONTRACTOR ❑ CONTRACTORAGENT 5? ARCrIIrECT ❑ ENGD(IM ❑ DEVELOPER ❑ TENANT CONTRACTOR NAM ,nw r L � LICENSE NUMBER LICENSE TYPE SUS. LIC # COMPANY NAME E-MAIL FAX . STREET ADDRESS CITY, STATE; ZIP PHONE ARCHTTECT/ENGWEEK NAME LICENSE NUMBER BUS. LIC # COMPANY NAME _TPE-MA.SL FATS STREETADDRESS Sn /J 5IA ZIP PHONE DESCRIPTION OF WORK {.TION —9w i V EXISTINGUSE PROPOSED USE CONSTRTYPE 9STORIEs S if q r� USE TYPE OCC. SQ -FT. VALUATION (S) FXISTG AREA AREA NEW FLOORgL4 DEMO TOTAL AREA NET AREA V HATHROoM REMODEL AREA KITCHEN REMODEL AREA OTHER REMODEL AREA 1 I � V'/3 '' (/ l fp PORCH AREA DECK AREA A TOTAL DECK/PORCH AREA GARAGE AREDETACH O OCLI WTTACH 4DWELLTNGUNITS: ISASECO"UNIT AYES SECONDSTORY EIYES ` BEING ADDED? ❑NO ADDITION' ❑NO PRE -APPLICATION []YES IF YES, PROVIDE COPY OF TSTIEBLDGAN E] YES RE B TOTAL VALUATION: PLANNING APPL # ❑NO PLANNING APPROVAL LETTER EICHT,ER HOME' ❑ NO _ / © Qp< By my signature below, I certify to each of dte following. I am the property owner or authorized agent to act on/the prrperty owner's behalf. •1 have read this application and the information I bave provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to building construction. I authorize representatives of Cupertino to enter the abcve-identi11fied property far inspection purposes. Sigaatore of Applicant(Agent Bate. O `1Tn'�- ( Z SUPPLEMENTAL INFORMATION MQ=D PLAN CHECK TYl E ROUTING STIP ❑ o TB7,Zourlrt a El SUILDBVG PLAN REVIEW New SFD or Multifamily dwellings: Apply for demolition permit for existing building(s). Demolition permit is required prior to issuance of building permit for new building. Q MMRMg ❑ PLANNING Ply REVIEW _ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure STANDARD ElPuBLIcwoRxs form if any Hazardous Materials are being used as part of this project ❑ LARGE ❑➢E7r _ Copy of Planning Approval Letter or Meeting with Planning prior to El MAJOR ElSAMTARY SEVfER DISTRIcr submittal of Building Permit application. ElErlvnrormmIVTaL BEAT.TI3 Bldg,4p,p2011.doc revised 06/21/11 CITY OF CUPERTINO RF -979,4 FEE ESTIMATOR — BUILDING DIVISION OCCUPANCY TYPE: ADDRESS: 10148 Prado Vista Ave DATE: 03/05/2012 REVIEWED BY: Sean PC FEE ID APN:J SP#:07 VALUATION: $700,000 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: New Construction PRIMARY SF❑ or Duplex USE: 2nd Unit? Yes No PENTAhIATION 1 R3SFDW PER11I1T TYPE: 10 WORK Construct a two story residence 3427 sq ft with 092 sq ft attached garage. SCOPE $3,292.10 OCCUPANCY TYPE: TYPE OF CONSTR. FLR AREA s.f. PC FEES PC FEE ID DP FEES SP FEE ID R-3 (Custom) 11-B,111-B,IV,V-B 4,119 $2,998.10 IR3PLNCK $3,292.10 IR3INSP Permit Fee: $3,292.10 Suppl. Insp. Fee:Q Reg. Q OT hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construction Tax: 1BCONSTfIXR # new ���rs $�a3.ao •f.urr.r',n�rLl'r 1 et O 0 Work Without Permit? Yes (j) No $0.00 TOTALS: 4,119 $2,998.10 $3,292.10 Strom Motion Fee: 1BSE1SrffCR NOTE. This estimate does not include fees due to other Departments (i.a Planning, Public {Yorks, Fire, Sanitary Sewer District, School District, eta). These fees tire based on the vrelindnary information available and are only an esiinrale. Contact the Dent for addn'1 info. FEE ITEMS (Fce Resolution 11-053 Eff. 7/1/111 FEE QTY/FEE 1. -Ice, !'ykm Ck i'r, SJ'r Fr n,:: hr F?t.•njh. 11t10Tetr h C, Ei., Yerrar f. r Suppl. PC Fee: Q Reg. Q OT 1,•,t� {}r1rt:1 f?r• lo,j)Li lf� 11 lratit� 1�'re 1'1aar� ;!, Lr=p. 1•i: L1er'. la -vi 1:rv, NOTE. This estimate does not include fees due to other Departments (i.a Planning, Public {Yorks, Fire, Sanitary Sewer District, School District, eta). These fees tire based on the vrelindnary information available and are only an esiinrale. Contact the Dent for addn'1 info. FEE ITEMS (Fce Resolution 11-053 Eff. 7/1/111 FEE QTY/FEE M1SC ITEMS Plan Check Fee: $2,998,10 Select a Misc Bldg/Structure or Element of a Building Suppl. PC Fee: Q Reg. Q OT 0,0 hrs $0.00 PME Plan Check: $0.00 Permit Fee: $3,292.10 Suppl. Insp. Fee:Q Reg. Q OT hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construction Tax: 1BCONSTfIXR # new ���rs $�a3.ao •f.urr.r',n�rLl'r 1 et O 0 Work Without Permit? Yes (j) No $0.00 Advanced Plannine Fee: PLLONGRNGR $535.47 Select a Non -Residential (S) Building or Strueture 4 Strom Motion Fee: 1BSE1SrffCR $70,00 Select an Administrative Item Bldg Stds Commission Fee: 1BCBSC $28.00 SUBTOTALS: $7,507.47 $0.00 TOTALFEE-T $7,507.47 Revised: 111912012 CUPERTINO CONTRACTOR / SUBCONTRACTOR LIST Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 Fax: 408-777-3333 JOB ADDRESS: Ci ADO (5 1 A PERMIT # OWNER'S NAME: PHONE #I ` 3-7 4z F� GENERAL CONTRACTOR: i VAC( 4C4?, QOn iYa&W BUSINESS LICENSE # ADDRESS: CITY/ZIPCODE: *Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAMs UPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR ANDBC N RACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. —3 / L3 I am not using any subcontractors: ` `2 Signature _ Date Please check applicable subcontractors and complete the following information: V SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing FIooring / Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner / Contractor Signature Date CUPERTINO CONTRACTOR / SUBCONTRACTOR LIST Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 Fax: 408-777-3333 JOB ADDRESS: to (Z-- ` CS PERMIT # OWNER'S NAME: PHONE #' GENERAL CONTRACTOR: 6`Q V1t( BUSINESS LICENSE # ADDRESS:0 7j -[G- QCt tU-�- CITY/ZIPCODE: Z Z. - *Our municipal code requires all buMinesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors: Signature Please check applicable subcontractors and complete the following information: Date ✓ SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & MilIwork Cement Finishing Electrical Excavation Fencing Flooring / Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile actor Signature Date THNORTON LANDSCAPE ARCHITECTURE TRANSFER OF LIABILITY Date: October 11, 2013 Client: Chakm Parvathaneni Project Address: !0148 Prado Vista Cupertino, CA 95014 TRANSFER OF LIABILITY: Chakra, Per your request to transfer the project and associated liability from T.H. Nottnn Lindsrape Architecture iTHN) to Juanita Salisbury -Landscape ArchitectISHAi: I Thomas Norton hereby authorized !SIA to take liability and modify the plans prepared for 10148 Prado Vista, Cupertino, CA 95014. By making changes to any portion of the plans, !SIA agrees to assume all responsibility and liability associated with the design and implementation of the plans. Chakra Parvathaneni and all parties hereby agree to hold harmless and protect Thomas Dorton and T.H. Norton Landscape Architecture for any cost, legal fees, Injury and damage incurred by, or to any person or property whatsoever associated with the plans prepared for 10148 Prado Vista, Cupertino, CA 95014. Sincerely, Thomas Norton Principal Juanita Salisbury CA Landscape Architect 9 5l _ Thomas Norton CA Landscape Architect 9 5642 Signature/Date: 1 SignaturelDate: Chakra Parvathaneni Owner SignatureJDate: �' ZS I -1� e49 JEFFRY DRIVE PLEASANT HILL CA 94523 PH 925 822 3685 WEB WWW,THNE3RT13N.C13M 1 OF 3 Page 1 of 2 LANDSCAPE WATER -EFFICIENCY CHECKLIST Counnunify Development Department 10300 Torre Avenue 408.777.3308/Fax 408.777.3333 Cupertino, CA 95014 planning®cupertino.org CUPERTINO http://cupertino.org/plannin Applicant Name joaar,1 a sai-6ir (13 k> -'A ! q rVCLi1-Qne11 L Email: a l IS 61 'S@IisburI-R•COA Project Site Address: (D (` g PV_AD0 VfStl�C+l qa 15D Ir -1 Phone: 65d -T, 1A �S [ Total LandscapeLandscape area: All the planting areas, turf areas, and water Area feet): -Jr f � ( features in a Iandscape installation. The landscape area does (square not include footprints of buildings or structures, sidewalks, driveways, parking lots, decks, patios, gravel or stone walks, Turf Area, (M&-l7lVE SOP7 other pervious or non -pervious hardscappes, and other non- irrigated areas designated for non -development (e.g., open spaces and existing wildland vegetation). Non -Turf PIant Area: Turf: A ground cover surface consisting of non-native grass species that is customarily mowed. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red fescue, and tall Special Landscape Area: P P fescue are examples of cool -season turf grasses. Bermuda grass, kikuyu grass, seashore paspalum, St. Augustine grass, zoysia grass, and buffalo grass are warm -season turf grasses. Water Feature Wet Surface Area: is SF If } 10% of landscaped area, water budget calcu- lation required with landscape project submittal. See reverse side for other definitions. NOTE: If landscape area exceeds 2,500 sq. ft., a landscape project submittal shall be required. If no landscaping is proposed, enter "0" above and proceed directly to the signature block at the bottom of this form. Landscape Parameter Requirements Project Compliance Turf Total turf area shall not exceed 25% of the landscape ❑ Yes ❑ No area, or 1,250 square feet, whichever is lesser in area, i[If no, Water budget calculation required with landscape projNl submittal] �V All portions of turf areas shall be wider than eight (8) feet. Q yes Turf (if utilized) is limited to slopes not exceeding 15%. ❑ Yes T Non -Turf At least 80% of non -turf area shall consist of native or i ❑ Yes No low water use plants. SES C��N L S [If no, Waler budget calculation required with landscape project subtnittall Hydrozones Plants with similar water needs shall be grouped within JR Yes ❑ No ' hydrozones. Each hydrozone shall be controlled by a i [Plants can be grouped her separate valve. ] Table 14,15.050(C)] Irrigation System Systems shall be designed and maintained to minimize L*Yes ❑ No ' water waste (e.g., runoff, low head drainage, overspray). Low-volume irrigation shall be utilized in non -turf areas. Irrigation shall only occur between the hours of 8:00 pm I [If no, Provide explanation on back] and 10:00 am. Soil A minimum of eight (8) inches of non -compacted topsoil 'Yes ❑ No Shall be available in planted areas. [If no, Provide explanation on back] I Soil amendments, such as compost or fertilizer, shall be ❑ Yes No appropriately added according to the soil conditions at the project site and based on what is appropriate for the [If no, provide explanation on back] selected plants. Mulch A minimum two (2) -inch layer of mulch shall be applied I R"Yes ❑ No i on all exposed soil surfaces of planting areas, except in areas of direct seeding application (e.g. hydro -seed). [lf no, Provide explanation on back) I am aware of available informational resources regarding native and low water use plants, irrigation efficiency, and other aspects of water -efficient landscaping. I certify that the information provided on this checklist is correct, and the installed landscape complies with the requirements of Chter 14.15. 1 also understand that any changes to the project will necessitate a new checklist. az�s i ature of prroper�owner or ai i w d re resentative _ Date Page 1 of 2 2010 CALGREEN RESIDENTIAL CHECKLIST - MANDATORY ITEMS lZC.CElVMD COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION APR 24 2W ALBrj SAIVA'DOE., C.B.O., BUiLDING'd� FICIAL CU1'i�RTlAi1i0 �� p 6� ��liAH ,.,y'�0300 TORR AVEy CUPERTINO, CA 95074ti355 E UC 7�7h,; It& (4D8) 7b� •FAX (408) 777-3333 • buildin c ' �n a 7 PURPOSE: -9 The 2010 CalGreen Code applies to all newly constructed hotels, motels, lodging houses, dwellings, dormitories, condominiums, shelters, congregate residences, employee housing, factory -built housing and other types of swellings with sleeping accommodations and new accessory buildings associated with such uses. Existing site and landscaping improvements that are not otherwise disturbed are not subject to the requirements of CALGreen. Project Name: Rajitha Lanka and Chakra Parvathaneni Home Project Address: 10148 Prado Vista Av, Cupertin Project Description: New Two Story Single Family Has...attached 9%A" Department APR 3 0 2012' Instructions: REVIEWED FOR C Id MPLIANCE 1. The Owner or the Owner's agent shat[ employ a licen�4#ional ex with the 2010 California Green Building Standards Codes to verify and assure that all required wo'IeCs s I properly planned and implemented in the project. 2. The licensed professional, in collaboration with the owner and the design psionalshall initial Column 2 of this checklist, sign and date Section 1 - Design Verification at the end of this checklist and have the checklist printed on the approved pians for the project. 3. Prior to final inspection by the Building Department, the licensed professional shall complete Column 3 and sign and date Section 2 - Implementation Verification at the end of this checklist and submit the completed form to the Building Inspector. Column 2 Column 3 MANDATORY FEATURE OR MEASURE Project Verification Requirements ,, .1 PLANNING AN -D DESIGN ..-aE.rr k%. -��.,' a }'. r�'&§ :',. .". e .�a,:. 71&. '�iy-$ ��}y ■}�■�(�V 4E y[.� �v 4 F/�s�&(�. ',.. _ _- a:� '�t\Tar�t/V��P4 Pp, a 'a�.1��iY'%Y�a- €saF k&;tiW' �<.s 3. -«gyre. .''a`',..fl�-`Ta°SS .,F.<d1`.8°Fi•...;�%g 4.104.1 A site plan and inventory of the site is developed and used to minimize site disturbance in order preserve desirable existing natural resources and ❑ minimize future adverse effects on the proposed structure. L:,>,; # r e@e LL r 1. < kE, �i _ t: s$ *�"'d E pary.. ffi '$fS%'4.•' , ;.te` `%a 'i_'W -ss. a Jd.x n5^° y % �d,,d- yy..ay3.,.....,.,r ,..ee::A. �" ::yp/��I' ■y��e/'�.'ES'r.;...R::.°...,.P .. > W.E . ..E F:':t. '. :. .° �x.<'�i e..�. . � �}, a �.X$" C E4- 'z8 �- &' d ysJ} z.d� a�$., 8 'a l?ln } yCI"`Iter�"1^`E ,,.5 j � "£`.gy,": `.. `,...'{��y�tp.<.°SB: A;•e.3 (3{9d: �P �- 99j.6� - E 3 =_' �"P°...., <['. AZA 4.106.2 A plan is developed and implemented to manage storm water drainage during construction. 4.106.3 The site shall be planned and developed to keep surface water away buildings. Construction plans shall indicate how site grading or a drainage 11from system will manage all surface water flows. A4.2 ENERGY 'G. ' :iB:•.� '&.. . '. , w« £.i, h� yrc.., C '_S :";"� � ..i.�'" '734 A t4 } " `:re .•e ^ `s a %' �' %?> >e: q, � ..., tM ..xf-„�. e. . .<... .:5;'ffi�" °.".' :.Ye.: �.:5.;.0 :a. °g,,"� �: - � a3=.,''F'i ms. .<"F;:& fir '�'. €N. ic':�,aK ,,.�ia;;�;a , '•ea'. .�- P ms's '$R$ z v,T" >« a'�" . .° ;t.,;ra(�€4i-4'u.. �"'a z•? s'S�G - a, - � � - ; A .. R, e 'e ... i may, r > �s �„'a - ” YddY � j, •�- 'i �° s .� ff Y t k 3'§ `: E'>$° � � 4E4 @. $$ r> "Yq '$34F:. ;.._'Y 4.201.1 Low-rise residential buildings shall meet or exceed the minimum rte/ ❑ E standard design required by the California Energy Standards. A4.3 'WATEIR EFFICIENCY AND CONSERVATION f b'k'°k9�y"py�M�yxdy��4 ■//■ js'�`c3aj�9',sr•,Edb d 'f'� ¢, 777, "F�� -b !� ,s�W�^.Beii".2s'..3 4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the follow methods. ❑ Water saving fixtures or flow restrictors shall be used per Table 4.303.2. ❑ As of 710112011 ❑ A 20 percent reduction in baseline water use shall be demonstrated per Table 4.303.1. 4.303.2 When using the calculation method specified in Section 4.303.1 multiple showerheads shall not exceed maximum flow rates. ❑ As of 7101120 1 4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with specified performance requirements. ❑ As of 7/01/2011 i d `'^mJA 14 `"v�" ". ..4..�r.aa�'�,4.c�roa"+�`:.?. a:is°a"»�:oa`�''sw�'.4. <., tst'&_'::i �":''a�:.''<>r°�.. �.e, $i. 'r^�^t, .m,ar�^ "® -, F.*''xs ., •. -'1€ ''`t`.:,'kii"'d a; tt^ s",�pf...a 4.304.1 Automatic irrigation systems installed at the time of final inspection ❑ shall be weather -based. - URCE EFFICIENCY A4.4MATERIAL .- J. AND .4 `� to .,-.ir..a _s �° ..-.':.k`_ .� he'$ yy++yy {p4 �^c ?d 96 �,3 ^.ti R +Yi'S"i$ hryry'YY�■�y■i ''. yy��i��[7 F[�[E` j may. /y�^�"Cyyw{�y^y{, ���{p ■ 9°2 �q aat g�gg,- ,� i ��'F °e,h.$ fg+�ygE 5°- y'tH&0. y jd^p Ehh'��rt MM �l �y SAY 3LIk�ILR-dl}Q�+I ty"i slid gp g�i�J-#. _P.a=: t. bk=`-✓ -- <._t' .' xY.e •r; b•.qe,§ sEd_„se A, 4.406.1 4.406.1 Joints and openings. Annular spaces around pipes, electric cables, conduits, or other openings in plates at exterior walls shall be protected El the passage of rodents by closing such openings with cement mortar, concrete masonry or similar method acceptable to the enforcing agency. ;; -tea` re. °se"ye'$ Yi s-, °#{ 5ai` d ♦♦�'�.Ejg y /- a;- W . "AP�44 c iffil a I V p,3 Tip i'Ad 3 4.408.2 Where a local jurisdiction does not have a construction and demolition waste management ordinance, a construction waste management plan shall ❑ be submitted for approval to the enforcing agency. �. e i $. - v k^ 3 b.'.itPa ,`{:x e• � # � '^: ""@"=:.. 5 ,, v VON ., r ' Y;:, p.<Y�. 'ti'"°e .5'^' C; e. �i C . ...,. � F �y y� +l�s� y ° �{ r1� ® p{ y gffy, Bir��l'�'I{»�Q��7;11-fi `.:;"�`'.`iSF;�: e m 4�[i;'e ,,.3t RL.. } �¢e .S"T'%8p. . ,A rF,....e..,k°+F?,,s>n i a..`nK 4.410.1 An operation and maintenance manual shall be provided to the ❑ building occupant or owner. A4.5 ENVIRONMENTAL QUALITY aces, - — ­X V 75ie0 _si FNISN F N� "'W"t 4.503.1 Install only a direct-vent sealed-combustion gas or sealed wood- ❑ burning fireplace, or a sealed woodstove, 71 R, 4.504.1 Duct openings and other related air distribution component openings El shall be covered during construction. 4.504.2.1 Adhesives, sealants and caulks shall be compliant with VOC and ❑ other toxic compound limits. 4.504.2.2 Paints, stains and other coatings shall be compliant with VOC limits. El 4.504.2.3 Aerosol paints and other coatings shall be compliant with product El weighted MIR Limits for ROC and other toxic compounds. 4.504.2.4 Documentation shall be provided to verify that compliant VOC limit ❑ finish materials have been used. 4.504.3 Carpet and carpet systems shall be compliant with VOC limits. 12( El 4.504.4 Fifty (50) percent of floor area receiving resilient flooring shall comply with the VOC-emission limits defined in the Collaborative for High Performance El Schools (CHPS) Low-emitting Materials List or be certified under the Resilient Floor Covering Institute (RCFI) FloorScore program. 4.504.5 Particleboard, medium density fiberboard (MDF), and hardwood plywood used in interior finish systems shall comply with low formaldehyde El emission standards. oki ir ... ... ... ..... Lr% _£o._ 4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. ❑ 4.505.3 Moisture content of building materials used in wall and floor framing is ❑ checked before enclosure. L a �i 3sf Jg�` t,.L d,.s kai.'°. . ?>%� a"" ?34?AMdQ>'€a�•".��t.yy.".d.w, .�W' .,8tSS53. ti- # 3: Ae 9 a9 xg aY ha4h .� # '.46"'f. j€ pf ''`ia.,tA itF'' Pti.dC°.$ Y`^t - ga .•--¢rf: yi$ .p°<.' 4.506.1 Exhaust fans which terminate outside the building are provided in ref LLL���JJJ El bathroom. &F«'$, - x',',.. ". `d�P.{'J��'B �'z �r ,,��.�.�....A. v�Z 6,.P. � � E Yx� �, 'g'§E9•.&S�e�b_.1�°<b'�9$G, �bC€ '. �g� "g�.i$4 a�P 5°� �`_ ` .Ya � `.4. �'g"fi` q$":i® .y$�✓� �-d$H' S( `° W��6 .F �.�` 6`a � Y' , "K, 1fl8%L�-.2 S 6: s'>>>; 4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the fan is off. Covers or louvers shall have a minimum ❑ insulation value of R-4.2. 4.507.2. Duct systems are sized and designed and equipment is selected using the following methods: 1. Establish heat loss and heat gain values according to ACCA Manual J or Elequivalent. 2. Size duct systems according to ACCA 29-D (Manual D) or equivalent. 3. Select heating and cooling equipment according to ACCA 36-S (Manual S) or equivalent. INSTALLER AND SPECIAL INSPECT- QUALIFICATIONS Room{'■�/�i gm,a.,a, �: � '. .•fig -$ C "af'. ',. ; c'"�� � -i..' ��i� -96 "3.. ✓¢� � �E �2 F$�P$"",m�n6. 4 �y d *k�6. ¢} ;y .�. ..b.;. ;� i.He Ff .>i:£�.v4. .�..9 �o-�, ,. =.'Y. "'�.... .<.<�:'ri".�.��,. 9ro .�G��F 702.1 HVAC system installers are trained and certified in the proper installation ❑ of HVAC systems. 702.2 The Licensed Professional responsible to verify CALGreen compliance is qualified and able to demonstrate competence in the discipline they inspect ❑ and verify. L'?ROAd'SB.. &' �'§ ij�,m�M1`&.. �i+.i/.�7!► qS.»a ...., F,»4gp.?C<pes Bye° ? s `.•x �! PddF F1 3 F�.T �!�I ICA lons°��€ 703.1 Verification of compliance with CALGreen may include construction documents, plans, specifications, builder or installer certification, inspection reports, or other methods acceptable to the enforcing agency which show ❑ substantial conformance. Implementation verification shall be submitted to the Building Department after implementation of all required measures and prior to final inspection approval. CALGREEN SIGNATURE DECLARATIONS Project Name: Rajitha Lanka and Chakra Parvathaneni Home Project Address: 10148 Prado Vista Av, Cupertino, CA Project Description: New Two Story Single Family House with attached garage SECTION 1 - DESIGN VERIFICATION Complete all lines of Section 1 — "Design Verification" and submit the completed checklist (Columns 1 and 2) with the plans and building permit application to the Building Department. The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and certify that the items checked above are hereby incorporated into the project plans and will be implemented into the project in accordance with the requirements set forth in the 2010 California Green Building Standards Code as adopted by the City of Cupertino. N'A 0 04/12/12 Owner's Signature Date Chakra Parvathaneni' Owner's Name (Please Print) Desig Profe ' al's Signature e Design Professional's Name ase Print) Signatu icense Pr sional Vresponible for CalGreen co nce e Na e o License Professional responsible for CalGreen compliance (Please Print) Phone Email Address for License Professional responsible for CalGreen compliance SECTION 2 - IMPLEMENTATION VERIFICATION Complete, sign and submit the competed checklist, including column 3, together with all original signatures on Section 2 to the Building Department prior to Building Department final inspection. I have inspected the work and have received sufficient documentation to verify and certify that the project identified above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of the 2010 California Green Building Standards Code as adopted by the City of Cupertino. Signature of License Professional responsible for CalGreen compliance Date Name of License Professional responsible for CalGreen compliance (Please Print) Phone Email Address for License ble for CalGreen corn Page 5 of 5 CalGreen 2010.doc revised 08127/11 BUILDING ENERGY ANALYSIS REPORT Report Prepared CUPER` INO Rick Rocklewitz Building Department NRG Compliance, 11 APR PO Box 3777 2012 Santa Rosa, California 98"12)wFD FOR C MPLIANCE 707-237-6957 Reviewed Br 4°A inn � NRG COMPLIANCE, iPIC.) Job Number: 012312 Date: 1/23/2012 IThe EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is -authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.enargysoft.com. I i=nergyPro 5.1 by EnergySoft User Number. 5581 RunCede: 2012-01-23709:39:15 ID: 012312 SUBMITTAL..,: -,-,4; pt PROJECT: t�. LANKA--PARVATHANENI S;�;AR 5 202 1 10148 PRADO VISTA DRIVE �v CUPERTINO, CA 95014 r-�r Project Designer: OFFICE Traditional Home Design 1112 Solano Avenue Albany, CA 94706 5105937087 Report Prepared CUPER` INO Rick Rocklewitz Building Department NRG Compliance, 11 APR PO Box 3777 2012 Santa Rosa, California 98"12)wFD FOR C MPLIANCE 707-237-6957 Reviewed Br 4°A inn � NRG COMPLIANCE, iPIC.) Job Number: 012312 Date: 1/23/2012 IThe EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is -authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.enargysoft.com. I i=nergyPro 5.1 by EnergySoft User Number. 5581 RunCede: 2012-01-23709:39:15 ID: 012312 I TABLE OF CONTENTS 1 Cover Page Table of Contents y Form CF -1 R Certificate of Compliance Form MF -1 R Mandatory Measures Summary HVAC System Heating and Cooling Loads Summary I EnergyPro 5.1 by EnergySoft Jab Number. Ib: 012312 User Number. 5581 1 2 3 8 11 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF -1 R Project Name LANKA-PARVATHANENI Building Type ® Single f=amily ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 1/2312012 Project Address 10148 PRADO VISTA DRIVE CUPERTIA California Energy Climate Zone CA Climate Zone 04 Total Cond. Floor Area 3,427 Addition n/a # of Stories 2 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes ❑ No HERS Measures -- if Yes, A CF -4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Area Special Construction Type Cavity (ft) Features see Part 2 of 5 Status Floor Wood Framed w/Crawl Space R-19 2,644 New Way Wood Framed R-13 3,331 New Door Opaque Door None 18 New Roof Wood Framed Attic R-30 2,584 Radiant Barrier New FENESTRATION U- Exterior Orientation Area(ft) Factor SHGC Overhang Sidef ins Shades Status Right (S) 36.0 0.340 0.34 none none Bug Screen New Rear (E) 254.0 0.340 0.34 none none Bug Screen New Left (N) 171.0 0.340 0.34 none none Bug Screen New Front (lM 185.5 0.340 0.34 none none Bug Screen New Skylight 36.0 0.390 0.29 none none None New Skylight 24.0 0.390 0.29 none none None New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 92% AFUE Split Air Conditioner 13.0 SEER Setback New HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R -Value Status HVAC System Ducted Ducted Attic, Ceiling Ins, vented 6.0 New WATER HEATING Qty. Type Gallons Min. Eff Distribution Status 1 Small Gas 50 0.65 No Pipe insulation New EnergyPro 54 by EnergySoft User Number. 5581 Run Code: 2012-01-23T09:39:15 ID. 012312 Page 3 of 11 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name LANKA-PARVATHANEN! Building Type ® Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 1/23/2012 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The Roof R-30 Roof Attic includes credit for a Radiant Barrier that is Continuous meeting eligibility and installation criteria as specified in Residential Appendix RA4.2.2. HERS REQUIRED VERIFICATION Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-411 form for each of the measures listed below for final to be given. EnergyPro 5.1 by EnerqySoft User Number. 5581 RunCode: 2012-01-23709:39:15 ID. 012312 Pa e 4 of 11 PERFORMANCE CERTIFICATE: Residential (Part 3 of 5) CF -1 R Project Name Building Type [O Single Family ❑ Addition Alone Date LANKA-PARVATHANENI ❑ Multi Family ❑ Existing+ Addilion/Alteration 1/23/2012 ANNUAL ENERGY USE SUMMARY Standard Proposed Margin TDV kBtu/ftZ- Space Heating 24.57 23.20 1.37 Space Cooling 7.20 9.79 -1.58 Fans 4.89 5.59 -0.70 Domestic Hot Water 11.53 10.43 1.10 Pumps 0.00 0.00 0.00 Totals 46.19 48.01 0.16 Percent Better Than Standard: 0.4% BUILDING COMPLIES - NO HERS VERIFICATION REQUIRED Fenestration Building Front Orientation: (tM 270 deg Ext. Walls/Roof Wail Area Area Number of Dwelling Units: 1.00 (tM 939 166 Fuel Available at Site: Natural Gas (N) 1,059 171 Raised Floor Area: 2,644 (E) 939 254 Slab on Grade Area: 0 (S) 1,059 36 Average Ceiling Height: 10.2 Roof 2,644 60 Fenestration Average U -Factor: 0.34 TOTAL: 707 Average SHOO: 0.34 Fenestration/CFA Ratio: 20.6% REMARKS STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 the Administrative Regulations and Part 6 the Efficiency Standards of the California Code of Regulations. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Company NRG Compliance, Inc 1123/2012 Address PO Box 3777 Name Rick Rocklewitz« City/Stale/ZipCity/Stale/Zip Santa Rosa, California 95402 Phone 707-237-6957 Signed Date The individual with overall design responsibility hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application, and recognizes that compliance using duct design, duct sealing, verification of refrigerant charge, insulation installation quality, and building envelope sealing require installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Company Traditional Nome Design Address 1112 Solano Avenue Name Richard Rowlett r L CityiStateop Albany, CA 94706 Phone 5105937087 Signid 'cense # Date EnerqyPro 5.1 by EnergySoft User Number. 6581 RunCode: 2012-01-23T09:39:15 ID: 012312 Page 5 of ii CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF -1 R Project Name LANKA-PARVATNANENI Building Type la Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 1/23/2012 OPAQUE SURFACE DETAILS Surface Type Area U- Insulation Joint Appendix Factor cavityTExterior Frame Interior Frame Azm Tilt Status 4 Location/Comments Floor 2,328 0.037 R-19 0 180 New 4.4.1-A4 First Floor Wall 664 0.102 R-13 180 90 New 4.3.1-A3 First Floor Door- 18 0.500 None 180 90 New 4.5.1-A4 First Floor Wall 378 0.102 R-13 90 90 New 4.3.1-A3 First Floor Wall 547 0.102 R-13 I 1 01 90 New 4.3.1-A3 First Floor Wal! 443 0.102 R-13 270 90 New 4.3. i -A3 First Floor Roof 1,509 0.031 R-30 270 18 New 4.2.1-A20 First Floor Floor 316 0.037 R49 0 180 New 4.4.1-A4 Second Floor Wall 341 0.102 R-13 160 90 New 4.3.1-A3 Second Floor Wall 307 0.102 R-13 90 90 Now 4.3.1-A3 Second Floor Wall 341 0.102 R-13 0 90 New 4.3. i A3 Second Floor Wall 310 0.102 R-13 270 90 New 4.3.1-A3 Second Floor Roof 1,075 0.031 R-30 270 18 New 4.21-A20 Second Floor FENESTRATION SURFACE DETAILS ID Type I Area U -Factor SHGC Azm Status Glazing Type Location/Comments 1 Window 6.0 0.340 NFRC 0.34 NFRC 180 New Jeld Wen Dual Vinyl LowE First Floor 2 Window 200.0 0.340 NFRC 0.34 NFRC 90 New Jeld Wen Dual Vinyl LowE First Floor 3 Window 141.0 0.340 NFRC 0.34 NFRC 0 New Jefd Wen Dual Vinyl LowE First Floor 4 Window 134.5 0.340 NFRC 0.34 NFRC 270 New Jeld Wen Dual Vinyl LowE First Floor 5 Skylight 36.0 0.390 NFRC 0.29 NFRC 270 New Velux Comfort+(74) Lowe2/Arg First Floor 6 Window 30.0 0.340 NFRC 0.34 NFRC 180 New I Jeld Wen Dual Vinyl LowE Second Floor 7 Window 54.01 0.340 NFRC 1 0.34 NFRC 90 New Jofd Wen Dual Vinyl LowE Second Floor 8 Window 30.0 0.340 NFRC 0.34 NFRC 0 New Jeld Wen Dual Vinyl LowE Second Floor 9 Window 51.0 0.340 NFRC 0.34 NFRC 270 New Jeld Wen Dual Vinyl LowE Second Floor 10 Skylight 24.0 0.390 NFRC 0.29 NFRC 270 New Velux Comfort+(74) Lowe2/Arg Second Floor (1) Ll -Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value 2 SHGC Type: 116-8 = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Window Exterior Shade Type SHGC Hat Wd Ove hang Left Fin Len Hat LExt RExt Dist Len Hat Right Fin Dist Len H t 1 Bug Screen 0.76 2 Bug Screen 0.76 3 Bug Screen 0.76 4 Bug Screen 0.76 5 None 1.00 6 Bug Screen 0.76 7 Bug Screen 0.76 8 Bug Screen 0.76 9 Bug Screen 0.76 10 None 1.00 ffnergyPro 5.1 by EnergySoft User Number. 5561 RunCode: 2012-01-23709:39.15 ID: 012312 Page 6 of 11 CERTIFICATE OF COMPLIANCE; Residential (Part 5 of 5) CF -1 R Project Name LANKA-PARVATHANENI Building Type IZ Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 1/23/2012 BUILDING ZONE INFORMATION System Name Zone Name Floor Area New Existing Altered Removed Volume Year Built HVAC System First Floor 2328 24,444 Second Floor 1,099 10,441 Totals 1 3,4271 0 0 0 HVAC SYSTEMS System Name Qty. Heating Type Min. Eff. Cooling Type Min. Eff. Thermostat Type Status HVAC System i Centra! Fumace 92% AFUE Split Air Conditioner 13.0 SEER Setback New HVAC DISTRIBUTION System Name Heating Duct Ducts Cooling Duct Location R -Value Tested? Status HVAC System Ducted Ducted Attic, Ceiling Ins, vented 6.0 ❑ New WATER HEATING SYSTEMS S stem Name Qty- Type Distribution Rated Input 13tuh(gal) Tank Cap. Energy Factor or RE Standby Loss or Pilot Ext. Tank Insul. R- Value Status Rheem 41 VRP50PT i Smaii Gas No Pipe Insulation 40,000 50 0.65 n/a Na New MULTI -FAMILY WATER HEATING DETAILS HYDRONIC HEATING SYSTEM PIPING Control Hot Water Piping Length ft m y ¢ c System Name Pipe Length Pipe Diameter Insui. Thick. Qty. HP Plenum Outside Buried 01 01 ❑ EnergyPro 5.1 by EnergySoft User Number. 5581 RunCode: 2012-01-23709:39:15 ID: 012312 Page 7 of 11 MANDATORY MEASURES SUMMARY: Residential Page 1 of 3 MF -1 R Project Name LANKA-PARVATHANENI Date 112312012 NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the compliance approach used. More stringent energy measures listed on the Certificate of Compliance (CF -1 R, CF -1 R -ADD, or CF - 1 R -ALT Form) shall supersede the items marked with an asterisk (') below. This Mandatory Measures Summary shall be incorporated into the permit documents, and the applicable features shall be considered by all parties as minimum component performance specifications whether they are shown elsewhere in the documents or in this summary. Submit all applicable sections of the MF -1 R Form with plans. Building Envelope Measures: 116(a)l: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage. §1 #6(a)4: Fenestration products (except field -fabricated windows) have a label listing the certified U -Factor, certified Solar Heat Gain Coefficient SHGC and infiltration that meets the requirements of 10-111 (a). 117: Exterior doors and windows are weather-stripped; all joints and penetrations are caulked and sealed. 118(a): Insulationspecified or installed meets Standards for Insulating Material. Indicate type and include on CF -6R Form. §118(i): The thermal emittance and solar reflectance values of the cool roofing material meets the requirements of §118(i) when the installation of a Cool Roof is specified on the CF -1 R Form. *§1 50 a : Minimum R-19 insulation in wood -frame ceiling orequivalent U -tactor. §150(b): Loose fill insulation shall conform with manufacturer's installed design labeled R -Value. *§150(c): Minimum R-13 insulation in wood -frame wall orequivalent U -factor. 150(d): Minimum R-13 insulation in raised wood -frame floor orequivalent U -factor. §150ft Air retarding wrap is tested, labeled, and installed according to ASTM E1677-95(2000) when specified on the CF -IR Form, §150(q): Mandatory Vapor barrier installed in Climate Zones 14 or 16. §150(1): Water absorption rate for slab edge insulation material alone without facings is no greater than 0.3%; water vapor permeance rate is no greater than 2.0 permlinch and shall be protected from physical damage and UV light deterioration. Fireplaces, Decorative Gas Appliances and Gas Log Measures: 150 e 1 A: Masonry or factory -built fireplaces have a closable metal or glass door covering the entire opening of the firebox. §150(e)1 B: Masonry or factory -built fireplaces have a combustion outside air intake, which is at least six square inches in area and is equipped with a with a readily accessible, operable, and fight-fiffing damper and or a combustion -air control device. §150(e)2: Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of the building, are prohibited. Space Conditioning, Water Heating and Plumbing System Measures: §110-§113: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified by the Energy Commission. §113(c)5: Water heating recirculation loops serving multiple dwelling units and High -Rise residential occupancies meet the air release valve, backflow prevention, pump isolation valve, and recirculation loop connection requirements of §113(c)5. §115: Continuously burning pilot lights are prohibited for natural gas: fan -type central fumaces, household cooking appliances (appliances with an electrical supply voltage connection with pilot lights that consume less than 150 Btulhr are exempt), and pool and spa heaters. 150(h): Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA. 150(i): Heating systems are equipped with thermostats that meet the setback requirements of Section 1 12 c . §1500)1A, Storage gas water heaters rated with an Energy Factor no greater than the federal minimal standard are externally wrapped with insulation having an installed thermal resistance of R-12 or greater. §1500)1 B: Unfired storage tanks, such as storage tanks or backup tanks for solar water -heating system, or other indirect hot water tanks have R-12 external insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank. §1500)2: First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes are insulated per Standards Table 150-B. §1500)2: Cooling system piping (suction, chilled water, or brine lines),and piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A. §1500?2: Pipe insulation for steam hydronic heating systems or hot water systems a15 psi, meets the requirements of Standards Table 123-A. 150(1)3A: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. §1 500)3A: Insulation for chilled water piping and refrigerant suction lines includes a vapor retardant or is enclosed entirely in conditioned space. §1150@4: Solar water -heating systems and/or collectors are certified by the Solar Rating and Certification Corporation. EnergyPro 5.1 by r=nergySoft User Number. 5581 RunCode: 2012-01-23709:39:15 ID: 012312 Page 8 of 11 MANDATORY MEASURES SUMMARY: Residential (Page 2 of 3 MF -1 R Project Name Date LANKA -PARVA THANEN! 1112312012 §150(m)1: All air -distribution system ducts and plenums installed, are sealed and insulated to meet the requirements of CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R- 4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape or other duct -closure system that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is usedto seal openings reater than 114 inch, the combination of mastic and either mesh or tape shall be used §150(m)1: Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. §150(m)2D: Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. 150(m)7: Exhaust fans stems have back draft or automatic dampers. §150(m)8: Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers, §150(m)g: Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause de radation of the material. 150 m 10: Flexible ducts cannot have porous inner cores. §150(0): All dwelling units shall meet the requirements of ANSUASHRAE Standard 62.2-2007 Ventilation and Acceptable Indoor Air Quality in Low -Rise Residential Buildings. Window operation is not a permissible method of providing the Whole Building Ventilation required in Section 4 of that Standard. Pool and Spa Heating Systems and Equipment Measures: §114(a): Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency Regulations; an on-off switch mounted outside of the heater; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating ora pilot light. §114(b)1: Any pool or spa heating equipment shall be installed with at least 36" of pipe between filter and heater, or dedicated suction and return lines, or built-up connections for future solar heating. 114(b)2: Outdoor pools ors as that have a heat pump or gas heater shall have a cover. §114(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or programmed to run only during off-peak electric demand periods. §150(p): Residential pool systems orequipment meet the pump sizing, flow rate, piping, filters, and valve requirements of §150 . Residential Lighting Measures: §150(k)i: High efficacy luminaires or LED Light Engine with Integral Heat Sink has an efficacy that is no lower than the efficacies contained in Table 150-C and is not a low efficacy luminaire asspecified by §150(k)2. §150(k)3: The wattage of permanently installed luminaires shall be determined asspecified by §130(d). §150(k)4: Ballasts for fluorescent lamps rated 13 Watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. §150(k)5: Permanently installed night lights and night lights integral to a permanently installed luminaire or exhaust fan shall contain only high efficacy lamps meeting the minimum efficacies contained in Table 150-C and shall not contain a line -voltage socket or line - voltage lamp holder; OR shall be rated to consume no more than five watts of power as determined by §130(d), and shall not contain a medium screw -base socket. 150(k)6: Lighting integral to exhaust fans, in rooms other than kitchens, shall meet tate applicable requirements of §150(k). §150(k)7: All switching devices and controls shall meet the requirements of §150(k)7. §150(k)8: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. EXCEPTION: Up to 50 watts for dwelling units less than or equal to 2,500 & or 100 watts for dwelling units larger than 2,500 fb may be exempt from the 50% high efficacy requirement when: all low efficacy luminaires in the kitchen are controlled by a manual on occupant sensor, dimmer, energy management system (FMCS), or a multi -scene programmable control system; and all permanently installed luminaries in garages, laundry rooms, closets greater than 70 square feet, and utility rooms are high efficacy and controlled by a manual -on occupant sensor. §150(k)9: Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated cabinet. EnergyPro 5.1 by t=nergy5oft User Number. 5581 RunCade: 2012-01-23T09:39:15 !D: 012312 Page 9 of 11 MANDATORY MEASURES SUMMARY: Residential (Page 3 of 3 MF -1 R Project Name Date LANKA-PARVATHANENI 1/23/2012 §150(k)10: Permanently installed luminaires in bathrooms, attached and detached garages, laundry rooms, closets and utility rooms shall be high efficacy. EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by a manual -on occupant sensor certified to comply with the applicable requirements of §119. EXCEPTION 2: Permanently installed low efficacy luminaires in closets less than 70 square feet are not required to be controlled by a manual -on occupancy sensor. §150(k)l 11: Permanently installed luminaires located in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, closets, and utility rooms shall be high efficacy luimnaires. EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided they are controlled by either a dimmer switch that complies with the applicable requirements of §119, or by a manual - on occupant sensor that complies with the applicable requirements of §119. EXCEPTION 2: Lighting in detached storage building less than 1000 square feet located on a residential site is not required to comply with §150 k 11. §150(k)l2: Luminaires recessed into insulated ceilings shall be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other nationally recognized testing/rating laboratory; and have a label that certifies the lumiunaire is airtight with air leakage less then 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; and be sealed with a gasket or caulk between the luminaire housing and ceiling. §150(k)l3: Luminaires providing outdoor fighting, including fighting for private patios in low-rise residential buildings with four or more dwelling units, entrances, balconies, and porches, which are permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy. EXCEPTION 1: Permanently installed outdoor low efficacy luminaires shall be allowed provided that they are controlled by a manual on/off switch, a motion sensor not having an override or bypass switch that disables the motion sensor, and one of the following controls: a photocontrol not having an override or bypass switch that disables the photocontrol; OR an astronomical time clock not having an override or bypass switch that disables the astronomical time clock; OR an energy management control system (FMCS) not having an override or bypass switch that allows the luminaire to be always on EXCEPTION 2: Outdoor luminaires used to comply with Exceptionl to §150(k)13 may be controlled by a temporary override switch which bypasses the motion sensing function provided that the motion sensor is automatically reactivated within six hours. EXCEPTION 3: Permanently installed luminaires in or around swimming pool, water features, or other location subject to Article 680 of the California Electric Code need not be high efficacy luminaires. §150(k)14: Internally illuminated address signs shall comply with Section 148; OR not contain a screw -base socket, and consume no more than five watts of power as determined according to §130(d). §150(k)15: Lighting for parking lots and carports with a total of for 8 or more vehicles per site shall comply with the applicable requirements in Sections 130, 132, 134, and 147. Lighting for parking garages for 8 or more vehicles shall comply with the applicable requirements of Sections 130, 131, 134, and 146. §150(k)16: Permanently installed lighting in the enclosed, non -dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires. EXCEPTION: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by an occupant sensors certified to comply with the applicable requirements of 119. EnergyPro 5.1 by EnergySoft User Number. 5581 RunCode: 2012-01-23T09:39:15 ID. 012312 Page 10 of 11 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name LAN KA-PARVATHAN EN I Date 1/23/2012 System Name HVAC System Floor Area 3,427 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,559 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 1 COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 60,000 32,492 1,517 851 42,132 „ Total Output Btuh 60,000 0 Output Btuh/s n 17.5 1,095 1,792 Cooling System 01 0 Output perSystem 36,000 0 0 0 0 Total Output (Btuh) 36,000 0 1,517 0 Total Output (Tons) 3.0 1,095 1,792 Total Output (Btuhlsgtt) 10.5 Total Output s ftrron 1,142.3 34,682 45,715 Air System CFM perSystem 1,565 HVAC EQUIPMENT SELECTION Airflow cfm 1,565 Central Pleating System 34,217 0 60,000 Airflow cfmis ft) 0.46 Airflow cfmf'ron) 521.7 Outside Air %) 0.0 % Total Adjusted System Output 34,217 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 0 Aug 3 PM 60,000 Outside Air cfm/s ft) 0.00 Jan 1 AM Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak 28 OF 67 OF Q Outside Air 0 cfm Supply Fan 1,565 cfm 67 °F 67 OF 115 OF Heating Coil 114 °F ROOM 68 °F COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak) 88168 OF 76162 OF 76162 OF 55154 OF Outside Air A c Fan 0 cfm Supply Cooling Coil 56154 OF 1,565 cfm 46.4% ROOM 76162 OF 75162 °F EnergyPro 5.1 byEnergy5off User Number. 5581 RunCode: 2012-01-23709:39:15 1D: 012312 Page 11 of 11