Loading...
Untitled RW Engineering, Inc. 505 Altamont Drive Milpitas, CA 95035 (408) 262-1899 May 31, 2012 City of Cupertino—Building Division 10300 Torre Avenue Cupertino, CA 95014-3202 Re: Building setback verification Project Site: 20550 Blossom Lane, Cupertino, CA To Whom It May Concern: This is letter is to confirm in writing that RW Engineering, Inc. has provided survey and building setback verification for the house on 20550 Blossom Lane. We have determined that the building comply with the setback requirements as shown on the approved plan. Please feel free to call me if you have any questions. Sincerely Ro Wang, P.E. RAFY JD��q LIC.filo.0'50541 q C 1 V 1 OF CAL 2n6 v NOTES: 1. THIS CONSTRUCTION STAKING PLAN IS BASED ON BOUNDARY SURVEY AND TOPOGRAPHIC MAP DONE BY LC ENGINEERING, DATED APRIL 14, 2010. 2. DISCREPANCIES BETWEEN EXISTING CONDITIONS, DRAWINGS, EXHIBITS, PLANS AND/OR SPECIFICATIONS SHALL BE REFERRED TO THE PROJECT ENGINEER FOR CLARIFICATION BEFORE THE START OF AFFECTED WORK. ALL SETBACKS SHALL BE CONFORMED TO THE REQUIREMENTS OF THE APPROVED PLANS. S89'57'00"W 62.00' LOT 14 TRACT NO.420 APN:359-18-028 0 5' i o i #2 i N I 5' 9: C) —td- 0 0 5' o #4 1 o cf i iri #5 0 C) 5' CD i C) NEW HOUSE FF=505.7 PAD=503.5 8' 7' i #1 #3 i o 5. � ^, LEGEND AND ABBREVIATION ❑� CONSTRUCTION POINT #1 POINT NUMBER PC PROPERTY IS89'57'00°W 62.00' I� CENTERLINE NE I j BLOSSOM LANE (50') `may 79.82' N89'57'00"E (BASIS OF BEARINGS) (295.85') DAM MOM RWEIVGLNEERING INC. ecKerazc► E)OiIB�T'A' _ NEW RESIDENCE K� r20550 BLOSSOM LANE Br. RMI M�.P1TAs.G9WX9608a 8TA4aN0 PLAN �� 'OFA FA O � CUPERTINO,CA