May 31, 2012
City of Cupertino—Building Division
10300 Torre Avenue
Cupertino, CA 95014-3202
Re: Building setback verification
Project Site: 20550 Blossom Lane, Cupertino, CA
To Whom It May Concern:
This is letter is to confirm in writing that RW Engineering, Inc. has provided survey and building
setback verification for the house on 20550 Blossom Lane. We have determined that the
building comply with the setback requirements as shown on the approved plan.
Please feel free to call me if you have any questions.
Sincerely
Ro Wang, P.E.
RAFY JD��q
LIC.filo.0'50541 q
C 1 V 1
OF CAL
2n6
v
NOTES:
1. THIS CONSTRUCTION STAKING PLAN IS BASED ON BOUNDARY SURVEY AND TOPOGRAPHIC MAP DONE BY
LC ENGINEERING, DATED APRIL 14, 2010.
2. DISCREPANCIES BETWEEN EXISTING CONDITIONS, DRAWINGS, EXHIBITS, PLANS AND/OR SPECIFICATIONS
SHALL BE REFERRED TO THE PROJECT ENGINEER FOR CLARIFICATION BEFORE THE START OF AFFECTED
WORK. ALL SETBACKS SHALL BE CONFORMED TO THE REQUIREMENTS OF THE APPROVED PLANS.
S89'57'00"W 62.00'
LOT 14
TRACT NO.420
APN:359-18-028 0
5' i o
i #2 i N
I 5' 9:
C) —td-
0
0
5' o
#4 1 o
cf i
iri
#5
0
C)
5'
CD i
C) NEW HOUSE
FF=505.7
PAD=503.5 8'
7'
i
#1 #3
i o 5.
�
^, LEGEND AND ABBREVIATION
❑� CONSTRUCTION POINT
#1 POINT NUMBER
PC PROPERTY
IS89'57'00°W 62.00' I� CENTERLINE NE
I
j BLOSSOM LANE (50')
`may 79.82' N89'57'00"E (BASIS OF BEARINGS)
(295.85')
DAM MOM RWEIVGLNEERING INC.
ecKerazc► E)OiIB�T'A' _ NEW RESIDENCE
K� r20550 BLOSSOM LANE
Br. RMI M�.P1TAs.G9WX9608a 8TA4aN0 PLAN
�� 'OFA FA O � CUPERTINO,CA