Loading...
ERC 04-30-08Community Development Department Cupertino, CA 95014 (408) 777-3308 APPROVED MINUTES OF THE REGULAR MEETING OF THE ENVIRONMENTAL REVIEW COMMITTEE HELD ON Apri130, 2008 Committee Members: Kris Wang Dave Knapp Ralph Qualls Marty Miller Committee Members absent: Steve Piasecki Staff present: Colin Jung APPROVAL OF MINUTES: January 23, 2008 ACTION: Approval of minutes from January 23, 2008 MOTION: Marty Miller SECOND: Ralph Qualls ABSTAIN: none VOTE: 4-0 APPROVAL OF MINUTES: February 20, 2008 ACTION: Approval of minutes from February 20, 2008 MOTION: Marty Miller SECOND: Ralph Qualls ABSTAIN: none VOTE: 4-0 NEW ITEMS: Application No.: U-2007-04, ASA-2007-06 (EA-2007-06), TM-2007-09 EXC-2008-07, TR-2008-02 Applicant: Karen Ngo (The Oaks Shopping Center) Location: 21265 Stevens Creek Blvd. Use Permit to demolish a theater and 2,430 square feet of commercial space and construct a 4- story, 122 room hotel, a 3-story 56,194 square foot mixed use retail/office/convention center building over an underground parking podium and site improvements in two phases at an existing shopping center; Architectural and Site approval for a proposed 4-story, 122 room hotel, 3-story 56,194 square foot mixed use retail/office/convention center building over an underground parking podium and site improvements at an existing shopping center; Tentative Map to subdivide an 8.1 net acre parcel into 2 parcels of 3.0 and 5.1 acres in size, with one parcel to be further subdivided into four commercial condominium units and a common area lot; An Exception to the Heart of the City to reduce one side-yard setback to 15 feet for a proposed 4-story, 122 room hotel, a 3-story 56,194 square foot mixed use retail/office/convention center building; A Tree Removal request to remove and replace approximately 47 trees that are part of an approved landscape plan for an existing shopping center ^ Noise o A noise study is not normally done with Hotel development applications ^ Geologic o No geologic/soils issues present ^ Trees ^ Traffic 0 47 trees are scheduled for removal. They are in the parking lot and building footprint area o No specimen or heritage trees will be removed 0 67 new trees will be planted around the site o The new traffic circulation pattern is an improvement over what exists at the site currently o The proposed development will correct an existing parking deficiency in the number of spaces. The first phase construction project will have 355 (shared) spaces and the second construction phase will add 470 (shared) spaces o The development is projected to generate 168 more am trips and 252 more pm trips during the commute period o No change in the LOS levels o No significant change in the signal wait times ^ Additional Discussion o Carbon emissions, solar systems should be considered in future discussions o Recycling of construction materials o Green Building practices ACTION: Recommendation for a Negative Declaration MOTION: Ralph Qualls SECOND: Dave Knapp NOES: none VOTE: 4-0 OLD BUSINESS None Respectfully submitted, Beth Ebben Administrative Clerk G/planning/erc/approvedminu tes043008