Loading...
Exhibit CC 2-19-13 #13 Appeal of Director of Public Works decision = 1/ 1/3 Paul Kalra H 10567 San Leandro Avenue Cupertino, CA 95014 Feb. 18, 2013 Mayor Mahoney and Council Members Cupertino City Council 10300 Torre Avenue Cupertino, CA 95014 Re: Appeal of City Engineer's decision to remove Utility Pole Relocation Appeal from Council Agenda Mr. Mayor Mahoney and Council Members: Paul Kalra, the owner of the residential property at 10567 San Leandro Avenue, requests your consideration of this appeal of a determination made by Timm Borden for removing the utility pole relocation appeal (Exhibit-13) from the Council Agenda of January 15, 2013. "The bond securing the work for the Public Works permit was submitted on July 27, 2012. The protest or appeal period was 30 days on the Public Works permit." The timeline of events leading to the utility pole relocation appeal follows: 7/27/12: Exhibit-1- Public Works required a$25,000 deposit to relocate utility pole. The deposit was made on 7/27/12 and the building permits were issued on 8/3/12. I made the refundable deposit based upon reasonable reliance on PW Engineer's false statement that the pole was located on my property. 8/14/12: Exhibit-2- Public Works admits that the utility pole is located on neighbor's property and the City does not have authority to relocate it. 8/16/12: Exhibit-3- I informed the City that relocating the pole is an illegal and unenforceable condition and the decision and responsibility tc relocate pole along with lawsuits and liability for damages was theirs. 8/20/12: Exhibit-4- Based on facts and City Engineer's admissions I requested refund of my ' $25,000 deposit. 9/13/12: Exhibit-5- First, Mr. Mosley agreed to refund the deposit and requested my Engineer to modify drawings in the City office. When I requested an appointment for the Engineer's visit he stopped answering phone calls or responding to emails. I had a meeting with Mr. Borden requesting refund of deposit. 9/14/12: Exhibit-6- Received letter from Mr. Borden stating the City will try to get an easement from neighbor for relocation of utility pole and the decision will be made by Oct 31, 2012. 9/20/12: Exhibit-7- I requested City the basis for requiring me to make a$25k deposit and move pole on neighbor's property. 10/24/12: Exhibit-8- A reminder to Mr. Borden for not responding to my questions and a request for immediate refund. 10/26/12: Exhibit-9- City informs me that an Easement has been obtained from neighbor and insists that I relocate the pole on neighbor's property. 11/17/12: Exhibit-10- I request City for answers to my questions and clarifications regarding their decision to relocate the pole. 12/13/12: Exhibit-11- Had a meeting with Mr. Borden and it was mutually agreed I would be appealing his decision. 12/20/12: Exhibit-12- Appeal of Mr. Borden's decision to relocate the utility pole is scheduled for Council Meeting on January 15, 2013. 1/9/13: Exhibit-J3- Mr. Borden informs me that the Appeal has been removed from the Council meeting agenda because the appeal period deadline has expired on August 27, 2012. The City Engineer's decision that the utility pole relocation appeal deadline was 8/27/12 is erroneous for the following reasons: • On 8/27/12 the $25k deposit and order to relocate the pole on neighbor's property was illegal and unenforceable and there is no deadline for decision ordering trespass on a neighbor's property. • The City Engineer admitted in writing that the City did not have authority to relocate the pole and would make a decision on October 31, 2012. • The staff has recognized their error and recommended action to waive the 8/27/12 deadline for utility pole relocation appeal. Wherefore Appellant respectfully requests that the appeal deadline of 8/27/12 be waived and the Appeal for relocation of utility pole be scheduled for Council meeting on March 5, 2013. Public Works Plan Check Comments Project Address: /a SVp 9 0/7 &14/A) APN: 3,62-0.5 79 "---)roject Scope: /__'_i) / 10-2. /W --- Building Permit#: /0007' Developer/Owner (circle one): )°,aantra/Zc? Phone Number: 9;a5-9,2—...? ? Architect/Engineer (circle one): E/��.et,//`-71-o q/z27L Phone Number: PW File# V---1 5 2 The following marked items are required by.Public Works Department. Provide written responses with resubmittals. If you have spgcific questions regarding these comments,contact Chad Mosley at(408)777-7604. Please provide project address when calling. Required /' ?"' coo Ftr Hill ' Date Completed X Pay Public Works Plan Check& Inspection Fee:1_5_17.00 —$258.00 (#110-4531) =p'---5S-97•511— --7 I Z�j L 12--X Copy of Grant Deed and Current Title Report Development Agreement for Public Works improvements° Required work in the public right-of-way. Clearly show and dimension on site or —1 (Z 5! .Z, improvement plan. Include applicable City standard details on the plans: Description Standard Detail Unit Price Quantity X, curb and gutter 1-16 $ /LF LF curb ramp 1-24 $ ea 59 T05.00 /SF SF C Z NCvv�ES X driveway approach 1-20; 1-21 $ IS 70 Coat) sidewalk 1-19 /SF SF F �,dC� 2S 0c2o 4-- - Aw6 1'r"Nfr x �i =eat 5-2; 5-4; 5-8; $ ea 1 (A-11M QD1E-5-10; 5-12; 5-22 a (verify w/John street tree Ferrante) $ ea sign poles 2-20 $ ea $ Submit 1 Engineer's Cost estimate listing all improvements within the public right of way(use f attached form). If grading permit is required, submit:Engineer's cost estimate for grading e f 2— work and/or retaining wall. • t Contact Jo Anne Johnson at(408)777-3245 for encroachment requirements and permit. All encroachment permits require a certificate of liability insurance and a separate endorsement naming the City of Cupertino as additional insured. . No Fee permit Encroachment •ermit fee' 2 C7. DC (#110-4540) .c 0 O I N l Tuww� X Encroachment bond: $ 3 -I- P Cr g 6 (#110-2211) MO Me tU u,,J t N Page 1 of 4 E XH 1 a\T_ I / Revised 08/11/2010 • PAUL KALRA P. O. BOX 23826, PLEASANT HILL, CA 94523 TEL: 925-676-2921 E-Mail: onlychief(aD,,hotmail.com August 14, 2012 Timm Borden, Director Public Works City,of Cupertino 10300 Torre Avenue, Cupertino, CA 95014 Re: Relocation of Utility Pole at 10555 San Leandro Ave, APN# 357-05-025 Dear Mr. Borden: In order to establish undisputed facts on the ground please answer the following questions: 1. Admit that according to the Engineers drawings the utility pole is located 1.22 feet from the boundary inside the property commonly known as 10555 San Leandro Ave, APN#357-05-025. 2. Admit that according to the Engineers drawings the anchor of the utility pole is located 6.89 feet from the boundary inside the property commonly known as 10555 San Leandro Ave, APN#357-05-025. 3. Admit that you do not have written permission from Mr. J. Wang APN#357-05-025 to relocate utility pole on his property. 4. Please provide the Cupertino Municipal Code and authority for holding Paul Kalra responsible for relocating utility pole at 10555 San Leandro Ave. 5. Does the City of Cupertino liability insurance policy cover relocation of utility pole at 10555 San Leandro Ave. 6. Please provide precedents if any in the City of Cupertino where a property owner was held responsible for relocating a utility pole on a neighbors property. Thank you for your cooperation. Sincerely, Paul Kalra, Owner 10567 San Leandro Ave. APN# 357-05-079 E x+� ► - z PAUL KALRA P. O. BOX13.826,PLEASANT HILL, CA 94523 TEL: 925-676-2921 E-Mail: onlychiefa,hotmail.com . August 16, 2012 • Timm Borden, Director.Public Works City of Cupertino 16300 Torre Avenue, Cupertino, CA 95014 • Re: Relocation of Utility Pole at 10555 San Leaiidro Ave, APN# 357-05-025 Dear Mr. Borden: • Thank you for your E-mail acknowledging the fact that the utility pole and the anchor cable are located 6.89 feet within Mr. Wang's property commonly known as 10555 San Leandro Ave, APN#357-05-025 and you do not have permission from Mr. Wang to relocate the pole. Please note the following: 1. I cannot get involved in any shape or form in the illegal relocation of the pole located on Mr. Wang'opropert which and chfd this interests adversely and create new hazards of physical 2. My primary objective is to maintain harmonious,peaceful relations with my neighbor and ensure good vibrations between us. Therefore, the decision and responsibility of relocating the 116le is entirely yours. I have no opinion or say in whatever you decide to do. 3. The United States of America was founded upon the sanctity of property rights principle. If you knowingly violate Mr. Wang's property rights you will be exposing the City of Cupertino to lawsuits and liability for damages. I would suggest you consult the City Attorney before taking any action. Please acknowledge receipt of this letter and let me know your decision in writing. Sincerely, Paul Kalra, Owner 10567 San Leandro Ave. APN# 357-05-079 • c.c. Mr. J. Wang, 10555 San Leandro Ave, Cupertino, CA 95014 PAUL KALRA P. O. BOX 23826, PLEASANT HILL, CA 94523 TEL: 925-676-2921 E-Mail: onlychief@hotmail.com August 20, 2012 Timm Borden, Director Public Works City.of Cupertino 10300 Torre Avenue, Cupertino, CA 95014 Re: Return of Building Permit Deposit, 10567 San Leandro Ave, APN#357-05-079 Utility Pole located at 10555 San Leandro Ave,APN#357-05-025 Dear Mr. Borden: I was told by your department that the utility pole was located on my property and to obtain building permits I would have to deposit$25,000 with the City of Cupertino and accept responsibility for relocating the utility pole. • On August 14, 2012 you acknowledged that the Engineer's drawings show that the utility pole and anchor cable are located.6.89 feet inside Mr. Wang's property commonly known as 10555 San Leandro Ave, APN#357-05-025 and you do not have permission from Mr. Wang to relocate the utility pole. . As the utility pole is not located on my property and I cannot be held responsible for relocating a pole on Mr. Wang's property please return my$25,000 deposit with immediate effect. Thank you for your attention and cooperation. Sincerely, f...._,Qp.... , , Paul Kalra, Owner 10567 San Leandro Ave. APN# 357-05-079 IM ib t - Li I - C PAUL KALRA P. 0. BOX•2 826;PLEASANT HILL, CA 94523 TEL: 925-676-2921 E-Mail: onlychiefa,hotmail.com Sept. 13, 2012 • Timm Borden, Director Public Works Citx of Cupertino 10300 Tone Avenue, Cupertino, CA 95014 Re: Meeting summary Sept. 11, 2012, APN#357-05-079 Dear Mr. Borden: • .This letter summarizes my meeting in your office with Mr. Chad Mosley as follows: 1. I was surprised that my letters dated August 16 and August 20, 2012 were withheld from you even though I had personally handed the letter to Mr. Mosley and given a copy to Mrs. Wang on August 16, 2012. I met Mr. Mosley again on August 29 and requested return of deposit with no response. The two letters are attached. 2. Your department has admitted that the utility pole and anchor cable are located 6.89 feet inside Mr. Wang's property and you do not have permission or easement to relocate the pole. Yet you have ordered me to relocate the pole and violate Mr. Wang's property•rights and expose myself to lawsuits and liability for damages. M . You are holding a $25,000 deposit hostage to force me to comply with your illegal directives. 4. Please return the deposit to me without further delay or provide a finding of facts regarding issues raised in my letters for a timely resolution. Thank you for your attention, cooperation and assistance. . Sincerely, erti.A.--e ft-- • • Paul Kalra, Owner 10567 San Leandro Ave. APN# 357-05-079 1.— ''• \•\'1 bi I -75-•--.*' -_____.....____________........_----/' . . . / City Hall 10300 Torre Avenue Cupertino,CA 95014-3255 PH: (408)777-3354 FX: (408)777-3333 co.i 9ss PUBLIC WORKS DEPARTMENT CUPERTINO 9/14/12 Paul Kalra P.O.Box 23826 Pleasant Hill, CA 94523 Subject: 10569 San Leandro Ave—Relocation of Utility Pole Dear Mr.Kalra, The development oryour property at 10569 San Lean-lb Ave tnggersThe requireemenrf construction of improvements in the public right of way,which include the installation of pavement, sidewalk,curb and gutter. These required improvements affect an existing utility pole located near the northeasterly corner of your property,where it meets the public right of way(San Leandro Ave). Construction of these improvements requires the relocation of the subject utility pole to a location behind the proposed new curb and gutter alignment. The City understands that PG&E will require an easement over a portion of 10555 San Leandro Ave, in order to accommodate the relocated utility pole and subsequent guy wire. The City is currently working with your neighbor to acquire these rights. If the City is able to obtain an easement from your neighbor,your project's requirement to relocate the pole will continue as the current approved plans indicate,and the City will not release your encroachment bond until such time that the pole has been relocated. However,if the City is unable to obtain an easement from your neighbor,we will require that alternative safety measures be implemented in order to protect the pole from on-coming traffic. This may.,include the installation of a curb island around the utility pole,with the addition of reflector-ized bollards to visually alert drivers of the utility pole. This installation will require that the approved building plans be modified to indicate that the pole is to remain in place and to show the aforementioned safety measures. These safety improvements will require that the City obtain a bond equivalent-to 115%ofthe ost ofinstalatiorr. We will then return outstan ' oition of the any- �P $25,000.00 encroachment bond that was required for the pole relocation. We understand that the cash-flow for your project is impacted by the timing of this decision, so the City hopes to exhaust it's efforts, successfully or unsuccessfully,to obtain an easement from your neighbor prior to October 31st, 2012. Until such time,this item should not affect the progress of your ,1 project, as you currently possess a building permit, and your house is under construction. Sincerely, Timm D.Borden, PE City of Cupertino Director of Public Works (408)777-3354 ( E >( - PAUL KALRA P. O. BOX 21'826,PLEASANT HILL, CA 94523 TEL: 925-676-2921 E-Mail: onlychiefa,hotmail.com . Timm Borden, Director Public Works 9/20/12 • City of Cupertino • 10300 Torre Avenue, Ctwertino, CA 95014 Re: (1) Return of Building Permit Deposit, 10569 San Leandro Ave, APN#357-05-079 (2) Utility Pole located at 10555 San Leandro Ave, APN#357-05r025 Dear Mr. Borden: Thank you for your letter dated 9/19/12 in response to my letters dated 8/14/12, 8/16/12, 8/20/12 and 9/13/12. Please address the basic issue raised in my letters as follows: 1. It is an acknowledged fact that the utility pole and anchor cable are located 6:89 feet inside Mr. Wang's property commonly known as 10555 San Leandro Ave, APN#357-05-025 and you do not have permission or easement to relocate it. Your department directed me to relocate the pole on Mr. Wang's property and expose myself to lawsuits and liability for damages. Your department is holding a $25,000 performance deposit to force me to violate Mr. Wang's property rights. 2. Please let me know on what basis I have been ordered to relocate the pole on.Mr. Wang's property and violate his rights. What is the con.iection with the $25,000 performance deposit and your decision to relocate the pole? • 3. As noted in my letter dated 8/16/12 the decision and responsibility to relocate the pole is entirely yours and you cannot pass the buck to me. Whether you relocate the pole with or without an easement you have to accept responsibility for the accompanying lawsuits andliability for damages. It is regrettable that your department is engaged in getting $25,000 performance deposits first and easements later violating the rights of Cupertino residents. 4. Please return the $25,000 performance deposit without further delay. I am willing to make any reasonable adjustments on my side of the property line as suggested by Mr. Mosley ' previously. Thank you for your cooperation and timely response. . Sincerely, Vs."' Paul Kalra, Owner 10569 San Leandro Ave. APN# 357-05-079 rE \')'‘ �r- PAUL KALRA P. O. BOX.2. 26,PLEASANT HILL, CA 94523 TEL: 925-676-2921 &Mail: onlychief@hotmail.com Timm Borden, Director Public Works 10/24/12 City of Cupertino 10300 Tone Avenue, Cupertino, CA 95014 Rd: (1)Return of Building Permit Deposit, 10569 San Leandro Ave,.APN#357-05-079 (2)Utility Pole located at 10555 San Leandro Ave, APN#357-05-025 Dear Mr. Borden: I am in receipt of your letter of October 2, 2012. You have not addressed issues raised in my letter dated September 20, 2012. (attached).:Please.return..the $25,000 deposit because it was obtained by Mr. Mosley on the basis of lies, misrepresentations, complete disregard for facts and Cupertino Municipal Code violations. Sincerely, RAJ, Paul Kalra, Owner 10569 San Leandro Ave. APN# 357-05-079 • • • • \ / City Hall 10300 Torre Avenue Cupertino,CA 95014-3255 PH: (408)777-3354 0.19s, FX: (408)777-3333 � C U P E RT I N O PUBLIC WORKS DEPARTMENT October 26,2012 Paul Kalra P.O.Box 23826 Pleasant Hill,CA 94523 Subject: 10569 San Leandro Ave—Relocation of Utility Pole Dear Mr.Kalra, This letter is to inform you that the City was successful in obtaining a Public Utility Easement over the necessary portion of your neighbor's property at 10555 San Leandro Ave. (APN:357- 05-025). A copy of the unrecorded easement document has been provided for your records. Chad Mosley, of the Public Works Department, will provide you a copy of the recorded document when it becomes available. This easement document will allow for the relocation of the pole, and any potential anchor wires and/or overhead wires, as necessary to complete the project's intended requirements. Please continue your coordination with PG&E on this item, as indicated on your approved building permit plans. The new utility pole location should be situated behind the proposed cu 'b and gutter along your property frontage, in a location that is acceptable to both PG&E and the City Engineer. Please contact the Public Works Inspector, at (408) 777-3104, prior to finalizing the new pole location. Sincerely, Timm Borden Director of Public Works City of Cupertino 'RA DAVID Ross ; ASSOCIATES LLc 900 Industrial Rd,Ste E • San Carlos, CA 94070 • 650/593-2001 • www.davidrossassociates.com November 17, 2012 Timm D. Borden, PE Director of Public Works City,of Cupertino 10300 Torre 14a4I Nelms c— Cupertino, CA 950143 Re: 10569 San Leandro Avenue—utility pole relocation Dear Mr. Borden, I am assisting Paul Kalra, the property owner at 10569 San Leandro with this issue. I've reviewed the related Public Works Confirmation Form (dated 3/26/12), correspondence, site conditions and relevant sections of the Cupertino Municipal Code. After this review and conversations with Mr. Kalra I am still not clear about the City's authority and foundation for the requirement that Mr. Kalra relocate the joint utility pole located on his neighbor's property. A meeting or even a telephone conversation with you may be sufficient for resolving my questions and settling this issue. Since I have been unable to reach you by telephone, though, I will offer my questions in writing here in order to move the discussion along. My first area of confusion is the City's assertion that offsite improvements are required in connection with Mr. Kalra's home construction project. As I read the parcel map and easement documents, all curb, gutter and sidewalk improvements as well as Mr. Kalra's new driveway apron will be built on his property, not public property. Perhaps this is just a terminology glitch, but I believe that it is more appropriate to refer 1:o these as on-site improvements. The PW Confirmation Form of March 26, 2012 includes this handwritten note: "Relocate ex. joint utility pole out of paved road after construction of curb and gutter." This is confusing to me, since even after Mr. Kalra's improvements are complete (including his driveway), the existing utility pole will still be on his neighbor's property, not in a "paved road." As far as I cen tell, Cupertino does not have an easement to that would permit curb, gutter, sidewalk or roadway improvements at the neighbor's property, 10555 San Leandro Avenue, and I know of no plans by Mr. Wang, the owner of that property to make those improvements on his own. Your letter of September 14, 2012 to Mr. Kalra includes a number of statements that I find confusing or misleading: DAVID, Ross ,„v, RA x .,> < ASSOCIATES Li..c • "The development of your property at 10569 San Leandro Ave triggers the requirement of construction of improvements in the public right of way..." Please identify the public right of way noted in this sentence. • "These required improvements affect an existing utility pole ..." Actually, the existing utility pole will not be affected in any way that I can determine. • "Construction of these improvements requires the relocation of the subject utility pole to a location behind the proposed new curb and gutter alignment." It may be in the way of some future curb, gutter and sidewalk improvements at such a time as they are constructed on Mr. Wang's property, but unless I'm missing something it does not need to be touched for work on Mr. Kalra's property. • "... we will require that alternative safety measures be implemented in order to protect the pole from on-coming traffic." I understand that this was Cupertino's fall-back position if it could not get a PUE from Mr. Wang, but it is misleading in suggesting that oncoming traffic would endanger the pole. As you probably know, the pole is at the southeast corner of a parking area that is entirely on Mr. Wang's property. If and when the roadway is widened in front of Mr. Wang's property the pole could be in the path of oncoming traffic. But until then, a vehicle would have to leave the roadway in order to contact the pole. It is understandable that Cupertino wishes to take every opportunity available to effect public improvements through development requirements. However, in this instance it appears to me that Cupertino is placing an unfair burden on Mr. Kalra. Mr. Wang's residence appears to have recently undergone significant improvements. Since the subject utility pole and guy wire are entirely on Mr. Wang's property, why wasn't this relocation project required of Mr. Wang? The October 20th PUE granted to Cupertino on Mr. Wang's property does not appear to grant Cupertino the authority to construct site improvements. Clearly, the attempt to make Mr. Kalra me e the pole from its existing location on his neighbor's property to a new location on his neighbor's property is in anticipation of site improvements to be made at a time when Mr. Wang's property is re-developed. Shouldn't the requirement to move the pole fall upon that future developer, at a time when those site improvements can be made, rather than on Mr. Kalra? New curb, gutter, sidewalk and roadway improvements cannot be made on Mr. Wang's property by Mr. Kalra. I hope you will consider these questions and agree to a meeting to discuss them with me and Mr. Kalra. Mr. Kalra is committed to pursuing relief from this requirement through an appeals process if necessary, but we hope that it can be resolved with less time and expense by discussions among us. Regards, Dave Ross . Re: 10569 San Leandro Ave - Relocation of Utlity pole To see messages related to this one, group messages by conversation. 12/13/12 To Timm Borden, 'onlychief @hotmail.com', Chad Mosley Dear Mr. Borden, Thank you again for meeting with us to clarify the Public Works Department's reasoning for requiring Mr. Kalra, the owner of 10569 San Leandro Ave to relocate the pole which is presently on Mr. Wong's property at 10555 San Leandro Ave..Mr. Kalra will be filing a request for appeal with the City Clerk next week so that the matter may be considered by the City Manager and, if necessary, by the City Council. In order to prepare a thorough and thoughtful appeal we would like to have a copy of all documents and correspondence in PW's files related to the pole relocation. The requested materials include any email correspondence with Mr. Wong (or others, including internal communications) and any notes taken in connection with discussions by PW employees with Mr. Wong. Mr. Kalra is planning to visit City Hall on Wednesday next week and it would be convenient for him to pick up the copies at that time. He understands that a copying fee may apply. Thanks in advance for your assistance. Regards, Dave Dave Ross Principal Consultant David Ross Associates LLC • www.davidrossassociates.com 900 Industrial Road, Suite E San Carlos, CA 94070 650-593-2001 (office) 650-458-0408 (direct) 650-444-0255 (cell) Ce-On \'D j OFFICE OF THE CITY CLERK •5C,194. CITY HALL 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 CUPERTINO TELEPHONE: (408)777-3223•FAX: (408)777-3366 December 20, 2012 Re: Appeal of a decision of the Director of Public Works regarding the relocation of a utility pole; Applicant Paul Kalra/David Ross The above stated item is scheduled for the January 15, 2013 City Council meeting. Council meets at 6:45 p.m., Council Chamber, Community Hall, 10350 Torre Avenue, Cupertino, California. Interested parties are invited to attend and be heard. If you have any questions, please feel free to call our office at 777-3223. If you wish to challenge the City Council's action in court, you may be limited to raising only those issues you or someone else raised at the hearing described in this notice, or in written correspondence delivered to the City of Cupertino City Hall at, or prior to, the hearing. Sincerely, Kirsten Squarcia Deputy City Clerk cc: City Attorney Public Works Paul Kalra P.O. Box 23826 Pleasant Hill, CA 94523 David Ross 900 Industrial Rd., Ste E San Carlos, CA 94070 RE: 10569 San Leandro Ave - Relocation of Utlity pole To see messages related to this one, group messages by conversation. 11:56 AM Reply • Timm Borden Add to contacts To ;dnlychief @hotmail.com', Chad Mosley, 'Dave Ross' Mr. Kalra, I also left a voicemail on your phone with this message. While I was prepared to take your appeal and a staff report to our City Council meeting on January 151x' with a staff recommendation to uphold the Director's decision, in working with our Manager's and Attorney's Office, they have informed me that I nor the Council have the ability to waive the appeal period for the Planning Permit or the Public Works permit, of which the pole relocation was a part of. We will refund your appeal fee that you submitted on December 19th You were informed of the need to relocate the pole back in March of 2012. The Planning permit was issued June 11, 2012 and the bond securing the work for the Public Works permit was submitted on July 27th. The protest or appeal period for these permits was 90 days on the Planning Permit and 30 days on the Public Works permit. The condition to relocate the pole will remain in full force and effect and is continued to be secured with your bond. Sincerely, Tirpm Borden a /r13 vv ■/ OFFICE OF COMMUNITY DEVELOPMENT / 1 9` CITY HALL 10300 TORRE AVENUE•CUPEERTINO,CA 95014-3255 C U P E RT I N O (408)777-3308•FAX(408)777-3333•plannina®cupertino.orq June 11,2012 GP Residential Attn:Erica Prado 829 S.7Th Street San Jose,Ca 95112 SUBJECT: TWO-STORY PERMIT ACTION LETTER—Application R-2012-20 This letter confirms the decision of the Director of Community Development, given on June 11, 2012; approving a Two-Story Permit for a new 3,696 square foot single family residence with an 800 square foot attached secondary dwelling unit, located at 10567 and 10569 San Leandro Avenue, with the following conditions: 1. APPROVED PROTECT This approval is based on a plan set entitled,"A Proposed New Residence and Secondary Unit,Kalra Residence, 10569 & 10567 San Leandro Ave., Cupertino, CA 95014,"consisting of 10 sheets dated April 2,2012,except as may be amended by conditions in this resolution. 2. ACCURACY OF THE PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 4. OAK TREE PROTECTION Prior to building permit issuance, the tree remediation and protection measures contained in the project arborist's report dated March 6, 2012 shall be implemented as deemed appropriate by the Director of Community Development for the multi-trunk Coast Live Oak tree in the rear of the property. The project arborist shall confirm in a letter that the tree remediation measures are complete and that the tree protection measures are in place prior to construction/demolition. The tree protection measures shall be placed in the construction plan set and posted on tree protection fence. A report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. 5. LANDSCAPE PROTECT SUBMITTAL If more than 2,500 square feet of planting area (non-hardscape) is proposed onsite, then detailed landscape and irrigation plans in conformance with the landscape project submittal requirements of Chapter 14.15,Landscape Ordinance,shall be submitted prior to permit issuance.The landscape plan shall include water conservation and pesticide reduction measures in conformance with Chapter 14.15, and the pesticide control measures referenced in Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection,of the Cupertino Municipal Code. Two-Story Permit Action Letter Page 2 R-2012-20 6. PRIVACY PLANTING The final privacy-planting plan shall be reviewed and approved by the Planning Division prior to issuance of building permits. 7. PRIVACY PROTECTION COVENANT The property owner shall record a covenant on this property to inform future property owners of the privacy protection measures and tree protection requirements consistent with the R-1 Ordinance, for all windows with views into neighboring yards and a sill height that is 5 feet or less from the second story finished floor. The precise language will be subject to approval by the Director of Community Development. Proof of recordation must be submitted to the Community Development Department prior to final occupancy of the residence. 8. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 9. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color,material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. 10. NOTICE OF FEES,DEDICATIONS,RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements,and other exactions. Pursuant to Government Code Section 66020(d) (1),these Conditions constitute written notice of a statement of the amount of such fees,and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Please be aware that if this permit is not used within two years,it shall expire on June 11,2014. Staff has made all the findings that are required for approval of a Two-Story Permit as required by the Cupertino's Municipal Code,Chapter 19.28.150(B).Also,please note that an appeal of this decision can be made within 14 calendar days from the date of this letter. If this happens,you will be notified of a public hearing,which will be scheduled before the Planning Commission. Sincerely, George Schroeder Assistant Planner City of Cupertino 408-777-7601 georges@cupertino.org Two-Story Permit Action Letter Page 3 R-2012-20 Enclosures: Approved Plan Set Cc: Paul Kalra,P.O.Box 23826,Pleasant Hill CA 94523 Jatin Parikh,22092 San Fernando Ct,Cupertino CA 95014 Kwai-Chuen So,10560 San Leandro Ave,Cupertino CA 95014 PUBLIC WORKS CONFIRMATION FORM Public Works Department 10300 Torre Avenue (408)777-3354/ Pax(408) 777-3333 4„,5s.1 s, Cupertino,CA 95014 publicworks®cupertino.org CUP E RT I N O http://www.cupertino.or8/publicworks A Public Works confirmation form, if required, must be completed prior to•project submittal to the Planning Department. The fee for the confirmation is$258.00. If a Building Permit Application is submitted within one year of the sign-off date at the bottom, the confirmation fee will be applied • towards the Public Works Building Permit fee. The purpose of this confirmation is to identify preliminary Public Works issues, which may adversely affect the application. Please submit this form, the fee, and a copy of the site plan to the Public Works Department for review. The Public Works Department can be reached at (408) 777-3354. /055 '.d Iv5(,�"5",, �L , ,d,;, o�� c:.1ic'.-1'" �"1lolma;),� I Project Address: Email Address: Applicant Name: rigid 1•• �� Phone No: (7 25 2-9 Z *** For Public Works Department Use Only *** . PW Confirmation Required($258) PW Confirmation Not Required Addition: Single Family Dwelling �' Flood Zone: Requirements: iDedicate Dedicate Right-of-way(road): /0 1) Z'i(Al/0A) ( ❑ Easement(streetlight): Offsite improvements required (circle 1 -w. • . . s. • tte`l curb ram., •rivewa avement street light,street tree RE4cul fc &K. 5c,r 07 poi-4 c.' /= PllvC16 i o AD ' Afice cvn15rlJC-r o;. c ' G-iiircZ tr Registered civil engineer required to design gra•1/1: . .1 • • . .*eaten p ans • Clearly show all utility lines from the house/project site to the street(electric, electric panel, gas,water,sewer). Indicate as new (N)or existing(E) /Underground all overhead utility service to new house or new electric panel C1 Show onsite drainage on site plan with direction and slope percentage • Include relevant City Standard notes and Details on plans e Encroachment permit o(evelopment Agree ❑ Streamside Permit jy t'Ay sZ)=av To f"ti i) 4 S tiR l () t1ho ',701-4.=(7 A r 5141v c r'4 ui14.'v ( L f.LL rIN • ❑ Soils letter/report /AY P,41/( reek , ,z �TS --- $15',GCG. OG ✓ Submit preliminary title report and Quitclaim underground water rights Comments ,xi w Co e 6, C-4)(r,' /1,v J s' io("ye (-IK iZ 3 ,u��t i="(..C. rlG /)L•)r0C TQPoG,erl1Wic $•/fee-r O 'Oc' (/-1& l i4c( zu fr.T//4- Z, vE fiCr t ta(/�Tlut/1. ,:vievcy Sr/cv'-O t.T1(tr,,,ia c/if' '' Y. 74 ( i ;r' Signature / Title Date C',vie C7 G iNC'cy� 3 f,A Z sheet 11 of 11 App2011-12.doc revised 7/1/11