Loading...
10080189 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10483 MIRA VISTA AVE CONTRACTOR:YIN CHAN PERMIT NO: 10080189 OWNER'S NAME: YIN CHAN 15159 MONTALVO RD DATE ISSUED: 11/052010 O. ..;R'S PHONE: 4088366070 SARATOGA,CA 95070 • PHONE NO: ❑ LICENSED CONTRACTOR'S DECLARATION r r BUILDING PERMIT INFO: BLDG T ELECT PLUMB License Class Lic.II MECH r RESIDENTIAL r COMMERCIAL ., Contractor Date I hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION:NEW TWO-STORY(3760SQ),GARAGE(579SQ)& (commencing with Section 7000)of Division 3 of the Business&Professions LANDSCAPE AREA(4517SQ) Code and that my license is In full force and effect. hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$800000 APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is APN Number:35704080.00 Occupancy Type: correct I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, PERMIT EXPIRES IF WORK IS NOT STARTED costs,and expenses which may accrue against said City in consequence of the granting of this permit Additionally,the applicant understands and will comply WITHIN 180 DAYS OF PERMIT ISSUANCE OR with all non-point source regulations per the Cupertino Municipal Code,Section 180 DAYS FROM LAST CALLED INSPECTION. 9.18. Si^-^cure Date Issued b:y!.,/ DateV'(' - %7--G r LI OWNER-BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of RE-ROOFS: the following two reasons: -• All roofs shall be inspected prior to any roofing material being installed.If a roof is I,as owner of the property,or my employees with wages as their sole compensation, installed without first obtaining an inspection,I agree to remove all new materials for will do the work,and the structure is not intended or offered for sale(Sec.7044, inspection. Business&Professions Code) Signature of Applicant: Date: I,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three At declarations: I have and will maintain a Certificate of Consent to self-insure for Worker's HAZARDOUS MATERIALS DISCLOSURE Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have read the hazardous materials requirements under Chapter 6.95 of the I have and will maintain Worker's Compensation Insurance,as provided for by California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material. permit is issued. Additionally,should I use equipment or devices which emit hazardous air I certify that in the performance of the work for which this permit is issued,I shall contaminants as defined by the Bay Area Air Quality Management District I will not employ any person in any manner so as to become subject to the Worker's maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the Compensation laws of California If,after making this certificate of exemption,1 Health&Safety Code,Sections 25505,25533,and 25534. become subject to the Worker's Compensation provisions of the Labor Code,I must Owner nt:" forthwith comply with such provisions or this permit shall be deemed revoked.ADate: I ( / sl �,l7/0 (,rl APPLICANT CERTIFICATION CONSTRUCTION LENDING AGENCY I certify that 1 have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating 1 hereby affirm that there is a construction lending agency for the performance of work's to building construction,and hereby authorize representatives of this city to enter for which this permit is issued(Sec.3097,Civ C.) i• he above mentioned property for inspection purposes.(We)agree to save Lender's Name I. .nify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address costs,and expenses which may accrue against said City in consequence of the granting of this permit Additionally,the applicant understands and will comply with all non-point source rept ' n's per, upertino Municipal Code,Section ARCHITECT'S DECLARATION 9.18. j _ " Date ( l/ç//o I understand my plans shall be used as public records. Signature Licensed Professional ri �•l 'e'. ,•;-,-},a:--_,..-- ".-.t. a-`ery.�, ,-. .,�. -�•n,� �,r ; r=• A^,., ,r.^, „�, y���". � � ,;'FGf•� ,;f r� T:iv�� � ., ,6. ^ r -3� �y n� r� _ � +.-� ,��� .'�. �! ti�T9,'•X' ry c•^c RG '� ��" � :iry > � �p .int .•h,.�'liA?� r2'ti,.; +��r'. ..,‘1: y�,7 Fti�,�t��.r' �i��k o �,,.. JJ J_ J •LJJ1 J CU .) Q". .. - ,� , . - "o,r. L ..„.„.....c...„,„�..;.,,,pc:-.;�,t+ .. ::...�....- *:-_. le:'-`2'.";.. .,d°�' .,...{, h 1;e1 ,. L,>-1 .r.- .,fe• !?rn... yy' S' 1•._ �-�> •,,,..- "+e y,er--) `^� ` ' File Edit Actions Details Links Favorites Help ard . • Perrnit Information- --•-- --- --- -- - -------• -- ,,-Location Information----.._-____— ___ .r.---_-- — -._--_ �. [Address' 10483MIRAVISTAAVE OK Permit Number” 1.0080189 . .., ; j [10080189 . • it " - i _ _._ {� Status' rC- ;"iClo ed?ng{ ?g v I City/State/Zip CUPERTINO CA 95014 ' (�Back Master Number I Notes I 71. ; APN 35704080.00 4` Project ! (.( ,-)1 i; Unit 1 . - I c Contractors ,1 t _ _ :.__ _ _ _ _ 1 •---•- - Fees Apply Date' (08/26/2010 a �! Operator patg -0!l:'nerEntityInformation -_ _ `.-_ - - _ - 1.0 Permit Issue Date 111/05/2010 Operator raciC _ T (Owner Name' YIN CHAN I � g Plan Reviews Certificate Issued 11/04'/2011 ! Operator [garys —_' h Use Default III Certificate Type ICC CERTIFICATE OF COMPL ', Inspections • Address Home-15159 MONTALVO RD , " Certificate Number I I it [ i l,g'=r,Print Permit -- � City/State/Zip !SARAOGA 1 CA{ I95070 I f ,Adjustments Permit' a Property l Zoning , Applicant I[ Contractor_I! Defined Fields 1[..Si Holds •-Permit Details ----- - . --- -•- • - - . Purpose/Special Conditions - - --- - -- --- I[E4CopyPermit Permit Type' I1R3SFDW gPI.IEW TWO—STORY(3760SQ),CARAGE(579SQ) & LANDSCAPE i AREA RHA(4517SQ) ® Close Permit i !SINGLE FAMILY DWELLING I ( Usage Class" I II/III B. CI "SEE NOTES"' ! Overrides 111/III B,IV-HT,V-B NEW - Supplemental Fields Applied Value' I 800000 I FILE LOCATED IN FLEA ROOK BOX 16 r 14 Notes SQUARE FT. 1 4340 '. ' I t Attachments Calculated Value I 0[-� • ! I ' US C-404 Type 1101 Q I NEW:SFD,DETACHED Permit Form' IAUTOPERM -PERMIT v 1 . i I I Ownership 1 •Private v ! Project Size I STANDARD •STANDARD vl :i [QAdd Default Text • r. < ,m 1 is I i Permit issued 11/0512010 - Enter permit status +OUR; CITY OF CUPERTINO 5 ITEMS OF 5 PERMIT RECEIPT OPERATOR: suew COPY # : 1 Sec: Twp: Rng: Sub: Blk: Lot: APN • 35704080. 00 DATE ISSUED • 11/05/2010 RECEIPT # • BS000011931 REFERENCE ID # . . . : 10080189 SITE ADDRESS • 10483 MIRA VISTA AVE SUBDIVISION CITY • CUPERTINO IMPACT AREA OWNER • YIN CHAN ADDRESS • 15159 MONTALVO RD CITY/STATE/ZIP . . . : SARATOGA, CA 95070 RECEIVED FROM • YIN CHAN CONTRACTOR LIC # *OWNER* COMPANY • YIN CHAN ADDRESS • 15159 MONTALVO RD CITY/STATE/ZIP . . . : SARATOGA, CA 95070 TELEPHONE FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL 1BCBSC VALUATION 800, 000 . 00 32 . 00 0 . 00 32 . 00 0. 00 1BCONSTAXR FLAT RATE 1 . 00 558. 42 0 .00 558.42 0. 00 1BSEISMICR VALUATION 800, 000 . 00 80. 00 0 .00 80 . 00 0. 00 1PLLONGR SQUARE FEET 4, 340 . 00 564 .20 0 . 00 564 .20 0. 00 1R31NSP SQUARE FEET 4, 340 . 00 3303 .72 0 .00 3303 .72 0. 00 1R3PLNCK SQUARE FEET 4, 340 .00 2924 . 36 2924 .36 0 . 00 0. 00 TOTAL PERMIT : 7462 .70 2924 .36 4538 . 34 0. 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER CHECK 4, 538 .34 1146 TOTAL RECEIPT : 4, 538. 34 CITY OF CUPERTINO ITEM 1 OF 1 PERMIT RECEIPT OPERATOR: suew COPY # : 1 Sec : Twp: Rng: Sub: Blk: Lot: APN • 35704080 . 00 DATE ISSUED • 08/26/2010 RECEIPT # • BS000011295 REFERENCE ID # . . . : 10080189 SITE ADDRESS • 10483 MIRA VISTA AVE SUBDIVISION CITY • CUPERTINO IMPACT AREA OWNER • YIN CHAN ADDRESS • 15159 MONTALVO RD CITY/STATE/ZIP . . . : SARATOGA, CA 95070 RECEIVED FROM • YIN CHAN CONTRACTOR LIC # *OWNER* COMPANY • YIN CHAN ADDRESS • 15159 MONTALVO RD CITY/STATE/ZIP . . . : SARATOGA, CA 95070 TELEPHONE FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL 1BCBSC VALUATION 800, 000 .00 32 . 00 32 .00 0 . 00 0. 00 1BCONSTAXR FLAT RATE 1 . 00 558 . 42 558 .42 0 . 00 0 . 00 1BSEISMICR VALUATION 800, 000 .00 80 . 00 80 .00 0 . 00 0. 00 1PLLONGR SQUARE FEET 4, 340.00 564. 20 564 .20 0 . 00 0. 00 1R3INSP SQUARE FEET 4, 340 . 00 3303 . 72 3303 .72 0 . 00 0 . 00 1R3PLNCK SQUARE FEET 4, 340.00 2924. 36 0 .00 2924 . 36 0. 00 TOTAL PERMIT : 7462 .70 4538 .34 2924 . 36 0. 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER CHECK 2, 924 . 36 #1067 TOTAL RECEIPT : 2, 924 . 36 INSPECTION WORK LOG - ONE PER PAGE DETAIL FORMAT PAGE-001 PRINTED ON 04/01/13 PERMIT NUMBER: 10080189 10483 MIRA VISTA AVE CUPERTINO PERMIT TYPE: 1R3SFDW SINGLE FAMILY DWELLING USAGE CLASS: II/III B, II/III B, IV-HT,V-B NEW SPECIAL :NEW TWO-STORY(3760SQ) ,GARAGE(579SQ) & LANDSCAPE PERMIT :AREA(4517SQ) CONDITIONS: AND NOTES : **SEE NOTES** PARCEL ID: 35704080 .00 LOT: BLOCK: SUBDIVISION: OWNER NAME: YIN CHAN OWNER ADDRESS: 15159 MONTALVO RD CONTRACTOR ID: OWNER CONTRACTOR NAME: YIN CHAN CONTRACTOR PHONE: * NOT ON FILE * SUB-CONTRACTOR ID: 25529 SUB-CONTRACTOR CATEGORY: BC SUB-CONTRACTOR NAME: DAVID BRANON CONSTRUCTION INC SUB-CONTRACTOR PHONE: (408)778-3696 SUB-CONTRACTOR ID: 32595 SUB-CONTRACTOR CATEGORY: BC SUB-CONTRACTOR NAME: BOBCAT BUSTER SUB-CONTRACTOR PHONE: (408) 687-7194 SUB-CONTRACTOR ID: 29950 SUB-CONTRACTOR CATEGORY: BC SUB-CONTRACTOR NAME: LOS GATOS GLASS SUB-CONTRACTOR PHONE: (408) 354-1523 SUB-CONTRACTOR ID: 28153 SUB-CONTRACTOR CATEGORY: BC SUB-CONTRACTOR NAME: SAS ROOTER & PLUMBING SUB-CONTRACTOR PHONE: (510) 468-8436 SUB-CONTRACTOR ID: 26871 SUB-CONTRACTOR CATEGORY: BC SUB-CONTRACTOR NAME: EXECUTIVE ROOFING SUB-CONTRACTOR PHONE: (408) 458-6044 SUB-CONTRACTOR ID: 33063 SUB-CONTRACTOR CATEGORY: BC SUB-CONTRACTOR NAME: ROSA CONSTRUCTION & DRYWALL SUB-CONTRACTOR PHONE: (408) 848-2622 INSPECTION TYPE: 516 FINAL BUILDING INSPECTION AREA: SCHED DATE: 11/02/11 INSPECT TIME: CONTACT INFO: INSPECTOR: GST STREAM, GARY INSTRUCTIONS: P.M. LATE - HENRY 691 3724 (408) COMMENTS: RESULTS: PASS FAIL CANCEL RE-FEE FAIL CODE: NOTES: PRIOR INSPECTION RESULTS: 101 FOUNDATION 11/17/10 P BG 101 FOUNDATION 11/16/10 I BG 106 SEWER & WATER 06/22/11 P BG 106 SEWER & WATER 06/21/11 I BG 106 SEWER & WATER 06/20/11 C BG 106 SEWER & WATER 06/17/11 C GST 202 UNDERFLOOR PLUMBING 11/30/10 P LS 203 UNDERFLOOR MECHANICA 11/30/10 P LS 204 UNDERFLOOR FRAME 11/30/10 P LS 301 ROUGH PLUMBING 04/15/11 P BG 301 ROUGH PLUMBING 03/31/11 P BG 302 TUB & OR SHOWER 04/22/11 P GST 302 TUB & OR SHOWER 04/15/11 P BG 302 TUB & OR SHOWER 04/12/11 F BG 302 TUB & OR SHOWER 04/08/11 F GST 303 ROUGH MECHANICAL 03/31/11 P BG 304 ROUGH ELECTRICAL 03/31/11 P BG 305 FRAME 03/31/11 P BG 307 INSULATION 04/05/11 P BG 308 SHEETROCK 04/12/11 P BG 309 EXTERIOR LATH 04/15/11 P BG 309 EXTERIOR LATH 01/20/11 C WRONG INSPECTION BG 310 INTERIOR LATH 05/02/11 P BG 311 SCRATCH COAT 04/22/11 P GST 313 ROOF NAIL 01/20/11 P BG 315 EXT SHEAR 01/20/11 P BG 316 INT SHEAR 01/20/11 P BG 404 ELECTRIC METER RELEA 09/08/11 P GST 404 ELECTRIC METER RELEA 09/07/11 F GST 501 FINAL ELECTRICAL ENE 10/25/11 P GST 502 FINAL PLUMBING ENERG 10/25/11 P GST 503 FINAL MECHANICAL ENE 10/25/11 P GST 504 FINAL BUILDING ENERG 10/25/11 P GST 505 FINAL ELECTRICAL 10/25/11 P GST 506 GAS TEST 04/15/11 P BG 507 FINAL PLUMBING 10/25/11 P GST 508 FINAL MECHANICAL 10/25/11 P GST 510 FINAL PLANNING 10/17/11 P GDS 516 FINAL BUILDING 11/02/11 P GST 516 FINAL BUILDING 10/25/11 F GST CommunityPlus V8 . 1 PAGE NUMBER: 1 DATE: 04/01/2013 Client Name MODULE : libNotes TIME: 08 : 04 : 03 Permitting Notes SELECTION CRITERIA: Permit Number = 10080189 Note Date/Time Date of Record Operator Note Code Reminder Date 2011-11-04 07 :35: 56 11/04/2011 patg FAXED GAS MTR RLS TO PGE(GSTREAM FINALLED 11/2/2011) 2011-09-08 16 :32 :20 09/08/2011 patg FAXED TO PG&E ELECTRIC MTR RLS 2010-10-27 17 :02 : 33 10/27/2010 SylviaM E-MAILED COMMENTS TO YIN CHAN @ CARLSONCHAN@YAHOO.COM RESUBMIT 5 COPIES TO THE BLDG DEPARTMEMT 2010-09-16 16 : 50: 09 09/16/2010 suew Hi Carlson, Attached are the plan check comments for 10483 Mira Vista Rd #10080189. Please make the changes and re-submit 6 complete sets of plans with the written responses for all departments attached to each set of plans . If you have any questions, please contact the Building Department at 408-777-3228 or by .email suew@cupertino.org. Sincerely, Susan Winslow Bldg Dept . Original Message From: Carlson Chan [mailto:carlsonchan@yahoo.com] Sent: Thursday, September 16, 2010 3 : 19 PM To: Building Subject: 10483 Mira vista comments Hi, I am the owner if 10483 Mira vista. I would like to request a soft copy of the plan review comments. Regards Carlson Yin Chan 2010-09-14 16 :29 : 59 09/14/2010 SylviaM CommunityPlus V8. 1 PAGE NUMBER: 2 DATE: 04/01/2013 Client Name MODULE : libNotes TIME: 08 :04 : 03 Permitting Notes SELECTION CRITERIA: Permit Number = 10080189 Note Date/Time Date of Record Operator Note Code Reminder Date LEFT MESSAGE W/ Y CHAN TO CALL BACK AND PROVIDE FAXD # OR E-MAIL ADDRESS OR WANTS TO PICK UP COMMENTS 2010-08-26 14 :30: 29 08/26/2010 suew THIS APN# IS ASSOCIATED WITH 22331 SANTA PAULA AVE & 10483 MIRA VISTA RD. THE LOTS WERE DIVIDED. 10483 MIRA VISTA IS NEW-WE USED 35704080 . 10483 AS THE APN # . YIN CHAN WAS MADE AWARE WHEN HE SUBMITTED PLANS TO BUILDING THAT THE PLANNING APPEAL PERIOD IS NOT OVER TILL 9/7/10 . APPEALS CAN BE FILED UP TO END OF DAY ON THE 7TH. HE WAS INFORMED THAT IF THERE IS AN APPEAL, HE COULD LOSE HIS PLAN CK FEE IF NOT ALLOWED TO BUILD AS PER PLANS HE SUBMITTED. SUEW. 2010-08-26 14 : 15: 53 08/26/2010 patg 10483 IS MIRA VISTA & APN IS SAME FOR 22331 SANTA PAULA; LOTS SPLIT Date:4/1/2013 Permit Holds Permit Location Address Reason Entered Released Number Operator Operator 10080189 10483 MIRA VISTA AVE DO NOT PRINT-MST BE PKD UP AS OWNR/BLDR RELEASED PER BOB S 11/16/10 SUEW patg TraciC 10483 MIRA VISTA AVE NO 516 UNTIL LANDSCAPE INSTALLATION RELEASED PER BOB S 11/16/10 SUEW piug bethe 10483 MIRA VISTA AVE NO BLDG FINAL NEED QUITCLIAM RELEASED PER BOB S 11/16/10 SUEW SylviaM SylviaM 10483 MIRA VISTA AVE NO FINAL-ND SUBCONTRACTORS'BSL INFO RELEASED PER BOB S 11/16/10 SUEW patg patg 10483 MIRA VISTA AVE NO FINALS SUBMIT QUITCLAIM TO PW RELEASED PER BOB S 11/16/10 SUEW SylviaM SylviaM 10483 MIRA VISTA AVE OK TO RELEASE RELEASED PER BOB S 11/16/10 SUEW counter George 10483 MIRA VISTA AVE OK TO RELEASE RELEASED PER BOB S 11/16/10 SUEW plug George 10483 MIRA VISTA AVE PROVIDE ARBORIST LETTER RE:EXISTING RELEASED PER BOB S 11/16/10 SUEW plug TraciC Page 1 • r-- r .-.,�,,• ar; ,�- ..._ " -�:c,.: : _ . , = .:= • :F.,4...4,......7, ,,.;,_"....:.,._ "..--} iYi '1_- S' x� 4 yL%L.:::74,•,..;77,-•• am . 1a 'tt.1 .: v..1.,-;,,,,-_, '.1, "`• -`3" �:r..-�... } . La-t:F: -- Y -- r` L.Y ., 4''„_ .`",j'AArrt' .Je.« ;`,'?'".14.j ' 9X c r:i �,SJ�_ P,m7:l + Nqy,. e.Vit - j : .1 ,.1-q54,r_- . •�, i1.5174•}" ear ru'! Flt 11J 1�Midi • all- . '`i . �r ,.„.:,,,z.,r” ��1f4k `Z 'tt `�� % -...,1;:,,e- ,,rVin '''' 4p" ...t., < -�S .z't 't ;.ttri. .,1xrt },r.S4'i': •=.4t,..0.5 •1 File Edit Details Links Tools Favorites Help ` Permit Information------- - - -----• ----- - - _ -—_.— - — — - — — — -- - — -- • , Permit Number 10080189 I Status Open - j r OK APN 35704080.00 Back Address 10483 MIRA VISTA AVE ! - Owner Name YIN CHAN t ' a Print Reviews j I Review Stop ; Revision Date In Due Date 1 Date Out I Status I Time 1 Reviewer Notes I Contractor ID I Sent Tc. ..1 I S;SE V .V..-i, k ;%ti? tr.¢4a rQ8/2612O1'U 091��;Q`1 01U 1+1''7Q51 ;6 . . e�" -F tr. M. - `:x-•,i �^ ra.,", ' ti NV:,:j [4\gi,Out BLDG 1 1'08/26/2010 09/10/2010 !09/14/20101N_ I 0.00 ARNOLD I" I BLDG 2,10/13/2010 .10/20/2010 1 10/27/2010 ;.4 0.001 LARRY r" __— i _ _ --L----•• - - --- '�Reset [FIPE ^--;_ 1'08/26/2010 109/10/2010 109/02/2010 IN _ _I 1DOUG �" 1 Plan Review Information -. -. . Plan Review Notes-- --- -- -- - - - ._- ----- —. E-mail 1 Review Stop I NEW TWO—STORY(3760SQ),GARAGE(579SQ) & LANDSCAPE ..1 ; ' 1 Revision --1I . Continuous • i' AREA(4517SQ) ' ttiHolds • Reviewer — t'Supplemental Fields Date In 08/26/2010 I1:J Time In ' Project Size STANDARD I Default Days 1 141 i Notes Due Date F09/10/2010 4l:•i : EI Attachments Date Out 11105/2010 P_-.!.11 Time Out Status A-APPROVED ' ' ' Status Date _ 4'.°1 i • Time Spent f { •ti i1 i Contractor -•_t l 1 i Sent To !ASSESSOR -COUNTY ASSESSOR i • • Sent By ISUEW I • • 1 Y I ' - inVP1 - _ -,. ' .. -;�,E• _�S 1 ., --t ., � rtif�4' ^ ;,+3y .V.67:+1,,,--_,11,.,%; " -yy. ', ,«v :r6r,-4--,E :.4; th .�-t3 c.1trmo"i•F ,16. '," .z,; fid }^' ,y-'.fi. i `w .47t ,tM.C . K xbj , rE. 'rP, t -$4 '. ^� , j r<,-1�aig `1 .. : x.e:4417 - ,, ..5- 1 _. .� • ' ,.2.r .e ';n, . rr'. • 1 :/70- -.0f!.• " '.= .;1.,. .- — S"iriaA ; " .-- :L] L File Edit Details Links Tools Favorites Help . Permit Information-------- -- ---" -- -- _--- ___..._----- --- -------T-_� _ .---- --•- - = t r Permit Number 10080189 Status Open • - 1 us.OK ,j APN 35704080.00 j - Address 10483 fvfIFIA VISTA AVE 4%Back r Owner Name YIN CHAN I I : 0Print Reviews r i i Review Stop ' Revision Date In i Due Date Date Out Status ' Time I Reviewer Notes I Contractor ID I Sent Tct^I In FIRE 210/13/2010 ;10/20/2010 10/19/2010 LA_ —_� 0.00 DOUG t - _. -- — - --- - Ou PLANNING _ 3'11/04/2010_11/11/2010 .11/04/2010 A I___0.001PIU_ _ , _ I PLANNING _ _ _210/13/2010 110/20/2010 10/21/2010_ ••N _ I _0.0o PIU -- _�- __ - ._ ' — Reset PLANNING 1 08/26/2010 09/10/2010 09/14/2010 ;hl___ i — O.00IPIU _—_" ; ( - --_ — - ill - 1 1)•`-'.J ir:jb�Fees Plan Review Information, ---- - •- -Plan Review Notes -- --- - --- ---- - -- - .--._.-_.--_ - - _ LIE-mail J Review Stop ;FIRE -FIRE DISTRICT REVIEW NEW TWO—STORY(3760S0) ,GARAGE(579S0) & LANDSCAPE A 1 : r-- AREA(4517SQ) ! • ► HOIds Revision i 11 Continuous Reviewer !DOUG • Supplemental Fields , Date In 108/26/2010 10;1 Time In 1 - Project Size 1STANDARD ' Default Days 14 1 Notes Due Date 109/10/2010 !'_:::g Attachments : Date Out 09/02/2010 1 Time Out 14:08 Status IN •NOT APPROVED - ' . Status Date 109/02/2010 11011 Time Spent j I _` I E Contractor Sent To I ' ' 1 . Sent By suew _ ..,.i... '+'�.. . . r� .,. _.'.e.- v..._ - . - � ,... �.• . ` e*.~� .ip.. ,� 10,.r 4-",,,,,:, ,ta. .„4,..` e _ t. ,��vt- T ,t; i e ' P"i ._may am ''7?_ B . ,. ,.... _ -eg • •.7r • r .Yt.. . - s T• ,_ 's, ',."'.."4",... . ta, , vC�' -• , f ,,.--,..p.,-..•,.--4,:. . r ,. -,.$r" 4-. � .J IA, VVi- .-.. F0X _a73 _i. k . c'hY " 6 ; �srg, J r-P J it.... �,^-t ..n•_..-- . „c 4_,. .,..., „_-� .. � •f- 4 - d ' ,17- —I .. sr:', .w5”;, I:7,4 ,Y:, IV.Al �.4.:• ?v� ,.,r * , .• � ,r1 _• � � z9',ti ,' Ny.£ tri.ersrr '�r airr,,: _x�� ".�e,a •-sws�'ti•�- - L M ,��. ms.1''..rA.��. .9.3rht, :5 ..4�7 _ dt. 4�. v = 1..,;:, rap Li , '--".- FileFile Edit Details Links Tools Favorites Help - -Permit Information ------ - - - - - - - _ �____-- -__. _ -_ ------ _.. _.-- -- -- -._. Permit Number 10080189 Status Open -- ' ! 'rj OK P A.PN 35704080.00 i i 4o Back Address [L483 MIRA VISTA AVE ` Owner Name YIN CHAN a Print Reviews 1 Review Stop Revision Date In : Due Date ; Date Out 1 Status Time i Reviewer Notes i Contractor ID ; Sent Tc_" LtIn � i i PUBWORKS 1:08/26/2010 109110/2010 -109/09/2010 N l^� 0.001 CHAD _1,, ,r_� _ ! trjOut PUBWORKS 2!1 011 31201 0 _ 10/20/2010_ 110/18/2010 'N_ O.O0 CHAD — - ,, _„_. -___ - SANITARY __ _ 210/1312010 10/20/2010 10118/2010 'tJ_ _ __ _ 0.0_OiNICHOL 1 ,SANITA•RY 1108/26/2010-__109/1012010__J09/08/2010 IN j 0.00 NICHOL --L ;j 7 Reset 3111103/2010 111103/2010 I 11/03/2010 P 0.00 NICHOL � ! SANITARY _ _ --, I _-- __ 1 ,. i_ �1� 'j� Fees Plan Review Information-- --_-- .--- _- ._------- ---------- --_ ,-Plan Review•Notes. _ -_. _.._. — -J j `�E mail Review Stop PLANNING -PLANNING DEPARTMENT'REVIEW i� .NELT TWi7-STORY(37605Q) GARAGE(5795Q) 5 LANDSCAPE. l^�l i . �. Revision L 1 Continuous •' AREA('4517SQ-)-YIN CHp.N•-WAS TOLD THAT THE'L'E•LA.NNING.APPEAL:'._ r•;1 I I. i Holds PERIOD WAS NOT OVER TILL 9/7/10 AND IF THERE WERE APPEALS Reviewer PIU - 1 • HE COULD HOLD UP HIS PLANS IN BLDG AND POSSIBLY LOSE PLAN I I't Supplemental Fields I Date In 108/26/2010 I1;r?Ij Time In 116:33_ I CK FEES. HE SAID HE WAS WILLING TO TAKE THAT CHANCE_ ll I •. 1_1 Notes t Project Size 1STANDARD Default Days i 1411 • 11, UPDATE PRIVACY PROTECTIOI•I AND LANDSCAPE PLANS PER THE . Due Date 109/10/2010 Ii+.?I I CONDITIONS IN THE APPROVAL LETTER. I . 6,. Attachments �_l •092. FINAL LANDSCAPE PLANS MUST HAVE WET-SIGN OF LANDSCAPE Date Out j 09/14/2010 1 Time Out 24 1 . 12. FINAL , Status IN NOT APPROVED I I3 _ SHOW TREE PROTECTION FENCING AROUND ALL TREES THAT ARE Status Date 1 9/14/2010 0.11 BEING PROTECTED. NO REMOVAL OF FENCING DURING CONSTRUCTION_ PLEASE ADD THIS NOTE TO BUILDING PLANS FOR Time Spent L 0.00 CONTRACTOR TO ACKNOWLEDGE THIS. • F_-_:-_--- Contractor I r.' I 4. AN ARBORIST REPORT WILL BE REQUIRE PRIOR TO FINAL ' ' _ -I — 11NSPECTIONS AFFIRMING THAT THE EXISTING TREES BEING USED Sent To j FOR PRIVACY PROTECTION ARE ADEQUATE. Sent By plug S. A LANDSCAPE INSTALLATION REPORT MUST' BE PROVIDED PRIOR , TO FINAL INSPECTIONS. 6. PRIVACY PROTECTION COVENANTS MUST BE RECORDED PRIOR TO - FINAL INSPECTIONS. ' 1_7__A_LAIID-SCARE_P_ROTECTION—C_OVEN.k T_MU5T_HE—RECORDED PRIOR 'v, 1 4 i4,F• ..i COMMUNITYPLUS V8 .1 PAGE NUMBER: 1 DATE: 04/01/2013 MODULE pinrvrpt : TIME: 07 :37 : 58 PLAN REVIEW STOP REPORT SELECTION CRITERIA: PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ID : 35704080 . 00 PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 APPLY DATE : 08/26/10 ISSUE DATE : 11/05/10 C/O DATE : 11/04/11 REVIEW STOP: ASSESS - REV NO: 1 STATUS: A DATE: CONT ID: REVIEW SENT BY: SUEW DATE: 11/05/10 DUE: 09/10/10 TIME SPENT: REV RECEIVD BY: DATE: 08/26/10 SENT TO: ASSESSOR REVIEW NOTES: 08/26/2010 NEW TWO-STORY(3760SQ) ,GARAGE(579SQ) & LANDSCAPE AREA(4517SQ) REVIEW STOP: BLDG - BUILDING DEPARTMENT REVIEW REV NO: 2 STATUS: A DATE: 10/27/10 CONT ID: REVIEW SENT BY: roberts DATE: 10/27/10 DUE: 10/20/10 TIME SPENT: 0 .00 REV RECEIVD BY: LARRY DATE: 10/13/10 SENT TO: REVIEW NOTES: 10/14/2010 2ND SUBMITTAL CONSTRUCT 2 STORY SFDWL 3 , 760 SQ FT ATTACHED 580 SQ FT REVIEW STOP: BLDG - BUILDING DEPARTMENT REVIEW REV NO: 1 STATUS: N DATE: 09/14/10 CONT ID: REVIEW SENT BY: ArnoldH DATE: 09/14/10 DUE: 09/10/10 TIME SPENT: 0 . 00 REV RECEIVD BY: ARNOLD DATE: 08/26/10 SENT TO: REVIEW NOTES: 09/14/2010 A written response letter clearly addressing each item is required. Re-submittal without a response letter will be considered incomplete. Responses must fully address the comment and indicate where items are located. Any changes to the drawings or calculations requires a delta-revision cloud bubble around the changes, and a date stamp indicating when the changes were made. For any questions regarding the Building Comments, please call (408) 777-3235. 1 . Sheet A0, Sheet Index: Include the Cupertino Construction Best Management Practices Sheet. Response: 2 . Sheet A0 : Provide a Deferred Submittal List, showing all deferred submittals (such as Fire Sprinklers, Gas Piping Diagram, etc . ) . For buildings over 3 , 600 sf, Fire sprinklers are required. Response: 3 . Designer to sign all sheets, and provide printed name in the Consultant Directory on sheet A0. If an architect, provide stamp and signature. Response: 4 . Sheet A0, Site Plan: Show locations of all easements. Show locations of any right of ways, to COMMUNITYPLUS V8 . 1 PAGE NUMBER: 2 DATE: 04/01/2013 MODULE pinrvrpt: PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 enter property. Response: 5 . Sheet A0, Site Plan: Demonstrate that the ground floor of the building is built above the flood plain. Response: 6 . Revise soils report. Provide boring samples, and all info required per section 1802 . 6 of 2007 CBC. Response: 7 . Per item 6, provide a letter of acceptance from the soils engineer, accepting the foundation design of the building. Response: 8 . Sheet A2 and A3 : Provide written dimensions of the second floor on sheet A3 . On key plans on A2, demonstrate how the square footage was calculated for each level. First floor seems to exceed 3 , 300 sf. Unable to verify square footage of 2nd floor since no dimensions were provided; as a result, a full plan review could not be performed. Response: 9 . Sheet A2 and A3 : Provide the following info regarding stairs and changes in heights: a. Provide details for the winder stairs, demonstrating that they meet the requirements of sections 1009 . 3 . 2 and 1009 .3 . 3 of 2007 CBC. b. Provide notes on maximum stair riser and tread. Per section 1009 . 3 of 2007 CBC, for R-3 and dwelling units in R-2 occupancies (and any group U occupancies accessory to the R occupancies stated) , the maximum riser height can be 7 .75-inches. Minimum tread depth can be 10-inches, but for any tread depth less than 11-inches, a nosing of not less than 0 .75-inches, but not more than 1 .25-inches shall be provided. Also, doors cannot swing over riser. c . Provide details for handrails and guards, showing their mounting heights above finished floor and nosing, per section 1009 .10 and 1013 . Demonstrate method of attaching guardrail posts, and that it is capable of withstanding the required loads per section 1607 .7 . 1 of 2007 CBC. d. Show locations of all thresholds and changes in heights and landings. Show sizes of all landings, especially at exterior and at the change in elevation between Garage, Laundry Room, and Family Room. Response: 10 . Sheets A2 and A3 : Demonstrate which Bedroom windows meet the emergency egress requirements per COMMUNITYPLUS V8 . 1 PAGE NUMBER: 3 DATE: 04/01/2013 MODULE pinrvrpt: PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 section 1026 of 2007 CBC. Per section 1026 of 2007 CBC, egress windows require minimum dimensions of: 5 .7 sf opening (grade floor allows 5 sf) , 24-inch high opening, 20-inch wide opening, and opening to be 44-inches above finished floor. Response: 11 . Sheet A2 : At the Garage, provide either a 20-minute rated door or a 1-3/8-inch thick self closing self latching tight fitting solid core door, per section 406 . 1 .4 of 2007 CBC. Response: 12 . Sheet A2 : Indicate direction of slope and percentage of slope in garage. Per section 406 .2 . 6 of 2007 CBC, garage is to be sloped to drains or to the main vehicle entry way. Demonstrate if a drain occurs (in garage or at the front of the garage) . Response: 13 . Sheet Al and A2 : Per section 1803 . 3 of 2007 CBC, ground is to slope away from foundation 5% for a distance of 10 feet away from the building; if 10-feet cannot be met, provide swales . Provide 2% slope if impervious surface is used. Response: 14 . Sheet A2 : Identify ceiling heights at all areas (especially at coffered ceilings) and demonstrate which areas are vaulted ceilings . Response: 15 . Sheet A2 and A3 : Provide tempered glass at windows that enclose tubs and showers that are less than 60-inches from the tub floor, per section 2406 . 3 of 2007 CBC. Response: 16 . Sheet A2 : Provide tempered glass for the windows adjacent to the steps/ walkways at the Living Room (next to the front entry) , at the Family Room (next to steps) and at the Breakfast Nook Bay Window (next to steps) as they are in a hazardous location. Per section 2406 .3 of 2007 CBC. Response: 17 . Sheet A2 and A3 : Show locations and size of attic access and crawl space access. Per section 1209 .2 of 2007 CBC. Attic access is required where the clear ceiling height is more than 30-inches. If attic access to 1st floor roof is achieved at the 2nd floor walls, show locations at 2nd floor. Response: 18 . Per item 17, if any attic access is located in shearwalls of the 2nd floor, demonstrate via calculations and details that load path and capacity of shear wall is not affected. Response: COMMUNITYPLUS V8. 1 PAGE NUMBER: 4 DATE: 04/01/2013 MODULE pinrvrpt: PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 19 . Sheet A3 and A6 : Show locations of chimneys for fire places, and show their clearance dimensions to the exterior walls . Response: 20 . Sheets A4a, A4b, and A6: Provide Class A Roofing, per Cupertino Municipal Code section 16 . 04 . 080. Response: 21 . Sheet A2 : Clarify if chimney is gas or wood burning. Provide details on construction methods, clearances to combustible construction, anchorage details, hearth extension details, hearth support (non-combustible construction) , fire box construction, minimum duct/flue dimensions, and source of combustion air. Show method of anchoring masonry veneer to chimney. Indicate method of flue. See section 2111 for Masonry Fireplaces, and Spark Arrestors are required. If a gas unit is used, provide listing agency and listing number and model and make number of chimney. Response: 22 . Sheets A4a and A4b: Per section 802 . 5 .2 . 1 of 2007 CMC, chimney to terminate at least 3-feet above the highest point where it pass through a roof, and at least 2-feet higher than any portion of the building within a horizontal distance of 10-feet. Response: 23 . Structural engineer to provide structural details on method of connecting chimney back into house framing, per items 21 and 22 . Provide seismic analysis of chimney with masonry veneer. Response: 24 . Provide details for the method of attaching stone/ slab veneer to the house, per sections 1405 . 6 and 1405 .7 of 2007 CBC. Response: 25 . Sheet A5 : Sections and text are too small too read. Provide clear dimensions . a. Show framing at ceilings, to indicate which sections have vaulted ceilings and which have flat ceilings . b. Indicate clear height in all attic spaces; ceiling joists and roof rafters are not shown. See item 17 . c . Show locations of attic insulation at the 1st floor lower roof, to demonstrate building envelope requirements per Energy Report (R-30 insulation) . d. For any vaulted ceilings, coordinate item 26 below, as each individual rafter space must have high and low ventilation, per section 1203 of 2007 CBC. COMMUNITYPLUS V8 . 1 PAGE NUMBER: 5 DATE: 04/01/2013 MODULE pinrvrpt : PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 Response: 26 . Provide attic ventilation calculations . Per 2007 CBC, section 1203, 50% of vents to occur at eave, and 50% of vents to occur 3-feet above eave line. Provide size of vents, and number of vents . Show locations of high vents on roof plan. Attic ventilation to be distributed to each attic area (1st floor and 2nd floor respectively) . Response: 27 . Provide crawl space ventilation calculations. Per 2007 CBC, section 1203 . Provide size of vents and number of vents. Response: 28 . For all vents (such as gable, eave, and foundation vents) , demonstrate that they do not interfere with any brace walls/shear panels. Coordinate with structural drawings. If vents are not to occur in shearwalls/brace panels, indicate as such. If they do occur in shearwalls/brace panels, demonstrate that shear transfer is adequately addressed through details and calculations . Provide notes and/or details (e.g. edge nailing around openings, etc. ) . Response: 29 . Sheet El, General Note 19 : Revise note to indicate that all bedroom circuits shall be listed combination type arc-fault circuit interrupters protected at the panel . Circuits include luminary circuits, hard-wired smoke detectors, and receptacle outlets . Rooms within bedrooms (such as closets and open bathrooms/vanities) shall also be included. Per section 210 .12 (B) of 2007 CEC. Response: 30 . Sheet El: Provide a detail or note indicating that the attic equipment shall have (1) an accessible opening of not less than 22-inches by 30-inches or the at least as large as the largest single component of the unit, (2) the passageway to the unit is not more than 20 feet away measured along the centerline of the passageway (when the clear height is less than 6-feet) , (3) shall have solid flooring not less than 24-inches wide, (4) a level working platform not less than 30-inches by 30-inches in front of the unit, (4) a permanent 120V receptacle outlet near the equipment, (5) a light fixture near the equipment with the switch for the fixture located at the entrance to the passageway, (6) have a clear height at the access opening of at least 30-inches. Per sections 904 . 11 of 2007 CMC and 1209. 2 of 2007 CBC. Response: 31 . Sheet El : Provide a gas piping diagram. Diagram to show length of all gas pipes, materials used, gas pipe COMMUNITYPLUS V8 . 1 PAGE NUMBER: 6 DATE: 04/01/2013 MODULE pinrvrpt : PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 diameters, Btu and CFH of each piece of equipment. If this is to be a deferred submittal, have a Deferred Submittal List on sheet A0, showing this to be a deferred submittal . Response: 32 . Sheets El and E2 : Show locations of all electrical panels and subpanels. Show locations of all gas meters . Provide horizontal distances and vertical distances of gas meter to any opening in the building. Response: 33 . Per item 30, indicate method of combustion air of attic furnace. Response: 34 . Sheets El and E2 : Show locations of A/C units . Response: 35 . Sheets El and E2 : Provide fans at all bathrooms for mechanical ventilation, per section 1203 .4 . 2 . 1 of 2007 CBC. It is not clear if fans are used, as symbols in bathroom are not shown in Legend. Response: 36 . Sheet El: Show exterior weather protected GFCI outlet at the front and rear of the house, as required per section 210. 52E of 2007 CEC. Response: 37 . Sheet El : Per item 21, indicate if Fire place is gas. Response: 38 . Sheets El and E2 : Per section 410 . 4 (A) and (D) of 2007 CEC, demonstrate that all luminaires installed in wet or damp locations shall be listed for such use by an approved and recognized agency. Luminaires subject to shower spray must be listed "Suited for Wet Locations. " Luminaires not subject to shower spray can be listed as either "Suited for Wet Locations" or "Suited for Damp Locations. " Response: 39 . Sheet El, Electrical Notes : Indicate that all luminaries in closets shall be listed for such use, and will follow all dimensional clearances per section 410 . 8 of 2007 CEC. Response: 40 . Sheet A2 : Provide minimum 1/2-inch thick sheetrock at all concealed spaces under stairs, per section 1009 . 5 . 3 of 2007 CBC. Response: 41 . Sheet El : Show more GFCI outlets at kitchen countertop. Per section 210. 52C of the 2007 CEC, electrical outlets are required to be spaced such that COMMUNITYPLUS V8 . 1 PAGE NUMBER: 7 DATE: 04/01/2013 MODULE pinrvrpt: PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 no section of wall is more that 24-inches from an outlet. Response: 42 . Sheet El : per item 41 above, if an island or peninsula occurs in kitchen, provide a GFCI outlet, per section 210 . 52C(2) and (3) of 2007 CEC. Also, outlet cannot be spaced below counter if the counter extends more than 6-inches beyond the counter base support and cannot be more than 12-inches below the countertop, per section 210 . 52C(5) of 2007 CEC. Response: 43 . Sheets El and E2 : Per section 210 . 52 items a and b, there are many areas that do not have sufficient outlet spacing along walls. Areas include: a. Hallway between front entry way (as hallways more than 10-feet long require outlets) . b. Breakfast Nook north wall: c. Family Room South wall, along fire place d. Den Bedroom, west wall e. Living and Dining Room north walls f . Family Room North wall, along stair wall g. Office Bedroom North Wall h. Bedroom 1 west wall i . Bedroom 2 west and east walls j . Master Bedroom north and both south walls . Response: 44 . Sheets El and E2 : Smoke detectors are required to be inside each bedroom, and just outside each bedroom in the immediate vicinity of area the bedrooms, per section 907 .2 . 10 . 1.2 of 2007 CBC. Show locations of detectors. Response: 45 . Sheets El and E2 : Fan and lights must have separate switches per current Energy Code, section 150 (k) 7 (B) . This includes fan/light combo, unless exception from 150 (k) 7 (B) is used (fan continuing for extended period of time after light is switch off) . If it is used, indicate as such, and it must be a listed product for such use from a recognized approval/ listing agency. Response: 46 . Sheet Sl : Provide a statement that the building has been designed in accordance with the soils report . COMMUNITYPLUS V8 . 1 PAGE NUMBER: 8 DATE: 04/01/2013 MODULE pinrvrpt: PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 Indicate soils report date, report number, soils engineer, and contact information of soils engineer. Response: 47 . Sheet Si: Provide the design criteria for the new building: a. Indicate the dead and live loads used for the building (roof, exterior walls, exterior walls with masonry, floor loads) . b. Indicate the base shear (Cs value) used for the design. c. Indicate the soils bearing capacity (per soils report) for dead and live loads, and increase for wind/ seismic. Response: 48 . Sheet Si: Provide a Structural Observations List, to be performed by the engineer of record. For example, epoxy holdowns, rebar placement, shear diaphragms, holdowns, general framing from Structural Engineer. Footing and pad excavations by Soils Engineer, Response: 49 . Sheet S4: Indicate the full extent of Roof beam RB1 4x12 , and show it' s support at the North end toward grid line 4 . Demonstrate locations of posts/ king posts. Demonstrate how loads distribute to 2nd floor below and to foundation. Clarify if this beam is continuous or not. Response: 50 . Sheet S4 and S3 : Provide method of connection of hip beams to ridge beam. Response: 51 . Sheet S3 : Show header beams at the exterior walls. Response: 52 . Sheet S2 : Provide grid lines . Response: 53 . Sheet S2 : On grid line 2, there is a 6-foot long shearwall marked as Type A, however the holdowns on this wall takes cumulative load from shearwalls on Roof Level and 2nd Floor Level . Revise holdown. Response: 54 . Sheet S3 : Provide method of support for Beam RB6 between lines C and D. Demonstrate locations of posts/ king posts . Demonstrate how loads distribute to foundation. Also, see item 50 . Response: COMMUNITYPLUS V8. 1 PAGE NUMBER: 9 DATE: 04/01/2013 MODULE pinrvrpt : PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 55 . Sheet S3 : Provide method of support for hip beams RB3 between lines A and B near line 1 . Demonstrate locations of posts/ king posts . Demonstrate how loads distribute to foundation. Also, see item 50 . Response: 56 . Sheet S3 : Provide reference details on this plan showing method of connecting the lower roof diaphragm to the exterior wall of the 2nd floor. Detail 13/S5 is called out once. Demonstrate the extent of plywood at ceiling joists, per detail 13/S5. Clarify locations of any vaulted ceiling areas, and areas of coffered ceilings, per item 14 . Response: 57 . Sheet S3 : Per item 56, the analysis of the building does not provide a diaphragm analysis of the Roof and 2nd Floor. Provide a diaphragm analysis . Per section 12 . 14 .8. 5 and 12 . 12 . 3 of ASCE 7-05, building is to act as a single cohesive unit. There are discontinuities in the diaphragms, and some areas that are unclear. For example: a. Per item 56, demonstrate how 2nd floor diaphragm is achieved, as Living Floor Space has plywood at another level than Lower Roof Diaphragm. Demonstrate full extent of ceiling plywood, per detail 13/S5 . b. On sheet S4, on line B, demonstrate how discontinuity in collector is addressed on line B, as skylight opening occurs . Provide collectors. c . On sheet S3, large opening is created by winder stair. Provide blocking and strapping details/ notes around hole in diaphragm. Indicate size and extent of straps/ blocking. d. On sheet S3, on lines A and C, bay windows create discontinuity in double top plates. Demonstrate how collectors are achieved. e. On sheet S3, indicate size of Living Space Floor Joists. Indicate size of ceiling joists . Indicate locations of vaulted ceilings and coffered ceilings. Response: 58 . Sheet S3 : Collectors are not addressed for many of the Roof shearwalls landing on the 2nd floor framing. Provide a diaphragm analysis, and show how collectors are achieved. Demonstrate method of transferring load from these shearwalls onto the 2nd floor diaphragm, as there is a discontinuity. a. If method is through Lower Roof diaphragm, the Lower Roof Diaphragm has a different nailing pattern than the 2nd floor Living Space. Demonstrate capacity of diaphragm is not exceeded. COMMUNITYPLUS V8. 1 PAGE NUMBER: 10 DATE: 04/01/2013 MODULE pinrvrpt : PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 b. Many of the collectors for the Roof shearwalls onto the 2nd floor are not shown. Provide collectors . For example, on lines A, B, B. 5, both lines 3, and line 4. Collectors must address the Roof shearwalls onto the 2nd floor diaphragm. If some beams are edge nailed, please indicate as such. Provide strap locations, and any joists that are to align to achieve continuity. c. Many of the collectors for the 2nd Floor shearwalls connecting to the 2nd floor are not shown. Provide collectors. For example, on lines 4, 2, line 3 from each side of the stair, lines 2, and each side along line C. Collectors must address how the 2nd floor shearwalls connect to the 2nd floor diaphragm. If some beams are edge nailed, please indicate as such. Provide strap locations, and any joists that are to align to achieve continuity. 59 . Sheet S4: Show collectors at the two interior shearwalls running along the winder stair. Show rafters that align with these shearwalls and any straps . 08/03/2011 NEW TWO-STORY(3760SQ) ,GARAGE(579SQ) & LANDSCAPE AREA(4517SQ) REVIEW STOP: FIRE - FIRE DISTRICT REVIEW REV NO: 2 STATUS: A DATE: CONT ID: REVIEW SENT BY: DATE: 10/19/10 DUE: 10/20/10 TIME SPENT: 0 . 00 REV RECEIVD BY: DOUG DATE: 10/13/10 SENT TO: REVIEW NOTES: 10/14/2010 2ND SUBMITTAL CONSTRUCT 2 STORY SFDWL 3, 760 SQ FT ATTACHED 580 SQ FT 10/19/2010 REQUIREMENTS SATISFIED. REVIEW STOP: FIRE - FIRE DISTRICT REVIEW REV NO: 1 STATUS: N DATE: 09/02/10 CONT ID: REVIEW SENT BY: suew DATE: 09/02/10 DUE: 09/10/10 TIME SPENT: REV RECEIVD BY: DOUG DATE: 08/26/10 SENT TO: REVIEW NOTES: 08/26/2010 NEW TWO-STORY(3760SQ) ,GARAGE(579SQ) & LANDSCAPE AREA(4517SQ) REVIEW STOP: PLANNING - PLANNING DEPARTMENT REVIEW REV NO: 3 STATUS: A DATE: 11/04/10 CONT ID: REVIEW SENT BY: DATE: 11/04/10 DUE: 11/11/10 TIME SPENT: 0 . 00 REV RECEIVD BY: PIU DATE: 11/04/10 SENT TO: REVIEW NOTES: ***NONE*** COMMUNITYPLUS V8. 1 PAGE NUMBER: 11 DATE: 04/01/2013 MODULE pinrvrpt : PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 REVIEW STOP: PLANNING - PLANNING DEPARTMENT REVIEW REV NO: 2 STATUS: N DATE: 10/21/10 CONT ID: REVIEW SENT BY: piug DATE: 10/21/10 DUE: 10/20/10 TIME SPENT: 0 . 00 REV RECEIVD BY: PIU DATE: 10/13/10 SENT TO: REVIEW NOTES: 10/14/2010 2ND SUBMITTAL CONSTRUCT 2 STORY SFDWL 3, 760 SQ FT ATTACHED 580 SQ FT 11/02/2011 1. PLEASE HAVE LANDSCAPE ARCHITECT WET SIGN THE PLANS 2 . PLEASE SHOW TREE PROTECTION DETAILS AROUND PROTECTED TREES. 3 . IF NOTE HAS BEEN ADDED TO PLANS RE: TREE PROTECTION FENCE, PER COMMENTS FROM FIRST SUBMITTAL, PLEASE LET ME KNOW WHERE THEY ARE. REVIEW STOP: PLANNING - PLANNING DEPARTMENT REVIEW REV NO: 1 STATUS: N DATE: 09/14/10 CONT ID: REVIEW SENT BY: piug DATE: 09/14/10 DUE:09/10/10 TIME SPENT: 0 . 00 REV RECEIVD BY: PIU DATE: 08/26/10 SENT TO: REVIEW NOTES: 08/26/2010 NEW TWO-STORY(3760SQ) ,GARAGE(579SQ) & LANDSCAPE AREA(4517SQ) -YIN CHAN WAS TOLD THAT THE PLANNING APPEAL PERIOD WAS NOT OVER TILL 9/7/10 AND IF THERE WERE APPEALS HE COULD HOLD UP HIS PLANS IN BLDG AND POSSIBLY LOSE PLAN CK FEES. HE SAID HE WAS WILLING TO TAKE THAT CHANCE. 09/14/2010 1, UPDATE PRIVACY PROTECTION AND LANDSCAPE PLANS PER THE CONDITIONS IN THE APPROVAL LETTER. 2 . FINAL LANDSCAPE PLANS MUST HAVE WET-SIGN OF LANDSCAPE ARCHITECT. 3 . SHOW TREE PROTECTION FENCING AROUND ALL TREES THAT ARE BEING PROTECTED. NO REMOVAL OF FENCING DURING CONSTRUCTION. PLEASE ADD THIS NOTE TO BUILDING PLANS FOR CONTRACTOR TO ACKNOWLEDGE THIS. 4 . AN ARBORIST REPORT WILL BE REQUIRE PRIOR TO FINAL INSPECTIONS AFFIRMING THAT THE EXISTING TREES BEING USED FOR PRIVACY PROTECTION ARE ADEQUATE. 5 . A LANDSCAPE INSTALLATION REPORT MUST BE PROVIDED PRIOR TO FINAL INSPECTIONS . 6 . PRIVACY PROTECTION COVENANTS MUST BE RECORDED PRIOR TO FINAL INSPECTIONS. 7 . A LANDSCAPE PROTECTION COVENANT MUST BE RECORDED PRIOR TO FINAL INSPECTIONS AND OCCUPANCY. REVIEW STOP: PUBWORKS - PUBLIC WORKS DEPARTMENT REV NO: 2 STATUS: N DATE: CONT ID: REVIEW SENT BY: DATE: 10/18/10 DUE: 10/20/10 TIME SPENT: 0 .00 REV RECEIVD BY: CHAD DATE: 10/13/10 SENT TO: REVIEW NOTES: 10/14/2010 2ND SUBMITTAL CONSTRUCT 2 STORY SFDWL 3, 760 SQ FT COMMUNITYPLUS V8. 1 PAGE NUMBER: 12 DATE: 04/01/2013 MODULE pinrvrpt: PERMIT NUMBER: 10080189 - YIN CHAN TYPE: 1R3SFDW PARCEL ADDRS : 10483 MIRA VISTA AVE CUPERTINO, CA 95014 ATTACHED 580 SQ FT REVIEW STOP: PUBWORKS - PUBLIC WORKS DEPARTMENT REV NO: 1 STATUS: N DATE: CONT ID: REVIEW SENT BY: DATE: 09/09/10 DUE: 09/10/10 TIME SPENT: 0 .00 REV RECEIVD BY: CHAD DATE: 08/26/10 SENT TO: REVIEW NOTES: 08/26/2010 NEW TWO-STORY(3760SQ) ,GARAGE(579SQ) & LANDSCAPE AREA(4517SQ) REVIEW STOP: SANITARY - SANITARY DISTRICT REVIEW REV NO: 3 STATUS: P DATE: CONT ID: REVIEW SENT BY: DATE: 11/03/10 DUE: 11/03/10 TIME SPENT: 0 .00 REV RECEIVD BY: NICHOL DATE: 11/03/10 SENT TO: REVIEW NOTES: ***NONE*** REVIEW STOP: SANITARY - SANITARY DISTRICT REVIEW REV NO: 2 STATUS: N DATE: CONT ID: REVIEW SENT BY: DATE: 10/18/10 DUE: 10/20/10 TIME SPENT: 0 .00 REV RECEIVD BY: NICHOL DATE: 10/13/10 SENT TO: REVIEW NOTES: 02/26/2013 2ND SUBMITTAL CONSTRUCT 2 STORY SFDWL 3, 760 SQ FT ATTACHED 580 SQ FT REVIEW STOP: SANITARY - SANITARY DISTRICT REVIEW REV NO: 1 STATUS: N DATE: CONT ID: REVIEW SENT BY: DATE: 09/08/10 DUE:09/10/10 TIME SPENT: 0 .00 REV RECEIVD BY: NICHOL DATE: 08/26/10 SENT TO: REVIEW NOTES: 08/26/2010 NEW TWO-STORY(3760SQ) ,GARAGE(579SQ) & LANDSCAPE AREA(4517SQ)