Loading...
13040061 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 908 BROOKGROVE LN CONTRACTOR:ARMSTRONG PERMIT NO:13040061 INSTALLATION OWNER'S NAME: GE GAO 4575 SAN PABLO AVE DATE ISSUED:04/05/2013 OWNER'S PHONE: 6502158216 EMERYVILLE,CA 94608 PHONE NO:(510)777-1234 LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL 11 COMMERCIALL] e Class�.r_33-x_'SqLic. '—t S FOAM OVERLAY FLAT ROOF,CLASS PAINT EDGE Licen s FLASHING Contractor Date S 20 SQ I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Arca: Valuation:$18000 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:37539037.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 AYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAY rM LAST CALLED INSP TON. indemnify and keep harmless the City of Cupertino against liabilities,judgments, ? costs,and expenses which may accrue against said City in consequence of the Issued Da ssued bte: \ granting of this permit. Additionally,the applicant u de stands and will comply with all non-point source regulations per the Cupert o Municipal Code,Section 9.18. RE-ROOFS: Signature Date? `� All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materi for inspection. ❑ OWNER-BUILDER DECLARATION Signature of Applic � 1 hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation. will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. 1 will 1 hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,C pter 9.12 and the Health&Safety Code,Sections 255 5533,and 25534. I have and will maintain Worker's Compensation Insurance,as provided for by 1� Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agentt%i.ye� Dater 71 J permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY Compensation laws of California. If,after making this certificate of exemption,I become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the perfomrance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address 1 certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signatu Date REROOF PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION AVENUE•CUPERTINO, CA 95014-3255 10300 TORRE its (408)777-3228• FAX(408)777-3333•building akupertino.org CUPERTINO I PROJECT ADDRESS +� f O G r 9`-�+ APN# 2 �� OWNERNAME / /u PHONE J E-MAIL e STREET ADDRESS CITY/�STATE,ZIP //r FAX CONTACT NAME�GCJ 1/ C �I I�/ PHONy f �f / �'�y E l.0 JG L/- Jh �j .C O /SLY STREET ADDRESS /' S S,AN A .LL C Y,STATE,ZIP J� L FAX U / ❑OAR ❑ OWNER-BUILDER ❑ OWNER AGENT J0 CONTRACTOR ❑C RACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT CONTRACTOR NAMET 3 ^f s �r` �hf T f/ i LICENS2�BER��/ LICE�E e BUS.LIC.#FAXn COMPANY NAME /I/�y�i S JfGyj ��S E-MAILr,Z STREET ADDRESS� �S CITY,STATE,ZIP/"� l / e C J4 //d PHONE/GJ'7,77— y 7/J�Z 7 y 5�S7S l a 4 G �/ �" � .Yy l ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC.# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF SFD Or Duplex ❑ Multi-Family ROOF AREA: VALUATION: sTRucruRE: ❑ Commercial EXISTING ROOF TYPE: BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES ❑OTHER(SPECIFY) REMOVE/REPLACE ❑YES IF NO, PLYWOOD El %" 11 WD PLYEl OSB PITCH: 7� ROOF NO #LAYERS: 1 THICKNESS: 115/8" TYPE: ElCDX '12 CLASS: A ICC-ES REPORT# PROPOSED ROOF TYPE: )i�BUILT-UP ROOF 11ASPHALT SHINGLES 11WOOD SHAKES ) ❑WOOD SHINGLES OTHER L DESCRIPTION OF WORK_ O / . (fi/'t' /�ci✓ a rwve, / e 's /,h Cly ss �� - Sl-Z -'� 3 i C el By my signature below,I certify to each of the following: I am the property oer or authorized agent to act on the property owner's behalf. I have read this application and the information I have provided is rrect. I have read the De ription of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to b ilding tructio autho repr tatives of Cupertino to enter the above entifi�property for inspection purposes. Signature of Applicant/Agent: Date: SUPPLEMENTAL INFORMATION REQUIRED OFFICE USE ONLY _If building is associated with a Home Owner's Association,provide letter PLAN CHECK TYPE ROUT]IING SLIP of approval from HOA. ❑ OVER-THE-COUNTER ❑ BUILDING PLAN REVIEW _Provide Planning approval to verify if there any restrictions. ❑ EXPREss ❑ PLANNLING PLAN REVIEW _Provide copy of Manufacturer's Installation Specifications. ❑ STANDARD ❑ FIRE DEPT Provide signed copy of Cupertino's Tear-Off Policy. ❑ OTHER` ReroofApp_2011.doc revised 03/16/11 CITY OF CUPERTINO FEE ESTIMATOR- BUILDING DIVISION ADDRESS: 908 brookgrove lane DATE: 04/05/2013 REVIEWED BY: larrys AI BP#: `VALUATION: 1$18,000 'PERMIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof PRIMARY SFD or Du lex PENTAMATION 1 SFDWLROOF USE: P PERMIT TYPE: WORK erlay flat roof, class paint edge flashing 20 s SCOPE FEE ID ROOF AREA s.f. 1REROOFFRES 2,000 :llech. Pig 'hwib. Plan Check "Ion C hLL Plumb. PCI-M%(1" Elec. Permit Fee: Fh •Hech.Insp- Other Phrmb Insp. he•Elec.Ins/- L] _Insp.Fee: Piumb. hisp. fC NOTE: This estimate does not include fees due to other Departments(i.e.Planning,Public Works, Fire,Sanitary Sewer District,School District,etc. . Theseees are based on the relimina information available and are onlyan estimate. Contact the Dept or addn'1 in o. FEE ITEMS (Fee Resolution 11-053 E fl. 7,11%12) FEE QTY/FEE MISC ITEMS Plan Check Fee: Sup1�l. PC Fee Phu nb./blech./Elec Permit Fee: $300.00 Supp[ Insp Fee Ptttrnt�.,�tech.,I'le: Plumb. 11ech.%Elec Permit Fee: Constrzrction Tax: c1dlnhii.Ctrative Fee: Work Without Permit? Yes E) No $0.00 ,Idvunced Planning Fees: Travel Doctnnentation Fees: A Strong Motion Fee: IBSEISMICR $1.80 Select an Administrative Item Bldy,Stds Commission Fee: IBCBSC $1.00 SUBTOTALS: $302.801 $0.00 TOTAL FEE: $302.80 Revised: 04/01/2013 REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT-BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE-CUPERTINO, CA 95014-3255 CUPERTINO (408)777-3228-FAX(408)777-3333-building @cupertino.org PROJECT ADDRESS �/ Q�Ua ,�] C APN# / OWNER NAME & PHONE H�E E-MAIL STREET ADDRESS CjTY, STATEIP FAX CTOR N ME LICENSE NUMBER TYPE BUS.LIC.# CO /1 f»^s�rr� y 11)) J COMPANY AAJ)d M� _Zr�!K G. r E-MAIL FAX STREET ADDRESS �, /J CITY,STATE,ZIP - ) PHO�F Cv I UNDERSTAND AND AGREE T THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled up to one business day before the requested inspection date. Please call (408) 777-3228 from 7:30-3:30pm (Mon-Thurs) or 7:30-2:30pm (Friday) to schedule inspection. For Tear-Off and Nailing Inspections,you must also call on the day of the inspection only. after that phase of the work is completed. The building inspector will be available within one hour. Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or removed prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of'/4" per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. 7. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with th re-roof policy stated above. I also understand that smoke detectors and carbon monoxide de ctors are required to b installed in accordance with Sectio R314 and R315 of the 2010 California Residential Code. ^ �/ Signature of Applicant/Agent: Date;: RerooJPolicy_2012.doc revised 10/7/12