Loading...
11070192 I CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10671 MINETTE PL CONTRACTOR:QUALITY FIRST HOME PERMIT NO: 11070192 IMPROVEMENTS OWNER'S NAME: HOSSEIN TOUTOUNCHI 6545 SUNRISE BLVD STE 202 DATE ISSUED:07/26/2011 ER'S PHONE: 4082576779 CITRUS HEIGHTS,CA 95610 PHONE NO:(916)788-2921 ❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG f- ELECT f- PLUMB F_ License Class Lic.# 7S`2 72.- / l MECH RESIDENTIAL COMMERCIAL f— Contractor ,, �Date I hereby affirm that I am lice sed under the provisions of Chapter 9 JOB DESCRIPTION:RE-ROOF 19 SQUARES,REMOVE ASPHALT GRAVEL (commencing with Section 7000)of Division 3 of the Business&Professions INSTALL Code and that my license is in full force and effect. ROOL ROOF CLASS A I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$12000 permit is issued. APPLICANT CERTIFICATION APN Number:37532037.00 Occupancy Type: I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR granting of this permit. Additionally,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION. with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. �7 -^--� Signature / Date 7 C �j 11 Issued by��i Date: /, L OWNER-BUILDER DECLARATION RE-ROOFS: I hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is the following two reasons: installed without first obtaining an inspecti ,I agree to remove all new materials for I,as owner of the property,or my employees with wages as their sole compensation, inspection. will do the work,and the structure is not intended or offered for sale(Sec.7044, �%'\_�:�' = �/�� Business&Professions Code) Signature of Applican. L 1_._Date: 1,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE I have and will maintain a Certificate of Consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. 1 will maintain I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material. Additionally,should I use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the not employ any person in any manner so as to become subject to the Worker's Health&Safety Code,Sections 25505,25533,and 25534. Compensation laws of California. If,after making this certificate of exemption,I become subject to the Worker's Compensation provisions of the Labor Code,I must 07t oKuthor-A'jj e2, '.Date: forthwith comply with such provisions or this permit shall be deemed revoked. l�C� f3- APPLICANT CERTIFICATION CONSTRUCTION LENDING AGENCY I certify that I have read this application and state that the above information is I hereby affinm that there is a construction lending agency for the performance of work's correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.) to building construction,and hereby authorize representatives of this city to enter Lender's Name upon the above mentioned property for inspection purposes.(We)agree to save ir•'-mnify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address and expenses which may accrue against said City in consequence of the ......ung of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. I understand my plans shall be used as public records. Signature Date Licensed Professional CITY OF CUPERTINO 3 ITEMS OF 6 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec: Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 37532037. 00 DATE ISSUED. . . . . . . : 07/26/2011 RECEIPT #. . . . . . . . . : BS000014196 REFERENCE ID # . . . : 11070192 SITE ADDRESS . . . . . : 10671 MINETTE PL SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . . CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : HOSSEIN TOUTOUNCHI ADDRESS . . . . . . . . . . : 10671 MINETTE PL CITY/STATE/ZIP . . . : CUPERTINO, CA 95014 RECEIVED FROM . . . . : QUALITY FIRST HOME CONTRACTOR . . . . . . . : GC ANDERSON LIC # 30398 COMPANY . . . . . . . . . . : QUALITY FIRST HOME IMPROVEMENT ADDRESS . . . . . . . . . . : 6545 SUNRISE BLVD STE 202 CITY/STATE/ZIP . . . : CITRUS HEIGHTS, CA 95610 TELEPHONE . . . . . . . . : (916) 788-2921 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BCBSC VALUATION 12, 000 .00 1. 00 0. 00 1. 00 0. 00 1BSEISMICR VALUATION 12, 000 .00 1.20 0. 00 1.20 0. 00 1REROOFRES SQ FEET 19. 00 266. 00 0 . 00 266 . 00 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 268 .20 0 . 00 268 .20 0. 00 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 309 EXTERIOR LATH 311 SCRATCH COAT 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT-BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL CUPERTINO 10300 TORRE AVENUE -CUPERTINO, CA 95014-3255 (408)777-3228- FAX(408)777-3333-building5cupertino.mg Ir PROJECT ADDRESS , l`n ffe APN# 31 2 031 ` (DO OWNER NAME / Wf IC11 ' P}I E� t- / ] E-MAIL STREET AD S - CITY, ATE,ZIP y +' T FAX CO CTOR TMJ_ l�� LICE i IBE LIC PE BUS.LIC.# tcL`` r CO rN`NA ` E-MAIL FAX 6} ST KESS _e ` C jY, TATfi,ZIP Q,` I P )Z IOV6 I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled up to the day before the inspection date. Please call (408)777- 3228 from 7:30 - 3:30pm (Mon-Thurs) or 7:30 - 2:30pm (Friday) to schedule the next day inspection. For Tear-Off and Nailing Inspections, you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. Progress and Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or removed prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. Progress Inspection is required when approximately 50% of roof covering is installed. 7. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of I/" per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. 8. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that smoke detectors and carbon monoxide detectors are required to be installed in accordance with Sections R314 and R315 of the 2010 California Residential Code. ., Signature of Applicant/Agent: C Date: ._0 G-_l ReroofPolicv 2011.doc revised 02/16111 Building Department City Of Cupertino Lai 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 C U P E RT I N O Fax: 408-777-3333 CONTRACTOR/ SUBCONTRACTOR LIST JOB ADDRESS: L , PERMIT# OWNER'S NAME: PHONE# GENERAL CONTRACTOR: BUSINESS LICENSE# ADDRESS: C�qs CITY/ZIPCODE: *Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRAC ORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. ; I am not using any subcontractors: G Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring/Carpeting Linoleum /Wood Glass/ Glazing Heating Insulation Landscaping Lathing Masonry Painting/Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date REROOF PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 CUPERTIINO (408)777-3228• FAX(408)777-3333 • buildingacupertino.org I �2 PROTECT ADDRESS ' APN# 3 CC OWNER NAME w , STREET ADDRESS 1 ( STATE,ZIP N`tj FAX I V" 'k a&,q7 APPLIC k T ( L'I S 4 (` �•r.P PHO o/[ / j (/�I U E-MAIL S EA�D$ESS r i T ZIP/Q FAX `�ru-> ❑OWNER ❑ OWNER-BUILDER ❑ OWNER AGENT ❑ CONTRACTOR VCONTRACTORAGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT CTr�ME � LICENS n LIC TYPE BUS.LIC.# �(X \ r& ve e inn. G FAX r SS 1 j 1 CPI Y,xTt C" G C� P hyo ARCHITECT/ENGINEER NAME LICENSE NUMEER f BUS.LIC.# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF ❑ SFD or DuplexMulti-Family ROOF AREA: ALUATION: STRUCTURE: ElCommercial I'll0A, NW Cc>Lu�- EXISTTNG ROOF TYPE: ❑BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES ❑OTHER(SPECIFY) ! O REMOVE/REPLACE ❑YES IF NO. PLYWOOD ❑ 'h" ❑ PLYWD ❑ OSB PITCH ROOF J ❑ NO #LA THICKNESS: ❑ 5/8" TYPE: ❑ CDX 12 CLASS: A PROPOSED ROOF TYPE: ❑BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES XOTHER ICC-ES REPORT# DESCRIPTION OF WORK By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relatiU�=* I authorize repre entatives of Cupertino tc enter the above-identified property for inspection purposes. Signature ofApplicant/Agent7 Date: SUPPLEMENTAL INFORMATION REQUIRED OZITIl!7�Di ���-� If building is associated with a Home Owner's Association,provide letter � �� =�- of approval from HOA. r:S � 1TAat. vrw - -Provide Planning approval to verify if there any restrictions. - KESS . .......... sAL¢(II+TG Prx�nzFpIEW _Provide copy of Manufacturer's Installation Specifications. , ZWE � � rte.• � ti -- Provide signed copy of Cupertino's Tear-Off Policy. QosR �: ReroofApp_2011.doc revised 03/02/11