Loading...
09100023 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 918 OLD TOWN CT CONTRACTOR:LOS GATOS ROOFING PERMIT NO:09100023 OWNER'S NAME: WENZHE ZHOU P O BOX 1726 DATE ISSUED: 10/05/2009 iER'S PHONE: 4085680101 LOS GATOS,CA 95031 PHONE NO:(408)298-9399 LICENSED CONTRACTOR'S DECLARATION .tom BUILDING PERMIT INFO: BLDG ELECT PLUMB License Class Lic.# a � MECH r— RESIDENTIAL f— COMMERCIAL Contractor 6 Date I hereby affirm that I am licensed un r the provisions of hapter 9 JOB DESCRIPTION:RE-ROOF REMOVE EXISTING SHAKE ROOFING, (commencing with Section 7000)of Division 3 of the Business&Professions INSTALL Code and that my license is in full force and effect. 7/16"OSB,ROOFERS SELECT FELT AND PRESIDENTIAL TL SHINGLES BY CEERTAINTEED CLASS A 29SQ I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$9717 permit is issued. APPLICANT CERTIFICATION APN Number:35611039.00 Occupancy Type: 1 certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR granting of this permit. Additionally,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION. with all non-p 'nt source regulations per the Cupertino Municipal Code,Section 9.18. Issued by: ate: Signature Date 'J G OWNER-BUILDER DECLARATION RE-ROOFS: 1 hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is the following two reasons: installed without first obtainin an inspection,1 agree to remove all new materials for I,as owner of the property,or my employees with wages as their sole compensation, inspection. will do the work,and the structure is not intended or offered for sale(Sec.7044, /, Business&Professions Code) Signature of p licant: Date: 1,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self-insure for Worker's HAZARDOUS MATERIALS DISCLOSURE Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material. permit is issued. Additionally,should I use equipment or devices which emit hazardous air I certify that in the performance of the work for which this permit is issued,I shall contaminants as defined by the Bay Area Air Quality Management District 1 will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the not employ any person in any manner so as to become subject to the Worker's Health& afety Code,Sections 25505,25533,and 25534. Compensation laws of California. If,after making this certificate of exemption,I become subject to the Worker's Compensation provisions of the Labor Code,I must Own e a d agent: �1 forthwith comply with such provisions or this permit shall be deemed revoked. Date: 'J APPLICANT CERTIFICATION CONSTRUCTION LENDING AGENCY I certify that I have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.) to building construction,and hereby authorize representatives of this city to enter Lender's Name upon the above mentioned property for inspection purposes.(We)agree to save nify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address c, and expenses which may accrue against said City in consequence of the granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section ARCHITECT'S DECLARATION 9.18. I understand my plans shall be used as public records. Signature Date Licensed Professional CITY OF CUPERTINO 3 ITEMS OF 18 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec: Twp: Rng: Sub: Blk: Lot : APN . . . . . . . . : 35611039 .00 DATE ISSUED. . . . . . . : 10/05/2009 RECEIPT #. . . . . . . . . : BS000008829 REFERENCE ID # . . . : 09100023 SITE ADDRESS . . . . . : 918 OLD TOWN CT SUBDIVISION . . . . . . CITY . . . . . . . . . . . . . . CUPERTINO IMPACT AREA . . . . . . OWNER WENZHE ZHOU ADDRESS . . . . . . . . . . : 918 OLD TOWN CT CITY/STATE/ZIP . . . : CUPERTINO CA, CA 95014-4024 RECEIVED FROM . . . . : LOS GATOS ROOFING CONTRACTOR . . . . . . . : RANDY BROWN LIC # 23481 COMPANY . . . . . . . . . . : LOS GATOS ROOFING ADDRESS . . . . . . . . . . : P 0 BOX 1726 CITY/STATE/ZIP . . . : LOS GATOS, CA 95031 TELEPHONE . . . . . . . . : (408) 298-9399 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BCBSC VALUATION 9, 717. 00 1 . 00 0 . 00 1. 00 0 . 00 1BSEISMICR VALUATION 9, 717. 00 1 .00 0. 00 1. 00 0 .00 1REROOFRES SQ FEET 29. 00 377 .00 0 . 00 377. 00 0 .00 ---------- ---------- ---------- ---------- TOTAL PERMIT 379 .00 0 . 00 379. 00 0 . 00 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 601 ROOF TEAR OFF 602- ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF Community Development Department Building Division City of Cupertino 10300 Torre Avenue Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino municipal code 16.04.080. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City,the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed,a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the.sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of 1/ "per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O.report is required to be on the job site at the time on inspection. I understand and will comply with the above stated olicy on re-roofing. Homeowner's Name: Job Site Address: 0 Roofing Company Name: r Applicant's Signature: x" Date; Greg Casteel Building Official Revised 07/30/08 Community Development ;'' s '•r 10300 Torre Avenue - Cupertino CA 95014 G!Y 0 Telephone(408)777-3228 UPO I INO Fax(408)777-3333 Building Depa- r � L jOB ADDRESS: PERMIT=; OWNER'S NAME: ' PHONE _ �F� �} La GENE RAL CONIF RAC �S - y I am not using b any subcontractors: Signature Dat �- PIease check applicable subcontractors and coi?I lete the following i-L--Lformation: SUBCONTRACTOR BUSINESS NAME I BUSINESS LICENSLy- I Cabinets 00Z Millwork I Cement Finishing I IElectricaf I IExcavation Fencing I FloorLng: Carpeting Linoleum/ Wood I Glass/ Glazing IHeating Insulation Landscaping I Lathing I Masonry I Ornamental Sheet Metal I Painting/ Wallpaper I IPaving I I Plastering IPlurrLbing Roofing Septic Tank I I Sheet Metal I I Sheet Rock Tile Owne ontrac Lor gnature Date i . j CITY OF CUPERTINO OCt i REROOF CUPERTINO PERMIT APPLICATION APN# Date: -0 Building Add ss: 6 L// Owner's Name: Phqne #: ContractorPhone #: Fax#: Cupertino Business License #: Contractor License #: 1goo Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles Asphalt Shingles Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other(Specify) ,X Other(Specify) 7 /L ' 05,8 Number of existing coverings= ❑ Provide I.C.B.O. Report# To be Removed ❑ Provide Mfgr. Installation Specs. Job Des ription: yP Residential Commercial F-1 Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable, ' clude in plan set & the sheet index. Valuation: I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy: Signature Revised 6/16/08 CITY OF CUPERTINO REROOF CUPEk INO FEE SCHEDULE Number of Fee ID Fee Description Fee Permit Type Squares Group 1REROOFCOM Re-roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B 1REROOFRES ' Re-roof Residential B 1SFDWLROOF 29 r 1BSEISMICRE Seismic Residential B 1REROOFMRES Re-roof Multi-Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B Revised 6/16/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a"total points"value to a project to be considered environmentally friendly is not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost These measures can be used as a starting point for'greening"your project. A.Site 1:R cycle o�S'a C6n u0 &Demorit pn Waste 65%=1 point~75 _ poinls;BO"=4 point; up to 4 Resource pts p 2.Sah r-ga Reusable Building Materials 4 Resource pts y=yes p 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes p 4.Protect Native Soil 2 Resource pts y=yes p 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y—yes. p 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes p 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes p B.Design Resource-Eifici=nt Landscapes and Gardens 4 Resource pts y=yes p 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes p 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes p 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes p B.Foundation 1.Incorporate Recycled Flyash in Concrete 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resoui&ce pts D 2.Use Recycled Content Aggregate 2 Resource pts y—yes p 3.Insulate Foundation/Slab before backfill 3 Energy pts y—yes p C.Structural Frame ! ! ! 1.Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes p 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. p 3.Use Wood l-Joists for Floors and Ceilings 2 Resource pts y=yes p 4.Use Web Floor Trusses 2 Resource pts y=yes p 5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes p B.Use Finger-Jointed Studs for Vertical Applications 2 Resource,pts y=yes p 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes p B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes p 9.Use Structural Insulated Panels(SIPs) a.Floors 3 Energy pts y=yes p b.Wall 3 Energy pts y=yes p c.Roof 3 Energy pts y=yes p 10.Apply Advanced Framing Techniques 4 Resource pts y=yes p 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes p 12.Use OSB a.Subfloors 1 Resource pt y=yesF p b.Sheathing 1 Resource pt met p ! ! fi I.Windows 1.Install Ertergy-Efficient Windows a.Doub[ganad 1 Energy pt y=yam 0 b.Low-F, i►ssivity(Law-E) 2 Energy'pts y=yes 0 c.Low.fonduch ty Frames 2 Energy pts y=yes 0 2.Install Low Heat Transmission Glazing 1 Energy pt y=yes 0 ! 1 1 J.Heating Ventilation and Air Conditioning 1.Use Duct Mastic on All Duct Joints 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 B.Install Sealed Combustion Units a.Furnaces 3 IAQ/Health pts y=yes 0 b.Water Heaters 3 IAQ/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy.pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a T XV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 I 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burning Fireplaces a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y=yes 0 l b. Install/Replace Dampers 1 Energy pt y=yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 1 ! ! K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0 6.Select Safe and Durable Roofing Materials 1 Resource pt y=yes 0 7,Install Radiant Barrier 3 Energy pts y=yes _ 0 ! ! ! L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0 0 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes ! ! 1