Loading...
12100192 • • CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 22637 SAN JUAN RD 1 CONTRACTOR:SANTA CRUZ WESTSIDE PERMIT NO: 12100192 ELECTRIC OWNER'S NAME: RIFAI STEVEN M 849 ALMAR AVE C528 DATE ISSUED: 10262012 OWNER'S PHONE: 4082305984 SANTA CRUZ,CA 95060 PHONE NO:(831)469-8888 ❑ LICENSED CONTRACTOR'S DECLARATION. JOB DESCRIPTION: RESIDENTIAL d COMMERCIAL° • License Class C\U Lie.d tL\ce INSTALLATION OF ROOF MOUNTED SOLAR SYSTEM q WITH 24 Contractor San pe.I^ Date '01 Ili. MODULES WITH MICRO INVERTERS 5.76KW I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's • Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$30980 I have and will maintain Worker's Compensation Insurance,as provided for by • • Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. APN Number:34217064.00 Occupancy Type: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FROM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments. costs,and expenses which may accrue against said City in consequence of the �`A� 4,97G/1-7/ /� '7� .� ^L granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: v O with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. RE ROOFS: Signature Date lc i7/1,)„ All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. 0 OWNER-BUILDER DECLARATION Signature of Applicant: Date: I hereby affirm that I am exempt front the Contractor's License Law for one of the following two reasons: ALL,ROOF COVERINGS To BE CLASS"A"OR BEI-1'ER 1,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to IIA7\RDOtJS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Ilealth&Safety Code,Sections 25505.25533.and 25534. 1 will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter9.12 and the declarations: Ilealth&Safety Code.Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District 1 performance of the work for which this permit is isued. will maintain compliance with the Cupertino Municipal Code.Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the!Ranh&Safely Code,Sections 25505,25533.and 25534. Section 3700 of the Labor Code,for the performance of the work for which this permit is issued Owner or authorized agent: Date: ‘00.9i12- 1 certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If.after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name • APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCIII'fICCI"S DECLARATION costs,and expenses which may accrue against said City in consequence of the I understand my plans shall he used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature • Date ' a .�_. .�lr. l .�. � . Y. na r • :11•:+.-. ! ' 'r - 4-t -:<-.(_. . ice. v . .?' . .. .nt — • Building Department • City Of Cupertino (6)/ 10300 Tore Avenue Cupertino. CA 95014-3255 Telephone: 408-777-3228 CU P ERTI N O Fax: 408-777-3333 CONTRACTOR / SUBCONTRACTOR LIST JOB ADDRESS: as (0757 V- PERMIT# /DD/9a- OWNER'S NAME: S-I-e.„ P' -& PHONE # $30- 4(oct- 5($$� GENERAL CONTRACTOR: S,-4S_ BUSINESS LICENSE # ADDRESS:V4"t A1., - A_C &jI C 43-s155 CITY/ZIPCODE: -'# CAA. , 'tror 0 *Our municipal code requires all businesses working in the city to have a City of Cupertino business.license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY•OF CUPERTINO BUSINESS LICENSE. . ✓ /A I am not using any subcontractors:. 'igna re Date Please check applicable subcontractors and complete the following information: V SUBCONTRACTOR . BUSINESS NAME BUSINESS LICENSE # • Cabinets & Millwork • Cement Finishing Electrical Excavation • Fencing • Flooring/ Carpeting Linoleum/Wood • Glass/Glazing ' Heating • • - Insulation • • Landscaping • r Lathing Masonry Painting/Wallpaper Paving - Plastering Plumbing - - Roofing Septic Tank Sheet Metal Sheet Rock ' Tile Owner/Contractor Signature Date • • CITY OF CUPERTINO FEE ESTIMATOR - BUILDING DIVISION ADDRESS: 22637 San Juan Road DATE: 10/26/2012 REVIEWED BY: Sean 3"to APN: BP#: /2/0O/7Z *VALUATION: $30,980 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration / Repair PRIMARY PENTAMATION USE: SFD or Duplex PERMIT TYPE: SOLAR-RES WORK Installation of roof mounted solar system with (24 modules with micro inverters) (5.76 KW) SCOPE • Mech. Plan Check I Phunb. Plan Cheek Elec. Plan Check I Mech. Permit Fee: Plumb. Permit Fee: Eke.Permit Fee: Other A tech.Insp. Other Plumb Insp. Other Eke.Insp. I I Medi.Imp.Fec: Plumb. Imp. Fee: Lice./ncp.Fee: NOTE: This estimate does not include fees due to other Departments(Le. Planning, Public {Works, Fire,Sanitary Sewer District,Sc/mol District,etc.). These fees are based on die preliminary information available and are only an estimate. Contact the Dept for addn'I info. FEE ITEMS(Fee Resolution /1-053 FC 7/1/12) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 I 1 I # Alternative Energy System Suppl. PC Fee: 0 Reg. 0 OT 0.0 hrs $0.00 $219.00 IP/IOTOVRES Photovoltaic System PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp. Feer Reg. 0 OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construction Tax: Administrative Fee: 0 Work Without Permit? 0 Yes 0 No $0.00 0 Advanced Planning Fee: $0.00 Select a Non-Residential 0 Travel Documentation Fees; Building or Structure 0 i Strong Motion Fee: IBSE/SM/CR $3.10 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $2.00 SUBTOTALS: $5.10 $219.00 TOTAL FEE: $224.10 Revised: 10/01/2012 (26/9/- ALTERNATIVE ALTERNATIVE ENERGY PERMIT APPLICATION AE COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION 10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 CUPERTINO (408)777-3228• FAX(408)777-3333•buildinq@cuperlino.orq /a2/ X/1� PROJECT ADDRESS 22637 San Juan Rd. , 95014 APNM 31.y'a—,7004 OWNERNAME Steve Rifai P E-MAIL Y --- I �� �3 0-sy�y STREET ADDRESS 22637 San Juan Rd. Cm,STATE,zip Cupertino, CA 95014 FAN CONTACT NAME Ashe PHONE 831.430.6197 E-MAIL ashe@sandbarsc.com STREET ADDRESS 849 Almar Ave. St. C#528 Cm'.STATE,ZIP Santa Cruz. CA, 95060 FAX 831.515.5098 ❑w NER 0 OWNER-BUILDER 0 OWNER AGENT ❑ CONTRACTOR 0 ONTRACTOR AGENT 0 ARCHITECT 0 ENGINEER OWE LOPER ❑iNANT CONTRACTOR NAME Scott Laskey LICENSENUMBER 846294 I LICENSE TYPE C-lo BUS LIC z;e5 COMPANY NAME sante Cruz Renal. Electric. am Sandbar E-MAIL scott@sandbarsc . com FA\831 . 515 . 5098 sTREEr ADDREss 849 Almar Ave. St.0#528 CITY.STATE,ZIP Sant a Cruz, CA, 95060 PHONE 831 .469 . 8888 ARCI IITF:CI7ENGINEER NAME LICENSE NUMBER BUS,LIC COMPANY NAME E-MAIL FAX STREET ADDRESS CITY.STATE.ZIP PHONE NE USE OF O SFD or Duplex 0 Multi-Family PROJECT IN WILOLANO PROJECT IN STRUCTURE: El Commercial URBAN INTERFACE AREA 0 Yes LI No FLOOD ZONE 0 Yes 6 No el SOLAR PANELS ❑ ELECTRIC VEHICLE CHARGING STATION 0 SOLAR WATER HEATING ❑ OTHER: FOR SOAR RAVELS: NUMBER 24/OF2 OwSCJNIS: KILOWATTS(COMMERCIAL ONLY): TOTALVA19U NrION: tS DESCRIPTION OF WORK 5-76 kWDC Roof-Mounted Photovoltaic tilt-up Electric System with 24, 240 WDC Sharp Modules (NU-U240) ; and 24 Enphase 215-60-2LL-S22 Micro Inverters. Max tilt height 17 3/16". RECEIVED BY: ne/4:425,. By my signature below,I certify to each of the following: am the property owner or authorized agent to act on the property owner's behalf. I have read this application and the information I have proed is cone- . I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to st. -ly tln ' . sentatives of Cupertino to enter the above-identified property lbr inspection purposes. Signature of Applicant/AgentX Date:_I of ayrla SUPPLEMEN' 'FORMATION REQUIRED OFFICE USI:ONLY ig OVER-THE-COUNTER. ❑ EXPRESS 0 STANDARD 0 LARGE. ❑ MAJOR PFApp_201/.doc revised 03/16/11 • 4ELECTRICAL NOTES tr moRiDamaoumseci SANDBAR SOLAR & ELECTRIC 849 ALMAR AVE SUITE C. 4528 1. THIS PHOTOVOLTAIC INSTALLATION SHALL BE IN ACCORDANCE WITH THE EDITION OF THE SANTA CRUZ, CA 95080 NATIONAL ELECTRICAL CODE(NEC),CALIFORNIA ELECTRICAL CODE(CEC)AND LOCAL 831.469.8888 ELECTRICAL CODES CURRENTLY ENFORCED BY THE AUTHORITY HAVING JURISDICTION(AHI). iz m zo.oDJ c,br z 2. AGROUND FAULT DETECTION AND INTERRUPTION(GF DI)DEVICE IS INTEGRATED WITH THE §ceoWzi NdwPcw INVERTER IN ACCORDANCE WITH NEC/CEC 690.5(A} 4$4Nz ocirc vl 4.-0 4 ,o 6:voio>E,-g1^ 3. DISCONNECT SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE z z4- >8 .4 -goo° CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED"LINE SIDE" a i e o'^i a:r_F 4 o e (TYPICALLY THE UPPER TERMINALS} u z,-w r 8 w i o M<9 a O¢¢NW 4¢Hp _ 4. PHASE AND NEUTRAL CONDUCTORS SHALL BE COPPER,MINIMUM#10 AWG.SOLID OR STRANDED ZS DoznzC o o WIRE MAY BE USED.EXPOSED PHASE AND NEUTRAL CONDUCTORS SHALL BE USE-2 INSULATED. Rio 12o U rc g z2 'd i m, ALL OTHER PHASE AND NEUTRAL CONDUCTORS SHALL BE THWN.2 INSULATED UNLESS OTHERWISE NOTED. Cl 5. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER,MINIMUM#12 AWG.SOLID OR APPLICABLE CODES o e STRANDED WIRE MAY BE USED. C. o in 6. ALL RAILS ARE CONTINUOUSLY GROUNDED USING#10 AWG BARE COPPER WIRE. Z Q1 LU 7. ALL FRAMES ARE GROUNDED TO RAILS USING WEER GROUNDING CLIPS. 0 D Q 2010 BUILDING STANDARD ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R. Z —1 0 8. PV MODULE NEGATIVE SHALL BE THE GROUNDED CONDUCTOR 2010 CALIFORNIA BUILDING CODE (CBC), PART 2. TITLE 24 C.C.R. Lv (2010 INTERNATIONAL BUILDING CODE VOLUMES 1-3 AND 2007 CALIFORNIA AMENDMENTS) Z O 9. DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: 2010 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R. < LU N Z DC POSITNERED OR BLACK(OR MARKED RED) Z W DC NEGATIVE-WHITE(OR MARKED WHITE) (2010 NATIONAL ELECTRICAL CODE AND 2007 CALIFORNIA AMENDMENTS) cr Cr 2010 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R. cr U O Nn) LU 10. AC CONDUCTORS SHALL BE COLOR CODED FOR 480 VOLTS AS FOLLOWS: UJ Q < ( PHASE A.BLACK(OR MARKED BLACK IF#6AWG OR GREATER) (2010 UNIFORM MECHANICAL CODE AND 2007 CALIFORNIA AMENDMENTS) 0 L+- D d NU PHASE B-RED(OR MARKED RED IF#8 AWG OR GREATER) 2010 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R. CC ly H_(N U NEUTRAL-WHITE/GREY(OR MARKED WHITE/GREY IF#6 AWG OR GREATER) (2010 UNIFORM PLUMBING CODE AND 2007 CAUFORNIA AMENDMENTS) D- N 2010 CALIFORNIA ENERGY CODE. PART 6, TITLE 24 C.C.R. 11. ALL EQUIPMENT SHALL BE U.L.LISTED. 2010 SAFETY CODE FOR ELEVATORS AND ESCALATIONS (ASME A17-2004) 12 GROUNDING AND BONDING CONDUCTORS,IF INSULATED,SHALL BE COLOR CODED GREEN(AS 2010 CALIFORNIA FIRE CODE, PART 9, TITLE 24 C.C.R. MARKED GREEN IF#6AWG OR GREATER). (2010 INTERNATIONAL FIRE CODE AND 2007 CAUFORNIA AMENDMENTS) 13. CONDUIT SIZES INDICATED ARE MINIMUMS IN ACCORDANCE WITH APPLICABLE CODES AND MAY 2010 CAUFORNIA EXISTING BUILDING CODE. PART 10, TITLE 24 C.C.R. BE INCREASED IF REQUIRED. (2010 INTERNATIONAL BUILDING EXISTING CODE AND 2007 CALIFORNIA AMENDMENTS) 2010 CALIFORNIA -GREEN' BUILDING REQUIREMENTS, PART 11, TITLE 24 C.C.R. (PENDING DI 14. MARKING OF THE PHOTOVOLTAIC SYSTEM DISCONNECTING MEANS SHALL BE PROVIDED IN Z ACCORDANCE WITH NEC/CEC 690.17. 2010 CALIFORNIA REFERENCED STANDARDS, PART 12, PILE 24 C.C.R. Z 15. MARKING OF THE DIRECT CURRENT PHOTOVOLTAIC POWER SOURCE.SHALL BE PROVIDED IN TITLE 19 C.C.R. PUBUC SAFETY, STATE FIRE MARSHAL REGULATIONS, UI ACCORDANCE WITH NEC/CEC 690.53. N 16. MARKING OF THE INTERACTIVE SYSTEM POINT OF CONNECTION SHALL BE PROVIDED. C. ' 17. ALL WORK SHALL COMPLY WITH CALIFORNIA BUILDING CODE,SPECIFICALLY CEC ARTICLE 690. //��! , p o O 18. EQUIPMENT GROUDING CONDUCTORS SMALLER THAN 6AWG SHALL BE PROTECTED FROM PHYSICAL ,B.'L1I/f cf.PERI- NC DAMAGE BY A RACEWAY OR CABLE ARMOR EXCEPT WHERE NOT SUBJECT TO OR WHERE PROTECTED : 71-741.4% p Z FROM PHYSICAL DAMAGE. . Building Department O oi 19. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO CONSTRUCTION. � `SL OCTq/ s Z 20. ALL CONDUIT ABOVE GROUND SHALL BE METALLIC.ALL FITTINGS AND HUBS SHALL BE RATED FOR J �J I 71�� aR cc 2 a RAIN TIGHT OR WET LOCATION AND COMPLY WITH U.L.5148. REVIEWED ` V al ped 21. EXPOSED ABOVE GROUND DC CONDUITS WILL BE CLEARLY MARKED PER NEC 2008690.50. REVIEWED FOR Co � &MFLIANCE O tl • Rewewec Sy: v �\ � 0 111 SCALE:NONE DRAW DATE: BY: MML 9/30/12 DRAWING • TITLE: NOTES & CODES DRAWING NUMBER: G2 • • • 4:e _—___—_f JNAS'OT51'W tie.OP—_—_________.— ---____� QIP`iJIK{, MOD SANDBAR 5g ERN IG - f 8 WPERTINO SANITARY DISTRICT REQUIREMENTS '�I y SOLAR & ELECTRIC }_ `�. . 649 AL.MAR AVE €e INSTALL NEW PROPERTY UNE CLEANOUT OR LOCATE ,RAISE TO GRADE —� O F 4. HOUSE SUITE C. AN EXISTING PROPERTY UNE CLEANOUT.PROPERTY UNE CLEANOUT MUST GO j t E WITHIN S FEET OF PROPERTY UNE CLEANOUT SHALL BE THE SAME I ar' O ` SANTA CRUZ. CA 95060 1 DIAMETER AS THE STREET PORRON30F THE SERVICE LATERAL GRAVITY I _ _ O _ ARCHITECTURE 8}7.469.8888 (LAITERAL IS A'Du.MN.0 C.4101 Is �_i EE_ f/ ....• BDESIGN R4-00e E4 Vc��z EDCIRWT VIDEO OF EXISTING/NEW PROPERTY UNE CLEANOUT.AND F � CLEARANCEFOR CRY NPEFTP DISTRICT ILATERAL NSPECTION.OWNER TO CALL C - 'i+r.tw wro ag ��2N2i�ul VI Z ydj aw pI3TAIGi IN LECT INSPECTOR 5PT TO TOVIDE BUILDING T. SCHEDULE a ....1_ AOiiA ` c•w',m U=<o tP��>a SNo INSPECTOR DISTRICT TO PROVIDE BNIONG DEPT.WITH ''�� - wp_IE1 }c �� p 3 TIEN NOTFICATION UPON awns-non OF INSPECTION.(0C.31«) �I _ "` - KK �� _N ,SEWAGE CAN ADREWIREDUNIN FROM CIVILPLUMBING CERTIFIES THAT THE & I--------- � -- . -,,,.. ---- _a‘__________ -J'p ��ia '\ // , 'may`` Ow2F-w>]20V�<<m ,SEWAGE CAN ADEWATELT DRAIN FROM PLUMDING FlMURE9 TO FSLIC -_ ° tl \/y . / yCs� SEWERS RfpIIAN APPROVED DEVISE 1lARI00R UPC 4'"A1 op.„ L.„2, v a. iir PPROVED ISREOURED IYHERE THE LOWE3I FINI3NEDfLOOR WRH -'� ° p S�OA py� _ ,,AA ., ...-to.*,z,..... a0CC i (PLPSrnSEAmmANH E(0.C.IFSWTABWE THERIM OF THE NEAREST i���� L I� 1 �- III�Li�:• //� IA.. , F6020UCU=1Z03NO CC _� ° ISTING SANITARY SEWER LATERAL WILL EXTEND TO THE NEW PROPERTY —• - - --V�,A •_4_-- p 3 NE IF THERE IS NO STREET DEDICATION.LATERAL PERMIT WEL ONLY BE • .• ea , r ISSUED TO LICENSED UNDERGROUND CONTRACTOR REGISTERED TO _ Aryi Curt Cline ATUNIGtI Q WORN N CUPERTINO SANITARY DISTRICT.. ' '��. - _ _ j= ,• \% /ryy. 0 _ / l.r,Jv,r� •.ww• maa• M• • • • ; ,L/ Q� Ln Ln d1 Il/ !A \ �e.� IU Z Q }rte p Z i -- =� A W a w w N O CC 6 ° 77 a z o a w Q W au W _� EXISTING MM.TO ° w� K _ w N U t I L aMN. O z d N a z ; - / « ._ •. .:IRC IND NEW MAMWYFENCESME PROPOSED I f p®� TY 1 AIi•W.m•;A I• ", 'DIMING SgNONW FOCE3 ARE TO REMAIN I W S:W iii=�, �\1 \ ]© ° .. ._ ._ .;• •.`�1 4.P.IGroREFEREN« . .- K Hn y —GARAGE GaLD © WI e. ° iq a LEGEND•ENLARGED SITE PLAN: ,, �,�� J .:.© .uwwlroniwwa.e.v. (1 mnc irr'V)1r ���frE.F.TIN 0 fY ` I sem` II — �. °�'� ,; �+! .4III I Building C e{ artment w i! — Z 2%TTP ° OCT : 6 X11 W • yjw� «oIFCMM'L SYAAD ° ..w.l..r ..IIV.f F.LGLGRV..I' AYEc+e-, w : wle.. �y iimuum ��' «FRmclmw+wcNCN I C. \ \\ F fro AIY�PRNE Q1,1 REVIEWED FOR ,'A!=�I;ttiCE iC' 0 0 o NAT'1TV0:- \ Th< - A,raR,.N. ReviewedBy:13 \ba N co Oi� b {zP \ • be` �. K qq . .N ' )\\ \ \ • W W Pi `'\ '`I ARCHITECTURAL ME Q tlP PLAN O , 3 \\ ' '\/g Z o •= A 'O �,, G I 'ScSCALE - NONE ® SITE PLAN Qn qT •"�• wAA.• r� OF •m- Al.0 DRAW DATE: LNI; BY: MML 9/30/12 !iii DRAWING TITLE: SITE PLAN DRAWING NUMBER: 03 4......._ jc e¢ �G7PTli®IPSJIJd Q Q q 4 MOD SANDBAR 5 I ERN SOLAR & ELECTRIC @ �I 849 ALMAR AVE ti i HOUSE SUITE C. /528 I SANTA CRUZ, CA 95060 Y 1 i 1 li ARCHITECTURE 831.469.8888 iia &DESIGN i0:o'-ri WG6� 1 y z II 6W,TaMrO RP-GO Nm ® WZE�W _ F 6 1 I ....r.4.«... e. .°<" a"¢ mm° uric; °TiS.-ym I E 'a>- ,,.5 .1 mm�° a ,_ -- ;\ on Vatt8I3bagct S - -- - ' - m zzza m 1'1���>:+ i l-i`Oaoui'u'1Ho1Ee<ir. 'Fri TT__i`T__I-T-T--T`TT—T__T —T` `T__l`T_T`T__�_T__ `l__Ti_Z__'__ __f` -_T-'T_ `i`T_ i ',CW, i L! I I--I I I ! I I 1 1 I� r I I 1 1 1 r I i I 1 I 1 1 I I I 1 r I I - 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I , 1 I 1 1 1 1 ( I I I I I I 1 I I I I I 0 1 1 1 1 1 1 1 I _- 1 i 1 1 I I I L1 1 1 1 1 Cuh Clhq Architect Q t o- T _. ;,_.. - 1-_, ; 1-. I 'I ,„ ,., . I-I I-{.._ ,L. 1 1 - -I-; 4 �-I." 1 1-47.-.r*'.! ° a 0 1 I I I 'I I I I I I I II ! I 1 I 1 I I I I I I I I I I I I I o II j II : i ! I l Iii I I i j I i j l '- 1-ate j—;_ I zzcn 1 I 1 1 1 1 I 1 II 1 I t 1 I I I I 1—I—�—' w \ l i j I j ! j i til ; ' _r�, i -. 1 ; ifii i I i i I ® p o { I 1 1 1 I I I I I 1 1 1 I+-1-i i ' j I 1 1 I 1 I II l W w z O 6 _II i i 1 j I i i T 1 I I I ¢ (Ti W Q Z • ' I W Z w N ~ a I I I I I I I I I I ; I 11 1 _-_ - I i i I i ' II i i l I I IJ! i _I i I I II I I i i I 1 1 ;---T'—/ U o pM � C ' I i,=.i,-rYOai III I 1 I 1 1 I 1 1.I I1 �+ 1 /1 Z < (J W o- --. ISI �_� - _� r ° WQ 1 1 1 1 ; i IUI _I_7 I I I i e I / — N 0 7 ♦? I I 1 �I I !I I I I '— I I i r�° j 1 I 1 I ti;:.: / O z . t CV c� If Ti i I i ! 1 i I I I 1 I I ' 1 { -'j�.r, i 1 o f a_ VI 1 rr, I 1 1 i i 1 i I I II 1 1 I k I 1 i I M'u —1' / - F I i i + i 1 I •ua 1w ' 1 1 ' V 1 W z wash����_ I I E5+O1O 1 1 <W —�� I ` I I IIIi- lr I I I j� ccm6 1 1 i I I j ' I 11 11 I N J 1 , ffllAO1 I I i I I �T' TR,„„c,'YT. I I 1 Q €.;- I U I I I I 1 1 1 ar 1 I Na , I ,I Cia11 y I — N I I I I I I r 1 I I I •I •I I -.11-.11-.-4.-11-.-41- , '—'-• �•� I I iiI�1. 1 I Ip�1py �p1�y( A� 11 1i 1r 11 11 ry ry` p i1 1 1 I I i i I I I ' I '' U IG.RTINO E _IL 111 " I. II II IL_'L _!I__!1 IL_.11_© II IL_-L _ �.��m, A itl--.!! L_1_ ' ' ' '" -,{T- '�� W — te +Ti_N� r— pp 1 I i^I I , ,.....- -...t,_1_ 4-1-n-1---,- — i 1r 1,�� Buildinc Ce artment Z I I I —,—F—t- 1 If - r q r� W em �i i i 1Lj i I Ii'l \ j I\I j I I i 1 I I , 1 I / REVIEWED FC R C0—b .C'-_IANCE 0 ° i !Ill j I i I I I l i l r l Reviewed By:_ s i \ _ m LL L I I I I I I I , I I I I I I I I 1 I ` . o $ is 1 1 I I 1 R. : I a -- ---- o i F is 1 A A! I I I 1 :1, I 1 .tr2 p ::i I i I `� Cqy, :_E w 0 FM;FLOOR?EARMC : Ro°s rRu'Dr°wI ii i Z I •• ' I WESTFALLENGINEERS.INC. it'll' SCALE: NONE F;; •� FIRSTFLOOR SHEAR WI ROOF FRAMING PLAN " O1tO z 'WI. ..•a• ';it "'WM.".m. nem S1.2 DRAW DATE: "'J Ra.r BY: MML 9/30/12 DRAWING TITLE: 91:W ;41-Cal RI,WNG PLMI NUDRAWINR:G Si MBE SHARP 240 W SOLAR MODULE TYPICAL OI I 4E-- 1-1 -}- 1-5 I © 1-9 I -}- 2-1 I f 2-5 I -}- 2-9 I -}- MODULE INFORMATION bOgLKIPIIIC I 2#10 USE BLK . SHARP 240 1#12 BARE TYP. I QTY MODULES 24 SANDBAR - - W STC 240 W SOLAR & ELECTRIC I- I 849 ALMAR AVE II iI ill i t W CEC/PTC 216.3 W SUITE C. 4526 1-2 -I- 1-6 © 1-10 + 2-2 -F 2-6 -♦- 2-10 -I- Vmp 30.2 V SANTA CRUZ, CA 95080 _ 831.469.8888 Imp 7.95 A Voc 375V < NNO«„,,,,g p c, Isc 8.61 A §.14.zg'” N eW W t�00 ..0)-a--. Wp ¢1 >S < •,?. ° 1-3 I + , 1-7 I + 1-11 I + 2-3 I f 2-7 + 2-11 1I -{- <i'oz-0F<mm 11n. 4 §¢J =¢ 2=L8 .8vUcCO3NO 1 - I I II Q a 1-4 ± 1-8 1-12 Q 2-4 -12-8 ' 2-12 p x O u1 ENPHASE Z a) INVERTERS r , r r Z U TYPICAL I 1-1 i 1-5 i 1-9 I 2-1 i 2-5 I 2-9 w - \ l` ' I l` I I - J V)Q O `\ 'V fV + ti % ti + ti < w cc w U Z r 1-2 , 1-6 1 1-10 1 2-2 1 2-6 1 2-10 ;t2,-,3114 CVQERTINO o r-j w 1#8 BARE ` — i �e i ` n,4 ` J_ 1 a--P4 w Building Department LU u_ `isj N O ® w � (71 1-3 1 1-7 1 1-11 1 2-3 1 2-7 1 2-11 f�''-'• , OCT 2 6 2012 0_ rn % % % 'V 'V 'V REVIEWED FOR CO, _ . ' FLIANCE 1-4 1 1-8 I 1-12 i 2-4 i 2-8 '1 2-12 Revlewec By: i — 1 � i i 1 w w r r ( r r r z L� INVERTER INFOR ATION w cm `ENPHASE AC INTER CONNECT CABLEL , \ _ ENPHASE M215-60-2LL-522 BLK-L1 ORANGE-UNUSED J BOX _ J BOX OUTPUT VOLTAGE 240 V 0 RED-L2 BLUE-NEUTRAL, 1#8 BARE 1 r OUTPUT CURRENT 0.9 A I I QUANTITY MAX 17 EACH BRANCH O "EMT 3#12 , 1 BLK it. ♦ i"EMT 3#12, 1 BLK GARAGE POWER 2880 W 1 BRANCH g A El 1 RED, 1 WHT, 1#14 GRN I 4' 1 RED, 1 WHT, 1#14 GRN z i ce -Ca-e1 30o A2P I AC COMBINER 15A 15A i a SHEET NOTES a ff cm cm r- -' ' SUB-PANEL 15A 1P , — ENPHASE 50 AMP L PROVIDE SIGNAGE STATING: "WARNING:SOLAR VOLTAIC ELECTRIC o 1 gem _ :' ENVOYIl SYSTEM ON PREMISES' i o COMMUNICATION _,= EACH BRANCH CIRCUIT TERMINATES ON A 15 AMP 2-POLE -J — GATEWAY RJ45 CABLE ❑2 BREAKER: SCALE: NONE 200 AMP .er TO BROADBAND ADD NEW 30 AMP 2-POLE BREAKER RATED FOR BACKFEED TO MAIN METER PANEL ROUTER ,______ J 3 FACILITATE SOLAR INTERCONNECTION AT SUB-PANEL. DRAW RA ML DATE: /12 1"EMT W/ 1#8 BLK, 1#8 RED, AT EXTERIOR OF DRAWING 1#8 WHT, 1#8 GRN, 4 RUN A#8 BARE GEC TO ALL INVERTERS. SINGLE HOUSE I 1#10 GRN TITLE: n IRREVOCABLY CRIMP GEC TO EXISTING GEC. LINE DRAWING El NUMBER: ....._ .__...)k PV Modules inverter Output Circuit ' Sharp 240 Enphase 215 prlia=inft 'd Number of modules: 24 Maximum Output Current= 0.9 Amps 890.8(3) SANDBAR W STC: 240 Watts Number of Inverters= 12 SOLAR & ELECTRIC 849 ALMAR AVE W CECIPTC: 216.3 Watts Required Inverter output ampaolty= 13.5 Amps SUITE C. #528 Vmp: 30.2 Volts Output Voltage 240 Vac SANTA CRUZ. CA 95060 Inverter Output wiringto seance panel is THHN 831469.8868 Imp: 7.95 Amps P Pa Tr g.-_ c a • Voc: 37.5 Volts Temperature correction factor at 35C= 0.96 7310.16 Tr NOF N W Isc: 8.61 Amps Selected wire sizelampacity at 75C std temp= #12 AWG 30 Amps bZu acNz i�c gPso V Temperature Coefficient Voc: -0.35%Deg C Corrected Ampacity= 28,8 Amps> 13.5 Amps z-e a >6 <<a.-S4o Max.Series Fuse Rating: 15 Amps - Ampacity of wire at 60C Temp.= 25 ?'gmgv���'^: i`�-- u Temperature correction factor- 0.82 §,-(2,L, z of<xm Total STC: 5,760 Watts P 0WcL',SF3 N ma Total PTC: 5.191 Watts Check wire rating at 60C termination temp.= 20.5 Amps> 13.5 Amps 310.10 Ngv"u° azq'r:o Coldest Ambient Temp. -10C �noio'ua'o'e@eiai,. Use this temperature for USE-2 wire In free Voltage Drop Calculation Hot Ambient Temp. 45C O air. #10 AWG AC Resistance 2.05 T9 < Corrected Ambient Temp. 62C 310.10 FPN No.2, Use this temperature for Est.distance from Inverter to AC combiner box= 150 feet 0 wire in conduit on the rooftop. O Voltage Drop Calculation= 0.23% 215.2(A) if) Corrected Voc= 42 NEC 2005 690.7 °/Voltage Drop Calculation(2 x Distance(ft)x I x Ohm/kft x 100%)/(1000 ft/kft x V) w Z m Size Equipment Ground U D Q Equipment Ground Size= #14 AWG 690.43,250.122 LZ U Required size of OCD at Service Panek w 0 tit Z 5 13.5 Amps< 15A Fuse</=24.6 Amps 240.4(B) a Lt j w N Z p PV Source Circuit (for all arrays) I- 2 Q CMW L� D d CV D Size Conductors C N U r N PV Module Ise 8.61 Amps The PV source calculations hold for all arrays. Source circuit maximum continuous current 10.8 Amps 690.8(A)(1) This Is the wiring from the modules to the sub panel. AC Combiner Output Circuit Required Ampaclty= 13.5 Amps Source circuit outdoor wiring to DC combiner box=#10 AWG USE-2,90C rated.The wiring Is not In conduit Maximum Output Current 21.6 Amps 690.8(3) Ampaclty= 30 Amps T310.17 Required combiner empathy= 27.0 Amps Temperature correction for 35C= 0.96 T310.17 Voltagew e Corrected Ampaclty= 30 Amps> 13.0 Amps 240 Vac w AC combiner panel to House is THWN-2 z Ampacity of wire at 60C Termination Temp.= 30 Amps> 13.5 Amps T310.17 Temperature correction factor at 35C= 0.96 7310.16 z Li Selected wire size/ampacity at 75C std temp= #8 AWG 55 Amps Voltage Drop Calculation Corrected Ampaclty= 52.8 Amps>27.0 Amps N For voltage drop calculation,assume 14 modules per string.These calculations are not covered In the NEC. Check wire rating at 60C termination temp.= 40 310.10 Voltage at MPP= 30.2 x 14=422.8 VoltsTemperature correction factor- 0.91 a0 Current at MPP= 8.0 Amps Check wire rating at 75C termination temp.= 38.4 Amps>27.0 Amps #10 AWG DC Resistance= 1.24 ohms/kft T8 DC Resistance at 75C for uncoated copper. Required size of Disconnect= 30 Ampsm 3 Est.longest distance from module to DC Combiner- 80 ft Parallel Conductors Not Required A Voltage Drop Calculation at MPP= 0.37% %Voltage Drop Calculation Voltage Drop Calculation w �2%.,.m l r,U s+eM i I N C #8 AWG AC Resistance= 0.809 ohmsrkft T8 cc F J r,'f' Budeiltg Department Est.distance from house to AC combiner box= 60 feet 0. Sheet Notes: m Voltage Drop Calculation at MPP= 0.87% 215.2(A) § e %Voltage Drop Calculation(2 x Distance(ft)x I x Ohm/kft x 10M)/(1000 Wkft x V) N N 1.All rails are continuously grounded using#12 AWG bare copper Are. rl, aminC, 2 6 2( d 2.All frames are grounded to rails using WEEB grounding clips. L.6 OCT L 2 Size Equipment Ground z o Equipment Ground Size #10 AWG 690.43,250.122 3. PV module negative shall be the grounded conductor. 1SCALE: =• "^� Ra Required size of Disconnect=100 Ampsq • 4. DC Inverter terminations rated at 75C. REVIEWED FOR C( y L„ni••�•.... q Parallel Conductors Not Required NONE 5.Calculations performed per 2010 NEC Code. -01 Size Fuses DRAW DATE: R3viewed By: - \\ 27.0<30A<36.4 Amps BY: MML 9/30/12 ' DC Disconnect or overcurrent protection device sizing DRAWING • TITLE: CALCULATIONS WING E2 NUDRAMBER: O ARRAY LAYOUT • f a2' 2 6" aD ma=caIr.➢J 13,-2 ___..._(3, - r26'-616" 1 I soLANDBAR & E RSG ARRAY LENGTH ARRAY LENGTH 2'---I 849 ALMAR AVE SUITE C, #528 ! II II II II II SANTA CRUZ, CA 95060 'PER FIRE CODE Z 831.469.8WJ8881� ! 111 ZZNp~2 02P5Jt II II II I II II II II II II I II —1'-21" :OF y'o Fwe' § c'pU it II I. x-R, }O < p0 O 26 I i II II I ! '�o�"<��` i'<gm I! �� I --`I- -r- I - C!) I - - • f -•---Lb , • I ,�� ¢ i i i n u I ! o$ a 8:_ 8m� II —�— ti°Za J ' j 1 �ICHIMNEY Il I —41 i8) f a=a�vgi�o€�. I' li �I �i it !I I �� I . I 1 I ( II II I: ` I II l II ���� II y 1 p _ I 10' I o 27'-6" II it I I d Iir ' I / w z rn j I p II , --;- -r --1 -I II i I i - -1- 1--1- ., `—n n j ' I? � U U up _ II II iI II II II II II II II Ii il_II II II II II r it II II II II II I w p Z Q MODULE ROOF SEAM < w z p JB STANDOFF z ROOF RAFTER RAIL v - o N w I39'-9%„ o - ` N N U ARRAY LENGTH ��99 pp��ppA�1A' a N mit/ CAJP ER i }NC I lit:fF f Builtling Department :tat: Lii Lo PV AC PANEL J OL' `— OCT Z 6 2012 a Z W RACKING ELEVATION • REVIEWED oi,,c *;t : l �?cE 2ReviewecBy: C. — I.I o 0 AC MAIN `— V FRAIL 5 SOLAR MODULE 6 y, 1 er z $ UPPER-TILT BRACKET If a 1'-511' -�TILT-UP LEG 0 1 § B I Wg �LOWER-TILT BRACKET U 't--6" —STRUT gig 6 Lai g Z 0 SCALE:NONE STRUCTURAL NOTES: STANDOF ` DRAW DATE: I 1. MOUNTS ARE APPROXIMATE LOCATION BUT ACCURATELY SPACED. x. �„ � - i BY: MML 9/30/12 11 2, MOUNTS SHOULD BE STAGGERED WHEN POSSIBLE TO EVENLY ROOF SHINGLE SLAG BOLT (MIN. 2 a"EMBEDMENT) DRAWING DISTRIBUTE LOAD AMONGST RAFTERS. ROOF DECKING ROOF RAFTER TITLE: ARRAY LAYOUT DRAWING E3 NUMBER: • SIGNS AND LABELS Sa11:0=013 SANDBAR SOLAR & ELECTRIC 849 ALMAR AVE SUITE C. #528 SANTA CRUZ, CA 95060 831.469.8888 i ..or-o2�`ai' r&� �F NQy,yy VZZ <ON HNA §2,., ALL SIGNS SHALL BE RED BACKGROUND AND WHITE LETTERING. FOR €a=„==or. ___ OUTDOOR INSTALLATIONS THEY SHALL BE ENGRAVED PHENOLIC 'i_j° `tent:. WY6 YS ��20€NO PLASTIC TYPE. LABELS ON RACEWAYS AND OTHER EQUIPMENT '���"`art. '= AC CIRCUIT BREAKER - CEC 690.54 i=«'"W's:31 < = SHALL BE REFLECTIVE, WEATHER RESISTANT, AND SUITABLE FOR .4144 = q H: 4gorc0uiu'2t gi:nc, THE ENVIRONMENT. ALL RACEWAYS AND DC COMBINER BOXES LABELED "CAUTION: PHOTOVOLTAIC SYSTEM AC DISCONNECT o SOLAR CIRCUIT" EVERY 10' AND CHANGES IN DIRECTION. RATED AC OUTPUT CURRENT: 22 AMPS (Y a NOMINAL OPERATING AC VOLTAGE: 240 VOLTS w a • CAUTION! . w SOLAR CIRCUIT w (z cc z z < w wN o M W (Y.: Lai Q 'O CL ¢ Lel-- a v1 MAIN SERVICE PANEL -- INSTALL 'A PERMANENT PHENOLIC PLAQUE AT ALL JUNCTION BOXES, COMBINERS - CEC 690.17 AT THE SERVICE ENTRANCE EQUIPMENT ON FRONT OF THE SERVICE EQUIPMENT. WARNING: ELECTRICAL SHOCK HAZARD W SIZE 3"X4" - CEO 705.10 DO NOT TOUCH TERMINALS Z TERMINALS ON BOTH LINE AND LOAD w SIDES MAY BE ENERGIZED Warning IN THE OPEN POSITON Photovoltaic Power Generation A on Premises •I1,1,4 /. CUPERTIING s 1 f !% Building Department Lug : I AC Power will Disconnect with p Main Breaker OCT 2 s 017 o 1 O 0 REVIEWED FOR C'.i 1r L'': LIANCE SCALE: Ott NONE Reviewed By: / DRAW DATE: BY: MML 9/30/12 DRAWING TITLE: SIGNAGE DRAWING E4 NUMBER: SHARP? a � ,- -' � 240 WATT y�'_-- SANDBAR solar electricity �G� SOLAR & ELECTRIC S ND-F50240 849 ALMAR AVE SUITE C. /528 11.1°Module output cables:12 AWG PV Wire(per UL Subject 4703) SANT;;;;;;;;0 8 The next evolution In frame design — �FN A-z 24 0 WATT makes Installation a snap, literally.... ELECTRICAL CHARACTERISTICS DIMENSIONS ih 'tteff Y -- - - - - - J r -- - -- ---- - - b_w saving serious time and money. Maximum Power(Pmax)* 240W BACK VIEW <rrodeP m�No. RESIDENTIAL MODULE SIDE VIEW Tolerance of Pmax +5%/-0% ' A u„<a �a .< 3a,do PTC Rating 214.8 W o 1 ""(oomi���c��¢m NO NEED FOR MOUNTING RAILS T8 T� 8 its`«''roo Fes` _ Type of Cell Polycrystalline silicon OEC w8 30N ma With a series of drop-in and quarter-turn connections, ,_nenuoidz€a:Rz _ o / Cell Configuration 60 in series o qq the 240 Watt SunSnap”module installs faster than I I Pa'oa0u¢u'e@0 Inn. Open Circuit Voltage(Voc) 37.5 V conventional modules.The robust Zep Compatible Maximum Power Voltage(Vpm) 29.3 V tframe avoids the need for mounting rails and enables -_ (7 r - 1- ( "''r 7 ✓ Short Circuit Current(Ise) 8.77 A Q theft resistant,auto grounding connections. -'1^ d' - � - ' • `` • ADVANCED AESTHETICS Maximum Power Current(1pm) 8.21 A _t_i b 0 0 yO? Modula Efficiency(%) 14.7% (-)• (+) a If) ,i 1 Sleek,black frame and matching black backskin Maximum System(DC)Voltage 600 V W Z O) _ provides an elegant appearance that blends I beautifully with your home's roofline. Series Fuse Rating 15 A Z 0 _ NOCT 47.5•C W POSITIVE POWER TOLERANCE Temperature Coefficient(Pmax) -0.485%/°C C.j 0 Z O Count on Sharp to deliver all the watts you pay for Temperature Coefficient(Vac) -0,351%/•C marAtma ¢ N (/)07 N Z Li with a positive only power tolerance of+5%. ® n- Z 41 H Temperature Coefficient(Ise) 0.053%/•C u o • I Z p n ce ' RELIABLE •llumnation onww/m'osun)atspectral distribution Of AM IstastMEa92 - e - I : '-c 0 M LU U Q ¢ (C) a- ll The 240 Watt SunSnap"module is covered by both plabel IP CSI I ra4bnc.)n a a. temo.,atur.u . A D • B C D E W N the Sharp 10-year limited warranty on materials orI -_ .- --_ ------ _ -- --_-- -- -- 591/994 mm w 6A/1640 mm 21753 own 6 -nmm 9• 0p566 (Y f936mm Q . 1-N 0 workmanship as well as the 25-year limited warranty 1 MECHANICAL CHARACTERISTICS __ _i F C. N II - on power output, Dimensions fa•11x C tb tlwrblu) 391'°ear.217994.1640 a ss rum 4E371100 111171 p "BUY AMERICAN" Cable Length(F) 43 371100 contact Sharp fat tolerance scrtkkm ata c Designed In Camas.WA and manufactured in Output Interconnect Cable 12 AWG wit Connector •SMK Locking Conctor ND-F50240 SUnSnOp Memphis.TN from imported and domestic parts. Weight 46.7lbs/21.2kg ISO QUALITY A ENVIRONMENTAL MANAGEMENT • Max Load 50 psi(2400 Pascals) RESIDENTIAL 240 WATT SUNSNAPTM Operating Temperature(cell) -40 to 194•F/-40 to 90•C Sharp solar modules are manufactured in ISO W •imernsr.awarw r«Tilting with Mc-4 ww.ct«.(wn mane«.PVKsre; 9001:2000 and ISO 14001:2004 certified facilities. w MODULE FROM THE WORLD'S PV-1(0171) z TRUSTED SOURCE FOR SOLAR. ------ -- -- w a -�.ts, i CERTIFICATIONS _ . w `i - UL 1703.ULC/ORD-01703,CEC,FSEC "BUY AMERICAN" The 240 Watt SunSnap'"module is the power 'Ts-= K generating component of the new SunSnap'"solar •- - _, c 4L us Sharp solar modules are manufactured in the United cvet appliance.This powerful residential module is the I "' .• .' r—_ --- --- --- — - — States and Japan,and Qualify as"American"goods o WARRANTY perfect combination of high performance and e " �r ®i _a (-- warranty - —__—----- --- -- - - _ - under the"Buy American"clause of the American 25-year limited nton power output design.Sharp's robust Zep Compatible frame design -t (. .- p Recovery and Reinvestment Act(ARRA). z r�t ,, Contact Sharp for complete warranty Information O enables rail-free mounting,drastically reducing %dust black frame improve ihepO Tempered alms EVA lamination and - • us f«residential roof lonaootcations. weatherproof backskln weabelgnd piirplsev.wor.Ybmmata et him CorpowahWtrotk•. W installation hassles.Everything from the positioning, masspo ew•,•r•oboe.r.w.k blect lra c«p«•4theul1,tic., a•m«k.•,.prevent a' U: z a ill,and enhanced cell oen«menca. the're,p.ci-e—'I I r 11D Ir ` R to the mounting,To the wiring has been Streamlinede V SHARP:THE NAME TO TRUST (�1 �'ttand simplified, so it all comes together quickly and \ ( / ; J U t!ail 0 I iing ent FWhen you choose Sharp,you get more than well w easily,substantially reducing labor costs.Versatile — ? 1 e engineered products.You also get Sharp's proven ./."...% 00niik 0 enough to permit installation on nearly any kind of reliability,outstanding customer service and the � OCT c o roof,the 240 Watt SunSnap'"module is the newest assurance of both our 10-year limited warranty 2U • on materials or workmanshipaswell as the 25- SHARP ELECTRONICS CORrd,Cam s,W ' SCALE: NONE innovation in Sharp's residential product offerings. year limited warranty on power output,With over 5700 NW Pedfip Rim BoulevBN,Camas,WA 98807 50 years experience in solar and over 4.3 GW of SHARP 1-800-SOLAR-06•Email:aharpsolar®spa�rpuseaam .-, Fern 1:"•;�� K�VItVdE�f'Onl • Ols'r"L-'rtl'-L�- DRAW DATE: Installed capacity,Sham has a proven legacy as a wwwshariwsa,com/solar ��,� trusted name In solar. BY: MML 9/30/12 02012 sharp Ewualkc.c«ooraem.Andel,reserves. ns^L&`:inelnkti By: DRAWING BECOME POWERFUL TITLE: MODULE • SPECIFICATION DRAWING SPEC 1 NUMBER: Mall Om �Iu6QO0adCQ4CQ Q@� enphase • M215 — MICROINVERTER TECHNICAL DATA I-1 � � Q ti / Input Data (se) M215-602LL-522/523/524 GT M215-60-2LL-522-NA/S23-NA(Ontario) SANDBAR Recommended input power(STC) 190-270W SOLAR & ELECTRIC (/ Maximum input DC voltage 45V SUITE849 ALMARC. AVE 1 P 9 Z. A26 Peak power tracking voltage 22V-36V SANTA CRUZ, CA 95060 Operating range 16V-36V 831,469.8888 : :zro Ln W"'6j Min/Max.start voltage 22V/45V ZZbNo"y�J�81jrt�t,���z OrctNZtfoKOul"FFW y_ - _ _-_ _ _ Max.DC short circuit current 2152V4 z z - -- - Max.input current 10.55 u= ,o -n�ra^'aS-'^� W-Qe- ¢0 < -� 00: Output Data (AC) 0208 @240%15g 'go°"a8`::i3am f '� 's oa<&"'>S1x ( ma \ C " -� Maximum output power 215W 215W "$ wo?uz ° Co Nominal output current 1.04 (arms at nominal duration) 0.94(arms at nominal duration) 4n orceurcuzl g sins Nominal voltage/range 208V/183-229V 240V/211-264V v Extended voltage/range 208V/179-232V 240V/206-269V C Q enphase n IL Nominal frequency/range 60.0/59.3.60.5 Hz 60.0/59.3-60.5 Hz 0 ct __ __,..... _. [e' E N E R G Y Extended frequency range 60.0/59.2-60.6 Hz 60.0/59.2-60.6 Hz OLn Power Factor >0.95 >0.95 W < DI DMaximum units per 20A branch circuit 25(three phase) 17(single phase) C) Q Maximum output fault current 1.05 Arms,over 3 cycles;25.2 Apeak,1.74ms duration Z D U W w OZ O ataGgy E (/I en Q Z w N w — ce CEC weighted efficiency 96.0% 1- �_ o N- 0_ Peak inverter efficiency 96.3% w Q Ore, Li Q co 0- Static MPPT efficiency(weighted,reference EN50530) 99.6% 0 — -cc:i U Dynamic MPPT efficiency(fast irradiation changes,reference EN50530) 99.3% a to Night time power consumption 46mW • Maximum energy production Mechanical Data The Enphase Energy Microinverter PRODUCTIVE - Resilient to dust, debris and'shading - Performance monitoring per module Ambient temperature range -40°C to+65°C System improves energy harvest, Operating temperature range(internal) -40°C to+85°C tY Lu increases reliability, and dramatically xxcm x16.4 cm x .5 cm(6. x 6 45 x 1.0 )• w - Dimensions(WHD) 17.3 2 8" " " System availability greaterz RELIABLE than 99.8% weight bkg(3.S Iba1 z simplifies design, installation and Cooling Natural convection-No fans w -No single point of system failure Enclosure environmental rating Outdoor-NEMA6 management of solar power systems. without mounting bracket 'cv Quick and simple design, installation a 0 The Enphase System includes the e SM A R T and management Compatibility Pairs with most 60-cell PV modules n' microinverter, the Envoy Communications -24/7 monitoring and analysis Communication Power line tT. 1 CUPEIMPI g E Warranty 25-year limited warranty ss. GatewayT", and Enlighten®, Enphase's MonitoringFree lifetime monitoring via Enlighten software Building De)artmE 115 Compliance UL1741/1EEE1547,FCC Part 15 Cl ss 8' ' i ce o monitoring and analysis software. 5 A F E -Low voltage DCOCT 2 s 2.:..12 • Reduced fire risk CAN/CSA-C22.2 NO.0-M91,0.9-04„and 107:1-01 g REVIEWED FOR t r, , , Enphase Energy, Inc. QA"^�IA>�CE i o S Ae 1420 N.McDowell Boulevard Reviewer:By: A'� SCALE: Petaluma.CA 94954 NONE C uS P:877-797-4743 - info®enphaseenergy.com us10,Rev Dab DRAW DATE: enphase.com httpJ/www.enphase.com 02012 Enphase Energy. ' rights reserved. BY: MML 9/30/12 DRAWING TITLE: INVERTER SPECIFICATION DRAWING SPEC 2 NUMBER: • LET Roof Tilt Up Kit Installation Guide RoofTrdc Tilt Up Kit Installation Guide g , „ t.�'4 5/16"x 2"Socket Cap Boll STEP 1-USING FAST JACK SANDBAR C�4,e ,,- ATTACH THE REAR ASSEMBLY: SOLAR & ELECTRIC UPPER TILT ASSEMBLY et"- /- ' 849 ALMAR AVE FLAT ROOF DETAIL WITH END CLAMP Upper Tilt Up Bracket SUITE C. /525 SOLAR MODULES 5/16'lock washer y� (mrsdaare+rsrroealedenc A:Attach the lower(counter-bored)tilt up bracket to SANTA CRUZ, CA 95060 1,` namraryun me/aasr 831.469.8888 ��_ bracket) the strut/beam: / 1162s-,9 V T j o Place the lower tilt up bracket(non-threaded)over the � `N �� ��J= 1:24(1/7 "A,* <oN.2W" ago// y 3/8" threaded grab nut with the serrated surface fac ba=W = N SSS FQw ,� e. 1"x 1'x 24'Square4` ing down.Square off with the strut to insure a straight ,�`"gz�„orgama�� % � 1:;19/2/1 ��� �� N. Tube(clearanodized) {I tiltu leg. -rid ,o -< -3S ° •/� /1:; //. Tightendownwitha3/8" lock washer. (see N N° �__ / 3/e"zt-112"Hex BoltP 9 ><� /� �� /� � � . I Q noIkebab run kir illustration) Pmo <W tE cc let � �. J/���27 //� � T %" xI,+ i zi-u> w m / / //����"',��// /� �`'":,__ tLerTiltUpBracket B:Set in the rear Tilt Up leg(square tube):, C • 5116'x 2'Socket (mbrettwateo•M Place the lilt up leg(square lube)in the center of the� Cap Bolt Bnartha°metwo. bracket.Align the holes of the tube with the holes in brad's') t� .4- e, „,� j /� + /il,/��; /J�/ 12:221/ ;. �;° the lower bracket.Insert a 5/16”x 2" socket cap bolt Q v/ 9 ,� /// e, %/ /e +%j ' >• 5/16”Lock WasherSib s 3/8" Bolt/ with a lock washer through the holes.Do not tighten d / �j/',�� 6V7�/ '�/ i/� /'• I 1/ e Washer yet. Z Obi �. - / • ll� ��� _���/��, r/��� ,-- ," v C:Attach the upper(tapped)tilt up bracket to the U I.,�� � ������ <� • p� square tube:Place the upper bracket(tapped)on top LU 0 // x, ,- '. of the tube.Align the holes of the tube with the holes w o Z dz ,��',�J� 8wt(lo veate I in the lower bracket.Insert a 5/16" x 2" socket cap m vl Q in . A . % grid pattern) i 3/8'Grab Nut bolt with a lock washer through the holes.Do not z cc o^ I- J' • tighten yet. - _ •• • SW w Q 0 r') LU \ • • " w _N U 1 Residential / � Fast Jack `� a v7 All information in this IrtWlatbnguide(Product \,,,_, �'` =resent]npntratlwaropoperty m amfesyaul - � TILE TRAC ASSEMBLY ;� Upper Tilt Up Bracket for STEP 2--WHEN USING THE FAST JACK Solar Modem,Inc.wptimtion of whole or insert Is (Can also be used with Fast Jack) ���"' O lowerjoint(this bracket is strictly lxomdtadunlessauthaead nyvmfesslonal et.46 \ " hollow) ATTACH THE FRONT LEG ASSEMBLY: Sola Products.Inc. - _"' i A:Attach the lower(counter-bored)tilt up bracket to w l i 3!8"x1-1r/ Bolt/ the strut: z I ! flatwasher Place the lower tilt up bracket(non-threaded)over the Z TOOL LIST(WHAT YOU WILL NEED): The Roof Trac Tilt Upkit is a residential tilt upaccessoryfor 5/16'x 2"�.. I 0 ! (no*elided InkI0w O` grab nut with the serrated surface facing down.Square • 3/16"Drill(Roof Pilot hole) the Roof Trac solar PV mounting system. The Tilt up kit into- Socket Cap !,_. off with the strut to ensure a straight tilt upleg.Tighten • 3/16"Hex(T-wrench preferred) grates with both the Tile Trac and the Fast Jack attachment Bolt o lower Tilt Up 9 9 Bracket finis down with a 3/8"lock washer and 3/8"hex bolt con- c. • Cordless Impact methods(explained in this installation guide). 5/16"Lock Washer 4� r u�a rer-xveAead»ide, bination. (see illustration) ,o • 1/4"Drive Socket(hinge boll connection) man meapyav-&datey c 0 Each Tilt Up kit includes the following parts(comes In bares v • of3 kits): g B:Attach the upper(hollow)tilt up bracket to t�e,s The above tool list is what ProSolar recommends for instal- I 318. BoIU lower pracket Flace the upper brac`ketr(hollow,JnsideO lotion of the lilt Up kit along with the Tile Trac attachment. 3-1'x 1'x 24"square tube,drilled on each end © Flat Washer top oithe,lowe&bracket.Align the-holes of the Upper 0j For a complete guide to installing the Roof Trac mounting rr bracket. -n?r.ra a nent g 6-Lower(unthreaded)till-up brackets-pre tapped bracket wittl1the,hole5 in the lower bracket.Insert a system please refer to the Roof Trac installation manual. rQ t + rr z 3-Upper(threaded)tilt-up brackets Strut Recreate ` 5/16�xt2dsocket cap bolt with a lock washer through o 3-Upper(hollow)lower hinge brackets grid pattern) ?" the Holes Do nOhlighten yeL 2012 $ 12-6/16"x 2"Stainless Steel socket cap screws L•_r:_"J Ule 1 L s 6-3/8'x 3/4'Stainless Steel hex bolts 12-8/8"Stainless Steel lock washers 3/8'Grab Nut Residential REVIEWED FOR Cly - ./'.Y=�h,NCE • 0 Each box of tilt up kits contains 3 total kits-so components Fast Jack ReV19We�B SCALE: will be 3x the number of parts listed above. ,,,Lel Y• •- NONE \` DRAW DATE: BY: MML 9/30/12 I IaofessscoNSOLARproductscl www.Roofirac.mm Page 1 profesvonalSOL Rpraducts0 www.Roo -c.cbm Page 3 DRAWING TITLE: RACKING SPECIFICATION DRAWING SPEC 3 NUMBER: r --.4 TOP VIEW TEST SETUP—SIDE VIEW VIBdCI & ASSOCIATES sc�� '� Structural Engineers 1' 47 '1 j j tum Qj 4, SANDBAR CLIENT: Professional Solar Products,Inc. j - ala SOLAR & ELECTRIC MAR AVE 1551S.Rose Ave.,Oxnard,CA 93033 1—,•— Jr BSUITE 49 LC. #526 Tel:805486-4700 / SANTA CRUZ, CA 95060 831.469.8888 T Isom Subject Static load test results for the following: 48^ Ali a°°suppet §'O�E�'���bC= Mountln System Maximum Frame Maximum Frame Load Equivalent Weld Speed 5g2g ig¢g NrFW length•On.) Width'On.) (lbs/ft') (mph)" uo<u, ENO 4Nd RocRraceTilt Up 65 40 55 135 <adNi8No "[illTEST SETUP(ee shown In attached drawing Retell):Two modules,as specified above,were bolted toai less136'x.1.5k1.5' i� TOR LOAD DEFLECrON o.e/J^ $.€NN soProfessional Solar dproplietary patented Rooflampra norsupport erts.Tls using RoofTrnessembly ofl was attached Sthel(SS)bolts, � __ "ah:'<lao i<c SS lock washers and proprietary aluminum clamps and Inserts.The RoofTrace support rail was attached to the PSP Roofrrace 48' Tilt Up Kit at four attachment points.The setup was attached to 2'x6'wooden rafters using 5/1W x 3-1/2'SS lag bolts.The attachment spans consisted of 48•front to rear with structural attachments spaced 48'on center. 0 TEST PROCEDURE(as shown In attached drawing detail):The test set up was top loaded to 55 lb/ft'.The setup remained REAR VIEW e-e.,s 0 -- loaded for an approximate period of 30 minutes.The maximum deflection and any signs of permanent deformation were I.--.I in recorded.The test setup was then inverted and loaded to simulate the uplift condition.The test set up was re-loaded to 55 I I LU CP Ib/ft'.The setup remained loaded for an approximate period of 30 minutes.The maximum deflection and any signs of ton Ile U a Q a d) permanent deformation were recorded. _ z o TEST RESULTS: L M 0 N Q c The maximum top load deflection was recorded at 0.813",with no permanent deformation. 01 @ C W inZ The maximum uplift deflection was recorded at 0.563•,with no permanent deformation. �. UP LIFT DEFLECTION: s.ee1• Z a maA ~ o M W This document certifies the RoofTrace mountingsystem used with modules,as specified above,withstands a 55 lb/ft' nZ La Lir < tD Cl_ pressure load,equivalent to a wind speed of approximately 135 mph". The mounting system performed as expected. o CCN U a rn Sincerely, Attachment Options James R.Vinci,S.E. 4 RoofTraeRall .11i l This engineering report verifies that Vinci 6 Associates has provided Independent observation for load testing as described In this report. The results or this _ al l ft/ load lest reflect actual defection values end are generely adapted es the Industry Standard for tasting module mountingsystems.VinelS Associates does Till Tel Up Hardware not Odd check installations or verify that the mounting system is Installed es described M this eneneering repo. gabs�, A TleTraolt bas is K • �1 W To assist the building inspector in verIMng the authenticity of this proprietary mounting system.a permanent adhesion. I / ! I7. �eyir`I Z silver reflective'Roorrace'label.as shave tothe right.is placed on at bast one or to main support rots w (' —a Steel$4u1 SiI °( � , t� Permanently stomped with'Professional Solar Prod.Pat.#e,36o,491•on the underside of roll. II a r/ I (type varies Will spam = n / W eLCdOogt�tg',12 0a. Structural attachment tag bort enactment Should be installed using the proper pilot hole for optimum strength.A / LrMil min.,4'OC) t 5 1 6/16'lag bolt requires a 3/16'pilot holm It Is Me responsmmty of the Installer to Insure a proper attachment is mode �� ��� =3� FasuarJ®bason to the structural member of the roof.Failure to securely attach to the roar structure may resell in damage ID / nil (flashing ShOvm) WI � ' / H equipment.personal Injurycr property damage. I \ Li /' This office does not express an°Onion es to the load bearing characteristics of the structure the mounting hJ � � j' rp� .e (� "{system/modules are bring installed on. L1::CIIICNbICC accredited laboratory tested structuralatachmwn manufactured by Profs si nalSolarProducts / �•+c•�1� TileTmcS FesWaek®vdthstealstrut Os JCT 2 6 2012W cheek with local buWing department a AW for site specific requlmmenm. Nato:Roar 24^tuba can be afro ¢ p •Maddes measuringwithin stated specification,and tested to uL17o3.or equivalent.are Included In this length to decrease maximum tilt emgia F gtillengineering. I of approximately las s G I ••Wind loading values rdatfve to dere nee bed values wing wind bad exposure(135 mph for 5/12 roof i / REVIEWED FO='to' : i'• cU1 g pitch or lass:115 mph fo greater than 5/12 roof pitch)end gust factor coeffcient'exposure C as * ; •/ •`mfinedln th.2ooe(lec)/2o10(cecyRevietvee Bv: •••Moods lestex 84.6'x 391'x 18'(ahrp) • ••••Est snow load rating of 25 Lahr based err 2.0 inlay factor \ if ROOtTraCp Tilt ll v Y— i o aoolTrac°TM Up p SCALE: "o7ess nBJ Sotar AotlodePBB"�a a•d81 Solar modules II NONE Rpbvdlak mounting system Thousand Oaks, CA 91362 Static load test illustration DRAW DATE: Page 1 of 2 PSP: 'URUp Page 2 of 2 PSP: RT_Tilt Up BY: MML 9/30/12 iDRAWING TITLE: STRUCTURAL EN ONE ERIN C SPECIFICATION DRAWING SPEC 4 NUMBER: I