Loading...
13030066 (2)CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10190 S TANTAU AVE CONTRACTOR: SANCHEZ ELECTRIC, INC I PERMIT NO: 13030066 I OWNER'S NAME: TANG, CHAO YANG 1 5096 ENDENVIEW DR I DATE ISSUED: 03/13/2013 OWNER'S PHONE: 4082537553 SAN JOSE, CA 95111 PHONE NO: (408)281 -9854 ❑ LICENSED CONTRACTOR'S DECLARATION I` BUILDING PERMIT INFO: BLDG ELECT PLUMB License Class Lie. # f- MECH RESIDENTIAL COMMERCIAL Contractor Date I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self - insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signature JOB DESCRIPTION INSTALL 15 PANELS, 4.9 KW PHOTOVOLTAIC ON SFDWL ROOF TOP 4/5/2013 - REV #1 - CHANGE TO 13 PV MODULES ARE ON UPPER ROOF & 2 ON LOWER ROOF; THE SLD IS CORRECTED TO SHOW 15 MODULES(ONE STRING OF 8 MODULES & OTHER STRING OF 7);SLD INVERTER CALLS OUT FOR A 30 AMP BREAKER & SO THE 40 AMP BREAKER WAS CHANGED TO A 30 AMP: SLD ON THE AC SIDE IS #10 THHN -REV #I ISS SAME DAY Sq. Ft Floor Area: I Valuation: $24500 APN Number: 39507034.00 1 Occupancy Type: PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. Date I Issued by: ❑ OWNER- BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed. contractors to construct the project (Sec.7044, Business & Professions Code). I hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self - insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities; judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino. Municipal Code; Section 9.18. Signature Date Date: RE- ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant: Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Sections 25505, 25533, and 25534. Owner or authorized agent: Date: CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed sa eawT &ct , Dn& Zic. (?-10 #6119636 '9,4,ze 199-2„ 5096 rde"uieu a scr'c O a-40, (?,4 95111 (,Z/08) - 281 -9,95/1 • (4108) -281-8166 # Correction Notes. 1. The site plan the arrays change to 13 PV Modules are on upper roof and 2 on lower roof. 2. The SLD is corrected to show 15 modules. (One string of 8 Modules and the other string of 7) 3. Also the SLD inverter calls out for a 30 amp breaker. So the 40 amp breaker was change to a 30 amp. 4. The SLD on the AC side is #10 THHN. �'13o30v66 RIO, #� 0FFlCE COPY '4 AURORA Changing the Shope of Power Location Temperature ( °F) Amb Cell Mounting method CONTINENT North America Record Low 39 °F 39 °f Flush on roof COUNTRY United States LOCATION Average Maximum 86 °F 149 °f PVi- 5000 OUTD- US-240 Rated AC Power [kW]/ Rated AC Voltage [V] 5000 / 240 h Mppt Configuration PARALLEL MM (Num. MPPr ind.: 1) Total number of PV modules 15 Installed DC Power (STC) [kW} 4905 Notes Sunpower / E20/327 Tecnotogy STC Robed Power [M 327 Open Circuit Voltage - Voc M 64.9 Short Circuit Current - Isc [A] 6.46 Maximum Power. Voltage - Vmp M 54.7 Maximum Power Current - Imp W 5.98 Temperature Coefficient - Vac [VrC] -0.176 Temperature Coefficient - Isc [mA/°C] 3.5 ' r t.r PV Panels/String 5 n/a n/a n/a n/a n/a Number of Parallel Strings 3 n/a n/a n/a n/a n/a Total number of PV modules 15 n/a n/a n/a n/a n/a Notes n/a n/a n/a n/a Ma Installed DC Pewer (STC) [kW] 4.905 n/a n/a Na n/a n/a Maximum Power/MPPT [kW] 5.15 n/a n/a n/a n/a n/a Load Factor/MM [%1 95.24% n/a n/a n/a n/a nla PV Panel Max System Voltage (VdQ 1000 n/a n/a n/a n/a n/a Inverter Maximum Input Voltage [Vdc] 600 n/a n/a n/a n/a n/a String Open Circuit Voltage @WF [Vdc] 343 n/a n/a n/a n/a n/a String Open Circuit Voltage (8149 °F [Vdc] 289.3 n/a n/a n/a n/a n/a Inverter Activation Voltage (default) [Vdc] 200 n/a n/a n/a n/a n/a Inverter Reccomended Activation Voltage [Vdc] Default (200) n/a n/a n/a n/a n/a String Max Power Voltage @3rF [Vdc] 288.9 n/a I n/a n/a F n/a n/a String Max Power Voltage @UWF [Vdc] 247.8 n/a n/a n/a n/a n/a String Max Power Voltage @1"'F [Vdc] 244.1 n/a n/a n/a n/a n/a Inverter MPP Operating RwkW [Vdc] 140.530 n/a n/a n/a n/a n/a PV Array Max Short Circuit Ctur. OL49 °F [Adc] 19.8 n/a n/a n/a n/a n/a Inverter Max Short Circuit Current!MM [Adc 44 n/a n/a n/a n/a n/a PV Array MPP Current @2WF (Adc] 18.4 n/a n/a n/a n/a n/a Inverter Max MPPT Input Current [Adc] 36 Ma n/a n/a n/a n/a Nabs Explain I Range for MPPr operation considering the voltage default activation ww power -one. som ELECTRICAL GENERAL NOTES 1. ALL ELECTRICAL WORK TO COMPLY WITH 2009 INTERNATIONAL BUILDING CODE, 2010 CALIFORNIA BUILDING CODE, 2010 CALIFORNIA GREEN BUILDING CODE, 2, ALL ELECTRICAL WORK TO COMPLY WITH 2008 NATIONAL ELECTRICAL CODE, 2010 CALIFORNIA ELECTRICAL CODE. 3. ALL ELECTRICAL WORK TO COMPLY WITH 2010 CALIFORNIA FIRE CODE, 20081NTERNATIONAL FIRE CODE. 4. ALL ELECTRICAL WORK TO COMPLY WITH 2ODB NEC & 2010 CEC ARTICLE 800 FOR HAZARDOUS LOCATIONS. 5. ALL ALARM SYSTEMS WILL REWIRE SEPARATE PERMIT AND PLAN REVIEW FROM FIRE DEPARTMENT B. ACCESSB&ITY OF ALL CONTROL OR SWITCH INSTALLATIONS INTENDED TO BE USED BY THE OCCUPANT OF THE ROOM OR AREA TO CONTROL LIGHTING AND RECEPTACLE OUTLETS, APPLIANCES OR COOLING, HEATING AND VENTILATING EQUIPMENT, SHALL BE LOCATED NO MORE THAN 48 INCHES MEASURED FROM THE TOP OF THE JUNCTION OR DEVICE BOX NOR LESS THAN 15 INCHES MEASURED TO THE BOTTOM OF THE JUNCTION OR DEVICE BOX ABOVE THE FINISHED FLOOR PER IBC ARTICLE 1106.3.3. 7. WHERE ACCESS FOR PEOPLE WITH PHYSICAL DISABILITIES IS 18 INCHES TO THE CENTER OF RECEPTACLE OUTLETS ON BRANCH CIRCUITS OF 30 AMPS OR LESS AND COMMUNICATION SYSTEM RECEPTACLES SHALL BE LOCATED NO MORE THAN 48 INCHES MEASURED FROM THE TOP OF THE RECEPTACLE OUTLET BOX OR HOUSING NOR LESS THAN 15 INCHES MEASURED TO THE BOTTOM OF THE RECEPTACLE OUTLET BOX OR HOUSING ABOVE THE FINISHED FLOOR PER IBC ARTICLE 1105.3.3. 8. ALL CEILING MOUNTED ELECTRICAL DEVICES AND /OR EQUIPMENT SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE, NOT FROM THE CEILING TILES, PROVIDE SUPPORTS AS REQUIRED, 9. VERIFY EXACT LOCATION OF ALL MECHANICAL EQUIPMENT PRIOR TO INSTALLATION OF CONDUITS AND CONNECT AS REQUIRED. 10, ALL ELECTRICAL DEVICES AND EQUIPMENT OF ROOF & OUTDOORS SHALL BE WEATHERPROOF. A WP -GFCI WEATHER -PROOF PROTECTED RECEPTACLE SHALL BE INSTALLED WITHIN 25'-0' OF ALL NEW HVAC AND VENTILATING EQUIPMENT ON THE ROOF. 11. ALL DISCONNECT SWITCHES FOR PACKAGED MECHANICAL EQUIPMENT SHALL BE WITH DUAL ELEMENT FUSES AND SHALL BE SIZED BY UNIT LABEL. AND SHALL BE WITHIN SIGHT OF EQUIPMENT OR AS APPROVED BY BUILDING INSPECTOR. 12. BACK TO BACK OUTLET BOXES INSTALLED IN ONE -HOUR FIRE -RATED ASSEMBLY SHALL BE SEPERATED HORIZONTALLY BY A MINIMUM OF 24 INCHES BETWEEN THE OUTLET BOXES. THE MAXIMUM PENETRATION OF THE ONE-/DUR FIRE -RATED ASSEMBLY SHALL BE 100 SQUARE INCHES WITHIN 100 SQUARE FEET AND NO PENETRATION SHALL BE LARGER THAN 16 SQUARE INCHES. 13. ALL WIRING SHALL BE IN APPROVED RACEWAYS. ALL CONDUCTORS SHALL BE STRANDED COPPER WITH THHW rHWN INSULATION. 14. ALL GROUNDING SHALL BE IN ACCORDANCE PER NEC & DEC ARTICLE 250, e) A GROUNDING ELECTRODE SHALL BE BONDED TO THE GROUNDING ELECTRODE b) EXPOSED INTERIOR STRUCTURAL STEEL THAT IS INTERCONNECTED TO FORM A STEEL BUILDING FRAME SHALL BE BONDED TO THE SERVICE EQUIPMENT ENCLOSURE, THE GROUNDED CONDUCTOR AT THE SERVICE, THE GROUNDING ELECTRODE CONDUCTOR WHERE OF SUFFICIENT SIZE, OR TO THE ONE OR MORE GROUNDING ELECTRODES USEG. THE BONDING JUMPER SHALL BE SIZED IN ACCORDANCE WITH TABLE 250.68 OF THE 2ODS NATIONAL ELECTRICAL CODE & 2010 CEC. THE POINT OF ATTACHMENT OF THE BONDING JUMPER SHALL BE ACCESSIBLE. c) WHERE THERE IS SEPARATELY DERIVED SYSTEM USING A GROUNDING ELECTRODE. THE NEAREST AVAILABLE POINT ON THE INTERIOR METAL WATER PIPING SYSTEM IN THE SEPARATELY DERIVED SYSTEM SHALL BE BONDED TO THE GROUNDED CONDUCTOR OF THE SEPARATELY DERIVED SYSTEM. 15. ALL ELECTRICAL PANELS AND SERVICE EQUIPMENT TO BE ANCHORED PER NEC & CEC ARTICLE 110.13 AND HAVE ACCESS AS PER NEC & CEC 110.28. 18. ALL MECHANICAL AND ELECTRICAL EOUIPMENT SHALL BE LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY AND PROPERLY LABELED PER CEC 110.2 ANY EQUIPMENT NOT LISTED WILL BE REQUIRED TO BE FIELD TESTED AND CERTIFIED BY AN APPROVED TESTING AGENCY OR THILD PANTY. IT IS THE RESPONSBLITY OF THE OWNER AND HIS DESIGW CONSTRUCTION TEAM TO NOT THE BUILDING DEPARTMENT IF FIELD TESTING IS REQUIRED FOR ANY EQUIPMENT WITHOUT A UL OR EQUIVALENT LISTED LABEL APPROVED BY THE BUILDING DEPARTMENT. PROOF OF EQUIPMENT CERTIFICATION WILL NEED TO BE SUBMITTED AND APPROVED BEFORE A CERTIFICATE OF OCCUPANCY CAN BE ISSUED. 17, THE OVERCURRENT PROTECTION OF TRANSFORMER SECONDARY CONDUCTORS SHALL BE LOCATED ON THE SECONDARY SIDE OF THE TRANSFORMER AND NO MORE THAN 10 FEET OF SECONDARY CONDUCTOR BEFORE TERMINATING ON THE OVERCVRRENT DEVICE. THE TRANSFORMER SECONDARY CONDUCTORS' AMPACITY SHALL BE EQUAL TO OR GREATER THAN THE RATING OF THE OVERCURRENT DEVICE DEFINED IN SECTION 240.8, NEC 2010. PLUG -IN TYPE OVERCURRENT PROTECTION DEVICES OR PLUG4N TYPE MAIN LUG ASSEMBLIES THAT ARE SACKFED AND USED TO TERMINATE FIELD -INSTALL. UNGROUNDED SUPPLY CONDUCTORS SHALL BE SECURED IN PLACE BY AN ADDITIONAL FASTENER THAT REQUIRES OTHER THAN A PULL TO RELEASE THE DEVICE FROM THE MOUNTING MEANS ON THE PANEL CARD. 18. WHERE MORE THAN ONE NOMINAL VOLTAGE SYSTEM EXISTS IN A BUILDING, EACH UNGROUNDED SYSTEM CONDUCTOR SHALL BE IDENTIFIED BY PHASE AND SYSTEM. THE MEANS OF INDENTIFICATION SHALL BE PERMANANTLY POSTED AT EACH BRANCH CIRCUIT PANELSOARD PER 2010 DEC & 20DB NEC ART. 210.5(C) & 215.12. THE PHASE COLOR CODING OF THE INSULATION OF CONDUCTORS SHALL BE: e) BROWN - PURPLE -YELLOW FOR 480(177- VOLTS. b) SACK- RED -BLUE FOR 208/120, VOLTS . 19. ALL UPS (UNINTERRUPTED POWER SUPPLY) BATTERY CABINETS SHALL BE IN ACCORDANCE WRH ARTICLE 808.1 & 608.7608.9 OF THE 2070 CFC. THE TOTAL ELECTROLYTE IN EACH UPS BATTERY CABINET OF MORE THAN 50 GALLONS SHALL COMPLY WITH THE 2010 CFC TABLE 608.1 AND ARTICLE W8.1. PROVIDE SGNAGE FOR UPS BATTERIES PER 2010 CFC SECTION W8.7.1. 20. ELECTRICAL INSTALLATION SHALL BE IN ACCORDANCE WITH ARTICLE 6450E ELECTRICAL CODE, WIRING, DISCONNECTING MEANS, PENETRATION OF FIRE RESISTIVE BOUNDARY. 21, PROVIDE DISCONNECTING MEANS IN INDOOR LOCATIONS- OTHER THAN DWELUNGS AND ASSOCIATED ACCESSORY STRUCTURES. FLUORESCENT LUMINAIRES (FIXTURES) THAT UTILIZE DOUBLE -ENDED LAMPS AND CONTAN BALLAST(S) THAT CAN BE SERVICED IN PLACE OR BALLASTED LUMINAIRES THAT ARE SUPPLIED FROM MULTIWIRE BRANCH CIRCUITS AND CONTAIN BALLAST(S) THAT CAN BE SERVICED IN PLACE SHALL HAVE A DISCONNECTING MEANS EITHER INTERNAL OR EXTERNAL TO EACH LUMINAIRE (FIXTURE), TO DISCONNECT SIMULTANEOUSLY FROM THE SOURCE OF SUPPLY ALL CONDUCTORS OF THE BALLAST, INCLUDING THE GROUNDED CONDUCTOR IF ANY. THE LINE SIDE TERMINALS OF THE DISCONNECTING MEANS SHALL BE GUARDED, THE DISCONNECTING MEANS SHALL LOCATED SO AS TO BE ACCESSIBLE TO OUALIFIED PERSONS BEFORE SERVICING OR MANTAINING THE BALLAST. PER 2000 NEC SECTION 410.73(G). 22. WHERE GROUNDED CONDUCTORS OF DIFFERENT SYSTEMS ARE INSTALLED IN THE SAME RACEWAY. CABLE, BOX, AUXILIARY GUTTER, OR OTHER TYPE OF ENCLOSURE, EACH GROUNDED CONDUCTOR SHALL BE INDENTIFIED BY SYSTEM PER 2010 CEC & 2008 NEC ART. 2D0.6(D). THE COLOR CODING OF THE INSULATION OF CONDUCTORS SHALL BE: a) GRAY FOR 480/277- VOLTS. b) WHITE FOR 20&1120- VOLTS. 23. ALL SWITCHBOARDS, PANEL BOARDS, INDUSTRIAL CONTROL PANELS AND MOTOR CONTROL CENTERS SHALL BE FIELD MARKED WARNING QUALIFIED PERSONNEL OF THE POTENTIAL ARC FLASH HAZARDS AND THE APPROPRIATE PPE REWIRED PER 2008 NEC ART, 110.15 AND NFPA- 70E -2W9. it -__,- .`= i SITE LOCATION (N) PV Modules N T p reek BNd LL 9ra 4 U m Lu w- CrM AV lh TANG RESIDENCE 10190 S TANTAU AVE CUPERTINO, CA 95014 \- (E) 200A 240V Electric Panel (N) String Inverter Stevem Creek Blvd Stevens Creek BIvC W N fi s� 101ep 1�`° Lme Ave 107 9 x "ate cemgIT� Sage At CuperlM In O da.7Nar � W 1FA� AvP. (E) Skylight OFFICE COPY .w. �,YT ysyf �8�' ✓tee'• -7 M1 T it syp+,� 1Yae "\KO ,..i APR U5 2013 F. DAIEDVU�C,001� By: (N) PV Modules C. ,- WUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION - CUPERTINO APPROVED This set of plans and specifications MUST be kept at the job site during construction. It is unlawful to make any changes or alterations on same, or to deviate therafrom, without approval from the Building Official. The stamping of this plan and soe ifIcations SHALL NOT be held to permit or to be a proval of the violation of provisions o Ity Ordinance or State Law. PROJECT SCOPE THE PURPOSE OF THIS PROJECT IS TO INSTALL A ROOF MOUNTED 4.9KW -DC (4.2 KW- CEC -AC) PV SYSTEM IN THE RESIDENCE. DRAWING INDEX Pv -1 SITE PLAN (GENERAL NOTES, DRAWING INDEX & PROJECT SCOPE) PV -2 ROOF & DETAILS PLAN PV -3 WIRING PLAN PV-4 EQUIPMENT SPECS Pv -5 SINGLE LINE DIAGRAM PV-6 LABELS PV -7 CLEARANCE PLAN Sanchez Electric Inc 5096 Edenview Drive. San Jose, CA. 95111 C -10, B #649637 TANG RESIDENCE 10190 S TANTAU AVE CUPERTINO, CA 95014 P R O J E C T: 4.9 KW -DC PV SYSTEM 1851158 $ R5h01015 Dab bon B, 3/12/2013 CITY POW PNC SITE PLAN Projed No.: FAegme: TANG 3122013. Sole: N.T.S. Drv6i9 No.: Pv1 (E) Rafters LOWER ROOF (N) PV Panels locatio 2" x 6" Rafters @ 24' Max S' L nsupported Span c TYP ._ t SolarMount Mid Clamp Part No. 302101C, 302101D, 302103C, 302104D, 302105D.302106D Mid Clamp Beam �F ral0i.Fs cri 510 ed roo SolarMount End Ciwiip ...,.......... � : yp. 281 UGC -I Array Mounting Information: Roof Material: Spanish Tile Roof Pitch: 7/12 Module Dimension: 41.18" x 61.39" Module Square Area: 17.56 Sq. Ft. Module Weight- 41.0 Lb ea. Module Weight for Sq.Ft.- 2.33 Lbs /Sq.Ft. Array Total Sq. Ft.: 15 x 17.56 SgzF., — . S F' Overall Load: 15 x 41.0 Lbs �1 b Number of Attachment Points- 28 Load per point- 595.26 Ibs / 28'ea = 21.96 Ibs /poi'nt PV module _ - guides OLI UL 5n de d 40 Part No. 302001C, 302002C, 302002D, 302003C, 302003D, 302004C, 302004D, 302005C, 302005D, 302006C, 3020061), 302007D. 302008C, 302008D, 302009C, 302009D, 302010C, 302011C, 302012C ►X Clamp D Figure I. SlideUGGI grounding dip into top mounting slot of rail. Torque modules in place on top ofclip. Nibs will penetrate rail anodization and create grounding Penh through rail. SolarMount L -Foot Part No. 304000C, 304000D Y .x as Top I motmm9 clamps I I 1 i i i Nndv!e T -bolt - —x UGC-1 = SolaMatinIS rcd (any type) 3o/t L -Foot APR 0 5 2013 W E E B L U g Figure 2. Insert a bolt in the e aluminum rail or thro h the fiatwas er. acet estainlesssteel flat washer on the bolt, oriented aluminum rail. Place the lug l^. portion on the bolt and stainless ((�r�steel flat washer. Install stainless steel flat washer, lock washer and nut Tighten the nut until the dimples are completely embedded into the rad and hug. The embedded dimples make a gas - Stairless Steei Rat tight mechanical connection and Wasner I W EEB) ensure good electrical connection between the aluminum rail and the lug through the WT11. WEEBLug �.�►'��� SolatMount® rail ; anytypei 1 ..ate ..wrde`I✓ Fr 11 1 30 0 i RACKING COMPONENTS jr NOrINCLUCED i l J 4, N C10 649637 4 06/30yz \F �4r�FCTR \GPo�i Sanchez Electric Inc 5096 Edenview Drive. San Jose, CA. 95111 C -10, B #649637 TANG RESIDENCE 10190 S TANTAU AVE CUPERTINO, CA 95014 P R O J E C T: 4.9 KW -DC PV SYSTEM bsues h RV." Bate Issue BY 3/12/2013 MY PEW PNc ROOF & DETAILS P LAN Project No.: Fkmme: TANG 312Yo13A•g Goarl*": Dra"i.g 14m: PV2 ��tllO • •• N C10 649637 4 06/30yz \F �4r�FCTR \GPo�i Sanchez Electric Inc 5096 Edenview Drive. San Jose, CA. 95111 C -10, B #649637 TANG RESIDENCE 10190 S TANTAU AVE CUPERTINO, CA 95014 P R O J E C T: 4.9 KW -DC PV SYSTEM bsues h RV." Bate Issue BY 3/12/2013 MY PEW PNc ROOF & DETAILS P LAN Project No.: Fkmme: TANG 312Yo13A•g Goarl*": Dra"i.g 14m: PV2 (11"AWO BARE GROUNDING COI (6) #10 AWG USE -2 PV CABLE SUNLIGHT RESISTANT WIRE IN 1 "EMT CONDUIT 5 SUNPOWER MODULES E20 -327 (3 STRINGS TOTAL) Note #4 (3) #10 AWG THHN CU WIRE C##6 :SAR:ECU GROUNDING CONDUCTOR IN (1) 1" EMT CONDUIT NOTES. 1. ALL SUPPLIED EQUIPMENT IS IL OR CSA LISTED. 2. EQUIPMENT TO BE INSTALLED PER LISTING OR LABELING AND 2010 CBC, 2010 CEC AND 2008 NEC REQUIREMENTS. 3. ALL PV MODULES ARE CERTIFIED TO MEET UL 1703 STANDARDS AND HAVE A CLASS C FIRE RATING. 4. PROVIDE MODULE MARKING PER NEC 960.51 -53 5. PROVIDE PERMANENT PLAQUE / DIRECTORY INDICATING THE LOCATION OF THE SERVICE DISCONNECT AND THE PV SYSTEM DISCONNECT IF BOTH ARE NOT INSTALLED ON THE SAME LOCATION. 6. INSTALLATION SHALL BE PROVIDED BY A CALIFORNIA LICENSED CONTRACTOR (B, C-46 OR C10). 7, BUILDING WITH STAND ALONE SYSTEMS SHALL HAVE A PLACARD INDICATING THAT IT IS A STANDALONE SYSTEM AND SHALL SHOW THE LOCATION OF THE DISCONNECTING MEANS. OR 8. BUILDINGS WITH UTILITY SERVICES AND A PV SYSTEM SHALL HAVE A PLAQUE OR DIRECTORY INDICATING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PV SYSTEM DISCONNECTING MEANS. 9. ANY SOLAR STRUCTURE THAT REQUIRE VARIATION FROM THE SETBACK OR HEIGHT RESTRICTION OF THE R1 ORDINANCE MAY BE ALLOWED WITH A MINOR RESIDENTIAL PERMIT (PER SECTION 19.28.090). SOLAR INSTALLATIONS MAY NOT RESULT IN PRIVACY IMPACTS, SHADOWING, INTRUSIVE NOISE OR OTHER ADVERSE IMPACTS TO THE SURROUNDING AREA SOLAR MODULE PTC OUTPUT CALCS, SUNPOWER 327W MODULE (E20 -327) 15 MODULES X 301.4 W (ptc) /Module X 0.965 = 4.36KW (ptc) ARRAY CALCULATIONS: U P <E> 200A MAIN SWITCHBOARD 200A 120/240V 3Wire UTILITY lzoizcov METER 2PH -w 200A / 2PH Note #3 30A /2PH .vqC d APR D 5 2013 <E> GROUNDING ELECTRODE �E,q,� p G P�R i,ec j`.14,n Fart�`.'.1OR'� �Er.!!'ITrrL 6 NCE , �.�.ViL 4i�t_- , ARRAY CONSIST OF 15 EA. SUNPOWER 327W 2 STRINGS: ONE OF 8 MODULES AND THE OTHER ONE OF 7, 1 INVERTER CONTINUOUS POWER OUTPUT = 15 EA. X 327 W = 4905 W Voc = 8 X 64.9VDC X 1.14 = 591.88 VDC (max. per string) Ampacity Required for DC Conductors = 6.46A X 1.16 X 1.25 = 9.37A Ampacity Proposed Conductor 912 USE -2 Cable = 30A x 80% (Fill Factor) x 67% (ambient temp. derate) = 16.0 Amps Ampacity Required for AC Conductors =4905W / 240V X 1.25 = 25.54 Amps Ampacity Proposed Conductor #10 THHN =40A X 100% (Fill Factor) X 67% j (ambient temp. derate) = 26.8 Amps * O C10 649637 �9rF �FCTR�% Sanchez Electric Inc 5096 Edenview Drive. San Jose, CA. 95111 C -10, B #649637 TANG RESIDENCE 10190 S TANTAU AVE CUPERTINO, CA 95014 P R O J E C T: 4 -9 KW -DC PV SYSTEM Issues $ R"i ioae Date Issue By 3/12 /2013 Ott POW Pw PV WIRING PLAN Rnjeat M.: Fienanlx TANG 312201&* Drawnq No.: PV3 MODEL: SPR- 327NE -WHT -D ELECTRICAL DATA .-- d:saMmtl Y,•C,d- IS'e;: m.aa,ud WOW /m+, tun,.s,,-d rd wmpNrsu.-e Peak Power ( +5/.3 %) Pmax 327 W Cell Efficiency n 22+5% Panel Efficiency n 20.1 e Rated Volrage Vmpp 547V Rated Current Impp 5.98 A Open Circuit Voltage Voc 64.9 V Shod Circuit Current Isc 646A Maximum System Voltage UL 600 V Temperature Coefficients Power (PI - 0.38%//K Voltage (VaI - 176.6mV /K Current Ilse) 3.5mA/K NOCT 45" C +/- 2" C Series Fuse Rating 20 A Grounding Positive grounding not required MECHANICAL DATA Solar Cells 96 SursPoxver Maxeor" cells Front Glass Hig"ansmission tempered glass with anti- reflective (AR) coating Junction Box IR-65 rated with 3 bypass diodes Dimensions 32 x 155 x 126 mm Output Cables 1000 mm cables / Mul<onoct IMC4) conneclors Frame Anodized aluminum alloy ype 6063 Iblack) Weight 41.0Ibs (18.6 kgl Mrs IN - MCUNDNG HOLES 15)- 5RCUNDN O-Es (IN) 12X 06.6126) 10X 04.21. 71 IN CURVE 7 6 10oDw /rut 5 a 4 � 3 V 2 0 0 10 20 30 40 50 60 70 Voltage IV) Currant /ro8og. choradedsecs with d.pe„dence on irrod nd ,nod.6 w,npembre. TESTED OPERATING CONDITIONS Temperature -40' F to +185" F 1-40'C to + 85` C) Max load 113 psf 550 kg /m% (5400 Pal, hunt (e.g. snow) w /specified mounting configurations 50 psf 245 kg /m' 12400 Pal front and back le.g. wind) Impact Resistance HWIL (25 mml at 51 mph (23 m/s) ,,/VARRANIIFS ANTI) CFRIIFICAIIONS Warranties 25 -year limited power warranty 10 -year limited product warranty Cedificclions Tesled to UL 1703. Class C Fire Rating DIMENSIONS I- 1 -I. Please read safety and installation instructions before using this product, visit sunpowercorp.com for more details. D2111 SuAo.. Cupwaioo. SUNPOV&R, be Sa R,rw i«p. and TNL WORLDS STAMAM fOR SCIM, ad M&XECN. .d-6 w s u n powe rcorp. c o m .11.4.- Co,pamon in Fe US cad Doer x-. m -1. 4 R,¢n Rnnwd. Spedcm.m tided a ri death¢¢, Dc.,, -, 400I6544 R.'a I IR-EN csIr 1-1 PV MODULE Nominal Output Power W 5000 6000 - , < OF•CAL \F`1 Maximum Output Power W 5000 6000 Rated Grid AC Voltag. V 708 740 277 208 240 .,. Input Side (OCI Number of Independent MPPT Channels 1 Maxim um Usable Power for Each Channel W 4000 4000 Sanchez Electric Inc Absolute Maximum Voltage :Vmax1 V 600 600 5096 Edenview Drive. Start. Up Voltage l Vstart) Full Power MPPT Voltage Range V V 200 (adj. 120-350) 200 (ad} 120.350) 200530 200-530 San Jose, CA. 95111 Operating MPPTVoltag. Rang. V 0.7xVstart-580 0.7xVstart-580 Maximum Currant Ddcmax) for both MPPT In Parallel A 36 36 C -10, 13 #649637 Maximum Usable Current per Channel A 16 18 Maximum Short Circuit Current Limit per Channel A 22 72 Number of Wlre Landing Terminals Per Channel 2 Pairs 2 Pairs Array Wiring Termination Terminal block, Pressu re Clamp. AWG8mAWG4 Output Sid* (AC) Grid Connection Type 1012W Splh 013W 1012W 1012W SplIT O /3W 1012W Adfus(ableVoltage Rang,;Vmin -Vmaxl V 183 -228 211.264 244 -304 183 -228 211 -264 244 -304 Grid Frequency Hz 60 60 TANG RESIDENCE Adjustable Grid Frequency Range Hz 57-60.5 57 -60.5 10190 S TANTAU AVE Maximum Current Uacmax) A- 27 23 20 30 28 24 CUPERTINO, CA 95014 Power Factor '0.995 > 0.995 Total Harmonk Distortion At Rated Power % <2 <2 Contributory Fault Current" A./A- 36.25125.63 36.5/25.81 31.1511145 36.25/25.63 365125.81 31.75122A5 Grid Wlring Termination Type Terminal block Pressure Clamp, AWG8 AWG4 Pretectlan Devlces Input Reverse Polarity Protection Yes Yes Over Voltage Protectlon Type VarlSlor, 2 for each channel Vadsto, 2 for each channel P R O J E C T: PV Array Ground Fault Detection Pre start up Also and dynamic GFDI Pre start up Niso and dynamic GI-DI :Requires Floating Arrays) (Requires Flaming Arrays) output 4.9 KW -DC PV SYSTEM Anti Islanding Protection Meets UL 17414EE1547 requirements Meets UL 1741/EE1547 requirements Over - Voltage Protector Type Vadslar, 2(1111 L, - G) Varistor, 2(L. -L; 7L, -G) Maximum AC OCPD Rating A 35 30 25 40 35 30 Efaclency Maximum Efficiency % 97.1 97.1 CEC Efficiency % 96 96.5 96.5 96 965 96.5 Operating Performance stand -by Consumption Wxs, <8 <8 Night time consumption W., <(16 <06 Issues k Revisions Communication Dote 1-, User Interface 16charactersx2 lines LCDdlsplay 3/12/2013 CITY PERNII Ikti Remote Monitoring (1xRS485 Ind.) AURORA- UNIVFRSAI (opt.) Wired Local Monitoring II xRS48S Incl.) PVI- USB -RS485 232(opt.), PVI- DESKTOP (op1.) Wireless Local Monitoring PVI-DE5KTOP (opt.) with PVl- RADIOMODULE(opt.; - -- - - Environmental -- - - AmblestAirOp erating Temperature Fla nge 'F( °C) -13 to +140(-25 to +60) •131`0+140(-25to+W) - -- - -- with detaining above 122 (50) - _.... Ambient Air Storage Temperature Range 'FI °CI -40 to 1761.40 to +80) -40 to 176( -4010 +801 Relative Humid sty %RH 0100 condensing 0100 condensing Acoustic Noise Emission Level db(A)Olm <so <50 Maximum Operating Altitude without Oerating R(m) 6560(20001 6560120001 Mechanical Specifications Enclosure rating NEMA 4X NEMA 4X Cooling Natural Convection Natural Convection DlmensWns :H x W x DI in (mm) 41.4 x 12.8 x 86(1052 x 325 x 218) Weight Ib(kg) <. 59.5127.01 <59.5127AI Shipping Weight lb(kg) <78(35A) <78(35.4) Mounting System Wall bracket Wall bracket - Conduit Connections Trade Sire Kos:(2ea x 1 /2') Trade Size Kos: (2m x 1/21 and (tea x 1 -1/413 places side, front, rear) and (tea x 1 -1 /4; 3 places side, front, rear) DC Switch Rating JPor C.nta,I) AN 25/600 25/600 Safety Isolation Level Transformerless(Floating Arrays Transformerless(Floating Array) Safety and EMC Standard UL 1741, CSA -022.2 N. 107.1 -01 UL174I.C5A C22.2N.107.1.01 Safety Approval ,CSA„ ,CSA„ Warranty Standard Warranty years 10 10 - Extended Warranty years 15 &20 15 &20 Available Modals Standard - WIth OC Switch - Floating Amy PIA- 50WOUTD -US PV1-60DP0UTD -US - 'xll nail ksaw t0:Nnge wrn.ul rorxe immn ran aeny I11 rnA, --1.8- viii open C EQUIPMENT a <y` `� �,r�.,�. SPECS INVERTER -`` Y 1 _ APR I' wry I/� 1 N _.._. y... f1lf `e J F.o 13 Filename: TANG 3122013.dwq ..�_. -_. Scale; N.I.S. Description: - J�LL �C1S�ri Drawing No _ L.t'll hl� P V 4 OFFICE q == OPY�. UTILITY SERVICE 2�" 7-11-1 IN cl, A PR U 5 2013 AJPLAN 'FC Sanchez Electric Inc 5096 Edenview Drive. San Jose, CA. 95111 C-10,B #649637 TANG RESIDENCE 10 190 S TANTAU AVE CUPERTINO, CA 95014 P R 0 J E C T: 4.9 KW-DC PV SYSTEM D* bm 81 311VM13 C" KW— FIC SINGLE LINE DIAGRAM PMIW ft. Filwom' WE 317101 drg So* US Dwmipft: *m* ft-. PV5 LABEL FOR INVERTER DC DISCONNECT: LABEL ON ALL RACEWAYS: All markings to be 3/8" letter height on a red background with white letters, all capitals on a weather resistant material 040pyi LABELS AT MAIN PANEL: 1.4 C, APR U 5 2013 Sanchez Electric Inc 5096 Edenview Drive. San Jose, CA. 95111 C-10. B #649637 TANG RESIDENCE 1( 10190 S TANTAU AVE CUPERTINO, CA 95014 P R 0 J E C T 4.9 KW-DC PV SYSTEM I.— & Reasons Date I— Ity 3Z12/2013 CITY PERMIT PNC LABELS Project No, Rem— TANG 3122013Aq Scale: N.T.S. Dmriptime: Drawing N., PV6 3 Ft. --� SCALE: 1/2" - 1' 3 Ft. 7 Ft. kyl ig Correction Notes Note #1: New Panel Location Note #2: 15 Modules total Note #3: 30 amp breaker Note #4: Wire #10 3 Ft. 26 Ft. Note #1 A ISC APR 0 a 2013 .1 r 3 Ft. Sanchez Electric Inc 5096 Edenview Drive. San Jose, CA. 95111 C -10, B #649637 TANG RESIDENCE 10190 S TANTAU AVE CUPERTINO, CA 95014 P R O J E C T: 4.9 KW -DC PV SYSTEM 1.�, a awran ode rw» � 3111/2013 f11Y PM pw CLEARANCE PLAN Rood Na: Fiaoft, T" 311P01"" Daiafplim: Dtawig PVC