11050090 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10648 MAPLEWOOD RD CONTRACTOR:GORMAN ROOFING PERMIT NO: 11050090
SERVICES,INC
OWNER'S NAME: ESSEX PROPERTY TRUST 2229 E UNIVERSITY DR DATE ISSUED:05/23/2011
i ER'S PHONE: PHOENIX,AZ 85034 PHONE NO:(602)262-2423
❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG ELECT PLUMB
License Class C 31 Lic.# 2 N -1
,� MECH f— RESIDENTIAL r COMMERCIAL r
Contractor 0 Ko .1� o® Date a 3 )
I hereby affirm that I am licensed unde the provisions of Chapter 9 JOB DESCRIPTION:APT A-D-RE-ROOF OVERLAY EXISTING ROOF WITH
(commencing with Section 7000)of Division 3 of the Business&Professions POLYURETHANE FOAM CLASS A 27SQ
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$9450
permit is issued.
APPLICANT CERTIFICATION APN Number:31643004.10648 Occupancy Type:
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR
granting of this permit. Additionally,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION.
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18.
as 3 �� Issued by: Date:
Signature Date
G OWNER-BUILDER DECLARATION
RE-ROOFS:
I hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material berg installed.If a roof is
the following two reasons: installed without first obtaining an inspection,I agree to remove all new materials for
1,as owner of the property,or my employees with wages as their sole compensation, inspection.
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code) Signature of Ap icant: Date:
I,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three
declarations: HAZARDOUS MATERIALS DISCLOSURE
I have and will maintain a Certificate of Consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the
performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain
I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material.
Additionally,should I use equipment or devices which emit hazardous air
permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will
I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
not employ any person in any manner so as to become subject to the Worker's Health&Safety Code,Sections 25505,25533,and 25534.
Compensation laws of California. If,after making this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must Owner or au i d agent:
forthwith comply with such provisions or this permit shall be deemed revoked. Date:
CONSTRUCTION LENDING AGENCY
APPLICANT CERTIFICATION
I hereby affirm
I certify that I have read this application and state that the above information is firm that there is a construction lending agency for the performance of�wrk's
correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.)
to building construction,and hereby authorize representatives of this city to enter Lender's Name
upon the above mentioned property for inspection purposes.(We)agree to save
inify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address
and expenses which may accrue against said City in consequence of the
granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18. I understand my plans shall be used as public records.
Signature Date Licensed Professional
CITY OF CUPERTINO
3 ITEMS OF 36 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec: Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . : 31643004 . 10648
DATE ISSUED. . . . . . . : 05/23/2011
RECEIPT #. . . . . . • • • : BS000013530
REFERENCE ID # . . . : 11050090
SITE ADDRESS . . . . . : 10648 MAPLEWOOD RD
SUBDIVISION . . . . . . .
CITY CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : ESSEX PROPERTY TRUST
ADDRESS . . . . . . . . . . : 925 EAST MEADOW DR
CITY/STATE/ZIP . . . : PALO ALTO, CA 94303
RECEIVED FROM . . . . : GORMAN ROOFING
CONTRACTOR DANIEL J GORMAN LIC # 32440
COMPANY GORMAN ROOFING SERVICES, INC
ADDRESS 2229 E UNIVERSITY DR
CITY/STATE/ZIP . . . : PHOENIX, AZ 85034
TELEPHONE . . . . . . . . : (602) 262-2423
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BCBSC VALUATION 9,450 .00 1. 00 0. 00 1. 00 0 . 00
1BSEISMICR VALUATION 9,450 . 00 0 . 95 0 . 00 0 .95 0. 00
1REROOFRES SQ FEET 27 .00 351. 00 0. 00 351. 00 0 .00
---------- ---------- ---------- ----------
TOTAL PERMIT 352 . 95 0. 00 352 . 95 0 .00
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ---------
309 EXTERIOR LATH 311 SCRATCH COAT
600 PRE-INSPECTION 601 ROOF TEAR OFF
602 ROOF PLYWOOD NAIL 603 ROOF BATTENS
604 ROOF IN-PROGRESS 605 FINAL REROOF
REROOF PERMIT APPLICATION �G�O
COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION
10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 �\
(408)777-3228• FAX(408)777-3333 • buildingp_cupertino.org
CU P E.RTINU 11
PROJECT ADDRESS APN# 3( [
(4,2:)o
(�C)
OWNER NAS r PHONE � E-MAIL
STREET ADDRESS ] CITY, STATE,ZIP �110
APPLICANT N PHONE E-MAM
bo 1-7 57-1 o3 q*WAW9coV-ru6-Sr i-icEs 0�
STREET ADDRESS D CITY,STAI c `) FAX _3"7
❑OWNER ❑OWNER-BUILDER ❑ OWNER AGENT LYl CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT
CONTRACTOR NAV¢Gn n` LICENSE NUMBER y LICENSE TYP9E BUS.LIC.#
K y
COMPANY NAME E-MAIL FAX
STREET ADDRESS ' C u�e Com• �C O l� IJ£ j PHONE 1� Q-7 S
ARCHITEC-MENGINEERNAME LICENSE NUMBER 7 J y BUS.LIC.#,( (1
COMPANY NAME E-MAII FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
USE OF ❑ SFD or Duplex ulti-Family ROOF AREA: / VALUATION:995 ,0
STRUCTURE: ❑ Commercial
EXISTING ROOF T.PE: R BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES ❑OTHER(SPECIFY)
REMOVE/REPLAC9 El YES IF NO, PLYWOOD Yn" ❑ PLYWD ❑ OSB PITCH: ROOF
hd_NO #LAYERS: I THICKNESS: ❑ 5/8" TYPE: ❑ CDX 12 CLASS: A
...,/ ICC-ES REPORT#
PROPOSED ROOF TYPE: 13BUILT-UPROOF 13 ASPHALT SHINGLES El WOOD SHAKES El WOOD SHINGLES _ THER�w\-
DESCRIPTION OF WORK: J I
SIC' A e r b r tCA7 OM_
By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree o comply with all applicable local
ordinances and state laws relating to bui on tru tion. I authorize representatives of Cupertino to enter the above- entified propertj for inspection purposes.
Signature of Applicant/Agent: Date: a
SUPPLEMENTAL INFORMATION REQUIRED
If building is associated with a Home Owner's Association,provide letter ELArrc7cscxYPE RouTuv sraP
of approval from HOA. =-OVER_ COTIIW�E . ❑-su�D>nc PzaDt x>v»w
Provide Planning approval to verify If there any restrictions. —i
Q EXPRESS }❑`:p�Azreingr:Pt�TVREVIER'
Provide copy of Manufacturer's Installation Specifications. STANDAItI7 - t ❑ FTRty�gT -_ ay
Provide signed copy of Cupertino's Tear-Off Policy. _ — - Q_o
-� - —
ReroofApp_2011.d6c revised 03/02/11
REROOF TEAR-OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
ALBERT SALVADOR,P.E.,C.B.O.,BUILDING OFFICIAL
10300 TORRE AVENUE•CUPERTINO,CA 95014-3255.
CUPERTINCI
(408)777_3228• FAX(408)777-3333•building@cuPertin0.or4
�^!�- APN a
PROTECT ADDRESS a 0 "' O 0
1 E-MAII
OWNER NAME ESgE X 1 -- 4- PHONE 4 SO- 15- 16;V _
JC• �� � FAX
CITY,ST
STREET ADIr
LICENSE ER LI ENSE� BUS_I1G#
CONTRACTOR NAME 4 .7 A)-Aw ov ;71 FAX
E-MAILE-MACOMPANY NAME Et r ADD S ATE.ZIPDIA0 5t 50% SGb ` -t
srR
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes.
2. An inspection request shall be scheduled the day before the inspection date. Please call (408)777-
3228 from 7:30 - 3:30pm(Mon-Thurs) or 7:30 - 2:30pm(Friday) to schedule the next day inspe:Ction.
On the day of the inspection, a building inspector will be available within one hour for either a Tear-Off
Inspection or Nailing Inspection if you call again on that day between the hours specified.
3. The following inspections are required:
a. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this
inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners
shall be either completely knocked-down or removed prior to this inspection.
b. If plywood is installed, a plywood Nailing Inspection is required.
c. Progress Inspection is required when approximately 50% of roof covering is installed.
4. New roof coverings shall not be applied without first obtaining all inspection and written approvals from
the building inspector. Any roofing which is applied without first obtaining an approvedinspec=tion will
require the removal of all new material down to the sheathing so a proper inspection can be performed.
5. A final inspection and approval shall be obtained from the building inspector when the re-roofing is
completed. To receive a final sign-off,the following items will be verified:
a. Flat roofs shall have a minimum of 1/4"per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre-manufactured products used shall be
available on-site to review at the time of the inspection.
c. Proper spark arrestor installation.
6. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, .you will be
charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection
can be scheduled.
By my signing below,I certify each of the following is true: I am the property owner or authorized agent to act on the
property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that
smoke detectors and carbon monoxide d t ors are required to be installed in accordance with Secti ns 14 and 8315 of
the 2010 California Residential Code.
Signature of Applicant/Agent: Date:
ReroofPoli 2011.doc revised 02/16/11
'V
CITY OF CUPERTINO
FEE ESTIMATOR-BUILDING DIVISION 1,
Fal ADDRESS: rosewood/maplewood 01,Ue,.,,,• DATE: 05/11/2011 REVIEWED BY: bobs.
APN: I BP#: "VALUATION: 1$9,450
*PERMIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof
PRIMARY Multi-FamilyDwelling Buildino is PENTAMATION 1 R2ROOF
USE: g 1 >3 Stories 0 Yes E) No PERMIT TYPE:
WORK overlay existing roof with polyurethane foam.
SCOPE
FEE ID ROOF AREA
s.f.
1REROOFMRES 2,700
Li D L
NOTE: These Jees are based on the preliminary in ormation available and are only an estimate. Contact the Dept for addn'1 info.
FEE ITEMS (Fee Resolution 09-051 E'. 1.:1(1) FEE QTY/FEE MISC ITEMS
SUIPPI, PC 1'1i,:,_
' t-ri.•
Permit Fee: $351.00
a . T ...
_ j..
Ei3�m"3'i i.t_�Zf s6t �4.".
r7i
Work Without Permit? 0 Yes No $0.00
T I
.,
Strong Motion Fee: 1BSEISMICR $0.95 Select an Administrative Item
Bldg Commission Fee:Fee: IBCBSC $1.00
SUBTOTALS: ' $352.95 $0.00 TOTAL FEE: $352.95
Revised: 04/29/2011