Loading...
11030011 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 1361 ASTER LN CONTRACTOR:SOLARCITY PERMIT NO: 11030011 OWNER'S NAME: ROBERT GRISWOLD 393 VINTAGE PARK DR STE 140 DATE ISSUED:03/02/2011 V--""ER'S PHONE: 4087685545 FOSTER CITY,CA 94404 PHONE NO:(650)638-1028 CI LICENSED CONTRACTOR'S DECLARATION r— ELECTBUILDING PERMIT INFO: BLDG ELECT PLUMB License Class �lo Lie.# 999604 MECH F RESIDENTIAL F COMMERCIAL F Contractor GoC c��_Date I hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION: INSTALL NEMA GARAGE SUB-PANEL(125AMP)& (commencing with Section 7000)of Division 3 of the Business&Professions DEDICATED 240 VOLT CKT FOR ELECTRIC Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$2000 permit is issued. APPLICANT CERTIFICATION APN Number:36617106.00 Occupancy Type: I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR granting of this permit. Additionally, a applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION. with all non-point s ur re 10 er the Cupertino Municipal Co e,Section 9.18. Issued by: Date: Signature Date OWNER-BUILDER DECLARATION RE-ROOFS: I hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is the following two reasons: installed without first obtaining an inspection,I agree to remove all new materials for 1,as owner of the property,or my employees with wages as their sole compensation, inspection. will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) Signature of Applicant: Date: I,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE I have and will maintain a Certificate of Consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material. Additionally,should I use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the not employ any person in any manner so as to become subject to the Worker's Health&Safety od o s 25505,25533,and 25534. Compensation laws of California. If,after making this certificate of exemption,I become subject to the Worker's Compensation provisions of the Labor Code,I must Owner auth 'zed agen forthwith comply with such provisions or this permit shall be deemed revoked. Date:Z&/Y/ CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.) to building construction,and hereby authorize representatives of this city to enter Lender's Name upon the above mentioned property for inspection purposes.(We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address and expenses which may accrue against said City in consequence of the ig of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION wrua all non-point source regulations per the Cupertino Municipal Code,Section 9.18. I understand my plans shall be used as public records. Signature Date Licensed Professional V CITY OF CUPERTINO 5 ITEMS OF 5 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec : Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 36617106 . 00 DATE ISSUED. . . . . . . : 03/02/2011 RECEIPT #. . . . . . . . . : BS000012806 REFERENCE ID # . . . : 11030011 SITE ADDRESS . . . . . : 1361 ASTER LN SUBDIVISION . . . . . . CITY . . . . . . . . . . . . . . CUPERTINO IMPACT AREA . . . . . . OWNER ROBERT GRISWOLD ADDRESS 1361 ASTER LN CITY/STATE/ZIP . . . : CUPERTINO, CA 95014 RECEIVED FROM . . . . : SOLARCITY CORPORATI CONTRACTOR . . . . . . . : LYNDON RIVE LIC # 28844 COMPANY SOLARCITY ADDRESS 393 VINTAGE PARK DR STE 140 CITY/STATE/ZIP . . . : FOSTER CITY, CA 94404 TELEPHONE (650) 638-1028 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BCBSC VALUATION 2, 000 .00 1. 00 0 . 00 1 . 00 0 . 00 1BREMMISC EACH 1 .00 126 . 00 0 . 00 126 . 00 0 . 00 1BSEISMICR VALUATION 2, 000 . 00 0 . 50 0 .00 0 . 50 0. 00 1EPERMITFE FLAT RATE 1. 00 42 . 00 0 . 00 42 . 00 0 . 00 1TRAVDOC FLAT RATE 1 .00 42 . 00 0 . 00 42 . 00 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 211. 50 0 . 00 211 . 50 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CHECK 211.50 #210984 --------------- TOTAL RECEIPT 211 . 50 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 304 ROUGH ELECTRICAL 505 FINAL ELECTRICAL CITY OF CUPERTINO FEE ESTIMATOR- BUILDING DIVISION ADDRESS: 1361 aster lane DATE: 03/02/2011 REVIEWED BY: larry s APN: BP#: *VALUATION: 1$2,000 *PERMIT TYPE: Electrical Permit PLAN CHECK TYPE: Alteration/Addition / Repair PRIMARY SFD or Duplex PENTAMATION 1 REAP? USE: p PERMIT TYPE: WORK install nems garage sub-panel 125 am and dedicated 240 volt ckt for electric. SCOPE APPLIANCE/EQUIP TYPE FEE ID QTY UNITS BP FEES Apparatus 1BREMMISC 1 # $126 TOTALS: $126.00 <=°('1 Elec.Plan Check 0.0 1 hrs $0.00 Elec.Permit Fee: IEPERMIT Other Elec.Insp. L2-0hrs $42.00 5' th Inv) Fcc'� Pittr'tt�.li,_>z, t��� r. -tttzP, I`L NOTE. These ees are based on the preliminary information available and are only an estimate. Contact the De t or addh 7 info. FEE ITEMS (Fee Resolution 09-051 Ef. 7%1./10) FEE QTY/FEE MISC ITEMS Plan C hcc'l,I fcc: .5"r pp/. PC'/ 0! PME Plan Check: $0.00 1'crzrait Fcc: Supp[ his!) F PME Unit Fee: $126.00 PME Permit Fee: $42.00 (.onso-rrclion 7-a ,,Ic'f)Zf:1/id'Ltl Rc=rtea, Fce: Work Without Permit? 0 Yes E) No $0.00 Travel Documentation Fee: ITRA VDOC $42.00 Strongy Motion Fee: IBSEISMICR $0.50 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $1.00 SUBTOTALS: $211.50 $0.00 TOTAL FEE: $211.50 Revised: 03/01/2011 CITY OF CITY OF CUPERTINO GENERAL BUILDING CUPERTINO PERMIT APPLICATION FORM APN# 6,�? 1 -7 `IJ Date: -3z Building Address: 1 3(o 1 Mailing Address (if different from building address): Are Hazardous Materials being used as part 4this project? Yes No HOA: (Exterior work only) Yes ❑ No If yes, provide letter from HOA If Residential is house an Eichler? Yes ❑ No E If yes, needs planning approval. Owner's Name: Phone #:62i) Contractor: Phone: 9_ -17 SOI.P�tiZC.rC`� Fax: s-! 4�4 —SS Contractor License #: 'al 191p�{ Cupertino Business License #: Contact: / Phone: Z.S 7gS > Fax/e-mai Residential Commercial ❑ Job Description: v6W(Cll Building Permit Info: / Bldg ❑ Elect Plumb ❑ Mech ❑ Type of Construction(Usage Class): Occupancy Type: 1-A, 1-B ❑ II/III/V-A ❑ II/III B, IV-HT, V-B ❑ Valuation: - Square Footage: i 000 Project Size: Counter ❑ Express ❑ Standard ❑ Large ❑ Major ❑ Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Points Achieved: For help, contact Build it Green at www.buildit reen.or Revised 12/06/10 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)'` L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 oints E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS 40 points Plan Review Process Work Book Page-12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for"greening'your project. INPUT ReBDurces Energy AD A.Site 1 . !A13e f(tori 1Naste 9430b: �. . ... . 65%=1 p6M 75%= 2 points,80%=4 points up to 4 Resource pts 0 2.Salvage Reusable BuMng Materials 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y--yes 0 4.Protect Native Soil 2 Resource pts y--yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 B.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 1 ! 1 B.Foundation 1.Incorporate Recycled Flyash in Concrete 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource pts 0 2.Use Recycled Content Aggregate 2 Resource pts y=yes 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 1 01 1 1 i i C.Structural Frame 1.&&We Solid Sam Wmber with Engimwe lLumber 3 Resource pts y=yes 0 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y--yes 0 4.-Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource.pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPS) a.Floors 3 Energy pts y=yes 0 b.Wall 3 Energy pts y=yes 0 c.Roof 3 Energy pts y=yes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 i2.use OSB a.Subfloors 1 Resource pt y=yes 0 b.Sheathing 1 Resource pt y=yes 0 1 { 1 ! INPUT ResDurces Energy endows 1.Instait Energy-,Efficient Windows a.Double-Paned 1 Energy pt Y--yes0 b.Low-Ernissrvity(t ow-E) 2 Energy pts y=yes 0 c.Low.CaxbdNity Frames 2 Energy pts y=yes 0 2,Install Low Heat Transmission Glazing 1 Energy pt y=yes 0 1 1 1 J.Heating Ventilation and Air Conditioning 1.Use Duct Mastic on All Duct Joints 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAO/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 B.Install Sealed Combustion Units a.Furnaces 3 IAQ/Health pts y=yes 0 b.Water Heaters 3 IAQ/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burning Fireplaces a.Install EPA certified wood stovestinserts 1 IAQ/Health pt y=yes 0 b. Install/Replace Dampers 1 Energy pt y=yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y--yes0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 1 i 1 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0 6.Select Safe and Durable Roofing Materials � 1 Resource pt y=yes 0 7.Install Radiant Barrier 3 Energy pts y=yesl 1 0 1 1 1 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0 t 1 1