Loading...
09120129CITY OF CUPERTII BUILDING ADDRESS: 10192 PARK CL OWNER'S NAME: TSAI WILLIAM H AND PATRICIA NER'S PHONE: 6509689746 ❑ LICENSED CONTRACTOR'S DECLARATION License Class Lic. # �7'/• J ContractoDate I hereby affirm that 1 am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. 10 BUILDING PERMIT CONTRACTOR: NEWPANECOM PERMIT NO: 09120129 340 INDUSTRIAL WAY STE T DATE ISSUED: 12/21/2009 DIXON, CA 95620 PHONE NO: (707)678-9970 1 hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating; to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point s rce irgulations per the ertmo Municipal Code, Section 9.18. Signatur aAv Date/,112_9/_e OWNER -BUILDER DECLARATION 1 hereby affirm that I am exempt from the Contractor's License Law for one cf the following two reasons: 1, as owner of the property, or my employees with wages as their sole compensatiol 1, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). 1 hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I mu :t forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. 1 agree to comply with all city and county ordinances and state laws relatir g to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save ',�mnify and keep harmless the City of Cupertino against liabilities, judgments, ., and expenses which may accrue against said City in consequence of the g.anting of this permit. Additionally, the applicant understands and will comply with all non -points rce regulations per the upertmo Municipal Code, Section 9.18. SignaturDate�— JOB DESCRIPTION: RESIDENTIAL u COMMERCIAL 10192-10194, REPLACE 19 WINDOWS & 8 PATIO SLIDING DOORS LIKE FOR LIKE Sq. Ft Floor Area: I Valuation: $13433 APN Number: 32632007.00 1 Occupancy Type: PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. Issued bar'...— - Date: 12- RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, 1 agree to remove all new materials for inspection. Signature of Applicant: Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE 1 have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cup rtino Municipal Code, Chapter 9.12 and the Health & Safety Code, SerS9yon,05A05, 2V33, jp.4jW34. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's Address ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed Professional CITY OF -UPEkTINO Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax (408) 777-3333 Building Department JOB ADDRESS: � 1?v ` PERMIT # 2 0/ 2 T '..moi OWNER'S NAME: W, ',rcz < z� i - PHONE # GENERAL CONTRACTOR: . -E E C ' _ AX # 70 I am not using any subcontractors:; S:.gnature Date Please check avvlicable subcontractors and complete the following information: Owner/Contractor Signature Date SUBCONTRACTOR BUSI14ESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting inoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock 'e Owner/Contractor Signature Date CITY OF CITY OF CUPERTINO ..J GENERAL BUILDING CUPERTINO PERMIT APPLICATION FORM MIVNEq APN # –� Date: Building Address: Mailing Address (if different from building address): l-) "Z 100-c- L os' /�l4ps' Gl `i O2-4 Are Hazardous Materials bei used as pareof thi i project? Yes ❑ No Jam, HOA: Exterior work only) Yes ❑ No If yes, provide letter from HOA Owner's N m : W i�iTa �u� �S�t1 Phone #: %Jd �g Ct7`�f; Contractor: Phone: CU p6Ae. Coh. Fax: Contractor License #: -7 g 7-aJ -Z_ Cupertino Business License #: Contact: l K ' Phone: 70–) ycf7o -2 '8 <Yi Fax: 94 3 Residential ❑ Commercial Job Description: Z Building P rmit Info: Bldg Elect ❑ Plumb ❑ Mech ❑ Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B ❑ II/Ill/V-A ❑ II/III B, IV -HT, V-13 Valuation: — Square Footage: Project Size: Express0,--Standard ❑ Large [] Major ❑ Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Points Achieved: 6 For help, contact Build it Green at www.builditgrcen.org Revised 07/14/09 CITY OF CITY OF CUPERTINO GENERAL BUILDING APPLICATION CUPERTINO FEE SCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM 1STUCOAP Stucco A )plications (up to 400 so additiona stucco application B 2 1 WINREP Replacers ent windows/sliding glass door ea 8 windows B I WINMEWSTR New Window -structural shear wall/masons includes plan ck fee B 1 EPERMITFEE Electrical Permit Fee E 1 MPERMITFEE Mechanical Permit Fee M 1 PPERMITFEE Plumbing Permit Fee P 1 ELCPLNCK Stand Alone Electric Pin Ck (hourly) E 1 MECPLNCK Stand Alone Mechanical Pin Ck (hrly) M 1 PLMBLNCK Stand Alone Plumbing Pin Ck (hrly) P 1 STPLNCK-(3 Hr Min when not over counter) Standard Plan Check (when no E/M/P) hourl -stand alone B 1 BCBSC Cal Bldg Standards Commission Fee B ALL PERMIT TYPES ' 1 BSEISMICR Seismic f:esidential B I BSEISMICO Seismic Commercial B ITRAVDOC Travel & Documentation B 1 BUSLIC Business License B 5 of 5 1. Install Energy -Efficient Windows a. Double -Paned 1 Energy pt y=yes b. Low -Emissivity (Low -E) 2 Energy pts y=yes c. Low. Conductivity Frames 2 Energy pts y=yes 2. Install Low Heat Transmission Glazing 1 Energy pt y=yes J. Heating Ventilation and Air Conditioning 2 Energy pts 1. Use Duct Mastic on All Duct Joints 2 Energy pts 2. Install Ductwork within Conditioned Space 3 Energy pts 3. Vent Range Hood to the Outside 1 IAQ/Health pt 4. Clean all Ducts Before Occupancy 2 IAQ/Health pts 5. Install Solar Attic Fan 2 Energy pts 6. Install Attic Ventilation Systems 1 Energy pt 7. Install Whole House Fan 4 Energy pts 8. Install Sealed Combustion Units y=yes a. Furnaces 3 IAQ/Health pts b. Water Heaters 3 IAQ/Health pts 9. Replace Wall -Mounted Electric and Gas Heaters with y=yes Through -the -Wall Heat Pumps 3 Energy pts 10. Install 13 SEER/11 EER or higher AC with a TXV Energy pts 11. Install AC with Non -HCFC Refrigerants 2 Resource pts 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts y=yes 13. Retrofit Wood Burning Fireplaces 3. Pre -Wire for Future Photovoltaic (PV) Installation Energy pts y= a. Install EPA certified wood stoves/inserts 1 IAO/Health pt y=yes b. Install/Replace Dampers 1 Energy pt y=yes c. Install Airtight Doors 1 Energy pt y=yes 14. Install Zoned, Hydronic Radiant Heating : Energy pts y=yes 15. Install High Efficiency Filter 4 IAQ/Health pts y=yes 16. Install Heat Recovery Ventilation Unit (HRV) F IAQ/Health pts y=yes 17. Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating I Energy pts y= 2. Install Solar Water Heating System 1( Energy pts y= 3. Pre -Wire for Future Photovoltaic (PV) Installation Energy pts y= 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw = 18 points) Up to 18 Energy 6. Select Safe and Durable Roofing Materials 1 Resource pt y= 7. Install Radiant Barrier : Energy pts y= L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 5 =nergy pts 2. Install Overhangs or Awnings over South Facing Windows 3 -nergy pts 3. Plant Deciduous Trees on the West and South Sides 3 =nergy pts 1. Use Low/No-VOC Paint 1 IAQ/Health pts y=yes 2. Use Low VOC, Water -Based Wood Finishes 2 IAQ/Health pts y=yes 3. Use Low/No VOC Adhesives 12 IAQ/Health pts y=yes 4. Use Salvaged Materials for Interior Finishes ; Resource pts y=yes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde E IAQ/Health pts y=yes 6. Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 7. Seal all Exposed Particleboard or MDF 4 IAQ/Health pts y=yes 8. Use FSC Certified Materials for Interior Finish Resource pts y=yes 9. Use Finger -Jointed or Recycled -Content Trim Resource pts y=yes 10. Install Whole House Vacuum System 5 IAQ/Health pts y=yes N. Flooring 1. Select FSC Certified Wood Flooring 8 Resource pts 2. Use Rapidly Renewable Flooring Materials 4 Resource pts 3. Use Recycled Content Ceramic Tiles 4 Resource pts 4. Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts 5. Use Exposed Concrete as Finished Floor 4 Resource pts 6. Install Recycled Content Carpet with Low VOCs 4 Resource pts Total Points Available: Total Points Project Received: 0 0 0 1401 130 57 1 01 0 0 G:data/progs/greer)uildingguidelines/remodelers/greenpointsfinal2.12.04protected.xls