Loading...
09080107 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 7760 OROGRANDE PL CONTRACTOR:BLACK DIAMOND PERMIT NO:09080107 DESIGNS ' �VER'S NAME: PFARD WILLIAM AND MASAKO 3481 DEL NORTE DR DATE ISSUED:08/12/2009 L Ch-t NER'S PHONE: 4085645059 SAN JOSE,CA 95132 PHONE NO:(408)272-5959 ❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG ELECT PLUMB- License ClassC77 Lie.#77"/ Y —_ MECH RESIDENTIAL r�COMMERCIAL Contractor ('rte i f `R/�i ffs�L_—Date erl5p /Z.Og ---�� � JOB DESCRIPTION:REMODEL THREE(3)BATHROOMS& hereby affirm that 1 am licensed under the provisions of Chapter 9 ITCHEN(NON-STRUCTURAL)& (commencing with Section 7000)of Division 3 of the Business&Professions KITRE-ROOF INCLUDED Code and that my license is in full force and effect. NO 1 hereby affirm under penalty of perjury one of the following two declarations: 1 have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. 1 have and will maintain Worker's Compensation Insurance,as provided for by Sq.Ft Floor Area: Valuation:$5000 Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. APN Number:3618020.00 Occupancy Type: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct.1 agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs,and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION. granting of this permit. Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section _ 9.18. Issued b Date: ture'a Date_ /Z 4-f ❑ OWNER-BUILDER DECLARATION RE-ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is 1 hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection,I agree to remove all new materials for the following two reasons: inspection. 1,as owner of the property,or my employees with wages as their sole compensation, ,----� will do the work,and the structure is not intended or offered for sale(Sec.7044, Signature of Appli resin _ / Date: Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three HAZARDOUS MATERIALS DISCLOSURE declarations: I have and will maintain a Certificate of Consent to self-insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the Compensation,as provided for by Section 3700 of the Labor Code,for the California Health&Safety Code,Sections 25505,25533,and 25534. 1 will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& I have and will maintain Worker's Compensation Insurance,as provided for by Safety Code,Section 25532(a)should 1 store or handle hazardous material. Section 3700 of the labor Code,for the performance of the work for which this Additionally,should 1 use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District 1 will permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the I certify that in the performance of the work for which this permit is issued,I shall Health&Safety Code,Sections 25505,25533,and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I Owner authorized agent: become subject to the Worker's Compensation provisions of the Labor Code,I must Date:�LO-V9 X forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I hereby affirm that there is a construction lending agency for the performance of work's I certify that I have read this application and state that the above information is for which this permit is issued(See.3097,Civ C.) correct. I agree to comply with all city and county ordinances and state laws relating Lender's Name to hnilding construction,and hereby authorize representatives of this city to enter 'ie above mentioned property for inspection purposes.(We)agree to save Lender's Address nIfy and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the ARCHITECT'S DECLARATION granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section I understand my plans shall be used as public records. 9.18. Licensed Professional _ Signature _ Date_ R i 1 k - -S' 7`''7• M f .,s,.ciy.k 'x- -r- T." l' : * 'Ss.�R-,. r�4. '2: •, k'v.,-L - '' ' T-711077710',V,,7 AL i ";S"v?$-� a: - i ^?' ,. .-;.. .t '=._ t..z€w.•;f .5-- raNEn `"`4 r"`i-A. 5ze..rs. 'h� "• �' , s a P Y s > ,-,�'�-F-3."`k'+.�,�, '�t�' :.s.h `�., � +�a�a k Y;-:` ._: ','its .•r-,-..- ��-4,, «:. ,4,z =F �t � T _ `�'._.._ _ Assessor's Parcel Number: Name of owner. Mo.Sci o f�c�r eY� Project address. 7? a PL - �v�eYfited, CA Contactperson. ��� Phone. 4}a1- SG4{-5Os9' Fax. Net square footage of lot. Existin Proposed Square footage: First floor: Second floor: Garage: TOTAL: r' re thereat least two 10 foot by 20 foot clear spaces inside thegarage? �<N Is privacy protection planting required for the project? N On what floor(s) is work being done? Brief description of work. /��'v-r o�P .�o'c� /��f� roor.�r S �GiK�a�� 70 $5� 70 Sa -tCf ,. a_S' irs ;�i CIO x X�s,. Q 0) -44 PAK l24=cJ Csa1rflre741c Code editions:2008 CBC 0-1)2008 CFC ?N)2008 CMC (19-N) 2008 CPC (®-N) 2008 NEC -N) APPROVED IN ACCORDANCE WITH THE CITY OF CUPERTINO CODES AND ORDINANCES Z 'D 9 .. Effective 1/1/08 DATE— --- - SIGNE _— _— - - -- This set of plans and specifications MUST be kept on the lob at all times and it is unlawful to make any changes or alterations on same without written permission from the Building Department,City of Cu ,no. The stamping of this plan and spec,cations SHALL NOT be held to permit orto ro be an approval of the violation of any pions of any City Ordinance or State Law. BMP SHEET , Plan Review Process Work Book Page-8-Revised 1/1/08 :1 it II �.I i. j ----------- - . . 6 - -- ------------- t r --------------- � ►I $A - i ; ' tt '': - - - ----- - C.�r K ---- --- L t'� c' W1`s o r cMvioK .I. r r - - 51 _ 77 '.3ys ti, 'fib �3 'it mss--.• '� �•3 sz x ffP Assessor's Parcel Number: Name of owner. Masa o f e-ekP,a � Project address. 77(=0 Oro ' � �� - Cv,�en�'"&, C A Contact person. e, T'naY Phone. qQ 4{—50�9' Fac. Net square footage of lot. Existing Proposed Square footage: First floor: Second floor: Garage: TOTAL: re there at least two 10 foot by 20 foot clear spaces in:ide the_garage? �< Is privacy protection planting required for the project? N On what floor(s) is work being done? Brief description of work. ��'trt o�/P ®'c� %3c�}!� roor.N s N�iKsg-�- Masf�r /3�f� 7D Sa -�f "Ti�wa sY�airs 2 4,osa�, cs�+oo�P �ifr`rPc� vtcaJ cs���lh Code editions:2008 CBC a-N)2008 CFC (a N)2008 CMC (6)-N) 2008 CPCY 1)2008 NEC -1� �S'S�C s60 Effective 1/1/08 � c O/dy Plan Review Process Work Book Page-B-Revised 1/1/08 ------------------- ---------- i;i wIPA l - < lt� !%AC IIT------- -- I- ----- ' . .. Ir _ ---------------------- --��� PSG - -------t--_---- - - z i , i cam' O i, ,�I CITY OF CXPERTINO ADDITIOPI/REMODEL CUPEkTINO PERMIT APPLICATION FORM APN # v 9_0 ,<;�\ Date: -v 'r7jS � n Is a 2° unit being added? Yes ❑ No If yes, ;Tease fill out the permit application for 2 unit. Building Address: (O 0 V-0 r,_%A_CQP_ 7 C--0 perg�o SO Mailing Address (if differ nt from building address): Owner's Name: Phone# D eor440S Contractor: Phone#: 'Q�o.c�c �cai.cKoc�� S�S� Fax#: 7l>g O- Z.Co S Contractor License#: 7 74`T 1 Cupertino Business License#: l Qq- Contact: Phone#: Fax #: Building Permit Info: Bldg. Elect. [� Plumb. Mech. ❑ Hillside ❑ Job Description: Addition-What is being added?(Be Specific): What is being remodeled(not including addition,? 77,re-e- 3c.;�-4r YX ark Remodel Includes Re-Roof: Yes ❑ No [l"_ f yes list number of squares Remodel Includes Structural: Yes ❑ No [ Do you have the pre-application planning approval? Yes ❑ No [K If yes, please provide a copy of your planning approval letter. Planners name: Square Footage: Addition: Porch: Deck: Garage: Detached Attached Remodel: Kitchen ath -?-C>C>n 1�0 Other Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B ❑ II/IIUV-A ❑ IUIII B, IV-HT, V-B R-53 Valuation: � , c�c'� Please check this box if the project is a second-story addition ❑ Project Size: Express E'Sdard ❑ Large ❑ lgg2r❑ Please complete relevant portion of the Green Building Checklist& attach it to the application or if applicable, Green BuildinPg Points Achieved: include in plan set& the sheet index. ***For Office Use Only*** Over-the-Counter ❑ Revised 07/06/09 CITY OF CUPERTINO ADDITION/REMODEL CUPEI�TINO FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft ADDITIONS 1R3SFDADD 1PLLONGRNGR Long Range PL Planning/Residential 1R3INSP Dwellings Inspections B 1R3PLNCK Dwellings plan check B 1R3REPINSP Dwellings Repeat B Inspection 1R3REPPLNC Dwellings Repeat.Plan B Check 1R3HINSP Dwellings Hillside B inspection 1R3HPLNCK Dwellings Hillside plan B check 1 R3HREINSP Dwellings Hillside B Repeat Inspection 1R3HREPLNC Dwellings Hillsice. B Repeat Plan Check 1R3ALTINSP Dwellings Alternate B Materials Inspection 1R3ALTPLNC Dwellings Alternate B Materials Plan Check 1PCESS Cesspool P 1PPRSEWG Ea. Private Sewa;;e P Disposal System 1 PRSEWER Sewers P 1BPSPRINK Lawn Sprinkler/Ftackflow P 1BPWSVCS Main Water Service P 1BCBSC Cal Bldg Standards B ALL PERMIT TYPES Commission Fee 1BSEISMICRE SeismicResidential B 1RER00FRES Residential Re-roof Each B 100 SF CITY OF CUPERTINO ADDITON/REMODEL FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft DECKS 1R3SFDADD OR IR3SFDREM 1DECKWOOD Deck (Wood)-Each B (Each) 1 DECKRAIL Deck Railing-Each B (Each) GARAGES 1R3SFDADD OR DETACHED 1R3SFDREM 1 GARDTW<=1 K Wood Frame up to B 1,000 SF (each) 1GARDTM<=1K Masonry up tc, 1,000 SF B (each) 1 BCONSTAXR Construction lax Res (new detaches garage) PATIO'S OPEN 1R3SFDADD OR IR3SFDREM 1PATIOWOOD Wood Frame up to 300 B SF 1PATIOMETAL Metal Frame tip to 300 B SF 1PATIOOTHER Other Frame tip to 300 SF B PATIO'S CLOSED 1R3SFDADD OR & SUN ROOMS 1R3SFDREM 1PATIOENCLW Enclosed Woad up to 300 B SF 1PATIOENCLM Enclosed Metil up to 300 B SF 1 PATIOENCLO Other Enclose d Patio up B to 300 SF 1 COVPORCH Porch Covered-Each B (Each) REMODELS 1R3SFDREM 1 REMRESKIT Kitchen Remodel up to B (Deduct "$"for ea plan 300 SF check 1REMRESBAT Bath Remodel up to 300 B " SF 1 REMREOTH Other Remod:,l up to 300 B 46 SF INPUT Resourc:Ls Energy IAD/Health M.Indoor Air Quality and Finishes 1.Use LowMo-VOC Paint 1 IAQ/Health pts y=yes 0 2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0 3.Use Low/No VOC Adhesives 3 IAQ/Health pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 0 6.Use Exterior Grade Plywood for interior Uses 1 IAQ/Health pts y=yes 0 7.Sea]all Exposed Particleboard or MDF 4 IAQ/Health. pts y=yes 0 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0 N.Flooring 1.Select FSC Certified Wood Flooring E Resource pts y=yes 0 2.Use Rapidly Renewable Flooring Materials Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl i IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs Resource pts y=yes 0 Total Points Available: 140 1301 5'1 Total Points Project Received: 01 01 0 G:data/progslgree ibuildingguidelin2s/remodelers/greenpointsfinal2.12.04protected.xls