09080225 CITY OF CUPERTIN D BUILDING PERMIT
BUILDING ADDRESS: 10199 RICHWOOD DR CONTRACTOR:R E ROOFING& PERMIT NO:09080225
CONSTRUCTION INC
OWNER'S NAME: ALAN&LAURIE ROBELL 5230 CLYDELLE AVE DATE ISSUED:08/20/2009
c ER'S PHONE: 4089962009 ;;AN JOSE,CA 95032 PHONE NO:(408)626-9320
LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG ELECT r PLUMB r
License Class l_ Lic.#
MECH r RESIDENTIAL r COMMERCIAL�
Contractor Date ZO 0
1 hereby at i am licensed under the provisions of Chapter 9 JOB DESCRIPTION:RE-ROOF RMOVE EXISTING I LAYER OF WOOD
(commencing with Section 7000)of Division 3 of the Business&Professions iHAKE,
Code and that my license is in full force and effect. NSTALL NEW 1/2"CDX,30#FELT&LIFETIME COMP
1 hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by Sq,Ft Floor Area: Valuation:$13000
Section 3700 of the Labor Code,for the performance of the work for which this
permit is issued.
APN Number:36908041.00 Occupancy Type:
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct.1 agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED
upon the above mentioned property for inspection purposes. (We)agree to save
indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR
costs,and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION.
granting of this permit. Additionally,the applicant understands and will comply
witivftl non- rce regulations per the Cupertino Municip I Code,Section
,9.18. *r t� Issued Date:
Signature Date
❑ OWNER-BUILDER DECLARATION RE-ROOFS:
All roofs shall be inspected prior to any roofing material being installed.If a roof is
hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection,I agree to remove all new materials for
the following two reasons: inspection.
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044, Signature of Applicant: Date:
Business&Professions Code)
1,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three HAZARDOUS MATERIALS DISCLOSURE
declarations:
1 have and will maintain a Certificate of Consent to self-insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the
Compensation,as provided for by Section 3700 of the Labor Code,for the California Health&Safety Code,Sections 25505,25533,and 25534. 1 will maintain
Performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
I have and will maintain Worker's Compensation Insurance,as provided for by Safety Code,Section 25532(a)should I store or handle hazardous material.
Section 3700 of the Labor Code,for the performance of the work for which this Additionally,should I use equipment or devices which emit hazardous air
contaminants as defined by the Bay Area Air Quality Management District I will
permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
1 certify that in the performance of the work for which this permit is issued,1sha 1-- Ith&Safety Code,Sections 25505,25533,and 534.
not employ any person in any manner so as to become subject to the Worker' r�
Compensation laws of California. If,after making this certificate of exemption,I 07,n o �— 2J U /
become subject to the Worker's Compensation provisions of the Labor Code,I must Date:
forthwith comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
APPLICANT CERTIFICATION I hereby affirm that there is a construction lending agency for the performance of work's
I certify that 1 have read this application and state that the above information is for which this permit is issued(Sec.3097,Civ C.)
correct.I agree to comply with all city and county ordinances and state laws relating Lender's Name
to building construction,and hereby authorize representatives of this city to enter
ur she above mentioned property for inspection purposes.(We)agree to save Lender's Address
i :ify and keep harmless the City of Cupertino against liabilities,judgments,
cots,and expenses which may accrue against said City in consequence of the ARCHITECT'S DECLARATION
granting of this permit.Additionally,the applicant understands and will comply
a n` urce rWfatt fper the Cupertino Municipal Code,Section I understand my plans shall be used as public records.
9.18.'
Licensed Professional
Signature Date_ / u L
09 o �
CITY OF C'UPERTINO
a REROOF
CUPEkTiNO PERMIT APPLICATION
APN # 'a ` L[I Date: 2� vGi
Building Address:
U Vv
Owner's Name: AtA,�
, Phone #:
200
HOA: Yes ❑ No.-M If yes, provide letter from HOA 0
Contractor: 00� `5 Phone #: 4d- �2zG- 9�2C)
u Fax #: 1+0� 2� -7 I b I
Cupertino Business License #: Contractor Lic fj
#q �
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ Asphalt Shingles X Asphalt Shingles
Wood Shakes ❑ Wood Shakes
❑ Wood Shingles c3 Wood Shingles
c3Other (Specify) ❑ Other (Specify)
Number of existing coverings ❑ Provide I.C.C.E.S. Report#
To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description: L ��1L
Residential Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions:
applicable, include in plan set & the sheet index.
Valuatio l a"000 6
1-mav ead, Understand and Will Comply wits Cupertino's Tear-Off Policy:
Signature
Revised 02/05/09
al -,
CITY OF CUPERTINO
REROOF
CUPEkTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1REROOFCOM Re-roof Conanercial B 1COMMLROOF
1BCBSC Cal Bldg StELndards B ALL PERMIT TYPES
Commission. Fee
1BSEISMICO Seismic Commercial B
1RER00FRES Re-roof Residential B 1SFDWLR00F
1BCBSC Cal Bldg Stimdards B ALL PERMIT TYPES
Commission. Fee
/ 1BSEISMICRE Seismic Residential B
1 REROOFMRES Re-roof Mu:ti-Family B 1MFDWLROOF
1BCBSC Cal Bldg Standards B ALL PERMIT TYPES
Commissior. Fee
1BSEISMICRE Seismic Residential B
1BUSLIC Business License B
• Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards
and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to ar y roofing installation.
4. To receive a final sign off from the City,the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fe�! of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/ "per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O.report is required to be or the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: AW
Job Site Address:
Roofing Comp y Nam T
Applicant's S ature: Dater f d )
Greg Casteel _
Building Official
Revi;;ed 07/30/08
M.Indoor Air Quality and Ferns es INPUT RLscurcLs Energy [AaHealth
1.Use L o-VOC Paint 1 IAQ/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0
3.Use Lo*%VOC Adhe*es 3 IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0
7.Seal all EVoseditrbdeboard or;MDF 4 IAQ/Health. pts y=yes 0
S.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0
1 1
N.Flooring 1
1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0
2.Use Rapidy Renewable Flooring Materials 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes p
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes p
. 1 1 1
Total Points Av L 1401 130 57
Total Points Project Received: 01 01 0
G:datalprogssrgree ibuildingguidelines/remodelers/greenpointsfinal2.12.04proleoted.xls
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone(408)777-3228
„C(TY OF Fax(408)777-3333
'UPEkTINO
Builditt De artment
JOB ADDRESS: PERMIT #
I
OWNER'S NAME: 5 �,�: c} PHONE # �
GENERAL CONTRACTOR: oq(-�r� FAX #
D,J M.wL1 Ow� NC.
I am not using any subcontrctors: -_
N2
Si e
Date
Please check applicable subcontractors and complete the followin information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
owner/Contractor Signature Date