09080394 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 11081 SANTA TERESA DR CONTRACTOR:JNSJ ROOFING INC PERMIT NO:09080394
OWNER'S NAME: THEISNER WILLIAM G AND DOROTHY 691 W SAN CARLOS ST DATE ISSUED:08/28/2009
?ER'S PHONE: 4082538106 SAN JOSE,CA 95126 PHONE NO:4082796171
❑ LICENSED CONTRACTOR'S DECLAR/A�TIION BUILDING PERMIT INFO: BLDG� ELECT f— PLUMB�
License Class C. 3 Lic.# _�f�V Za
�--� MECH RESIDENTIAL COMMERCIAL
Contractor Date �'/7b-<n,�'—
I hereby affir at I am licensed under the provisions of Chapter 9 JOB DESCRIPTION:RE-ROOF,T/O WOOD SHAKE,INSTALL OSB
(commencin ith Section 7000)of Division 3 of the Business&Professions ROOF DECK
OVER EXISTING,INSTALL NEW 30#FELT UNDERLAYMENT,
Code and that my license is in full force and effect.
INSTALL 40YR LANDMARK CLASS A T/O WOOD SHAKE
1 hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$10500
permit is issued.
APPLICANT CERTIFICATION APN Number:35616004.00 Occupancy Type:
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR
granting of this permit. Additionally,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION.
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18. ,
/�1 [a' Date / �O�y Issued by: _ Date:� 2-'s
Signature /// _
L OWNER-BUILDER DECLARATION
RE-ROOFS:
1 hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is
the following two reasons: installed without first obtaining an inspection,I agree to remove all new materials for
1,as owner of the property,or my employees with wages as their sole compensation, inspection.
will do the work,and the structure is not intended or offered for sale(Sec.7044, f
Business&Professions Code) Signature of Applicant: ' Date:
1,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business&Professions Code).
ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three
declarations:
I have and will maintain a Certificate of Consent to self-insure for Worker's HAZARDOUS MATERIALS DISCLOSURE
Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the
performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain
I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material.
Additionally,should I use equipment or devices which emit hazardous air
permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will
I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
not employ any person in any manner so as to become subject to the Worker's Health&Safety Code,Sections 25505,25533,and 25534.
Compensation laws of California. If,after making this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must I Owner or autho ' ed a nt:
forthwith comply with such provisions or this permit shall be deemed revoked. Date: 9
APPLICANT CERTIFICATION F7 CONSTRUCTION LENDING AGENCY
I certify that I have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's
correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.)
to building construction,and hereby authorize representatives of this city to enter Lender's Name
upon the above mentioned property for inspection purposes.(We)agree to save
it' unify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address
and expenses which may accrue against said City in consequence of the
granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18. I understand my plans shall be used as public records.
Signature Date Licensed Professional
CITY O% Dc1 Una l
7__;
CITY OF CUPERTINO
REROOF
C u P i_RT i N o PERMIT APPLICATION
APN# Date: n�
Building Addre
11061 -
�:Sa Z _
Owner's Namet5(: - ,.t 4 C, -Ri l�li t5k Phone #:
4&6)
HOA
Yes No If es, provide letter from HOA C a�J 0
Contractor: Phone #: 0V,'- 9-(0 f T I
O-N�s_ ` 10 Fax#: )da CC -057
Cupertino Business License #: Contractor License #:
7 YO
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ Asphalt Shingles d,'*AXsphalt Shingles
w" Vood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
❑ Other(Specify) ❑ Other (Specify)
Number of existing coverings f _ ❑ Provide I.C.C.E.S. Report #
❑ To be Removed ' ❑ Provide Mfgr. Installation Specs.
Description: 6 UL Ditf
Job -e!X r�� ✓ l�Sdac l
j�a i 1�s�t K j v►S+u 11 cS.� (cx-- GU
1 v SIr1G �1i1 1 ���r �rL �
/ia iN �d� Ise. �
r ,A
Residential Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the Eipplicati or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation: r� '_...IDD
I Have Read, Undersand and Wi11 Comply with Cupertino's Tear-Off Policy:
Signature
Revised 02/05/09
CITY
r
CITY OF CUPERTINO
RFROOF
`A1 FEE SCHEDULE
c� r�0
F;rI
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1REROOFCOM Re-roof Commercial B 1COMMLROOF
1BCBSC Cal Bld€; Standards B ALL PERMIT TYPES
Commission Fee
1BSEISMICO Seismic Commercial B
(P 1REROOFRES Re-roof Residential B 1SFDWLR00F
a,
/ 1BCBSC Cal Bldl; Standards B ALL PERMIT TYPES
Commission Fee
/ 1BSEISMICRE Seismic Residential B
1REROOFMRES Re-roof Multi-Family B 1MFDWLROOF
1BCBSC Cal Bldg; Standards B ALL PERMIT TYPES
Commi:sion Fee
1BSEISMICRE Seismic Residential B
1 BUSLIC Busines> License B
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards
and manufacturers specifications on le-roofing.All roofs are Class "A"per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the buildvlg inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City,the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fe,� of$176.18. The re-inspection fee must
be paid before another inspection cal be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4 "per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O:report is required to be or the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: k2 !Z LI JI `�' ( `Y � f /
Job Site Address: 54 AJ I I.2 4&lecStq D
Roofing Company Name: ��S ,� �'c�O�//✓C2
Applicant's SignatWe-, Date: r 2d D ll'
Greg Casteel
Building Official
Revised 07/30/08
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
B. Site 9. Install H.E. Irrigation, (details/spac)" L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec..) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 oints
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, NoteiS ec. A-3 1 point
P. Other 1. List Green Features on Plans A•1 1 point
TOTAL POINTS1 40 points
Plan Review Process Work Book Page-12-Revised 3/25/(8
INPUT Resources Energy [AD/Health
M.Indoor Air Duality and Finishes
1.UseL*w1ND-VOC Paint 1 IAQ/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0
3,Use Low/No VOC Adhesives 3 IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0
7.Seal all imposed Particleboard or MDF 4 IAQ/Health. pts y=yes 0
B.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0
N.Flooring
1.Select FSC Certified Wood Flooring 3 Resource pts y=yes 0
2.Use Rapidly Renewable Flooring Materials 3 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 1 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 1 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 1 Resource pts y=yes 0
. 1 1 old
Total Points Available: I 14OF 130 57
Total Points Project Received:1 41 01 01 0
�— N &X-�,
G:data/progs/grei nbuildingguidelines/remodelerslgreenpointsfina12.12.0 ro ctedxls
\ Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
XPE�TINO
r � ,�; �� uildin Department
JOB ADDRESS: 'a-°r-!—���������� ��"��� PERMIT#D,�--? D a D
OWNER'S NAME: 4Q-t k4 R,4 c.) S o U Z PHONE # pg
GENERAL CONTRACTOR: C7- FAX #
I am not using any subcontractor
Signature Date
Please check applicable subcontract rs and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass/ Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature Date