09080331 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 11651 TIMBER SPRING CT CONTRACTOR:CASTILLO'S ROOFING PERMIT NO:09080331
OW'NER'S NAME: JAIN SANDEEP
1713 CATHAY DR DATE ISSUED:08/25/2009
C R'S PHONE: 4082524100
SpN JOSE,CA 95122 PHONE NO:(408)251-3565
❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG ELECT PLUMB
License Class 0 3P Lic.# V-56 Z/SG MECH I— RESIDENTIAL I— COMMERCIAL
Contrac Date p '�S'�
JOB DESCRIPTION:RE-ROOF TEAR OFF WOOD SHAKE,INSTALL
1 hereby affirm tat 1 am licensed under the provisions of Chapter 9 3(LB FELT,
(commencing with Section 7000)of Division 3 of the Business&Professions INSTALL GAF GRAND CANYON COMP,CLS A 20SQ;BUS LIC
Code and that my license is in full force and effect. R3NWD FOR CASTILLO'S ROOFING
hereby affirm under penalty of perjury one of the following two declarations:
1 have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this S I.Ft Floor Area: Valuation:$9850
permit is issued.
APPLICANT CERTIFICATION A PN Number:33654082.00 Occupancy Type:
I certify that I have read this application and state that the above information is
correct.1 agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR
granting of this permit. Additionally,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION.
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18.
signs —�
Date � O/ Issued by:'�-� Date:
OWNER-BUILDER DECLARATION RE-ROOFS:
I hereby affirm that I am exempt from the Contractor's License Law for one of 1 01 roofs shall be inspected prior to any roofing material being installed.If a roof is
the following two reasons: i nstalled without first obtaining an inspection,I agree to remove all new materials for
I,as owner of the property,or my employees with wages as their sole compensation, inspection.
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code) :;ignatur f Applrc Date:
-
1,as owner of the property,am exclusively contracting with licensed contractors to �
construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three
declarations: HAZARDOUS MATERIALS DISCLOSURE
I have and will maintain a Certificate of Consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the l have read the hazardous materials requirements under Chapter 6.95 of the
performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. 1 will maintain
I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
Safety Code,Section 25532(a)should I store or handle hazardous material.
Section 3700 of the Labor Code,for the performance of the work for which this Additionally,should I use equipment or devices which emit hazardous air
permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will
I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
not employ any person in any manner so as to become subject to the Worker's Health&Safety Code,Sections 25505,25533,and 25534.
Compensation laws of California. If,after making this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must Owner r authori agent: Dater ��
forthwith comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
APPLICANT CERTIFICATION
1 certify that I have read this application and state that the above information is 1 hereby affirm that there is a construction lending agency for the performance of work's
correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.)
to building construction,and hereby authorize representatives of this city to enter Lender's Name
upon the above mentioned property for inspection purposes.(We)agree to save
it iify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address
cum .nd expenses which may accrue against said City in consequence of the
granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18. 1 understand my plans shall be used as public records.
Signature Date Licensed Professional
a CITY OF (�UPERTINO
REIZOOF
CUPEI,TINO PERMIT APPLICATION
Date:
APN '� � �
!iL6
Building Address:
(off r�m.f-r' C/- --,,
Owner's Name: ��nde �l u h Phone #:
HOA: Yes � No ❑ If yes, provide let er from HOA
Contractor: Phone #:"o
CA s- 6 S
Fax #:
Cupertino Business License #: Contractor License #:
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ ,Asphalt Shingles 4,,'Xsphalt Shingles
Wood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
❑ Other (Specify) ❑ Other (Specify)
Number of existing coverings ❑ Provide I.C.C.E.S. Report#
Qr'To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description: �a D wood ��� 30 Fe
rZ1M OanyU7� Cb r►Y.
CV6 Q
Residential Commercial ❑
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions:
applicable, include in plan set & the sheet inclex.
Valuation:
qgsaaD
I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy:
Signa re
Revised 02/05/09
a�.
CITY OF CUPERTINO
REF:OOF
CUPEkTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1REROOFCOM Re-roof Commercial B 1COMMLROOF
1BCBSC Cal Bldg Standards B ALL PERMIT TYPES
Commissicn Fee
1BSEISMICO Seismic Ccmmercial B
,2,6 IREROOFRES Re-roof Residential B 1SFDWLR00F
1BCBSC Cal Bldg S tandards B ALL PERMIT TYPES
Commissicn Fee
1BSEISMICRE Seismic Residential B
1 REROOFMRES Re-roof Multi-Family B 1MFDWLROOF
1BCBSC Cal Bldg Standards B ALL PERMIT TYPES
Commissicn Fee
1BSEISMICRE Seismic Residential B
1 BUSLIC Business L icense B
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must a€;ree to comply with 2007 IBC Standards
and manufacturers specifications on -e-roofing.All roofs are Class "A"per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City,the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood ne it inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new m aterial down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nai:.inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection c;m be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of lii "per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O.report is required to be o the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: SO,n a i
Job Site Address:
Roofing Company Name: S l v 3a
Applicant's Signature: Date:
Greg Casteel
Building Official
Revised 07/30/08
INPUT Resources Energy IAQHiaafth
M.Indoor Air Quality and Finishes
1.Use LowJNo-VOC Paint 1 AQ/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y--yes 0
3.Use LowMo VOC Adhesives 3 AQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 6IAQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0
7.Sea]all Exposed Particleboard or MDF 4;AQJHealth. pts y=yes 0
8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y—yes 0
10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0
m1 1 1
N.Flooring
1.Select FSC Certified Wood Flooring 8 F esource pts y=yes 0
2.Use Rapidly Renewable Flooring Materials 4 F esource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 F esource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 14Q/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 F esource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 F esource pts y=yes 0
■ 1 1 1
Total Points Available: 1 1401 1301 57
Total Points Project Received: 01 0 0
� o s��
G:data/progs/greenbiildngguidelines/rem Iers/greenpointsfina1212.D4protected.xis
i
I
. i
I
`i
T {
I
COMMUNITY MANAGEMENT SERVICES,INCORPORATED
A igust 20,2009
i
Sandeep Iain
11651 Timber Spring Ct
Cupertino,CA 95014-5145
Re: Sven Springs Homeowners Association
1 [651 Timber Spring Court
I
Dear Homeowners: I
1
Enclosed you will find a copy of your Arcbitecttuc Application for the reroofing of your home,with the
1
approval from the Board of Directors, as well a s any restrictions or conditions that the Board deemed
necessary. According to your application you are installing The GAF Laminated Fiberglass Asphalt -
style"Grand Canyon",color"Mission Brown".
I
Please keep in mind that any deviation from your approved application will require you to resubmit your j
application for review. If you utilize an unapprm ed material you will be required to reprove and replace I
the material with an approved selection. j
i
The approval of your project's architecun-A compatibility with the Seven Springs Owners' Association's j
complex does not constitute or imply, that the Ai chitectural Committee and/or the Association Board of ;-
Directors deem your project as meeting City of C apertmo/County of Santa Clara.codes. The approval is
given contingent upon you and /or your eantrac tor(s) obtaining the required construction permits and
meeting all code requirements,if any.
If you have any questions,please don't hesitate to 1=W me.
E incerely !
Community Management ,Inc. I
Luis Heredia,Senior Association Manager
[even Springs Homeowners Association
LH/kmj j
cc: Board of Directors
File#4
1935 Dry Creek Road, Suite 203 @ Campbell CA x�E5008-3631 a voice 54081 559-1977 s fax (408) 559-1970