Loading...
10070182 CITY OF CUPERTINO BUILDING P RMIT BUILDING ADDRESS: 10239 AMELIA CT CONTRACTOR:KELLY GORDON PERMIT NO: 10070182 DEVELOPMENT CORP OWNER'S NAME: KELLY GORDON DEVELOPMENT CORP 12241 SARATOGA-SUNNYVALE RD STE C DATE ISSUED: 12/08/2010 "INER'S PHONE: 4088738774 SARATOGA,CA 95070: PHONE NO:(408)873-8774 LICENSED CONT'RACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL El COMMERCIAL License Class Lic.# Z 2721-Cr LOT 2-NEW CONSTRUCTION 2 STORY 3845 SQ LIVING AREA,839SQ ATTACHED GARAGE Contracto Date I hereby affirm that I am licensed un ler the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$600000 1 have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:32617017.10239 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXIPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FROM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the >/ � —� granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: with all non-point so ulations per the Cu . o cipal Code,Section 9.18. RE-ROOFS: Signature ate All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,1 agree to remove all new materials for inspection. OWNER-BUILDER DECLARATION I hereby affirm that 1 am exempt from the Contractor's License Law for one of Signature of Applicant: Date: the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. 1 will hereby affirm under penalty of perjury one of the following three maintain compliance wiXh the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous 1 have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliande with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sec' L75505,25533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized Date: permit is issued. 1 certify that in the performance of the work for which this permit is issued,1 shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there;is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. nting of this permit.Additionally,the applicant understands and will comply ,h all non-point source regulations per the Cupe .no Municipal Code,Section Licensed Professional_ 9.18. Signature Date 2 �� Kelly Gordon Development Corp. 12241 SARATOGA-SUNNYVALE RD., SARATOGA, CA 95070 O (408) 873-8174 O FAX: (408) 873-8819 November 29, 2010 City of Cupertino Building Division ��y 10300 Torre Avenue Cupertino, CA 95014 RE: Re -Submittal, 10239 Amelia Court, Lot 2. Permit 10070182 S� To Whom It May Concern: Attached is the itemized response letter from Memarie Associates, along with the response letter and revised calculations by the Structural Engineer, RC Engineering. Please note that the Special Request forms have been previously submitted twice to the Building Department and was not included with this third submittal.. Please do not hesitate to call if you have any questions or if we can be of any further assistance. Sincerely, Oclott Kelly ;-F_ MEMARIE ASSOC., INC. Design & Planning October 24, 2010 City of Cupertino Community Development Department 10300 Torre Avenue Cupertino, CA RE: Plan Check Review Comments dated October 18, 2010 Permit #: 10070182 Building Department Review: 1. See revised note #57 on sheet "A-4". 2. See sheets "A-6", "A-7", and "A-10" for correction. Please feel free to call me @ (408) 741-3308 if you have any questions. Thank You Reza Norouzi 20480 Blauer Dr., Suite B, Saratoga, CA 95070, Tel: 408-741-3308 www.Memarie.com MEMA"E ASSOC, INC. Design & Planning November 2, 2010 ik City of Cupertino NOV 3C 2019 Community Development Department 10300 Torre Avenue 13yo Cupertino, CA RE: Plan Check Review Comments dated September 29, 2010 Permit #: 10070182 Building Department Review: 1. Sheet "C-6" is not part of this submittal and has been removed. 2. See added note "57" on sheets "A-4" and "A-5" for fire rated access door. Also see added a new access door at second floor, bedroom #2 for the front left side low roof. See sheet "A-5" 3. Roof vent calculation has been modified.. See sheets "A-6", "A-7", and "A- 10" for new calculation and sheet "AD-3" for changes on details "1", "2", and "10". See sheet "AD-4" for added "ICC" of the Ridge Vent. 4.. See sheets "A-6", "A-7, "A-10", and "AD-3" for changes. 5. See added receptacle to bedroom #2 on sheet "A-12". 6. By owner.����� 7: See revised structural drawings. 00 Please feel free to call me @ (408) 741-3308 if you have any questions. Thank You Reza Norouzi UBM11 T --,,S AL 20480 Blauer Dr., Suite B, Saratoga, CA 95070, Tel: 408-741-3308 www.Memarie.com l RC Consulting Engineers, Inc. Structural & Earthquake Design 317 Piercy Road San, Jose, CA 95138 November 2, 2010 To: Kelly Gordon Development Corp. 12241 Saratoga -Sunnyvale Rd. Saratoga, CA 95070 Re: Amelia Court, Lot # 2 Cupertino, CA (Job # 10-184) To Brian Kelly, tel 408-229-8155 fax 408-229-8157 e-mail: rcengr@aol.com This letter is to confirm our review of the structural plans of Lot # 2 prepared by Kihlthau, Inc. and architectural plans prepared by Memarie Assoc. Inc. Our review revealed there were discrepancies between the two plans as follows: 1. The architectural plans show double doors and the structural plan show an opening for a single door. 2. The structural plans show a number 8 shear wall approximately 7'-0" long located along line D in the dinning room. However, the architectural plans is only 4'-8" a plywood standard shear wall does not work in this wall due to the height to width limitation exceeding 2. 3. A double HPX-44 X 9 Hardy Frame wall will not fit inside the 1'-10" wall located along line E at the stairs. Based upon these circumstances and falling out between you and Kihlthau, Inc. RC Consulting Engineers, Inc. (RCCEI) was asked by you to prepare structural plans. The plans by RCCEI is to replace the plans prepared by Kihlthau, Inc. and reduce and any further delays in obtaining the building permit. If you have any questions, or if we may be of further assistance, please do not hesitate to call. oQRO�ESS/p,�, Sincerely, RC Consulting Engineers, Inc. rn oc N0. C 4$956 m Exp.09-30-11 omeo C. Cabalar, P.E. ' Principal Consulting Engineer �91F FC�A`\�oQ��Q 1�OV � C 2010 1 of 1 ` ' ' RIC-Consulting E|g'R8erSjOC. Structural &E | uakeDes�n ` _ 3i7PkamyRoad � San Jose, CA`^05138 tel 408'229'8155 �TO: Building Department ` � ! City cfCupertino PLAN CHECK RESPONSE `` —��l ` RESPONSE NO.:. 1 � DATE: 10/2912010 PLCHKCOMMENTS #: 1 DATED: 0C29C2010 B SS 10231 Amelia Court APPLICANT:| Gordon Dev't ITEMSSTRUCTURAL ITEM: Please see revised plans and structural d esign calculationsSEE REFERENCE(S): 8. Please see revisedplans'showing collectors for diaphragmsee revised plans S-2,S'3 9. Please see revised plans showing 10. Please see revised plans and details see revised plan S-2 G. COPIES TO: File �IECI JVF-1)1 _-3 vf— o CON SgULD rN1 Tplik G N STRUCTURAL�-ARTHQUAKE DESIGN' 317 PIERCYROAD; SAN JOSE, CA 5138 TEL. (4081.229-8155 FAX. (4@S-Y9.8157 1llL�� 1LCl o R September 3, 2010 City of Cupertino - Building Division 10300 Torre Ave. -Cupertino, CA 95014 Re: Lot # 2 Amelia Court Cupertino, CA (Project No: 10-184) To Whom It May Concern: In response to the additional plan check correction list dated August 16,.2010, we have prepared this itemized explanation letter identifying each structural item pertaining to us for the above referenced project. Each item is numbered to correspond to your correction list. COMMENTS/RESPONSE 58. See calculation on sheets 1 to 11. 59. See sheets 8 to 11. 60. See revised note on PT-2. 61. See added notes on sheet PT-2. 62. See sheet PT-3 for revised note. / 63. See revised into. on PT-3. J 64. See revised PTA detail 10. We trust this addressed all the structural questions in your correction list. If you have any questions, or if we may be of further assistance, please do not hesitate to call. gRO�SS� Sincerely, C, RC Consulting Engineers, Inc. a cc oft C _,,� 61� 09�11 /,-""'IRomeo C. Cabalar, P.E. � CIVIL � Principal Consulting Engineer FCA 1 of 1 ,q �JAL ►Geotechnical ►Geoenviromental ►Spelpection ENGINEERS •dj1� OIOZ !!ON C[SAJ` a Jisl Kelly Gordon Development Corporation 12241 Saratoga Sunnyvale Road, #C Saratoga, California 95070 ATTN: Mr. Brian Kelly August 20, 2010 BAGG Job No. KELLG-01-00 STRUCTURAL PLAN REVIEW Proposed 3-Lot Residential Development 10231 Amelia Court Cupertino, California Reference: Geotechnical Engineering Consultation, Proposed 3-Lot Residential Subdivision, 10231 Amelia Court, Cupertino, California, by BAGG Engineers, dated June 16, 2010. Dear Mr. Kelly, As_ you authorized, BAGG Engineers reviewed the foundation plans related to the construction of three homes at 10231 Amelia Court in Cupertino, California. The plans were prepared by RC Consulting Engineers, Inc., and were reviewed to evaluate compliance with the recommendations included in the above referenced report. The plans submitted for review are listed below: Sheet No. Title Date PT-1 Lot 1, Amelia Court, Foundation Plan July 7, 2010 PT-2 Lot 1, Amelia Court, Foundation Details July 7, 2010 PT-3 Lot 1— Amelia Court, Notes July 7, 2010 PT-4 Lot 1 — Amelia Court, Details July 7, 2010 PT-1 Lot 2 —Amelia Court, Foundation Plan July 21, 2010 PT-2 Lot 2 — Amelia Court, Foundation Details July 21, 2010 PT-3 Lot 2 — Amelia Court, Notes & Details July 21, 2010 ►www.baggengineers.com ►phone: 650,852.9133 ► fax: 650.852.9138 ► info@baggengineers.com 847 West Maude Avenue, Sunnyvale, California 94085-2911 Amelia Court Residential Development BAGG Job No. KELLG-01-00 August 20, 2010 Page 3 PT-4 Lot 2 — Amelia Court, Foundation Details July 21, 2010 Based on the review, it is our opinion that the above -listed plans are in general compliance with the recommendations included in the above -referenced report. If you have any questions or require additional information, please feel free to contact us. y Very truly yours, BAGG Engineers Ajay.Singh Senior Engineer \ Civil Engineer 53647 2 copies to addressee 1 copy to RC Consulting Engineers, Inc. -BVQG ENGdNEEAS